HomeMy WebLinkAboutMeeting Packet Planner 7/17/2023AGENDA
DEVELOPMENT REVIEW
COMMITTEE
DEVELOPMENT SERVICES DEPARTMENT
225 FIFTH STREET
Conference Room 616/ MS Teams
Staff Review., Tuesday, August 1, 2023 g.30 —10.,00 am.
1. Partition Tentative 811-23-000157-TYP2 811-23-000136-PROJ Bedortha Holdings
Assessor's Map: 17-02-34-32 TL: 202
Address: 5842 Main Street
Existing Use: Vacant
Applicant submitted plans for a 2 -lot partition of NC zoned vacant parcel
Planner: Andy Limbird
Meeting: Tuesday, August 1, 2023 9:30 — 10:00 virtual meeting via Microsoft Teams
The Complete DRC Packet for this meeting is available online for you to review or print out
from the laserfiche website: htti)://www.si)ringfield-or.gov/weblink8/browse.asi)x
1
1 � n
sri[. FNb t9:' ..v. q� �- �� 'tltQ�a�• __
SITE
VICINITY MAP
811-23-000157-TYP2 Partition Tentative
17-02-34-32 TL202
5842 Main Street
Bedortha Holdings
DocuSign Envelope lD:71084o1c-F2164718-9124 152866M9130
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Land Division Tentative Plan
Partition, Subdivision
SPNINGFIELG
0
16,
Application Type (Applicant: check ne
Partition Tentative Pre -Submittal: Subdivision Tentative Pre -Submittal: I❑
Partition Tentative Submittal: Subdivision Tentative Submittal:
Required Project Information (Applicant., complete this section)
A licant Name: BEDORTHA HOLDINGS LLC Phone:
Company:
Fax:
Address: 32115 COBURG BOTTOM LOOP RD, EUGENE, OR 97405
Applicant's Rep.:
Phone:
Company:
Fax:
Address:
Property Owner: BEDORTHA HOLDINGS, LLC
Phone:
Company:
Fax:
Address: 32115 COBURG BOTTOM LOOP RD, EUGENE, OR 97405
ASSESSOR'S MAP NO: 17-02-34-32
TAX LOT NOS : 202
Property Address: 5542 MAIN ST, SPRINGFIELD OR 97475
Size of Property: 1.2 Acres ® Square Feet ❑
Proposed Name of Subdivision:
DeSCf lPtlon Of If you are filling in this form by hand, please attach your proposal description to this application.
Pro osal: 2 parcel partition
Existing Use: Vacant
# of Lots/Parcels: 2
Total acreage of parcels/ Parcel 1: 0.85ac,
al 11s dens' Parce12:0.33ac.
Proposed # 0
Dwell Units
Si natures: Please sign and print your name and date in the appropriate
Required Project Information (City Intake Staff.,
Associated Applications:
box on the nexta e.
complete this section)
Signs:
Pre -Sub Case No.:
Date:
Reviewed by:
Case No.:
Date:
Reviewed by: slm
811-23-000157-TYP2
7/13/2023
Application Fee: $
Technical Fee: $316.75
1
Posta a Fee: $ 203
6335
TOTAL FEES: $ 6854.75
PROJECT NUMBER: 811-23-000136-PROJ
Revised 1/7/14 kl 1 of 10
DocuSign Fsvelope 10:7108401C-F216i71&9124-052868248900
Owner Signatures
This application form is used for both the required pre -submittal meeting and subsequent
complete application submittal. Owner signatures are required at both stages in the application
process.
An application without the Owner's original signature will not be accepted.
Pre -Submittal
Owner:
The undersigned acknowledges that the information in this application is correct and
accurate for scheduling of the Pre- Submittal Meeting. If the applicant is not the
owner, the owner hereby grants permission for the applicant to act in his/her behalf.
I/we do hereby acknowledge that I/we are legally responsible for all statutory
timelines, information, requests and requirements conveyed to my representative.
Date:
Signature
Submittal
I represent this application to be complete for submittal to the City. Consistent with the completeness check
performed on this application at the Pre -Submittal Meeting, I affirm the information identified by the City as
necessary for processing the application is provided herein or the information will not be provided if not otherwise
contained within the submittal, and the City may begin processing the application with the information as
submitted. This statement serves as written notice pursuant to the requirements of ORS 227.176 pertaining to a
complete application.
Owner: �aoousieo.e W:
VIQ b'h Date: 7/11/2023
Signature
Levi aedortha
Print
Revised 1/7/14 kl 2 of 10
Dowagn Envelope ID:7108401C-F216471&9124-052868248900
Land Division Tentative Application Process
1. Applicant Submits a Land Division Tentative Application for Pre -Submittal
• The application must conform to the Land Division Tentative Submittal Requirements
Checklist on pages 4-6 of this application packet.
• A pre -submittal meeting to discuss completeness is mandatory, and pre -submittal
meetings are conducted every Tuesday and Friday, from 10:00 am - noon.
• Planning Division staff strives to conduct pre -submittal meetings within five to seven
working days of receiving an application.
2. Applicant and the City Conduct the Pre -Submittal Meeting
• The applicant, owner, and design team are strongly encouraged to attend the pre -
submittal meeting.
• The meeting is held with representatives from Public Works Engineering and
Transportation, Community Services (Building), Fire Marshall's office, and the Planning
Division and is scheduled for 30 to 60 minutes.
The Planner provides the applicant with a Pre -Submittal Checklist specifying the items
required to make the application complete if it is not already complete, and the
applicant has 160 days submit a complete application to the City.
3. Applicant Submits a Complete Application, City Staff Review the Application and
Issue a Decision
• A complete application must conform to the Land Division Tentative Submittal
Requirements Checklist on pages 4-6 of this application packet.
• A Type II decision, made after public notice, but without a public hearing, unless
appealed, is issued within 120 days of submittal of a complete application.
• Mailed notice is provided to property owners and occupants within 300 feet of the
property being reviewed and to any applicable neighborhood association. In addition,
the applicant must post one sign, provided by the City, on the subject property.
• There is a 14 -day public comment period, starting on the date notice is mailed.
• Applications are distributed to the Development Review Committee, and their
comments are incorporated into a decision that addresses all applicable approval
criteria and/or development standards, as well as any written comments from those
given notice.
• Applications may be approved, approved with conditions, or denied.
• At the applicant's request, the Planner can provide a copy of the draft land use decision
prior to issuing the final land use decision.
• The City mails the applicant and any party of standing a copy of the decision, which is
effective on the day it is mailed.
• The decision issued is the final decision of the City but may be appealed within 15
calendar days to the Planning Commission or Hearings Official.
Revised 1/7/14 kl 3 of 10
Dowagn Envelope ID:7108401C-F216471&9124-052868248900
Land Division Tentative Submittal Requirements Checklist
NOTE:
• ALL of the following items MUST be submitted for BOTH Pre -Submittal and Submittal.
• If you feel an item on the list below does not apply to your specific application, please
state the reason why and attach the explanation to this form.
❑x Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. Any applicable application, technology, and postage fees are collected
at the pre -submittal and submittal stages.
x❑ Land Division Tentative Application Form
x❑ Narrative explaining the purpose of the proposed development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. Density - list the size of property (acres), maximum allowable density
and the density proposed.
❑x Copy of the Deed
❑x Copy of a Preliminary Title Report issued within the past 30 days documenting
ownership and listing all encumbrances.
x❑ Copy of the Land Division Plan Reduced to 81/2"x 11", which will be mailed as part of
the required neighboring property notification packet.
x❑ Right -of -Way Approach Permit Application provided where the property has frontage
on an Oregon Department of Transportation (ODOT) facility.
n/a❑ Three (3) Copies of the Stormwater Management System Study with Completed
Stormwater Scoping Sheet Attached - The plan, supporting calculations, and
documentation must be consistent with the Engineering Design Standards and Procedures
Manual.
n/a ❑ Three (3) Copies of the Traffic Impact Study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 A.4. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, metro plan and state land use and transportation policies and
objectives.
❑x Four (4) Copies of the Following Plan Sets for Pre -Submittal OR
Three (3) Copies of the Following Plan Sets:
❑x All of the following plans must include the scale appropriate to the area involved
and sufficient to show detail of the plan and related data, north arrow, and date of
preparation.
x❑ All plan sets must be folded to 61/2" by 11" and bound by rubber bands.
a. Site Assessment of Existing Conditions
x❑ Prepared by an Oregon licensed Landscape Architect or Engineer
Revised 1/7/14 kl 4 of 10
Dowagn Envelope ID:7108401C-F216471&9124-052868248900
❑ Vicinity Map
x❑ The name, location, and dimensions of all existing site features including buildings,
curb cuts, trees, and impervious surface areas, clearly indicating what is remaining and
what is being removed. For existing structures to remain, also indicate present use
and required setbacks from proposed property lines.
n/a❑ The name, location, dimensions, direction of flow and top of bank of all watercourses
and required riparian setback that are shown on the Water Quality Limited Watercourse
Map on file in the Development & Public Works Department
n/a❑ The 100 -year floodplain and floodway boundaries on the site, as specified in the latest
adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment
or Letter of Map Revision
x❑ The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead
Protection Areas Map on file in the Development & Public Works Department
❑x Physical features including, but not limited to trees 5" in diameter or greater when
measured 4 '/2 feet above the ground, significant clusters of trees and shrubs, riparian
areas, wetlands and rock outcroppings
❑x Soil types and water table information as mapped and specified in the Soils Survey of
Lane County. A Geotechnical Report prepared by an Engineer must be submitted
concurrently if the Soils Survey indicates the proposed development area has unstable
soils and/or a high water table
b. Land Division Tentative Plan
❑x Prepared by an Oregon licensed Land Surveyor
n/a❑ City boundaries, the Urban Growth Boundary, and any special service district
boundaries or railroad right-of-way which cross or abut the proposed land division
x❑ Location and width of all existing and proposed easements on and abutting the
proposed land division
x❑ Boundaries of entire area owned by the property owner, of which the proposed land
division is a part, as well as dimensions and size of each parcel and the approximate
dimensions of each building site indicating the top and toe of cut and fill slopes to scale
❑x Location and type of existing and proposed street lighting, including type, height, and
area of illumination
❑x Location, widths, conditions, and names of all existing and proposed streets, alleys,
dedications or other right-of-ways within or adjacent to the proposed land division.
Proposed streets should also include approximate radius of curves and grades and
relationship to any projected streets as shown on the Metro Plan, TransPlan,
Conceptual Development Plan, or Conceptual Local Street Map.
x❑ Location of existing and required traffic control devices, fire hydrants, power poles,
transformers, neighborhood mailbox units and similar public facilities
x❑ Location and dimensions of existing and proposed driveways
x❑ Location of existing and proposed transit facilities
❑x Location and width of all existing and proposed sidewalks, sidewalk ramps, pedestrian
access ways and bike trails
❑x Location, size and type of plantings and street trees in any required planter strip
Revised 1/7/14 kl 5 of 10
Dowagn Envelope lD:71M101C-F216i71&9124 5N6624B9D0
x❑ Location and size of existing and proposed utilities on and adjacent to the site including
sanitary sewer mains, stormwater management systems, water mains, power, gas,
telephone, and cable TV. Indicate the proposed connection points
n/a ❑ The locations of all areas to be dedicated or reserved for public use, with the purpose,
condition or limitations of the reservations clearly indicated
n/a❑ Future Development Plan where phasing or large lots/parcels are proposed as specified
in SDC 5.12-120 E.
c. Stormwater Management Plan
n/a❑ Prepared by an Oregon licensed Civil Engineer
n/a ❑ Planting plan prepared by an Oregon licensed Landscape Architect where plants are
proposed as part of the stormwater management system
n/a❑ Roof drainage patterns and discharge locations
n/a❑ Pervious and impervious area drainage patterns
n/a❑ The size and location of stormwater management systems components, including but
not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater
quality measures; and natural drainageways to be retained
n/a❑ Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for
land with a slope over 10 percent, the contour lines may be at 5 foot intervals)
n/a❑ Amount of proposed cut and fill
n/a ❑ Additional Materials That May be Required
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL
STANDARDS/APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE
APPLICANT SHOULD CONSIDER UTILIZING PRE -DEVELOPMENT MEETINGS AS
DISCUSSED IN SDC 5.1-120:
❑ Proposed deed restrictions and a draft of any Homeowner's Association Agreement
❑ Additional plans and documentation for submittal of a Cluster Subdivision proposal
as specified in SDC 3.2-230
❑ Riparian Area Protection Report for properties located within 150 feet of the top of
bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the
top of bank of any direct tributaries of WQLW
❑ A Geotechnical Report prepared by an engineer must be submitted concurrently if
there are unstable soils and/or a high water table present
❑ Where the development area is within an overlay district, address the
additional standards of the overlay district
❑ If five or more trees are proposed to be removed, a Tree Felling Permit as specified
in SDC 5.19-100
❑ A wetland delineation approved by the Oregon Division of State Lands must be
submitted concurrently where there is a wetland on the property
❑ Any required federal or state permit must be submitted concurrently or evidence
the permit application has been submitted for review
❑ Where any grading, filling or excavating is proposed with the development, a Land
and Drainage Alteration permit must be submitted prior to development
Revised 1/7/14 kl 6 of 10
Oowagn Envelope 10:7108401C -F216471&9124-052868248900
❑ Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100
and 5.21-100
❑ An Annexation application, as specified in SDC 5.7-100, where a development is
proposed outside of the city limits but within the City's urban service area and can
be served by sanitary sewer
❑ All public improvements proposed to be installed and to include the approximate
time of installation and method of financing
Revised 1/7/14 kl 7 of 10
ranch
ENGINEERING=
June 13, 2023
WRITTEN STATEMENT
TM 17-02-34-32, TL 202
Branch Engineering Inc. Project No. 23-096
This application is for a two -parcel partition. The site lies east of 5V Street
between A Street and Main Street. It is primarily vacant, but a sanitary sewer main
crosses through the northerly portion and some drive aisles, parking spaces and
stormwater infrastructure are also present. The proposed parcel boundary is the
centerline of a drive aisle.
SDC 5.12.125(B) requires the zoning to be consistent with the Metro Plan diagram.
The site zoning is Neighborhood Commercial and the Metro Plan designation is Medium
Density Residential. Neighborhood Commercial zoning is consistent with the Medium
Density Residential designation since light commercial is permitted in R-2 (the zone
implementation of Medium Density Residential designation).
Several previous applications are relevant to the site. the most recent is SUB2008-
00007 which approved a three parcel partition on the site. Two Plat Pre -Submittal
Meetings were held for the plat associated with SUB2008-00007, but the plat never
recorded and the approval expired. The SUB2008-00007 Conditions of Approval are
acknowledged in this application as follows:
1. A permit was obtained (COM2008-01053) for installation of the sanitary sewer
laterals shown on the tentative plan approved previously. City records indicate
the permit expired without piping being installed and the owner records are
inconclusive. therefore, it is assumed at this time that no laterals were installed.
No laterals are proposed in this application. The sanitary sewer main crosses
both of the proposed parcels, giving each of them ready access without disruption
to other properties or public infrastructure.
2. A permit was obtained (COM2008-01053) for installation of the stormwater
laterals shown on the tentative plan approved previously. City records indicate
the permit expired without piping being installed and the owner records are
inconclusive. therefore, it is assumed at this time that no laterals were installed.
No laterals are proposed in this application. Each parcel has ready access to a
stormwater connection without disruption to other properties or public
infrastructure - Parcel 1 has a lateral available for connection to the existing swale
in the southern portion of the parcel and Parcel 2 has a lateral available for
connection to the existing public pipe system in A Street.
EOG ENE -SPRIG FIELD PHILOMATH
310 5th Street, Springfield, OR 97477 1 p- 541.746.0637 1 w .branchengineenng.mm
Written Statement
June 13, 2023
3. This easement is proposed in this application and will be included on the plat
which follows this approval.
4. During the previous Plat Pre -Submittal Meetings the city agreed that the 2-3" and
3-2" power conduits from a 3-phase power line in 5V Street were satisfactory for
establishing compliance with this condition. SUB Electric mapping indicates wires
have now been pulled through the conduits.
5. During the previous Plat Pre -Submittal Meetings the city agreed that the 1-4"
phone conduit, 1-2" cable conduit and 1-4" gas conduit from 5V Street were
satisfactory for establishing compliance with this condition.
6. During the previous Plat Pre -Submittal Meetings the city agreed that the 8" water
main within a PUE on the south side of A Street was satisfactory for establishing
compliance with this condition since each lot can make connection without
disturbance to private or other public facilities.
7. A copy of ODOT's Approach Permit is included in this submittal.
8. No vision clearance obstructions exist or are proposed.
Branch Engineering, Inc.
Page 2 42
July 13, 2023 Branch
ENGINEERING=
Andy Limbird�
Development and Public Works
City of Springfield
225 5� St
Springfield OR 97477
RE TENTATIVE BEDORTHA HOLDINGS PARTITION
Branch Engineering Inc. Project No. 23-096
Dear Andy,
Per the comments made at the Pre -Submittal Meeting, this revised application
material is provided for the review submittal of the Tentative Bedortha Holdings
Partition The following is a description of the changes made per the Pre -Submittal
Meeting comments:
• Provide updated title report at the time of application submittal. Current version still
had former ownership group listed.
An updated title report showing current ownership is included in this submittal.
• Springfield Utility Board Fire Hydrant H-763 located to the northeast of the proposed
Parcel 2 (located near the southwest corner of 5894 A St) not shown
A note with leader has been added the tentative partition plans on Sheet 1 to denote
the existing fire hydrant located on the north side ofA St and east side of pedestrian
path.
• Need signs more thoroughly shown and type labeled. Review previous development
approvals and ODOT access permit for signs required and now gone.
The signs are noted with type on the plan set. Signs that were required per previous
planning actions and permits, but are not in place today, are proposed for
installation prior to rinal plat recording.
• Need street light pole and light mount heights.
Pole and light mount heights were measured using a leveling rod and are now
noted on the plan set.
• Show A St pedestrian crossing striping (Main St not needed).
The pedestrian crossing on A St has been added to the plan set.
EOG ENE -SPRIG FIELD CORVALLIS-PHILOMATH
310 5th Street, Springfield, OR 97477 1 p- 541.746.0637 1 w .branchengineenng.mm
Tentative Partition Application
Bedortha Holdings
July 13, 2023
Please reach out if any questions arise during the review process.
Sincerely,
Renee Clough, PIS, PE, AICP
Principal
Branch Engineering Inc.
Branch Engineering, Inc.
Page 2 .172
PERMIT NO: 54963 PERMIT TO OPERATE, MAINTAIN AND USE A
STATE HIGHWAY APPROACH
Appl No.:7596 Turn Movement: Left OUt[7 Right Out K1 Left In❑Right ln®
Permittee Information
Nesee:
Roger Laneiiers
co
Arai
Ami os 111 LLC,
MUIrgAdaes&:
23021 Brushline Court
Bend, OR 97701-0119
PMne:
(541)728-0054 ( ) -
e.lxil:
rwl@ricgroup.com
Prooertv Information
Adeteaa:
17
5850 Main street
Units of Measure:
Scrinerflaid OR 9'1478
23200.00 Sq. Ft
count':
oabat
Lane
06
NIWweY H,
RxM1v
McKenzie 016
ORE126
MlaPam: Eve,eng Statlan:
'.aa c: Fut': Puaiw,ma:x
6.50 282+65
L Private
Pr '- tt Qn:
3341
Right.m Right -out approach serving
commercial developemeln
02
pmmitm op=te, mabtainand use an appraacb shall he b effect for m i¢dcfivim period oftimc mks&:
(a) revoked by ..al ..at
(b) Far failure m abide by dee corms and ee. iumr;
(c) A chaogc ofuse Deem& as set Imth in DAR 73 4 0514045;
(d)Safety ae opr-ti Problems exiss.s at forth b734-051;
Faame ache app5ca¢im comply ¢ithany oftbe icy& and conditions of the pamitahail be sn0icimtcaae krcam ]hm¢
ofthe permit and may result is removal ofihe IMRlry by rbc Lheges Deparseacnt afTmnaparhtian.
1 Pemit is maa,d&.bje.. the avisions of Orega¢Admb:s¢adve Rata 734051
Land Use
17
Land Use Description:
Units of Measure:
Cries
23200.00 Sq. Ft
Retail
4142.00 Sq. Ft.
Espresso Stand
2.00 wind.
- Met -
3341
Tax Lot
T.e.1do Rance Section Tax Lot
17
02
3432
202
17
02
3341
23DO
17
02
3341
2502
17
02
3341
2600
17
02
3341
2601
17
02
3341
2602
17
02
3432
300
0
Reasonfor Request: Changeofuse
Site ADT: 685
Plan View
See custom Drawing
Specification
141h
ere.(A):
35.00ft
s0
Re]ue1(RIs
Rad e3iR2):
A0ft
.00ft
pease Ist:(P1):
Paving len11P2):
AOR
.COR
Wlsoa'
=1(00): RPM(W:
.00ft
.00ft .00ft
C..t
qam: Ln:
None
Sib eaaeasa.
TNagcsa.
12.00in
nae ax:
TNewxaa.
4.00In
.1 one:
Thiesex4:
vreatcru:
Trimleax:
Concrete
B.ODin
This permit is not valid until signed by a duly authorized
representative of the Oregon Department of Transportation.
lirant
Ignature
Date
��
1020 Il
A wed OOOT ym
%per
Dale
CHAMPS-d_qptyermit_aprxkwas-w b Page 1 oft PMMA 1M1320110&24:30AM
gtur is- '6
PERMIT TO OPERATE, MAINTAIN AND USE A °�De PBpaarwhe pw ebo
PERMIT NO: 52338 STATE HIGHWAY APPROACH
Application ld: 4404 Highway Number. 015 Milepum: 6.50 Reamntor Request: Improvement
Aoolicant Information
w
Mikael Shields
Compaw.
Bl
akhiser & hubbard
naaaaa'.
100 West 13th Avenue
P.O. Box 10347
Eugene OR 97440
P [S
(55 4116863478 [Sill 345-5303
¢Mail:
Prooertv Information
A. -
representative of the Oregon Department of Transportation.
6M Main Street
Date
SKiruifield OR 97478
f
Lane
M
SL
McKenzie
ORE126
nc
sae ornwy nau wrmrr.
6.SO2+6asmnorc
8.50 2852+65
L N
LeM�naM:
395' East of 58th Street
Plan view
Specification
w x
Pon Themes
Ce w
Amigos 111, LLC
Pass
BOX 25
Wat
Wallerviile OR 97489 lane
Pnme'. F/.%
(541)726$795 ( ) -
e il:
Tax Lot Information
Towvskp Hoag¢ Seamon T.Ut
77 92 3432_300 S
This permit is not valid until signed by a duly authorized
representative of the Oregon Department of Transportation.
AU rizaa COOT Signature
Date
'y 'C0,4-
f
CHAMPS- rLmlt,umft apprch use Pu,eloft FM d:09/15 5012798PM
PERMIT FOR ENCROACHMENT, CONSTRUCTION
PERMIT NO: 52338 ON OR USE OF STATE HIGHWAY
Applicationld:4406 Highway Number: 015 MilePoint 6.50 PROVISIONS Reason for Request: Improvement
Applicant: Mikael Shields Company: SalzNser& hubbard
140.301 Construction Plans are approved in general only. The District Manager or representative may require field changes. When revisions are made in
the field, as -constructed drawings must be submitted to the District.
150.101 The permit and all specifications, details, typical drawings and standard drawings attached to the permit shall take precedence over all plans,
drawings and specifications produced by the Architect or Engineer representing the Applicant or Contractor.
150.201 Within 48 hours before beginning permit work and again after completing permit work, the Applicant (or agent) shall notify the District permitting
representative.
150.411 Applicant (or agent) shall have on the job site, at all times, a copy of the permit and all attachments. The permit shall be readily available for
inspection.
150.501 The permitted work is located within the Oregon Utility Notification Center (OUNC) area. The OUNC is a utilities notification system to notify owners
of utilities about excavation work performed in the vicinity of their facilities. The utilftles notification system telephone number is 1-800-332-2344.
150.701 Maintain all existing highway signs. If any signs are damaged due to Contractor's operations, replace those signs before the and of that work shift -
Avoid operations whose methods, conditions, ortiming may injure people or damage properties. Damage includes staining surfaces with such
things as mud and asphalt. When damage occurs, the District Manager will determine if it is to be corrected by repair, replacement, or
compensatory payment. If compensatory payment is required, the District Manager will determine the amount
150.702 Do not park on state right-of-way unless permitted by the District Manager. Comply with ORS 810.230, 610.160.
150.703 Remove all dirt and debris from the highway at the end of each work shift or more frequently if a hazard to the traveling public exists or as directed
by the District Manager.
160.801 All areas of excavation shall be returned to "pre -construction" condition or better. Repair natural drainage so no water stands or collects in
excavated areas, when practical. Slopes shall be trimmed to blend with the adjacent terrain. Replace the vegetative cover to blend with the
adjacent natural growth,
200.021 The work area during construction or maintenance performed underthe permit provisions shall be protected in accordance with the current Manuel
on Uniform Traffic Control Devices for Streets and Highways, US Department of Transportation, and the Oregon Department of Transportation
supplements thereto. Flaggers must have certification and must carry proof indicating their completion of an approved workzone traffic control
course. All traffic control devices shall be maintained according to the ATTSSA Quality Standards for Work Zone Traffic Control Devices handbook.
225.051 Submit the following in writing five days before the permitted activity.
- Proposed Traffic Control Plan (TCP) showing all Traffic Control Measures (TCM). Include the proposed order and duration of all TCM. Do not
start work on any stage of construction until all TCM are in place and the TCP is operating satisfactorily.
1.000 SPECIAL PROVISIONS
2.000 Applicant shall remove all existing approaches to Tax Lots 300 & 400 and replace with one single approach to serve both.
CHAMPS -dr tymv vmasb Page t of 1 Printed 0911MOS 0121:11 PM