HomeMy WebLinkAboutDecision Planner 11/5/2020AFFIDAVIT OF SERVICE
STATE OF OREGON)
)Ss.
County of Lane )
I, Shannon Morris, being first duly sworn, do hereby depose and say as follows:
1. 1 state that I am an Administrative Specialist for the Planning Division
of the Development and Public Works Department, City of Springfield,
Oregon.
2. 1 state that in my capacity as Administrative Specialist, I prepared and
caused to be mailed copies of T11- af) -0001(aa-UPI Ate) S o✓�-y
A 4 us (See attachment "A") on NOV 5 , 2020
addressed to (see tAttachment "B"), by causing said letters to be
placed in a U.S. mail box with postage fully prepaid thereon.
STATE OF OREGON, County of Lane
;39,, 2020, Personally appeared the above named Shannon
Morris, Administrative Specialist, who acknowledged the foregoing instrument
to be their voluntary act. Before me:
My Commission Expires: � O l 3I I � l
KATRINA ANDERSON
NOTARY PUBLIC -OREGON
COMMISSION NO. 967995
MY COMMISSION EXPIRES OCTOBER 31, 2021
Type I Accessory Dwelling Unit,
Staff Report & Decision
Project Name: 342 341h Street, ADU — Carlos
Nature of Application: The applicant has applied for an 868 sq.
ft. accessory dwelling unit; the additional square footage was
approved per Minor Variance 811-20-000161-TYP2.
Case Number: 811-20-000162-TYPI —ADU
Project Location: 432 34th Street
Map and Tax Lot 17-02-31-24; 9400
Zoning: Low Density Residential
Metro Plan Designation: Low Density Residential
Overlay Districts: n/a
Zoning of Surrounding Properties:
Low Density Residential (LDR)
SPRINGFifLO
IL
Current Site Conditions: The subject property is located along 34th Street, south of Tyson Park. 34th Street is an
improved right of way with parking on both sides of the street. The site is accessed from 34th Street with an existing
concrete laydown and approach.
Application Submitted/Accepted Date: September 4, 2020
Decision Issued Date: November 4, 2020
Recommendation: Approved, with Conditions. All revisions to be shown on the Building Permit Plot Plan.
Associated Applications: N/A
APPLICANT/PROPERTY OWNER: Applicant's Representative:
Ruben Carlos N/A
432 34th Street
Springfield, OR 97478
CITY OF SPRINGFIELD DEVELOPMENT REVIEW TEAM
POSITION
REVIEW OF
NAME
PHONE
Planner
Development Code
Drew Larson
736-1003
Public Works
Sanitary & Storm Sewer
Clavton McEachern
726-5750
De u;y Fire Marshal
Fire and Life Safety
Eric Phillips -Meadow
726-3737
Building Official
Building Code
Chris Carpenter
744-4153
Project Proposal: The applicant has submitted plans concurrently with a Minor Variance application (811-20-
000161-TYP2) in order to convert the existing detached home into an 868 sq. ft. Accessory Dwelling Unit and
construct a larger primary dwelling to the rear.
Purpose: An accessory dwelling unit is intended to provide the opportunity to add accessible and affordable units to
existing neighborhoods and new residential areas; Provide flexibility to accommodate changes in household size or
composition over the course of time, allowing for intergenerational living and on-site caretakers/assistants; Make
811-20-000162-TYPI
All
efficient use of residential land; and Fit into the neighborhood while maintaining stability, property values, and, in the
case of low-density residential zones, the single-family residential appearance of the neighborhood.
Criteria of Approval: In order to grant ADU approval, the Director shall determine compliance with all applicable
standards specified below:
Section 5.5-125 ADU Development Standards
A) The accessory dwelling unit shall meet all applicable standards in this Code including, but not limited
to; setbacks, height, lot/parcel coverage, solar access and building codes in effect at the time of
construction.
❑ Complies as Shown on Plot Plan
■ Proposal Complies when the following Condition(s) is/are met:
Finding: The existing house, proposed to be converted to an ADU, meets applicable primary structure
setbacks including the solar setback per Section 3.2-225 Base Solar Development Standards and Table 3.2-1.
Finding: The proposed new primary dwelling height will exceed the existing home proposed as the ADU.
Finding: The addition of the ADU will not exceed the 45% maximum parcel coverage of the zoning district.
ELECTRIC & WATER LITILITIE
Finding: Section 4.3-130.A of the Springfield Development Code requires each development area to be
provided with a water system having sufficiently sized mains and lesser lines to furnish adequate supply to
the development and sufficient access for maintenance. Springfield Utility Board coordinates the design of
the water system within Springfield city limits.
Finding: The ADU will require its own water and electric meter that will each need three feet of clearance
around the meter.
Condition of Approval: Prior to Building Permit approval, the applicant shall coordinate with
Springfield Utility Board prior to trenching for the underground electric and water utilities and for
final meter location approval. This information shall be shown on the Building Permit.
SANITARY SEWER
Finding: Section 4.3-105.A of the SDC requires that sanitary sewers shall be installed to serve each new
development and to connect developments to existing mains. Additionally, installation of sanitary sewers
shall provide sufficient access for maintenance activities.
Finding: The site has access to the public sewer along its western (rear) property line with a service lateral to
the existing home. This connection is adequate for the proposed additional home on this site.
STQRMWATER MANAGEMENT
Finding: Section 4.3-110.13 of the SDC requires that the Approval Authority shall grant development approval
only where adequate public and/or private stormwater management systems provisions have been made as
determined by the Public Works Director, consistent with the Engineering Design Standards and Procedures
Manual (EDSPM).
Finding: Section 4.3-110.0 of the SDC states that a stormwater management system shall accommodate
potential run-off from its entire upstream drainage area, whether inside or outside of the development.
Finding: Section 4.3-110.D of the SDC requires that run-off from a development shall be directed to an
approved stormwater management system with sufficient capacity to accept the discharge.
811-20-000162-TYP1 2
Finding: Section 4.3-110.E of the SDC requires new developments to employ drainage management practices
which minimize the amount and rate of surface water run-off into receiving streams, and which promote
water quality.
Finding: No information on stormwater management is proposed with this application.
Condition ofApproval: Prior to Building Permit approval of the new primary dwelling, the applicant
shall perform an infiltration test that meets the requirements listed in the City of Eugene stormwater
management manual and submit this information with the Building Permit.
Condition ofApproval: Prior to Building Permit approval of the new primary dwelling, the applicant
shall provide stormwater management and infiltration onsite for the existing home, new primary
dwelling, and new paved parking area that meets requirements of the City of Eugene's stormwater
management manual.
ADVISORYNOTE: The existing home to remain as an ADU on the lot can be drained to the curb via weepholes
Assuming the onsite soil have sufficient infiltration, Staff recommends using an infiltration Swale or planter for
the parking area and using a drywell or soakage trench for the new home roof runoff. It may be possible to use
an infiltration planter for both the parking area and the new home roof discharge.
A
Finding: Under Federal regulation of the Clean Water Act (CWA), Endangered Species Act (ESA), and National
Pollutant Discharge Elimination System (NPDES), the City of Springfield has obtained a Municipal Separate
Storm Sewer System (MS4) permit. A provision of this permit requires the City demonstrate efforts to reduce
the pollution in urban stormwater to the Maximum Extent Practicable (MEP).
Finding: Federal and Oregon Department of Environmental Quality (ODEQ) rules require the City's MS4 plan
address six "Minimum Control Measures." Minimum Control Measure 5, "Post -Construction Stormwater
Management for New Development and Redevelopment," applies to the proposed development.
Finding: Minimum Control Measure 5 requires the City of Springfield to develop, implement and enforce a
program to ensure the reduction of pollutants in stormwater runoff to the MEP. The City must also develop
and implement strategies that include a combination of structural or non-structural Best Management
Practices (BMPs) appropriated for the community.
Finding: Minimum Control Measure 5 requires the City of Springfield use an ordinance or other regulatory
mechanism to address post construction runoff from new and re -development projects to the extent
allowable under State law. Regulatory mechanisms used by the City include the Springfield Development
Code (SDC), the City's Engineering Design Standards and Procedures Manual (EDSPM) and the future
Stormwater Facilities Master Plan (SFMP).
Finding: As required in Section 4.3-110.E of the SDC, "a development shall be required to employ drainage
management practices approved by the Public Works Director and consistent with Metro Plan policies and
the Engineering Design Standards and Procedures Manual."
Finding: Section 3.01 of the City's EDSPM states the Public Works Department will accept, as interim design
standards for stormwater quality, water quality facilities designed pursuant to the City of Eugene Stormwater
Management Manual.
Finding: Section 3.02 of the City's EDSPM states all public and private development and redevelopment
projects shall employ a system of one or more post -developed BMPs that in combination are designed to
achieve at least a 70 percent reduction in the total suspended solids in the runoff generated by that
development. Section 3.03.4.E of the manual requires a minimum of 50 percent of the non -building rooftop
impervious area on a site shall be treated for stormwater quality improvement using vegetative methods.
811-20-000162-TYP1
Condition ofApproval: Prior to Building Permit approval for the new primary dwelling, the applicant
shall prepare a stormwater infiltration and treatment facility onsite for the new parking area. This
information shall be provided with the Building Permit Plot Plan.
ADVISORYNOTE: Use of the recommended infiltration swale or planter to limit stormwater runoff from the
driveway/parking area will also meet this requirement
Finding: The vegetation proposed for use in the treatment areas will serve as the primary pollutant removal
mechanism for the stormwater runoff, and will remove suspended solids and pollutants through the
processes of sedimentation and filtration. Satisfactory pollutant removal will occur only when the vegetation
has been fully established.
Finding: The location of the stormwater treatment area has not been shown with sufficient details to meet
the requirements set forth in Eugene Stormwater Management Manual. There was no inclusion of a
stormwater treatment area detail drawing on the plan set
Condition ofApproval: Prior to Building Permit approval for the new primary dwelling, the applicant
shall provide an operations and maintenance plan to the City for review to ensure the long-term
maintenance and operation of the stormwater treatment area, consistent with maintenance criteria
required by EDSPM 3.03.1. The plan should designate maintenance responsibility for operating and
maintaining the system, and should be distributed to all property owners and tenants of the site.
Condition ofApproval: To ensure a fully functioning water quality system and meet objectives of
Springfield's MS4 permit, the Springfield Development Code and the EDSPM, the proposed
stormwater management area shall be shall be fully vegetated with all vegetation species established
prior to approval of Final site inspection. Alternatively, if this condition cannot be met, the applicant
shall provide and maintain additional interim erosion control/water quality measures acceptable to
the Public Works Department that will suffice until such time as the swale vegetation becomes fully
established.
B) The accessory dwelling unit shall contain a kitchen, bathroom, living, and sleeping area that are
completely independent from the primary dwelling.
■ Complies as Shown on Plot Plan
❑ Proposal Complies when the following Condition(s) is/are met:
Finding: The ADU proposed floor plan shows all applicable dwelling unit amenities, including a kitchen,
bathroom, living, and sleeping area.
C) The accessory dwelling unit shall not exceed 800 square feet or the square footage of the primary
dwelling (exclusive of the garage for the primary dwelling), whichever is less.
Complies as Shown on Plot Plan
Proposal Complies when the following Condition(s) is/are met:
Finding: The applicant received a Minor Variance approval (811-20-000161-TYP2) to increase the size of
the ADU by 8% for a total of 868 sq. ft. The proposed new primary dwelling is 1,620 sq. ft. The proposed ADU
does not exceed the square footage of the primary dwelling.
D) The accessory dwelling unit shall have an outside entrance that is separate from the entrance to the
primary dwelling.*
A hard surface walkway, a minimum of 3 feet wide, shall be required from the primary entrance of the
accessory dwelling unit to the street or walkway serving the primary dwelling.
811-20-000162-TYP1
■ Complies as Shown on Plot Plan
❑ Proposal Complies when the following Condition(s) is/are met:
Finding: The proposed ADU exists and currently has a separate entrance that is connected to off-street
parking and the adjacent right of way.
E) Each dwelling shall have its own address.
■ Complies as Shown on Plot Plan
❑ Proposal Complies when the following Condition(s) is/are met:
Finding: The existing home, proposed as the ADU onsite, is addressed at 432 34th Street. The new primary
dwelling will be assigned a separate address at the time of building permit
F) There shall be 1 parking space 9 feet by 18 feet in size for the accessory dwelling unit, in addition to
the parking spaces required by Section 4.6-100 for the primary dwelling. The parking space for the
accessory dwelling may be provided either on -street or off-street as described in Section 5.5-
125(F)(1-4).
■ Complies as Shown on Plot Plan
❑ Proposal Complies when the following Condition(s) is/are met:
Finding: Per Oregon State Law, a third off-street parking space for the Accessory Dwelling Unit is no longer
required.
Finding: The applicant has demonstrated that off-street parking can be provide onsite with the new primary
dwelling which will be confirmed at the time of Building Permit.
G) Outdoor storage and garbage areas shall be screened from view from adjacent properties and those
across the street or alley with a minimum 42 -inch tall 100 -percent site obscuring fence or enclosure
on at least 3 sides.
❑ Complies as Shown on Plot Plan
■ Proposal Complies when the following Condition(s) is/are met:
Finding: The applicant did not indicate a location where the trash recepticles are to be stored.
Condition of Approval: Prior to Building Permit approval for the new primary dwelling, the applicant
shall amend the plot plan to show trash receptacle area on site and provide necessary screening as
required per Section 5.5-125(G) of the Springfield Development Code.
Section 5.5-130 ADU Design Standards
A) The Accessory Dweiiing unit shall match the primary dwelling. An accessory dwelling unit may
approved under Type 1 procedure if it meets the following design standards except that these
standards may be altered when necessary to meet current fire or building codes.
1. Exterior finish materials shall be the same as or visually match those of the primary dwelling in
terms of type, size, and placement.
2. Roof pitch shall be the same as the predominate roof pitch of the primary dwelling.
3. The trim around the doors and windows shall be the same type and finish as the primary
dwelling.
4. Windows shall match those of the primary dwelling in terms of proportion (height and width
ratio) and orientation (vertical vs. horizontal).
811-20-000162-TYP1 5
5. Eaves shall project from the accessory dwelling unit addition the same distance as the eaves on
the primary dwelling.
■ Complies as Shown on Plot Plan
❑ Proposal Complies when the following Condition(s) is/are met:
Finding: The applicant's submitted plans and narrative demonstrate that the ADU and new primary dwelling
will substantially match in terms of type, size, trim, finish materials, roof pitch, windows, and eve projections.
Timelines and Conditions of Approval:
The property owner and/or applicant shall comply with the standards specified herein within 2 years of the Director's
approval as follows:
A. Approval of a building permit within 1 year of the Director's approval, including the following Conditions of
Approval:
1. Prior to Building Permit approval, the applicant shall coordinate with Springfield Utility Board
prior to trenching for the underground electric and water utilities and for final meter location
approval. This information shall be shown on the Building Permit.
2. Prior to Building Permit approval of the new primary dwelling, the applicant shall perform an
infiltration test that meets the requirements listed in the City of Eugene stormwater management
manual and submit this information with the Building Permit.
3. Prior to Building Permit approval of the new primary dwelling, the applicant shall provide
stormwater management and infiltration onsite for the existing home, new primary dwelling, and
new paved parking area that meets requirements of the City of Eugene's stormwater management
manual.
ADVISORYNOTE: The existing home to remain as an ADU on the lot can be drained to the curb via
weepholes. Assuming the onsite soil have sufficient infiltration, Staff recommends using an infiltration Swale
or planter for the parking area and using a drywell or soakage trench for the new home roof runoff It may
be possible to use an infiltration planter for both the parking area and the new home roof discharge.
4. Prior to Building Permit approval for the new primary dwelling, the applicant shall prepare a
stormwater infiltration and treatment facility onsite for the new parking area. This information
shall be provided with the Building PermitPlot-Plan.
5. Prior to Building Permit approval for the new primary dwelling, the applicant shall provide an
operations and maintenance plan to the City for review to ensure the long-term maintenance and
operation of the stormwater treatment area, consistent with maintenance criteria required by
EDSPM 3.03.1. The plan should designate maintenance responsibility for operating and
maintaining, the system, and should be distributed to all property owners and tenants of the site.
6. To ensure a fully functioning water quality system and meet objectives of Springfield's MS4
permit, the Springfield Development Code and the EDSPM, the proposed stormwater management
area shall be shall be fully vegetated with all vegetation species established prior to approval of
Final site inspection. Alternatively, if this condition cannot be met, the applicant shall provide
and maintain additional interim erosion control/water quality measures acceptable to the Public
Works Department that will suffice until such time as the swale vegetation becomes fully
established.
Prior to Building Permit approval for the new primary dwelling, the applicant shall amend the
plot plan to show trash receptacle area on site and provide necessary screening as required per
Section 5.5-125(G) of the Springfield Development Code..
B. The construction of the accessory dwelling unit shall be complete within 1 year of Building Permit issuance. If
this time line cannot be met, the applicant may submit a written request for a single 1 -year extension for
completion.
811-20-000162-TYP1
C. If the timeline established for completion of construction in Subsection B. above is not met and the applicant
has not requested an extension, then the Director shall declare the application null and void.
D. Upon satisfactory completion of Accessory Dwelling Unit, as determined by a Final Site Inspection (prior to
the final building inspection), the City shall authorize the provision of public facilities and services and issue a
Certificate of Occupancy or otherwise authorize use of the site.
E. All required improvements shall be installed prior to the issuance of a Certificate of Occupancy or Final
Building Inspection for the development, unless improvements have been deferred for good cause by the
Director as noted below:
Permits That May Be Required:
• Building Permit
• Plumbing Permit
• Electrical Permit
• Encroachment Permit - working within the public right-of-way.
Pay applicable Systems Development Charges when building permits are issued for developments within the City
limits or within the Springfield Urban Growth Boundary. (The cost relates to the amount of increase in impervious
surface area, transportation trip rates, and plumbing fixture units. Some exceptions apply to Springfield Urban
Growth areas.) [Springfield Code Chapter II, Article 11]
Systems Development Charges (SDC's) will apply to the construction of buildings and site improvements within the
subject site. The Charges will be based upon the rates in effect at the time of permit submittal for buildings or site
improvements on each portion or phase of the development.
Additional Information: The application, all documents, and evidence relied upon by the applicant, and the
applicable criteria of approval are available for free inspection and copies are available for a fee at the Development
Services Department, 225 Fifth Street, Springfield, Oregon.
Appeals: This Type I decision is exempt from the provisions of ORS 197.195, 197.763 and 227.173 and therefore
cannot be subject to the appeal provisions of SDC Section 5.3-100, Appeals.
Questions: Please call Drew Larson in the Planning Division of the Development and Public Works Department at
(541)736-1003 if you have any questions regarding this process.
811-20-000162-TYP1
SPRINGFIELD CITY OF SPRINGFIELD
DEVELOPMENT & PUBLIC WORKS
OREGON 225 5th St.
SPRINGFIELD, OR 97477
�v�ean Cau1�5
�f3a ?)Hill 5-y-eer
Attachment 6