HomeMy WebLinkAboutMeeting Packet Planner 8/3/2023AGENDA
DEVELOPMENT REVIEW
COMMITTEE
DEVELOPMENT SERVICES DEPARTMENT
225 FIFTH STREET
Conference Room 616/ MS Teams
StaffReview.' Tuesday, August 22, 2023 R'00 —.9.,30 am.
1. Partition Tentative 811-23-000168-TYP2 811-23-000118-PROJ Chad Saunders
Assessor's Map: 17-02-31-24 TL: 11800
Address: 475 35`h Street
Existing Use: residential
Applicant submitted plans for 3 -lot residential partition
Planner: Tom Sievers
Meeting: Tuesday, August 22, 2023 9:00 — 9:30 virtual meeting via Microsoft Teams
The Complete DRC Packet for this meeting is available online for you to review or print out
from the laserfiche website: htti)://www.si)ringfield-or.gov/weblink8/browse.asi)x
VICINITY MAP
811-23-000168-TYP2 Partition Tentative
17-02-31-24 TL 11800
475 35t' Street
Chad Saunders
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Land Division Tentative Plan
Partition, Subdivision
IEPgINOPI�
Application Type (Applicant., check ne❑
•❑
Partition Tentative Pre -Submittal: ❑ Subdivision Tentative Pre -Submittal:
Partition Tentative Submittal: Subdivision Tentative Submittal:
Required Project Information (Applicant: complete this section)
Applicant Name: Chad Saunders Phone: 541-729-3486
Company: j
Fax:
Address: '1j !;U p✓ e -14,,4o
Applicant's Rep.: Anthony J. Favreau
Phone: 541-683-7048
Company: The Favreau Group
Fax:
Address: 3750 Norwich Ave., Eugene, OR 97408
Propertyy Owner: Same as applicant
Phone:
Company:
Fax:
Address:
ASSESSOR'S MAP NO: 17-02-31-24
TAX LOT NOS : 11800
Property Address: 475 35th St.
Size of Property: 20666 Acres ❑ Square Feet
Proposed Name of Subdivision: Partition
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: 3 -Lot Partition
Existing Use: Single Family Residence
# of Lots/Parcels: 3
Total acreage of parcels/
allowable density: 0.47 acres
proposed #
Dwell units3
Si natures: Please sign and Drint your name and date in thea
Required Project Information (City Zntake Staff.,
II -23- Dw l rD-wc-
Associated Applications: II -23' 0
ro riate box on the next na e.
complete this section)
si ns:
Pre -Sub Case NO.:
Date:
Reviewed by:
Case No.: I ' 3' fes-
Date:
('
Reviewed b xlf'✓�
ApplicationlFee:
Technical Fee: $
Postage Fee: $203
pT �r
TOTAL FEES: $
PROJECT NUMBER: V -.4-3-00C) IS
Revised 1/7/14 kl 1 of 10
SAUNDERS TENTATIVE MAP NARRATIVE
May 25, 2023
Assessor's Map:
17-02-31-24 Tax Lot 11800
Applicants:
Chad Saunders
(541) 729-3486
Applicant's
Representative:
The Favreau Group
3750 Norwich Ave.
Eugene, OR 97408
541-683-7048
Attn: Tony Favreau
LAND USE REQUEST
The applicant proposes to divide the subject 0.47 acre property to create 3 lots and to provide
all necessary infrastructure to support the development. The proposed residential use and
density (6-14 dwelling units/acre) are consistent with the existing Low Density Residential (LDR)
zoning and the City's standards for development in the LDR zoning district, where a maximum
of 14 dwelling units/acre is permitted and the proposed is 7.7 units per acre.
The proposal does not include any improvements to 35" Street.
SITE AND SURROUNDING CHARACTERISTICS
The site is within an established Springfield residential neighborhood. The property is located at
475 35" St. and has an existing home situated towards the front of the property. The Northern,
Southern and Eastern property lines abut fully developed parcels with existing homes. The site
soils are 2226A- Awbrig Urban Land Complex, soil group D.
5.12-125 Tentative Plan Criteria
The Director shall approve or approve with conditions a Tentative Plan application upon
determining that all applicable criteria have been satisfied. If conditions cannot be attached to
satisfy the approval criteria, the Director shall deny the application. In the case of Partitions that
involve the donation of land to a public agency, the Director may waive any approval criteria
upon determining the particular criterion can be addressed as part of a future development
application.
A. The request conforms to the provisions of this Code pertaining to lot/parcel size
and dimensions.
Response: The proposed lots meet the 4,500 sq. ft. minimum lot size and the 50 -foot street
frontage requirements for the north -south streets established by SDC. Parcel 1 is 6,563 s.f. with
74.00' of frontage. Parcel 2 is 7,036 s.f. panhandle with a 20' access easement. Parcel 3 is
7,067 s.f. panhandle with a 20' access easement.
B. The zoning is consistent with the Metro Plan diagram and/or applicable
Refinement Plan diagram, Plan District map, and Conceptual Development Plan.
Response: The property is zoned Low Density Residential (LDR). The Metro Plan diagram for the
subject property is LDR.
C. Capacity requirements of public and private facilities, including but not limited to,
water and electricity; sanitary sewer and stormwater management facilities; and streets
and traffic safety controls shall not be exceeded and the public improvements shall be
available to serve the site at the time of development, unless otherwise provided for by
this Code and other applicable regulations. The Public Works Director or a utility
provider shall determine capacity issues.
Response:
a. Water: The proposed development is within the Springfield city limits and will receive
water service from the Springfield Utility Board (SUB). There is an existing 8"
waterline in 35th St.
b. Wastewater: There are 2 existing 8" wastewater systems. One in 35'" St. and one
along the east property line.
c. Stone Drain: There is an existing storm drain along the southerly property line.
d. Streets: 35th Street is fully built and no improvements are proposed.
D. The proposed land division shall comply with all applicable public and private
design and construction standards contained in this Code and other applicable
regulations.
Response: See Response to part C.
E. Physical features, including, but not limited to: steep slopes with unstable soil or
geologic conditions; areas with susceptibility of flooding; significant clusters of trees
and shrubs; watercourses shown on the WOLW Map and their associated riparian areas;
other riparian areas and wetlands specified in Section 4.3-117; rock outcroppings; open
spaces; and areas of historic and/or archaeological significance, as may be specified in
Section 3.3-900 or ORS 97.740-7605 358.905-955 and 390.235-240, shall be protected as
specified in this Code or in State or Federal law.
Response: The Metro Area General Plan, Water Quality Limited Watercourse Map, State
Designated Wetlands Map, Hydric Soils Map, Wellhead Protection Zone Map, FEMA Maps, and
the list of Historic landmark sites have been consulted and with the exception noted below,
there are no features needing to be protected or preserved on this site. If any artifacts are
found during construction, there are state laws that could apply; ORS 97.740, ORS 358.905,
ORS 390.235. If human remains are discovered during construction, it is a Class "C" felony to
proceed under ORS 97.740.
The site is relatively level and drains to the north. The driveway will drain to an inlet and then to
a treatment planter as shown. The required treatment area per the City of Eugene Stormwater
Surface Filtration/infiltration Facility Sizing Spreadsheet form is 180 s.f. and 180 s.f is provided.
This facility will drain to the existing storm drain along the southern property line. The houses
on parcels 2 & 3 will have individual treatment facilities on each parcel that will overflow to the
existing storm drain via a drainage easement on parcel 2.
Criterion 6 is met. Physical features, including but not limited to significant clusters of trees and
shrubs, watercourses shown on the WOLW Map and their associated riparian areas, wetlands,
rock outcroppings, and historic features are not present on the site.
F. Parking areas and ingress -egress points have been designed to: facilitate
vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity
within the development area and to adjacent residential areas, transit stops,
neighborhood activity centers, and commercial, industrial and public areas; minimize
driveways on arterial and collector streets as specified in this Code or other applicable
regulations and comply with the ODOT access management standards for State
highways.
Response: 35th Street is fully built and no improvements are proposed.
G. Development of any remainder of the property under the same ownership can be
accomplished as specified in this Code.
Response: There is no other adjoining property under the same ownership that can be
developed.
H. Adjacent land can be developed or Is provided access that will allow its
development as specified in this Code.
Response: There is no undeveloped land adjoining the property. Approval of the proposed
subdivision will not impede development of adjacent land.
I. Where the Partition of property that is outside of the city limits but within the
City's urbanizable area and no concurrent annexation application is submitted, the
standards specified below shall also apply.
Response: This does not apply
Stormwater Surface FiltrationAnfiltration Facility Sizing Spreadsheet
24 Hour Storm, NRCS Type 1 A Rainfall Distribution
City of Eugene
Name:
Saunders
Date:
6/27/2023
Address:
47535th St
Permit Number:
Permit
Flood Control
Sorirrofield. OR Rio Cutlet
Catchment ID:
clrhr
rr:
Anthony J. Fsvhmu
TY:
The Firmest, Group
Complete this form for each drainage catchment in the project site that is to be sized per the Presumptive Approach.
Provide a distinctive Catchment ID for each facility coordinated with the site basin map to correlate the appropriate
calculations with the facility.
The maximum drainage catchment to be modeled per the Presumptive Approach is 1 acre (43,560 SF)
=or infiltration facilities in Class A or B soils where no infiltration testing has been pedromed use an infiltration rate of 0.5 in/hr.
For all facilities use a maximum soil infiltration rate of 2.5 in/hr for lommi/growing medium.
loose'Ym' from the dmpdown loxes below next to the design standards requirements for this facility.
Pollution Reduction (PR)Yes
Flow Control (FC)l No
Destination(DT) No 'Ani11hationkciiiry nnuA1x Arxeenae Netaciiiryh,em novtdvsmotion rsqulremeMe
Total Square Footage Impervious Area=sgfl Total Square Footage Pervious Area- 0 scfl
Mae ea CN= 98 Pervious Area CN=l 85
Total Square Footage of Drainage Area= 2958 sfl Time of Concentration Post Development= OS min
Weighted Average CN=l 98
Pre�Development CN= 85 Time of Concentration Pre�Development= 10 min
Tested Soil Infiltration Rate= 0.5 iNhr(Soo We 4) Destination Design=®iNhr
Design Soil Infiltration Rate= 0.5 in/hr Soil Infiltration Rate
R uirement
Rainfall De h
Desi nStorm
Stoma
P011otlonleVuIlon
1.4inches
Water
Flow Control
3.6 inches
Flood Control
Destination
I 3.6 inches
Flood Control
Facility
Facility Side Slop(
Max. Ponding Depth
in Stormwater Facility -
Depth of Growing Medium (So
6/27/2023-7:38 AM
Facility Surface
Facility Surface Perri
Facility Bottom
Facility Bottom Perri
Ratio of Facility Area to
Basin Vc
Pollution Reduction-Calculation Results
Peak Flow Rate to Stormwater Facility = 0.023 cfs
Peak Facility Overflow Rate= 0.000 cfs
Total Runoff Volume to Stormwater
Facility 291 cf
Total Overflow Volume= 0 cf
Max. Depth of Stormwater in Facility= 8.6 in
Drawdown Time= 1?2 hours
Yes Facility Sizing Meets Pollution Reduction Standards?
VES Meets Requirementoi No Facility Flooding?
VES Meets Requirement for Maximum of 18 Hour Drawdown Time?
Flow Control-Calculation Results
Peak Flow Rate to Stormwater Facility = 0.064 cfs
Peak Facility Overflow Rate= 0.011 cfs
Total Runoff Volume to Stormwater
Facility= 828 cf
Total Overflow Volume= 296 cf
Peak Off -Site Flow Rate
Max. Depth of Stormwater in Facility= 23.9 in
Filtration Facility Underdrain= 0.002 cfs
Drawdown Time= 47.7 hours
Pr w,lmmnent Runoff Data
Peak Flow Rate = O.IXtS cfs
Total Runoff Volume =1 519 cf
=Facility Sizing Meets Flow Control Standards?
Nw Meets Requirement for Post Development offsite flow less or equal to Pre-Development Flow?
ZI
NW Meets Requirement for Maximum of 18 Hour Drawdown Time?
Destination-Calculation Results
Peak Flow Rate to Stormwater Facility = N/A cfs
Peak Facility Overflow Rate= N/A cfs
Total Runoff Volume to Stormwater
Facility= N/A cf
Total Overflow Volume= N/A cf
Max. Depth of Stormwater in Facility- N/A in
Drawdown Time= N/A lours
N/A Facility Sizing Meets Destination Standards?
N/A Meets Requirement of No Facility Flooding?
L.2LAJMftts Requirement for Maximum of 30 hour Drawdown Time?
6/2]/2023-]:38 AM