HomeMy WebLinkAboutApplication Applicant 8/3/2023City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Land Division Tentative Plan
Partition, Subdivision
IEPgINOPI�
Application Type (Applicant., check ne❑
•❑
Partition Tentative Pre -Submittal: ❑ Subdivision Tentative Pre -Submittal:
Partition Tentative Submittal: Subdivision Tentative Submittal:
Required Project Information (Applicant: complete this section)
Applicant Name: Chad Saunders Phone: 541-729-3486
Company: j
Fax:
Address: '1j !;U p✓ e -14,,4o
Applicant's Rep.: Anthony J. Favreau
Phone: 541-683-7048
Company: The Favreau Group
Fax:
Address: 3750 Norwich Ave., Eugene, OR 97408
Propertyy Owner: Same as applicant
Phone:
Company:
Fax:
Address:
ASSESSOR'S MAP NO: 17-02-31-24
TAX LOT NOS : 11800
Property Address: 475 35th St.
Size of Property: 20666 Acres ❑ Square Feet
Proposed Name of Subdivision: Partition
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: 3 -Lot Partition
Existing Use: Single Family Residence
# of Lots/Parcels: 3
Total acreage of parcels/
allowable density: 0.47 acres
proposed #
Dwell units3
Si natures: Please sign and Drint your name and date in thea
Required Project Information (City Zntake Staff.,
II -23- Dw l rD-wc-
Associated Applications: II -23' 0
ro riate box on the next na e.
complete this section)
si ns:
Pre -Sub Case NO.:
Date:
Reviewed by:
Case No.: I ' 3' fes-
Date:
('
Reviewed b xlf'✓�
ApplicationlFee:
Technical Fee: $
Postage Fee: $203
pT �r
TOTAL FEES: $
PROJECT NUMBER: V -.4-3-00C) IS
Revised 1/7/14 kl 1 of 10
Owner Signatures
This application form is used for both the required pre -submittal meeting and subsequent
complete application submittal. Owner signatures are required at both stages in the application
process.
An application without the Owner's original signature will not be accepted.
The undersigned acknowledges that the information in this application is correct and
accurate for scheduling of the Pre- Submittal Meeting. If the applicant is not the
owner, the owner hereby grants permission for the applicant to act in his/her behalf.
I/we do hereby acknowle a that I/we are legally responsible for all statutory
timelings, informatio uests and requirements conveyed to my representative.
I represent this application to be
performed on this application at
necessary for processing the apl
contained within the submittal, z
submitted. This statement seryl
Print
Date:
rr submittal to the City. Consistent with the completeness check
mittal Meeting, I affirm the information identified by the City as
rovided herein or the information will not be provided if not otherwise
may begin processing the application with the Information as
notice pursuant to the requirements of ORS 227.178 pertaining to a
Date:
Revised 1/7/14 kl 2 of 10
Land Division Tentative Application Process
1. Applicant Submits a Land Division Tentative Application for Pre -Submittal
• The application must conform to the Land Division Tentative Submittal Requirements
Checklist on pages 4-6 of this application packet.
• A pre -submittal meeting to discuss completeness is mandatory, and pre -submittal
meetings are conducted every Tuesday and Friday, from 10:00 am - noon.
• Planning Division staff strives to conduct pre -submittal meetings within five to seven
working days of receiving an application.
2. Applicant and the City Conduct the Pre -Submittal Meeting
• The applicant, owner, and design team are strongly encouraged to attend the pre -
submittal meeting.
• The meeting is held with representatives from Public Works Engineering and
Transportation, Community Services (Building), Fire Marshall's office, and the Planning
Division and is scheduled for 30 to 60 minutes.
The Planner provides the applicant with a Pre -Submittal Checklist specifying the items
required to make the application complete if it is not already complete, and the
applicant has 160 days submit a complete application to the City.
3. Applicant Submits a Complete Application, City Staff Review the Application and
Issue a Decision
• A complete application must conform to the Land Division Tentative Submittal
Requirements Checklist on pages 4-6 of this application packet.
• A Type II decision, made after public notice, but without a public hearing, unless
appealed, is issued within 120 days of submittal of a complete application.
• Mailed notice is provided to property owners and occupants within 300 feet of the
property being reviewed and to any applicable neighborhood association. In addition,
the applicant must post one sign, provided by the City, on the subject property.
• There is a 14 -day public comment period, starting on the date notice is mailed.
• Applications are distributed to the Development Review Committee, and their
comments are incorporated into a decision that addresses all applicable approval
criteria and/or development standards, as well as any written comments from those
given notice.
• Applications may be approved, approved with conditions, or denied.
• At the applicant's request, the Planner can provide a copy of the draft land use decision
prior to issuing the final land use decision.
• The City mails the applicant and any party of standing a copy of the decision, which is
effective on the day it is mailed.
• The decision issued is the final decision of the City but may be appealed within 15
calendar days to the Planning Commission or Hearings Official.
Revised 1/7/14 kl 3 of 10
Land Division Tentative Submittal Requirements Checklist
NOTE:
• ALL of the following items MUST be submitted for BOTH Pre -Submittal and Submittal.
• If you feel an item on the list below does not apply to your specific application, please
state the reason why and attach the explanation to this form.
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. Any applicable application, technology, and postage fees are collected
at the pre -submittal and submittal stages.
❑ Land Division Tentative Application Form
❑ Narrative explaining the purpose of the proposed development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. Density - list the size of property (acres), maximum allowable density
and the density proposed.
❑ Copy of the Deed
❑ Copy of a Preliminary Title Report issued within the past 30 days documenting
ownership and listing all encumbrances.
❑ Copy of the Land Division Plan Reduced to 81/2"x 11", which will be mailed as part of
the required neighboring property notification packet.
❑ Right -of -Way Approach Permit Application provided where the property has frontage
on an Oregon Department of Transportation (ODOT) facility.
❑ Three (3) Copies of the Stormwater Management System Study with Completed
Stormwater Scoping Sheet Attached - The plan, supporting calculations, and
documentation must be consistent with the Engineering Design Standards and Procedures
Manual.
❑ Three (3) Copies of the Traffic Impact Study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 A.4. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, metro plan and state land use and transportation policies and
objectives.
❑ Four (4) Copies of the Following Plan Sets for Pre -Submittal OR
Three (3) Copies of the Following Plan Sets:
❑ All of the following plans must include the scale appropriate to the area involved
and sufficient to show detail of the plan and related data, north arrow, and date of
preparation.
❑ All plan sets must be folded to 61/2" by 11" and bound by rubber bands.
a. Site Assessment of Existing Conditions
❑ Prepared by an Oregon licensed Landscape Architect or Engineer
Revised 1/7/14 kl 4 of 10
❑ Vicinity Map
❑ The name, location, and dimensions of all existing site features including buildings,
curb cuts, trees, and impervious surface areas, clearly indicating what is remaining and
what is being removed. For existing structures to remain, also indicate present use
and required setbacks from proposed property lines.
❑ The name, location, dimensions, direction of flow and top of bank of all watercourses
and required riparian setback that are shown on the Water Quality Limited Watercourse
Map on file in the Development & Public Works Department
❑ The 100 -year floodplain and floodway boundaries on the site, as specified in the latest
adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment
or Letter of Map Revision
❑ The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead
Protection Areas Map on file in the Development & Public Works Department
❑ Physical features including, but not limited to trees 5" in diameter or greater when
measured 4 '/3 feet above the ground, significant clusters of trees and shrubs, riparian
areas, wetlands and rock outcroppings
❑ Soil types and water table information as mapped and specified in the Soils Survey of
Lane County. A Geotechnical Report prepared by an Engineer must be submitted
concurrently if the Soils Survey indicates the proposed development area has unstable
soils and/or a high water table
b. Land Division Tentative Plan
❑ Prepared by an Oregon licensed Land Surveyor
❑ City boundaries, the Urban Growth Boundary, and any special service district
boundaries or railroad right-of-way which cross or abut the proposed land division
❑ Location and width of all existing and proposed easements on and abutting the
proposed land division
❑ Boundaries of entire area owned by the property owner, of which the proposed land
division is a part, as well as dimensions and size of each parcel and the approximate
dimensions of each building site indicating the top and toe of cut and fill slopes to scale
❑ Location and type of existing and proposed street lighting, including type, height, and
area of illumination
❑ Location, widths, conditions, and names of all existing and proposed streets, alleys,
dedications or other right-of-ways within or adjacent to the proposed land division.
Proposed streets should also include approximate radius of curves and grades and
relationship to any projected streets as shown on the Metro Plan, TransPlan,
Conceptual Development Plan, or Conceptual Local Street Map.
❑ Location of existing and required traffic control devices, fire hydrants, power poles,
transformers, neighborhood mailbox units and similar public facilities
❑ Location and dimensions of existing and proposed driveways
❑ Location of existing and proposed transit facilities
❑ Location and width of all existing and proposed sidewalks, sidewalk ramps, pedestrian
access ways and bike trails
❑ Location, size and type of plantings and street trees in any required planter strip
Revised 1/7/14 kl 5 of 10
❑ Location and size of existing and proposed utilities on and adjacent to the site including
sanitary sewer mains, stormwater management systems, water mains, power, gas,
telephone, and cable TV. Indicate the proposed connection points
❑ The locations of all areas to be dedicated or reserved for public use, with the purpose,
condition or limitations of the reservations clearly indicated
❑ Future Development Plan where phasing or large lots/parcels are proposed as specified
in SDC 5.12-120 E.
c. Stormwater Management Plan
❑ Prepared by an Oregon licensed Civil Engineer
❑ Planting plan prepared by an Oregon licensed Landscape Architect where plants are
proposed as part of the stormwater management system
❑ Roof drainage patterns and discharge locations
❑ Pervious and impervious area drainage patterns
❑ The size and location of stormwater management systems components, including but
not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater
quality measures; and natural drainageways to be retained
❑ Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for
land with a slope over 10 percent, the contour lines may be at 5 foot intervals)
❑ Amount of proposed cut and fill
❑ Additional Materials That May be Required
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL
STANDARDS/APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE
APPLICANT SHOULD CONSIDER UTILIZING PRE -DEVELOPMENT MEETINGS AS
DISCUSSED IN SDC 5.1-120:
❑ Proposed deed restrictions and a draft of any Homeowner's Association Agreement
❑ Additional plans and documentation for submittal of a Cluster Subdivision proposal
as specified in SDC 3.2-230
❑ Riparian Area Protection Report for properties located within 150 feet of the top of
bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the
top of bank of any direct tributaries of WQLW
❑ A Geotechnical Report prepared by an engineer must be submitted concurrently if
there are unstable soils and/or a high water table present
❑ Where the development area is within an overlay district, address the
additional standards of the overlay district
❑ If five or more trees are proposed to be removed, a Tree Felling Permit as specified
in SDC 5.19-100
❑ A wetland delineation approved by the Oregon Division of State Lands must be
submitted concurrently where there is a wetland on the property
❑ Any required federal or state permit must be submitted concurrently or evidence
the permit application has been submitted for review
❑ Where any grading, filling or excavating is proposed with the development, a Land
and Drainage Alteration permit must be submitted prior to development
Revised 1/7/14 kl 6 of 10
❑ Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100
and 5.21-100
❑ An Annexation application, as specified in SDC 5.7-100, where a development is
proposed outside of the city limits but within the City's urban service area and can
be served by sanitary sewer
❑ All public improvements proposed to be installed and to include the approximate
time of installation and method of financing
Revised 1/7/14 kl 7 of 10
225 FIFTH STREET
SPRINGFIELD, OR 97477
PHONE: 541.726.3753
FAX. 541.736.1021
www.spnngfield-orgov
December 6, 2013
REQUIRED STORMWATER SCOPING SHEET USE POLICY:
In October 2003, Springfield Public Works released a trial "stonnwater scoping sheet," provided to help
engineers and developers meet stormwater requirements in the Springfield Development Code (SDC) and
Engineering Design Standards and Procedures Manual (EDSPM). After a five month trial period, it became
apparent that users of the scoping sheet submitted much more complete applications than non-users. An added
bonus was a decrease in the overall review time spent on the applications, resulting in quicker notice of
decisions.
As a result of the benefits of the scoping sheets, the City has decided to make their use a mandatory process.
Current city policy is that the use of stormwater scoping sheets is required for all applications which require
development review. All applications submitted to the City shall provide a copy of a completed stormwater
scoping sheet with the application packet. Attached with this letter is the latest version of the scoping sheet,
which reflects changes requested by the development community.
PLEASE NOTE: SUBMITTED APPLICATIONS WILL NOW BE REQUIRED TO SUBMIT A
COMPLETED STORMWATER SCOPING SHEET, STORMWATER STUDY AND PLANS IN
CONFORMANCE WITH THE SCOPE REQUIREMENTS
U 17 rrrrr 31b4LCeI91 ri7 V,P"IN N:1
1.) Obtain scoping sheet from application packet, city website, or other location.
2.) Fill out project information (top half of front sheet) prior to commencement of work on stormwater study.
(Note: Do not sign scoping sheet until it is received from the City with requirements checked.)
3.) Mail, fax, or email all pages to: City of Springfield, Development and Public Works Dept., Attu: Clayton
McEachem.
4.) Receive completed scoping sheet (filled out by the City) indicating minimum requirements for a complete
stormwater study.
5.) Include four (4) copies of complete scoping sheet (signed by engineer at the bottom of page 2), stormwater
study and plans that comply with the minimum required scope with submittal of application packet. The
scoping sheet shall be included as an attachment, inside the front cover of the stormwater study.
Stormwater scoping sheets can be found with all application packets (City website and the DPW front counter)
as well as on the Engineering and Construction Resources webpage located at: httv://www.springfield-
or.gov/DPW/EnginmringmdConstructionResources.htm under the Public Improvement Permit Projects Forms
section. Thank you in advance for working with the City of Springfield with this new process.
Sincerely,
Clayton McEachern, PE
City of Springfield, Development and Public Works
Email: cmeeachem@springfieldor.gov
Phone: (541) 736 —1036
Fax: (541) 736-1021
DEVELOPMENT AND PUBLIC WORKS
SPRINGFIELD
225 FIFTH STREET
OREGON SPRINGFIELD, OR 97477
PHONE: 541.726.3753
FAX: 541.726.1021
www.spdrygfialdor.gov
STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK
----------- — (Area below this b'sefdled out by Applicant) __—
(Please return to Clayton MEachern @ City ofSprtngiiield Development and Public Works, Fan # 736-1021, Phone # 736-1036),
enwd:cnae�lern@sprirtglleldor.gov
Project Name:
Applicant:
Assessors Parcel #:
Date:
Land Use(s):
Phone #:
Project Size (Acres):
Fax #:
Approx. Impervious Area:
Email:
Project Description (Include a copy of Assessor's map):
Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary:
Proposed Stormwater Best Management Practices:
(Area below this line /'died outby the City andReturned m the Aaabeand
(At a nurumuan, all boxes checked by the City on the front and backoftlus sheet shall be subnutted
or on application to be coaWletefor subnuttal, afthough other requirements n be recess
Drainage Study Type (EDSPM Section 4.03.2): (Note, UH may be substituted for Rational Method)
❑ Small Site Study—(use Rational Method for calculations)
❑ Mid -Level Development Study— (use Unit Hydrograph Method for calculations)
❑ Full Drainage Development Study— (use Unit Hydrograph Method for calculations)
Environmental Considerations:
❑ Wellhead Zone:
❑ Wedand/Riparian:
❑ Soil Type:
Downstream Analysis:
❑ N/A
❑ Flow line for starting water surface elevation:
❑ Design HGL to use for starting water surface elevation:
❑ Manhole/Junction to take analysis to:
❑ Hillside Development:
❑ Floodway/Floodplain:
❑ Other Jurisdictions
Return to Clayton McEachem @ City of Springfield, email: cmceachem@springfeAd-or,gov, FAX., (541) 736-1021
COMPLETE STUDY ITEMS
r Baredupon the tnfor nation provided on tie front ofdds sheet, the follou>ing represents a ndndnnou of uvh w it merkdfor on
application to be complete for subnddal with respect to drainage; however, this list should not be used in lieu ofde Sprirgtield
Development Cork (SDC) or the City's Engineering Design A3mma1. Connpltance with these requirements does not constitute site
appromol, Adebooml site specific information nary be required Note: Upon scoping sheet subndttal, ensure completedfornu has been
signed in the spare provickel below:
Interim Design Standards/Water Quality (EDSPM Chapter 3
Req'd N/A
❑ ❑ All non -building rooftop (NBR) impervious surfaces shall be pre-treated (e. g. multi-chambered catchbasin w/oil filtration
media) for stonmvater quality. Additionally, aminimum of 50% of the NBR impervious surface shall be treated by
vegetated methods.
❑ ❑ Where required, vegetative stommwater design shall be consistent with design standards (EDSPM Section 3.02), set forth
in Chapter 2 of the Eugene Stormrmer Management Manual.
❑ ❑ For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified
by the Eugene Stomrmvater Management Manual (Sec2A.1).
❑ ❑ If a stormrmer treatment Swale is proposed, submit calculations/specifications for sizing, velocity, flow, side slopes,
bottom slope, and seed mix consistent with City of Springfield or Eugene's Stomrmvater Management Manual.
❑ Water Quality calculations as required in Section 3.03.1 of the EDSPM.
All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall
be provided with secondary containment or weather resistant enclosure.
❑ n Design of Stoma Systems (EDSPM Section 4.04).
❑ ❑ Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set
❑ ❑ Minimum pipe cover shall be 15 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or
proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 50,000 lb load
without failure of the pipe structure.
❑ ❑ Manning's "n" values for pipes shall be consistent with Table 4-1 of the EDSP. All stoma pipes shall be designed to
Other/Miscethmeous
❑
Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon.
Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site
❑
A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map.
drains.
❑
Calculations showing system capacity for a 2 -year stoma event and overflow effects of a 25 -year stoma event
Private stommwater easements shall be clearly depicted on plans when private stommater flows from one property to
The time of concentration (Tc) shall be determined using a 10 minute start time for developed basins.
Review ofDownstream System EDSPM Section 4.03A.0
❑
A downstream drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the
Oregon Plumbing Specialty Code (OPSC).
❑
❑
Elevations of the HGL and flow lines for both city and private systems where applicable.
❑ n Design of Stoma Systems (EDSPM Section 4.04).
❑ ❑ Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set
❑ ❑ Minimum pipe cover shall be 15 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or
proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 50,000 lb load
without failure of the pipe structure.
❑ ❑ Manning's "n" values for pipes shall be consistent with Table 4-1 of the EDSP. All stoma pipes shall be designed to
Other/Miscethmeous
❑
Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site
drains.
❑
Private stommwater easements shall be clearly depicted on plans when private stommater flows from one property to
another.
❑
Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of
residential building roofs (EDSP Section 3.03A A). Additional provisions apply to this as required by the DEQ. Refer to
thewebsite: him/Avww.deo.state.or.ushvo/uic/uic.htm for more infomuation.
❑
Detention ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events.
*Thisform simU be inchukd m nn Nhuhmen5 inside the frontcover, ofthe stormnsder shady.
* IAWORTANT..- ENGINEER PLEASE READ BEEOWAND SIGN'
As the engineer of record, I hereby certify the above required items are complete and included with the submitted stommater study
and plan set. Signature Date
Form Version 5: June 2015
SAUNDERS TENTATIVE MAP NARRATIVE
May 25, 2023
Assessor's Map:
17-02-31-24 Tax Lot 11800
Applicants:
Chad Saunders
(541) 729-3486
Applicant's
Representative:
The Favreau Group
3750 Norwich Ave.
Eugene, OR 97408
541-683-7048
Attn: Tony Favreau
LAND USE REQUEST
The applicant proposes to divide the subject 0.47 acre property to create 3 lots and to provide
all necessary infrastructure to support the development. The proposed residential use and
density (6-14 dwelling units/acre) are consistent with the existing Low Density Residential (LDR)
zoning and the City's standards for development in the LDR zoning district, where a maximum
of 14 dwelling units/acre is permitted and the proposed is 7.7 units per acre.
The proposal does not include any improvements to 35" Street.
SITE AND SURROUNDING CHARACTERISTICS
The site is within an established Springfield residential neighborhood. The property is located at
475 35" St. and has an existing home situated towards the front of the property. The Northern,
Southern and Eastern property lines abut fully developed parcels with existing homes. The site
soils are 2226A- Awbrig Urban Land Complex, soil group D.
5.12-125 Tentative Plan Criteria
The Director shall approve or approve with conditions a Tentative Plan application upon
determining that all applicable criteria have been satisfied. If conditions cannot be attached to
satisfy the approval criteria, the Director shall deny the application. In the case of Partitions that
involve the donation of land to a public agency, the Director may waive any approval criteria
upon determining the particular criterion can be addressed as part of a future development
application.
A. The request conforms to the provisions of this Code pertaining to lot/parcel size
and dimensions.
Response: The proposed lots meet the 4,500 sq. ft. minimum lot size and the 50 -foot street
frontage requirements for the north -south streets established by SDC. Parcel 1 is 6,563 s.f. with
74.00' of frontage. Parcel 2 is 7,036 s.f. panhandle with a 20' access easement. Parcel 3 is
7,067 s.f. panhandle with a 20' access easement.
B. The zoning is consistent with the Metro Plan diagram and/or applicable
Refinement Plan diagram, Plan District map, and Conceptual Development Plan.
Response: The property is zoned Low Density Residential (LDR). The Metro Plan diagram for the
subject property is LDR.
C. Capacity requirements of public and private facilities, including but not limited to,
water and electricity; sanitary sewer and stormwater management facilities; and streets
and traffic safety controls shall not be exceeded and the public improvements shall be
available to serve the site at the time of development, unless otherwise provided for by
this Code and other applicable regulations. The Public Works Director or a utility
provider shall determine capacity issues.
Response:
a. Water: The proposed development is within the Springfield city limits and will receive
water service from the Springfield Utility Board (SUB). There is an existing 8"
waterline in 35th St.
b. Wastewater: There are 2 existing 8" wastewater systems. One in 35'" St. and one
along the east property line.
c. Stone Drain: There is an existing storm drain along the southerly property line.
d. Streets: 35th Street is fully built and no improvements are proposed.
D. The proposed land division shall comply with all applicable public and private
design and construction standards contained in this Code and other applicable
regulations.
Response: See Response to part C.
E. Physical features, including, but not limited to: steep slopes with unstable soil or
geologic conditions; areas with susceptibility of flooding; significant clusters of trees
and shrubs; watercourses shown on the WOLW Map and their associated riparian areas;
other riparian areas and wetlands specified in Section 4.3-117; rock outcroppings; open
spaces; and areas of historic and/or archaeological significance, as may be specified in
Section 3.3-900 or ORS 97.740-7605 358.905-955 and 390.235-240, shall be protected as
specified in this Code or in State or Federal law.
Response: The Metro Area General Plan, Water Quality Limited Watercourse Map, State
Designated Wetlands Map, Hydric Soils Map, Wellhead Protection Zone Map, FEMA Maps, and
the list of Historic landmark sites have been consulted and with the exception noted below,
there are no features needing to be protected or preserved on this site. If any artifacts are
found during construction, there are state laws that could apply; ORS 97.740, ORS 358.905,
ORS 390.235. If human remains are discovered during construction, it is a Class "C" felony to
proceed under ORS 97.740.
The site is relatively level and drains to the north. The driveway will drain to an inlet and then to
a treatment planter as shown. The required treatment area per the City of Eugene Stormwater
Surface Filtration/infiltration Facility Sizing Spreadsheet form is 180 s.f. and 180 s.f is provided.
This facility will drain to the existing storm drain along the southern property line. The houses
on parcels 2 & 3 will have individual treatment facilities on each parcel that will overflow to the
existing storm drain via a drainage easement on parcel 2.
Criterion 6 is met. Physical features, including but not limited to significant clusters of trees and
shrubs, watercourses shown on the WOLW Map and their associated riparian areas, wetlands,
rock outcroppings, and historic features are not present on the site.
F. Parking areas and ingress -egress points have been designed to: facilitate
vehicular traffic, bicycle and pedestrian safety to avoid congestion; provide connectivity
within the development area and to adjacent residential areas, transit stops,
neighborhood activity centers, and commercial, industrial and public areas; minimize
driveways on arterial and collector streets as specified in this Code or other applicable
regulations and comply with the ODOT access management standards for State
highways.
Response: 35th Street is fully built and no improvements are proposed.
G. Development of any remainder of the property under the same ownership can be
accomplished as specified in this Code.
Response: There is no other adjoining property under the same ownership that can be
developed.
H. Adjacent land can be developed or Is provided access that will allow its
development as specified in this Code.
Response: There is no undeveloped land adjoining the property. Approval of the proposed
subdivision will not impede development of adjacent land.
I. Where the Partition of property that is outside of the city limits but within the
City's urbanizable area and no concurrent annexation application is submitted, the
standards specified below shall also apply.
Response: This does not apply
Stormwater Surface FiltrationAnfiltration Facility Sizing Spreadsheet
24 Hour Storm, NRCS Type 1 A Rainfall Distribution
City of Eugene
Name:
Saunders
Date:
6/27/2023
Address:
47535th St
Permit Number:
Permit
Flood Control
Sorirrofield. OR Rio Cutlet
Catchment ID:
clrhr
rr:
Anthony J. Fsvhmu
TY:
The Firmest, Group
Complete this form for each drainage catchment in the project site that is to be sized per the Presumptive Approach.
Provide a distinctive Catchment ID for each facility coordinated with the site basin map to correlate the appropriate
calculations with the facility.
The maximum drainage catchment to be modeled per the Presumptive Approach is 1 acre (43,560 SF)
=or infiltration facilities in Class A or B soils where no infiltration testing has been pedromed use an infiltration rate of 0.5 in/hr.
For all facilities use a maximum soil infiltration rate of 2.5 in/hr for lommi/growing medium.
loose'Ym' from the dmpdown loxes below next to the design standards requirements for this facility.
Pollution Reduction (PR)Yes
Flow Control (FC)l No
Destination(DT) No 'Ani11hationkciiiry nnuA1x Arxeenae Netaciiiryh,em novtdvsmotion rsqulremeMe
Total Square Footage Impervious Area=sgfl Total Square Footage Pervious Area- 0 scfl
Mae ea CN= 98 Pervious Area CN=l 85
Total Square Footage of Drainage Area= 2958 sfl Time of Concentration Post Development= OS min
Weighted Average CN=l 98
Pre�Development CN= 85 Time of Concentration Pre�Development= 10 min
Tested Soil Infiltration Rate= 0.5 iNhr(Soo We 4) Destination Design=®iNhr
Design Soil Infiltration Rate= 0.5 in/hr Soil Infiltration Rate
R uirement
Rainfall De h
Desi nStorm
Stoma
P011otlonleVuIlon
1.4inches
Water
Flow Control
3.6 inches
Flood Control
Destination
I 3.6 inches
Flood Control
Facility
Facility Side Slop(
Max. Ponding Depth
in Stormwater Facility -
Depth of Growing Medium (So
6/27/2023-7:38 AM
Facility Surface
Facility Surface Perri
Facility Bottom
Facility Bottom Perri
Ratio of Facility Area to
Basin Vc
Pollution Reduction-Calculation Results
Peak Flow Rate to Stormwater Facility = 0.023 cfs
Peak Facility Overflow Rate= 0.000 cfs
Total Runoff Volume to Stormwater
Facility 291 cf
Total Overflow Volume= 0 cf
Max. Depth of Stormwater in Facility= 8.6 in
Drawdown Time= 1?2 hours
Yes Facility Sizing Meets Pollution Reduction Standards?
VES Meets Requirementoi No Facility Flooding?
VES Meets Requirement for Maximum of 18 Hour Drawdown Time?
Flow Control-Calculation Results
Peak Flow Rate to Stormwater Facility = 0.064 cfs
Peak Facility Overflow Rate= 0.011 cfs
Total Runoff Volume to Stormwater
Facility= 828 cf
Total Overflow Volume= 296 cf
Peak Off -Site Flow Rate
Max. Depth of Stormwater in Facility= 23.9 in
Filtration Facility Underdrain= 0.002 cfs
Drawdown Time= 47.7 hours
Pr w,lmmnent Runoff Data
Peak Flow Rate = O.IXtS cfs
Total Runoff Volume =1 519 cf
=Facility Sizing Meets Flow Control Standards?
Nw Meets Requirement for Post Development offsite flow less or equal to Pre-Development Flow?
ZI
NW Meets Requirement for Maximum of 18 Hour Drawdown Time?
Destination-Calculation Results
Peak Flow Rate to Stormwater Facility = N/A cfs
Peak Facility Overflow Rate= N/A cfs
Total Runoff Volume to Stormwater
Facility= N/A cf
Total Overflow Volume= N/A cf
Max. Depth of Stormwater in Facility- N/A in
Drawdown Time= N/A lours
N/A Facility Sizing Meets Destination Standards?
N/A Meets Requirement of No Facility Flooding?
L.2LAJMftts Requirement for Maximum of 30 hour Drawdown Time?
6/2]/2023-]:38 AM
Lane County Clerk 2023-011407
RECORDING REQUESTED BY: Lane County Deeds & Records
FideG Nati Tid8 3pages 04/28/202309x27:25 AM
•,r � ori RPR-DEED 000 St n=8 CASHIER 12
$1s oo $11 00 $tnoo s61 00 $97.00
3007 North Delta Hwy., Ste 206
Eugene, OR 97408
GRANTOR'S NAME:
Robert C. Eckerson
GRANTEE'S NAME:
Wonderwall Ventures LLC, an Oregon limited liability company
r AFTER RECORDING RETURN TO:
Order No.: 60222301563-KB
Wondenvall Ventures LLC, an Oregon limited liability company
PO Box 1553
1 Eugene, OR 97440
SEND TAX STATEMENTS TO:
Wondenwall Ventures LLC, an Oregon limited liability company
O PO Box 1553
Eugene, OR 97440
Sk APN: 0120632
Map: 17-02-31-24.11800
475 35th Street, Springfield, OR 97478
SPACE ABOVE THIS LINE FOR RECORDER'S USE
STATUTORY WARRANTY DEED
Robert C. Eckerson, Grantor, conveys and warrants to Wonderwall Ventures LLC, an Oregon limited liability
company, Grantee, the following described real property, free and clear of encumbrances except as specifically
set forth below, situated in the County of Lane, State of Oregon:
Beginning at a point 281 feet South of the Northeast corner of Block 1, PACKER SUBDIVISION, as
platted and recorded in Book 11, Page 25, Lane County Oregon Plat Records, in Lane County, Oregon;
running thence West parallel with the North line of said Block 1 a distance of 279.3 feet; thence South
parallel with the East line of Block 1 a distance of 74 feet; thence East parallel with the North line of Block
1 a distance of 279.3 feet; thence North along the East line of Block 1 a distance of 74 feet to the Point of
Beginning, in Lane County, Oregon.
EXCEPTING THEREFROM that portion, if any, lying within the limits of 35th Street.
THE TRUE AND ACTUAL CONSIDERATION FOR THIS CONVEYANCE IS THREE HUNDRED THIRTY
THOUSAND AND NO/100 DOLLARS ($330,000.00). (See ORS 93.030).
Subject to;
SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF
BEFORE SIGNING OR ACCEPTING THIS INSTRUMENT, THE PERSON TRANSFERRING FEE TITLE
SHOULD INQUIRE ABOUT THE PERSON'S RIGHTS, IF ANY, UNDER ORS 195.300, 195.301 AND 195.305
TO 195.336 AND SECTIONS 5 TO 11, CHAPTER 424, OREGON LAWS 2007, SECTIONS 2 TO 9 AND 17,
CHAPTER 855, OREGON LAWS 2009, AND SECTIONS 2 TO 7, CHAPTERS, OREGON LAWS 2010. THIS
INSTRUMENT DOES NOT ALLOW USE OF THE PROPERTY DESCRIBED IN THIS INSTRUMENT IN
VIOLATION OF APPLICABLE LAND USE LAWS AND REGULATIONS. BEFORE SIGNING OR ACCEPTING
THIS INSTRUMENT, THE PERSON ACQUIRING FEE TITLE TO THE PROPERTY SHOULD CHECK WITH
THE APPROPRIATE CITY OR COUNTY PLANNING DEPARTMENT TO VERIFY THAT THE UNIT OF LAND
BEING TRANSFERRED IS A LAWFULLY ESTABLISHED LOT OR PARCEL, AS DEFINED IN ORS 92.010 OR
215.010, TO VERIFY THE APPROVED USES OF THE LOT OR PARCEL, TO DETERMINE ANY LIMITS ON
LAWSUITS AGAINST FARMING OR FOREST PRACTICES, AS DEFINED IN ORS 30.930, AND TO INQUIRE
ABOUT THE RIGHTS OF NEIGHBORING PROPERTY OWNERS, IF ANY, UNDER ORS 195.300, 195.301 AND
195.305 TO 195.336 AND SECTIONS 5 TO 11, CHAPTER 424, OREGON LAWS 2007, SECTIONS 2 TO 9 AND
17, CHAPTER 855, OREGON LAWS 2009, AND SECTIONS 2 TO 7, CHAPTER 8, OREGON LAWS 2010.
Deed (SLI WaaeMy) Legal
ORD1368doc/Updated: N26.19 Pagel
STATUTORY WARRANTY DEED
(continued)
IN WITNESS WHEREOF, the undersigned have executed this document on the date(s) set forth below.
Oat :Q4-'Lo�_z62�
e
Robert C. Eckerson
State of () I `--�
County of Ill. f)
This ins ant was acknowledged before me onb r�}-�i I�� - by Robert C. Eckerson.
N ub is - State Oregon
My Commission Expirere s:
7-]4OFFICIALST
"""nE ANN S
00MIMPAR� TARY PUBLIC-REGON
MMISSION NO.1012209A
ON EXPIRES MY 10, 025
Deed (Statutory Warranty) Legal
DR01368.dool Updated: 04.26.19 Pepe2 OR-FT-FE000152047000 OM301563
EXHIBIT "A"
Exceptions
Subject to:
1. Easement(s) for the purpose(s) shown below and rights incidental thereto, as granted in a document:
Granted to:
The City of Springfield, a municipal corporation, in Lane County, Oregon
Purpose:
as stated in said easement
Recording Date:
March 14,1963
Recording No:
3049
and
Recording Date:
March 14, 1963
Recording No:
3050
and
Recording Date:
March 14, 1963
Recording No:
3051
Affects:
Easterly 14 feet as described in said easement
2. Easement(s) for the
purpose(s) shown below and rights incidental thereto, as granted in a document:
Granted to:
The City of Springfield, a municipal corporation, in Lane County, Oregon
Purpose:
as stated in said easement
Recording Date:
October 5, 1967
Recording No:
608
Affects:
Southerly 7 feet as described in said easement
3. Easement(s) for the
purpose(s) shown below and rights incidental thereto, as granted in a document:
Granted to:
The City of Springfield, a municipal corporation, in Lane County, Oregon
Purpose:
as stated in said easement
Recording Date:
August 17, 1979
Recording No:
7949411
Affects:
Westerly 5 feet as described in said easement
4. Possible encroachments
as set forth on the surveyors report dated April 17, 2023 by Jeremy A. Sharer,
Professional Land
Surveyor. There's a possible fence encroachment on the East line of the subject
property that would be better detailed in a complete land survey being attained.
This Company will require an indemnification from both the seller and the buyer to remove this exception
to the final title policy.
Deed (statutory wxnamr) Legal
ORD1368.docl Updated: 06.26.19 Page OR-FT-FEUG-01520470003-60222301563
�e
WONDERWALL VENTURES LLC
ATTN: CHAD SAUNDERS
475 35TH STREET
SPRINGFIELD, OR 97478
STATUS OF RECORD TITLE REPORT
Date: JULY 03, 2023
Our No: CT -0340163
Your No: --
Charge: $300.00
As requested, Cascade Title Co. has searched our tract indices as to the following
described real property:
( A T T A C H E D
and as of: JUNE 23, 2023 at 8:00 A.M., we find the following:
Vestee:
WONDERWALL VENTURES LLC,
an Oregon limited liability company
Said property is subject to the following on record matters:
1. Property taxes in an undetermined amount, which are a lien but not yet payable,
including any assessments collected with taxes to be levied for the fiscal year
2023-2024.
2. City liens, if any, as levied by the City of Springfield for which no search was
made.
3. Public utility easement, including the terms and provisions thereof, granted the
City of Springfield, by instruments recorded March 14, 1963, Reception No. 1963-
003049, Reception No. 1963-003050, and Reception No. 1963-003051, Lane County
Official Records.
4. Storm sewer easement, including the terms and provisions thereof, granted the City
of Springfield, by instrument recorded October 5, 1967, Reception No. 1967-000608,
Lane County Official Records.
5. Public utility easement, including the terms and provisions thereof, granted the
City of Springfield, by instrument recorded August 17, 1979, Reception No. 1979-
049411, Lane County Official Records.
6. Possible encroachments as set forth in surveyors report dated April 17, 2023, by
Jeremy A. Sherer, PLS, as disclosed in Warranty Deed recorded April 20, 2023,
Reception No. 2023-011407, Lane County Deeds and Records.
MAW OFHCE FLORENCE OFFICE VILLAGE PLAEA OFFICE
811W LAMETTESM 915 HWY 101' FLORENCE OREGON 97439 47M VE,LAGE PLAZA LOOP SUITE 100
EUGENE, OREGON 97401 MAU.ING: PO BOX 508' FLORENCE OREGON 97439 EUGENE OREGON 97401
PH: (541) 689-2233 * FAX: (541)185-0309 PH: (541) 99]341] * FAX: (541)9978246 PH: (541) 653-8622 * FAX: (541) 8444626
Order No. 0340163
Page 2
7. Deed of Trust, including the terms and provisions thereof, executed by Wonderwall
Ventures LLC, Grantor, to David L. Jacobson, Trustee, for the benefit of Chase
Development LLC, Beneficiary, dated April 28, 2023, recorded April 28, 2023,
Reception No. 2023-011408, Lane County Deeds and Records, to secure payment of a
note in the amount of $260,000.00.
NOTE: The property address as shown on the Assessor's Roll is:
475 35th Street
Springfield, OR 97478
NOTE: Taxes, Account No. 0120632, Assessor's Map No. 17 02 31 2 4, 411800, Code 19-00,
2022-2023, in the amount of $2,021.30, PAID IN FULL.
This report is to be utilized for information only. This report is not to be used as a
basis for transferring, encumbering or foreclosing the real property described.
The liability of Cascade Title Co. is limited to the addressee and shall not exceed the
premium paid hereunder.
CASCADE TITLE CO., by:
rmh/rh: Title Officer: KURT BEATY
Order No. 0340163
Page 3
PROPERTY DESCRIPTION
Beginning at a point 281 feet South of the Northeast corner of Block 1, PACKER
SUBDIVISION, as platted and recorded in Book 11, Page 25, Lane County Oregon Plat
Records, in Lane County, Oregon; running thence West parallel with the North line of
said Block 1, a distance of 279.3 feet; thence South parallel with the East line of
Block 1, a distance of 74 feet; thence East parallel with the North line of Block 1,
distance of 279.3 feet; thence North along the East line of Block 1, a distance of 74
feet, to the point of beginning, in Lane County, Oregon.