SITE PLAN REVIEW
COM PLETENESS REVIEW CHECKLIST
SPRINGFI ELD
OREGON
Project Name: Oregon Urology Clinic Parking Lot Expansion
Project Proposal: Construction of a 16-space parking lot expansion on an existing,
developed site.
Case Number: 811-23-000037-PRE
Project Address: 2400 Haftman Lane
Assessors Map and Tax Lot Number(s): Map 17-03-22-33, Tax Lot 600
Zoning: General Office (GO)
Overlay District(s): Drinking Water Protection (DWP)
Applicable Refinement Plan: Gateway
Refinement Plan Designation:
General Office (GO)
Metro Plan Designation:
Medium Density Residential (R-2)
Completeness Check Meeting Date: March L0,2023
Application Submittal Deadline: September 6, 2023
Associated Applications: DRC2002-tL397 (Site Plan Review)
Datc
POSITION REVIEW OF NAME
Proiect Planner Land Use Planning Andy Limbird 726-3784
Transportation Planninq Enqineer Transportation Michael Liebler 736-LO34
Public Works Civil Enqineer Utilities, Sanitary & Storm Sewer Clayton McEachern 736- 1036
Deoutv Fire Marshal Fire and Life Safety Gilbert Gordon 7 26-2293
Buildinq Official Buildinq Chris Carpenter 7 44-4153
Applicant
Terry Fitzpatrick
Harlow Urology Center LLC
2400 Haftman Lane
Springfield OR 97477
Appl ica nt's Representative
Nathan Patterson, PE
Branch Engineering Inc.
310 Fifth Street
Springfield OR 97477
Revised tOl25/O7 Irllnner: Al P,tor lof ll
TENTATIVE SITE PLAN REVIEW APPLICATION
COMPLETENESS REVIEW CHECKLIST
PLANNING
o Application fee - discuss the applicable fees
o Copy of the Site PIan reduced to 81/z"x LL"
Complete Incomplete See Planning
Note(s)
tr X 1 B 1/2" x Ll" Copy of Site Plan
o Copy of the deed and a preliminary title report issued within the past 30 days
documenting ownership and listing all encumbrances. If the applicant is not the property
owner, written permission from the property owner is required.
Complete Incomplete See Planning
Note(s)
tr X 2 Deed and Preliminary Title Report
o Brief narrative explaining the purpose of the development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. The narrative should also include the proposed number of employees
and future expansion plans, if known.
Complete Incomplete See Planning
Note(s)
X X Brief Narrative
o Site Plan
Complete
x
x
Incomplete SeePlanning
Note(s)
tr
Prepared by an Oregon Licensed Architect,
Landscape Architect, or Engineer
Proposed buildings: location, dimensions,
size (gross floor area applicable to the
parking requirement for the proposed
use(s)), setbacks from property lines, and
distance between buildings
Location and height of existing or proposed
fences, walls, outdoor equipment, storage,
trash receptacles, and signs
Location, dimensions, and number of typical,
compact, and disabled parking spaces;
including aisles, wheel bumpers, directional
signs, and striping
Dimensions of the development area, as well
as area and percentage of the site proposed
for buildings, structures, parking and
3
Revised lO/25/07
X
Xtr
x
u
tr
x
tr
N/A
See Planning
Note(s)
4
4
4
n
x
x
x
x
vehicular areas, sidewalks, patios, and other
impervious surfaces
Observance of solar access requirements as
specified in the applicable zoning district
On-site loading areas and vehicular and
pedestrian circulation
Location, type, and number of bicycle
parking spaces
Area and dimensions of all propefty to be
conveyed, dedicated, or reserved for
common open spaces, recreational areas,
and other similar public and semi-public uses
Location of existing and proposed transit
facilities
Drawn by a Landscape Architect
Location and dimensions of landscaping and
open space areas to include calculation of
landscape coverage
Screening in accordance with SDC 4.4-110
Written description, including specifications,
of the permanent irrigation system
Location and type of street trees
List in chart form the proposed types of
landscape materials (trees, shrubs, ground
cover). Include in the chart genus, species,
common name, quantity, size, spacing and
method of planting
o Phased Development PIan Where applicable, the Site Plan application must include a
phasing plan indicating any proposed phases for development, including the boundaries
and sequencing of each phase. Phasing must progress in a sequence promoting street
connectivity between the various phases of the development and accommodating other
required public improvements, including but not limited to, sanitary sewer, stormwater
management, water, and electricity. The applicant must indicate which phases apply to
the Site Plan application being submitted.
Complete Incomplete See Planning
Note(s)
N/A Phased Development Plan
o Landscape Plan
Complete Incomplete
X
x
x
X
4
4
N/A
Revised LO/25/O7
T
T
tr
xtr
I
o
o
x
Architectural Plan
Complete Incomplete See Planning
Note(s)
N/A
N/A
Exterior elevations of all buildings and
structures proposed for the development site,
including height
Conceptual floor plansxtr
On-Site Lighting Plan
Complete Incomplete
trX
See Planning
Note(s)
5 Location, orientation, and maximum height of
exterior light fixtures, both free standing and
attached
Type and extent of shielding, including cut-off
angles and type of illumination, wattage, and
luminous area
Photometric test report for each light sourcefN
Planning Notes:
1. Provide a reduced 8.5x11 size copy of the site plan with the hard copy submittal.
2. Provide a copy of the property deed and a current title report with the application
submittal (SDC 5. 1.220(BX7)).
3. Provide an existing conditions plan showing the entire site in an "as-built"
condition. Subsequent plan sheets can show just the parking lot expansion detail.
4. Provide a site landscaping plan for the remaining poftion of the site not being
paved for parking, and a planting plan for the stormwater planter.
5. Is the existing parking lot light being modified to illuminate the new spaces? If so,
provide a manufacturer's cut sheet for the light fixture to be installed in the project
area.
Additional comments not related to the completeness of the applicationt
. Landscaping adjacent to parking spaces can be extended by two feet to allow for
bumper overhang, which eliminates the need for concrete curb stops.
5
5
Revised tO/25/07
tr
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE.SU BMITTAL CH ECKLIST
Engineer: Clayton McEachern Case#: 811-23-37-PRE
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete Incomplete See PW
Note(s)trtr
n/a
nla
x tr
1
x
x
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location, and dimensions of all existing
site features including buildings, curb cuts, trees
and impervious surface areas, clearly indicating
what is remaining and what is being removed. For
existing structures to remain, also indicate present
use, size, setbacks from propefty lines, and distance
between buildings
The name, location, dimensions, direction of flow
and top of bank of all watercourses and required
riparian setback that are shown on the Water
Quality Limited Watercourse Map on file in the
Development Services Department
The 100-year floodplain and floodway boundaries on
the site, as specified in the latest adopted FEMA
Flood Insurance Rate Maps or FEMA approved Letter
of Map Amendment or Letter of Map Revision
The Time of Travel Zones, as specified in SDC 3.3-
200 and delineated on the Wellhead protection
Areas Map on file in the Development Services
Department
Physical features incruding, but not rimited to trees5" in diameter or greater when measured 4 1/z feetabove the ground, signiflcant clusters of trees andshrubs, riparian areas, wetlands, and rock
outcroppings
Soil types and water table information as mappedand specified in the Soils Survey of Lane Couir[V-.- AGeotechnical Report prepared by an Engineer mustbe submitted concurrently if the Soils S-urveyindicates the proposed development area hasunstable soils and/or a high water table
Ttr
I
x
T
tr
x
2
1n
Revised LO/25/07
tr
tr
o Improvement and Public Utilities Plan must be in compliance with the regulations of
SDC Sections 5.17-100, 4.1-100, 4.2-t00, and 4.3-100 and must include the following
information:
Complete Incomplete
xtrxn
n
Complete Incomplete
Xtr
See PW
Note(s)
1
1
Prepared by an Oregon licensed Civil Engineer
Location and width of all existing and proposed
easements
Location of existing and required power poles,
transformers, neighborhood mailbox units, and similar
public facilities
Location and size of existing and proposed utilities on
and adjacent to the site, including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable W.
Indicate the proposed connection points
Scoping Sheet and attached Stormwater Management
System Study
1
1
x
X
o
o
1
n
x
x
x
x
T
X
X
tr
trI
X
x
Grading and Paving Plan
Complete Incomplete See PW
Note(s)
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed
Landscape Architect where plants are proposed as
paft of the stormwater management system
Roof drainage patterns and discharge locations
Pervious and impervious area drainage patterns
The size and location of stormwater management
systems components, including but not limited to:
drain lines, catch basins, dry wells and/or detention
ponds; stormwater quality measures; and natural
drainageways to be retained
Existing and proposed spot elevations and contours
lines drawn at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
intervals)
Amount of proposed cut and fill
Stormwater Management System Study - provide four (4) copies of the study with
the completed Stormwater Scoping Sheet attached. The plan, calculations, and
documentation must be consistent with the Engineering Design Standards and
Procedures Manual.
3
4
4
See PW
Note(s)
Revised tO/25107
PW Notest
1. Entire site is not shown on existinq conditions sheet'
2. site is in 99 vlu. tirn" or t.ar"i')""""i"i a.inking water protection'
3. Stormwat", piunt"' requires a full vegetation.plan'
4. It appears that untreated waterJio*"n" par*ing*'rot is being inflltrated directly
without soins through u.g.t.tir. iilui*.nt *niZnli not all6wed per Oregon DEQ
rules.
5. A fuil drainage report is submitted with this application, showing no increase in
stormwater iunoff from the existing condition'
Additional comments not retatid t5 tne completeness of the application:
o A new Stormwater operations and Maintenance Agreement is required for the new
facility and the rest of the site (to cover maintaining the existing catchbasins on
site).
Revised LO|25/O7
TENTATIVE SITE PLAN REVIEW APPLICATION
coMPuerirrEss cH EcKLrsT
Transportation Engineer/ Planner: Michael Liebler P' E' case#: 23-000037
Applicantl Harlow UrologY Center
TRANSPORTATION
Right-of-way Approach permit apptication must be provided where the property has
frontage on a Lane County or an Oregon Department of Transportation (ODOT) facility'
o
o
o
o
Complete IncomPlete
XN
See Transpoftation
Note(s)
Improvement and Public Utilities Plan
Complete Incomplete See Transpoftation
Note(s)TX
Copy of ROW APProach Permit
Application
Traffic Impact Study
Access to streets, alleys, and propefties to
be served, including the location and
dimensions of existing and proposed curb
cuts and curb cuts proposed to be closed
Location and type of existing and
proposed street lighting
Location, width, and construction material
of all existing and proposed sidewalks,
sidewalk ramps, pedestrian access ways,
and trails
Location, widths (of paving and right-of-
way) and names of all existing and
Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 A.4. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transpoftation system. In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, Metro Plan and state land use and transportation policies and
objectives.
Complete
x
Site Plan
Complete
X
Incomplete
tr
See Transpoftation
Note(s)
NA
Incomplete
l
See Transpoftation
Note(s)
trX
Revised tO/25/O7
nX
P ro P osed "':":i':':lifi S...flff,H?:i.y'access easementl
within or adjacent to the ProPosed
i.r.ilp.',.tit, inciuding ownership and
*iint"nunce status, if aPPlicable
xtr
Transpottation Notes:
1,
Additional comments not related to the completeness of the application:
Location of existing and required trafflc
control devices
a
Revised LO/25/07
ANY REQUIRED ADDITIONAL MATERIALS, APPLICATIONS OR
PERMITS
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION:
Applicable Not
Applicable
x
X
tr
X
X
tr
tr
tr
T
u
N
x
r
Where a multi-family development is proposed, any additional
materials to demonstrate compliance with SDC 3.2-240
Riparian Area Protection Report for properties located within 150
feet of the top of bank of any Water Quality Limited Watercourses
(WQLW) or within 100 feet of the top of bank of any direct
tributaries of WQLW
A Geotechnical Report prepared by an engineer must be
submitted concurrently if there are unstable soils and/or a high
water table present
Where the development area is within an overlay district, address
the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified in SDC 5.19-100
A wetland delineation approved by the oregon Division of State
Lands must be submitted concurrently where there is a wetland
on the property
Any required federal or state permit must be submitted
concurrently or evidence the permit application has been
submitted for review
where any grading, filling or excavating is proposed with the
development, a Land and Drainage Alteration permit must besubmitted prior to development
where applicable, ofly Discretionary Use or variance as specifiedin SDC 5.9-100 and 5.21-100
An Annexation application, as specified in SDC s.7-Loo, where adevelopment is proposed outside of the city limits but within thecity's urban service area and can be serviced by sanitary sewer
Revised LO/25/07
x
x
tr
THIS APPLICATION IS:
COMPLETE FOR PROCESSTNG
INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
Ct"./t l.hAbl March L0,2023
City Planner Date
This is not a decision on your application. Springfield Development Code Section 5.4-
105 and Oregon Revised Statutes 227.L78 require the City take final action on a limited land
use decision within 120 days after the application is deemed complete. The 120-day
processing period for this application begins when all the missing information is submitted or
when you request that the City proceed without the information. You must indicate by either
signing this form or by submitting a written response to the City within seven days of the
date of this form asserting your intentions regarding the provision of the missing
information. If you indicate herein or in your written response that the missing information
will be submitted, then you have 180 days from the date the application was submitted for
Pre-Submittal Review to provide the City with the missing information. If you refuse to
submit the missing information, then upon receipt of the full application packet and
processing fee, the City will deem the application complete for purposes of stafting the 120-
day clock and begin processing the application. No new information may be submitted after
the start of the LZ}-day period unless accompanied by a request for an extension of the
120-day processing time. Upon receipt of a request for extension, the City may extend the
120-day period for a reasonable period of time. The City may also require additional fees if
the new information is submitted after the Notification to Surrounding Property Owners is
sent out and a second notification is required or if the new information substantially affects
the application proposal and additional review is required.
I, the owner/applicant, intend to submit all missing items indicated herein to the
City within the l8o-day timeline.
Owner/Appl icant's Si g natu re Date
Revised L0/25/07
trx