HomeMy WebLinkAboutMiscellaneous Planner 2/7/2022Oregon DEQ Land Use Compatibility Statement
1A. Applicant Name: Cellco Partnership (Verizon Wireless)1B. Project Name:Blue Bell
Contact Name: Tessie Murakami, ACoM consulting lnc.Physical Address: 7305 Main St
Mailing Address: S2OO SW Meadows Rd., Suite 150 city, State' ZiP: springfield, oR 97478
City, State, Zip: 61" Osweto, OR 97035 Tax Lot #: tzozgsooo4loo & 17023s0004104 (Acct 0142875)
Telephone: 310.483.5343 Township:Range:Section:
Latitude: 44-02-34.7 N
Tax Account #:
Longitude : t22_53_4t.0 W
The facility is an existing crown castle communications site with verizon wireless as a tenant. As an unmanned facility, it relies onbackup/emergency power generators to keep cell service active during any utility outages. The facility produces no physical products. Forthis project, the existing, on-site backup power generator was installed and the
"rargJn.y
generator was expected to have potentialemissions at less than "de minimis,, levels.
*Generator lnfo: Manufacturer (Generac), Model (Go07o9o0), Size (20 kw), Fuel type (Diesel), lnstall Date (s/3/2oLg).
Describec the include the ofproject,btype or anddevelopment,usiness,servtces orfacility products (attachprovided
additiona ationinform if necess ary)
1D, Check the type of DEQ permit(s)or approval(s) being applied for at this time.
{Air Quality Notice of Construction
! ni, Contaminant Discharge permit
! ni, Quatity Tifle V permit
l! nir Quatity lndirect Source permit
n Parting lTrafiic Circutation ptan
ff soria Waste Land Disposatsite permit
f, SofiO Waste Treatment Facility permit
I Sofia Waste Composting Facitity permit
(includes Anaerobic Digester)
n Conr"r.ion Technotogy Facility permit
lf] Sofia Waste Letter Autho rizationpermir
! SofiO Waste tMaterial Recovery Facility permit
f, SofiO Waste Energy Recovery Facitity permit
I SotiO Waste Transfer Station permit
l-l Waste Tire Storage Site permit
n eottrtion Control Bond Request
n Hazardous Waste Treatment, Storage or
Disposal permit
fJCtean Water State Revolving Fund Loan
Request
n Wastewater/Sewer Construction plan/
Specifications (includes review of plan
changes that require use of new land)
I Water euatity NpDES tndividuat permit
I Wrt"r euatity WPCF tndividuat permit (for
onsite construction_installation permits use
the DEe Onsite LUCS form)
n Wrt", euality NPDES Stormwater General
Permit (1200-4, 12OO_C, 12OO_CA,
1200-COLS, and 1200_2)
fJWrte, euality Generat permit (ail generat
permits, except 600, 700_pM , 1700_A, and
1700-8 when they are mobile)
n Wrt"r. euality 401 Certification for federal
permit or license
r'PermitRenewalThisapplication is for:
it Modification
Section 1 - To be completed by the applicant
Section 2-To be completed by city or county planning olticial
Project name:Blue BellApplicant name: cellco Partnership (verizon wireless)
based on thedecision is
bleactionsarenfromarewritteacceptaallforlocadecisionsfindingspreviousrittenWfinfactrequired;oflnstructions:dings
n formthe aofwillfindiwrittentvenlaEQngsDacceptcomhtptheorf,alloweduses prehensacknowledgedoutrigby ofindicationwithantonrethedecisrewereliedthatnderingorstandardsupontctestoreferencethepolplanspecific
Outside UGBlnside UGBlnsidelimitsI is located2A. The
jurisdiction (the legal entity respo
or land ofthe
nsible for land use decisions for28. Name of the citY or countY that has land use
2C niorland ng ntityzomofotheruse,planng,ictioniswithnotthetn anyThisjurisdproject
oruselandofictionthethewithinalsoISThis then check one:ES if{No,Measure 49 is notallowed under lvleasure 492D. ls the
#:orderCDDLbyapproved
Conditional;by DLCD order #:
local ment docket or order #:ent decision or courta
{uirem ents have been met.
faci ity?a composting
notification203462BilSenate
2E. ls the
No
page).
?660-031OARASbyrequiredcomplanprehensiveacknowleedgedwithcobouseyourthempati2Fon theactivityc1 previousIS(seeicantapprovaltheseekingwhichforappluseorthetoactivityddressathiformS inPleasedescribedthecompleteaddTESSESrovaphasesatthensureappyournUmpleasetoISoccurphases,Itipleuseorthe andtfactivityclearingthatcatesonlyinditheLUCSandtvlslonaASubdStnc1describedisectifthentilUprojissuanceapplicant'sorFc deexamplewillDEO lay permitISbdivisionSUapprovedthewhethericateindnotutbdoesallowedoutrightaregradingnlobtai'lslon ive plan; exPlainacknowledged comPrehensexemPt bY theThe activitY or use is specificallY
for local ordinance)outright bY (Provide referenceing use allowedre-existin g nonconformYes, the activitY or use isp
Developent code (sDc) 3.2-7LO
local ordinance):(provide reference for
Yes, the activitY or use is allowed outright bY
ments;local requirewithfutocomPlYirementsllydesincluthatrequapprovalreceivednaryuseprelimiortheactivitYYes
are attachedfindalloweduseisorYesthe 49 attached.arefindingsrelvleasunderualloweduseorabove,2D activitYseeNo
Provide the reasons for the decision
must comPlY with beforethe aPPlicantrequirementsand identifYliancenonforcompfindingsattachorOWbelNo,complete(
nedetermdbecancompatibilitY ardsstandorcriteria,nt policies,Releva planspecific
as needed)informationadditional(attachAdditionalcomments
T'tt"'Plannat
Planning Official Signature:
Date: 92797lzo22
Print Name: AndreW V. LarSOn
Telephone #'s4L-73G-1003
UGB:but withincity limitsiction outsideent on jurisd[pon citY/countY agreemlf necessarY,depending
Date:Telephone #:
Print Name:
Alternative formats
DEQ can provide documents in an alternate format or in a language other than English upon request' call DEQ at
AOoaSZ-riO1 1 or email deqinfo@deq'state'or'us'
tncriteria,