HomeMy WebLinkAboutMiscellaneous Internal Reviewers 4/1/2021 (2)c|.PlrcG&
PLJO.MPT
ICOOTIPACIED
Yt'8
f Tt{cr(
CASTIRO{VALVE N'C6EUERNPE
?oRlI.AtDSTtt-F ASTII BGX. SDR t5
SON-\'ENTIflEI.o
SEWER CLEANOUT SURFACE DETAIL
NOTES:
,1. VALVE BOXES SHALL BE CENTERED DIRECTLY OVER
THE STANDPIPE IN A VERTICAL POSITION.
2. THE VALVE BOX TOP SHALL BE ADJUSTED TO MEET
THE FINISHED GRADE.
3. PVC PIPE SHALL BE ONE CONTINOUS PIECE WITH NO
BELLS OR COUPLERS.
2 WAY SEWER CLEANOUT DETAIL
NO REVISION DATE BY ADDP CIW OF SPBINGflEI,D
SPRINGFIELD
rORKS
SEWER CLEANOUT DETAIL
R.O.W. PAVED SURFACE
Jeff Paschall City Fngineer 2016
STANDARD
DRAWNG
4-4a
2016
Dato $teceived
J'lenner: .A.L
r rtut -. .*,
r
t
L
,r-tIc*,
r