Loading...
HomeMy WebLinkAbout2022 03 01 AIS for Zoning Map AmendmentAGENDA ITEM SUMMARY Meeting Date: 3/1/2022 Meeting Type: Regular Meeting Staff Contact/Dept.: Andy Limbird, DPW Staff Phone No: 541-726-3784 Estimated Time: 10 Minutes S P R I N G F I E L D PLANNING COMMISSION Council Goals: Encourage Economic Development and Revitalization through Community Partnerships ITEM TITLE: REQUEST FOR ZONING MAP AMENDMENT FOR 0.99 ACRES OF PROPERTY LOCATED AT 1025 G STREET, CASE 811-21-000294-TYP3 ACTION REQUESTED: Conduct deliberations and adopt/not adopt a Final Order to amend the adopted Springfield Zoning Map. ISSUE STATEMENT: The applicant has submitted a Zoning Map amendment request for approximately 0.99 acres of property at the southeast corner of 10th and G Streets near downtown Springfield. The applicant is requesting to change the property zoning from Low Density Residential to Neighborhood Commercial. In accordance with provisions of the Metro Plan and the City’s Development Code, the proposed rezoning does not require an accompanying comprehensive plan amendment. ATTACHMENTS: 1. Application for Zoning Map Amendment 2. Site maps for Zoning Map Amendment 3. Applicant’s Traffic Study 4. Letter of Support from First Baptist Church of Springfield 5. Letter of Support from Springfield Public Schools 6. PC Final Order – Zoning Map Amendment Application 811-21-000294-TYP3 Exhibit A – Site Map and Legal Description Exhibit B – Staff Report and Findings DISCUSSION: The subject property is addressed as 1025 G Street and it contains a 15,200 ft2 two-story building operated by Catholic Community Services of Lane County. The subject parcel is approximately 0.99 acres and it is identified as Assessor’s Map 17-03-35-11, Tax Lot 3500. The applicant is requesting the zone change to accommodate the existing charitable services use on the property and to facilitate future expansions or modifications to the site. The property is currently zoned and designated Low Density Residential in accordance with the adopted Metro Plan diagram and the Springfield Zoning Map. Within the Low Density Residential district, offices for charitable services are not a listed use. However, charitable services are a listed use in the Neighborhood Commercial zoning district. The applicant contends the site meets the criteria for rezoning from residential to commercial as outlined in the attached staff report. The Planning Commission conducted a public hearing on the proposal to amend the Springfield Zoning Map at the regular meeting on February 1, 2022. At the meeting, several people provided written and verbal testimony opposing the request. One person rescinded their written testimony opposing the request and, instead, expressed support for the proposal after having discussed their concerns with the applicant. At the conclusion of the public hearing, the Planning Commission requested an amended staff report that clarifies the history of the current charitable services use operating on the site and provides additional background information on staff direction provided to the applicant to legitimize the use on the property. The Planning Commission is requested to use this opportunity to review all materials and testimony previously submitted into the record, to conduct deliberations, and to vote on adopting the Final Order based on the totality of the information. City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Zoning Map Amendment, Type III SPgIXOFlwreamiq Required Project Applicant Name: Company: Address: Information (Applicant: complete this section) Chris Pickering, Operations Director Phone 541-345-3628 Catholic CommunityServices Lane Co LLC ext 312 1025 G Street, Springfie OR 97477 Applicant Signature: Property Owner: Company: Address: 1 Catholic Community Services Lane Co LLC Phone Fax: Susan Paiement, Executive Director 1025 G Street, Springfield OR 97477 Owner Signature: GLcc If the applicant is other than the owner, the owner hereby grants permission for the applicent to act in his or her behalf ASSESSOR'S MAP NO: 17-03-35-11 TAX LOT NO(S): 3500 Property Address: 1025 G Street, Springfield OR 97477 Area of Request Square Feet: 43,124 Acres: 0.99 Existing Use(s) Catholic Community Services is an essential provider of safety -net of Property: services in Lane County, offering immediate assistance with food, clothing, and energy & housing assistance. Description of The Proposal: The proposed zone change from Low Density Residential to Neighborhood Commercial will allow Catholic Community Services to continue to provide charitable services and to expand operations. Required Property Information (City Intake Staff. mplete this section) I I 0002 I — I (P' f l ["I •Received by: 'vl(I I 'cCaseNo.: ate I (initials) Ip Aye Postage 1 j- Total Application Fee: ;.Jl/f + VV Fee: '"1 1(i Fee: Edited 7/192007 bjones Attachment 1, Page 1 of 36 Zoning Map Amendment Submittal Requirements Checklist 1. The application fee - Refer to the Development Code Fee Schedule for the appropriate application and postage fee. A copy of the Fee Schedule is available at the Development & Public Works Department. 2. Deed - A copy of the deed to show ownership, 3. Vicinity Map - A map of the property and the surrounding vicinity which includes the existing zoning and plan designations. One copy must be reduced to 8 h" by11" which will be mailed as part of the required neighboring property notification packet. 4. findings - Before the Planning Commission can approve a Zone/Overlay District Change Request, there must be information submitted by the applicant which adequately supports the request. The Criteria the Planning Commission will consider in making their decision is listed below. If insufficient or unclear data Is submitted by the applicant, there is a good chance that the request will be denied or delayed. It is recommended that you hire a professional planner or land use attorney to prepare your findings. Criteria of Approval (Ouasi-iudicial) SDC 12.030 requires that In reaching a decision on these actions, the Planning Commission or Hearings Official map approve, approve with conditions or deny a quasi- judicial Zoning Map amendment based upon approval criteria (a) -(c), below. a)Consistency with the Metro Plan policies and the Metro Plan Diagram; b)Consistency with applicable Refinement Plans, Plan District maps, Conceptual Development Plans and functional plans; and c) The property Is presently provided with adequate public facilities, services and transportation networks to support the use, or these facilities, services and transportation networks are planned to be provided concurrently with thedevelopmentoftheproperty. Attachment 1, Page 2 of 36 CATHOLIC COMMUNITY SERVICES OF LANE COUNTY ZONE CHANGE APPLICATION Submitted to: City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Prepared for., Catholic Community Services of Lane County 1025 G Street Springfield, OR 97477 Submitted by: M cBIISHOW Submittal Date: November 9, 2021 Attachment 1, Page 3 of 36 ZONE CHANGE -APPLICATION CONTENTS PARTI- SUMMARY PART II -APPLICATION SUBMITTAL REQUIREMENTS PART III - APPROVAL CRITERIA & SUPPORTING EVIDENCE EXHIBITS Exhibit,'A••.......................................................................................... Vicinity Map Exhibit"B.. ..................................................................... Metro Plan Designations Exhibit"C.. .................................................................................... Existing Zoning Exhibit"D.. ................................................................................. Proposed Zoning Exhibit"E.. .................................................................................Site Context Map Exhibit"F.. ...................................................................................Assessor's Map Exhibit ,.G"................................................................................... Warranty Deed Exhibit "H .. ....................................................................... Preliminary Title Report Exhibit "I.. ...................CCSLC Springfield CDBG Proposal 2021-2022 (Excerpt) Exhibit "J.. .................................. Letter Announcing City Award of CDBG Funds SUBMITTED SEPARATELY Zone Change Application Form Application Fee Traffic Impact Analysis, Sandow Engineering CCSLC Zone Change Page 2 of 10 P`n BISHOW Written Narrative November 9, 2021 119 CONS U LTI N G Attachment 1, Page 4 of 36 PARTI- SUMMARY Project Name: CATHOLIC COMMUNITY SERVICES OF LANE COUNTY ZONE CHANGE Project Proposal: Zone Change Application from Low Density Residential to Neighborhood Commercial Application: Zoning Map Amendment, Type III Project Location: 1025 G Street, Springfield OR 97477 Assessor's Map: 17-03-35-11 Tax Lot: 3500 Project Size: 43,124 sq. ft. or 0.99 Acres Plan Designation: Low Density Residential Existing Zoning: Low Density Residential Proposed Zoning: Neighborhood Commercial Existing Use: Charitable Services Proposed Use: Charitable Services including the OASIS Program Project Team: Applicant Land Use Planner Chris Pickering, Operations Director Teresa Bishow, AICP Catholic Community Services of Lane County Bishow Consulting LLC 1025 G Street P.O. Box 50721 Springfield, OR 97477 Eugene, OR 97405 coickerinc(W.ccslc.orc teresa(a)bishowconsuiltinc.com Architect Traffic Engineer Andrew L. Scheidt, AIA Kelly Sandow, PE Andrew L. Scheidt, Architect, AIA Sandow Engineering 57 North Polk Street 160 Madison St, Ste A Eugene, OR 97402 Eugene, OR 97402 andrewlscheidt(a)..amail.com kellvsandow(o)sandowenaineerinc.com General Contractor McKenzie Commercial Contractors, Inc Toby Demasters T Dem a sters(dmccma il. b iz CCSLC Zone Change Page 3 of 10 Qq BISHOW Written Narrative November 9, 2021 6%d CON 5 U LT I NG Attachment 1, Page 5 of 36 Site Characteristics The subject property is a 0.99 -acre parcel at the southeast corner of North 10" Street and G Street in Springfield. (Refer to Exhibit "A" —Vicinity Mao.) The parcel has about 120 feet of frontage on North 10th Street and about 360 feet of frontage on G Street and abuts a 14 foot wide alley. The abutting property to the east is owned and occupied by the First Baptist Church. To the west and south of the property are detached single- family homes. To the north across G Street is The Brattain House and Two Rivers — Dos Rios elementary school. The Brattain House is home to a number of Springfield Public Schools programs and provides a variety of resources to families including information and referrals to low-cost resources and services. ( Refer to Exhibit "E" — Site Context Mao. The subject property is developed with an existing building, interior landscaped courtyards, and a parking lot. The partial two-story building contains about 15,200 square feet and is occupied by the Community Catholic Services of Lane County CCSLC). Reason for Zone Change Request: In 1965, the subject property was developed for a church. In 1998, the subject property was sold to a non -church entity and the church use was discontinued. In 2004, CCSLC purchased the subject property to provide safety -net services for low- income individuals and families offering immediate assistance with food, clothing, and energy & housing assistance. In March 2021, CCSLC submitted a proposal to the City of Springfield for Community Development Block Grant Funds (CDBG) for 2021-2022. The proposal was to construct a 1,600 square foot addition to their Community Service Center at 1025 G Street in order to permanently house their OASIS program, which assists low-income and homeless families with a range of essential services. The OASIS program is currently operated by CCSLC staff at First Baptist Church across the parking lot. The use of the room at First Baptist Church is not fully under the control of CCSLC staff and is not ADA accessible. Please refer to Exhibit "I" - CCSLC Springfield CDBG Proposal 2021-2022 Excerpt). The City of Springfield awarded CCSLC a federal CDBG grant to expand the existing building for the OASIS program. Please refer to Exhibit "J" - Letter Announcing Citv Award of CDBG Funds. Historically, cities often permitted churches outright in low-density residential zones to help serve the surrounding neighborhoods. In general, as churches grew in size their impacts, such as traffic, increased substantially. The existing Springfield Development Code only allows churches to operate with an approved Discretionary Use (DU) Permit in the Low Density Residential zone. There is no explicit allowance in LDR for Charitable Services" or "Community and Senior Centers'. The Neighborhood CCSLC Zone Change Page 4 of 10 V101SHOW Written Narrative November 9, 2021 B9 CONSULTING Attachment 1, Page 6 of 36 Commercial (NC) zone permits outright the following uses: "Charitable services", Community and senior centers" and "Churches, temples and weekly religious schools". Approval of the zone change request will amend the zoning to NC and thus allow CCSLC to operate as an outright permitted use. The minor building addition for the OASIS program could occur without the need for a DU Permit. PART II - APPLICATION SUBMITTAL REQUIREMENTS Part II lists the application submittal requirements per the Springfield Development Code (SDC) in bold italics following by the applicant's response. SDC 5.4-105 Basic Application Submittal Requirements and Completeness Time Lines A. All applications required by this Code shall be submitted to the Development Services Department on a City application form. The applicant submitted the City Zoning Map Amendment, Type III application form signed by the applicant and property owner. B. An application shall consist of items required by this Code and the following: An explanation of the proposal and any additional information that may have a bearing in determining the action to be taken, including findings demonstrating compliance with applicable approval criteria; This written narrative explains the basis for the proposed zone change and contains findings demonstrating the application complies with applicable approval criteria. 2. Evidence that the property affected by the application is in exclusive ownership or control of the applicant, or that the applicant has the consent of all owners of the affected property to act on their behalf,• The property is owned by the Catholic Community Services of Lane County, LLC. Please refer to Exhibit "G" - Warranty Deed and Exhibit "H" - Preliminary Title Report. Sue Paiement, CCSLC Executive Director, signed the application form on behalf of the property owner. 3. The legal description and assessor map and tax lot number of the property affected by the application; CCSLC Zone Change Page 5 of 10 Qq BISHOW Written Narrative November 9, 2021 ESg CON 5 U LT I N G Attachment 1, Page 7 of 36 The legal description is submitted as part of the Preliminary Title Report. The assessor map and tax lot number is provided on the application form and in this written narrative in Part I — Summary. Please also refer to Exhibit "F' Assessor Mao, and Exhibit "G" - Warranty Deed. 4. Additional information including maps, siteplans, sketches and calculations as required by applicable Sections of this Code or in information packets provided by the Development Services Department; The City Zoning Map Amendment application form specifies a requirement for a vicinity map and information concerning the comprehensive plan designation and zoning in the area. Please refer to Exhibit "A" — Vicinity Mao. Exhibit "B" - Metro Plan Designations, Exhibit "C" - Existing Zoning and Exhibit "D" - Procosed Zoning. 5. The required number of copies of the applicant; and This application was submitted electronically according to current City administrative procedures. 6. Payment of the applicable application fee at the time of application submittal. Required fees were paid concurrent with this application. PART III - APPROVAL CRITERIA & SUPPORTING EVIDENCE Part III provides the applicable approval criteria and findings for the requested Zoning Map Amendment. Springfield Development Code sections are shown in bold italics followed by findings demonstrating compliance. SDC 5.22-115 Criteria A. Quasi-judicial Zoning Map Amendments. The Planning Commission or Hearings Official may approve, approve with conditions or deny a quasi-judicial Zoning Map amendment based upon approval criteria C.1. through 3., below. The Planning Commission or Hearings Official shall make the final local decision on all quasi-judicial Zoning Map amendments that do not include a Metro Plan diagram amendment. This is a request for a quasi-judicial zoning map amendment that does not include or necessitate a Metro Plan Diagram amendment. C. Zoning Map amendment criteria of approval., CCSLC Zone Change Page 6 of 10 Qq BISHOW Written Narrative November 9, 2021 110 CONSULTING Attachment 1, Page 8 of 36 Consistency with applicable Metro Plan policies and the Metro Plan diagram; The Metro Plan diagram designates the subject property "Low Density Residential". Refer to Exhibit "B" — Metro Plan Designations) As stated in the Metro Plan text (page II -G-4), the Metro Plan diagram does not depict neighborhood commercial zoning.' The Metro Plan text describes the purpose of neighborhood commercial facilities not shown on the Metro Plan Diagram and establishes minimum location standards and site criteria? The Metro Plan standards and site criteria are listed below in italics following by findings demonstrating compliance. Within convenient walking or bicycling distance of an adequate support population. For a full-service neighborhood commercial center at the high end of the size criteria, an adequate support population would be about 4, 000 persons (existing or anticipated) within an area conveniently accessible to the site. For smaller sites or more limited services, a smaller support population or service area may be sufficient. The Metro Plan does not define "adequate support population" for smaller sites or "an area conveniently accessable to the site". The subject property is conveniently located at the edge of a residential area and close to public schools and major employment areas such as the McKenzie Willamette Medical Center. The subject property is only about one acre is size and is considered a smaller site. Based on the general density of people living, working, and going to school in the area, the site has a sufficient support population. 2. Adequate area to accommodate off-street parking and loading needs and landscaping, particularly between the center and adjacent residential property, as well as along street frontages next door to outdoor parking areas. The subject property is a 0.99 -acre parcel on a corner rectangular shaped lot. The size and configuration of the lot are suitable for uses permitted in the Neighborhood Commercial zone. Due to the 14 -foot wide alley to the south of the subject property, the site is not adjacent to any property in residential use. The Metro Plan, page I -G-2 describes why certain zones are not depicted on the Metro Plan diagram as follows: Certain land uses are not individually of metropolitan -wide significance in terms of size or location because of their special nature or limited extent. Therefore, it is not advisable to account for mot of them on the Metro Plan Diagram. The Diagram's depiction of land use designations is not intended to invalidate local zoning or land uses which are not sufficiently intensive or large enough to be included on the Metro Plan Diagram" 2 Metro Plan, page II -G-5 CCSLC Zone Change Page 7 of 10 Ti BISHOWWritten Narrative November 9, 2021 M CON 5 U LT I NG Attachment 1, Page 9 of 36 3. Sufficient frontage to ensure safe and efficient automobile, pedestrian and bicycle access without conflict with moving traffic at intersections and along adjacent streets. The subject property is on a corner rectangular shaped lot with an alley along the south side. The lot provides sufficient frontage for safe and efficient automobile pedestrian and bicycle access without creating conflicts with traffic at the intersection or along adjacent streets. 4. The site shall be no more than five acres, including existing commercial development. The exact size shall depend on the number of establishments associated with the center and the population to be served. The proposed Neighborhood Commercial site is 0.99 acres. The First Baptist Church adjacent to the subject property is located on 1.45 acres. If the church was considered existing commercial development", it would bring the total neighborhood commercial site up to 2.44 acres, less than the maximum size allowed in the Metro Plan. The Metro Plan text also provides3: In certain circumstances, convenience grocery stores or similar retail operations play an important role in providing services to existing neighborhoods. These types of operations which currently exist can be recognized and allowed to continue through such actions as rezoning." Since 2004, CCSLC has provided vital safety -net services to the neighborhood. Services include immediate assistance with food, clothing, and energy & housing assistance. Approval of the zone change will allow these charitable services to continue to be offered on the site. The NC zoning will also allow a 1,600 square foot building addition to house the OASIS Program on-site. 2. Consistency with applicable Refinement Plans, Plan District maps, Conceptual Development Plans and functional plans; The subject property is not located in an area with an adopted Refinement Plan, Plan District map or Conceptual Development Plan. The Zoning Map Amendment is consistent with the applicable functional plans as described below. Sprinafield 2035 Transportation System Plan (TSP) The Springfield 2035 TSP provides a framework for how the City should maintain and improve the transportation network to meet growth within Springfield's Urban Growth Metro Plan, page II -G-6 CCSLC Zone Change Page 8 of 10 VET BISHOWWrittenNarrativeNovember9, 2021 6d CONSULT I N G Attachment 1, Page 10 of 36 Boundary (UGB). The 2035 TSP includes a recommended set of transportation improvements for the 20 -year planning horizon. The subject property has frontage on G Street and North 101h Street. The 2035 TSP functional classification for both streets is "Major Collector". As set forth in the Metro Plan, the location of Neighborhood Commercial sites greater than 1.5 acres must abut a Collector or Arterial. In this case, the Neighborhood Commercial site is only about an acre and abuts two streets with a Collector classification. The subject property is also located on a transit line with a bus stop abutting the property. The 2035 TSP contains one project relevant to the subject property - PB -54 G Street 51h St to 28"' St.4 The project is described as "G Street will be restriped with bike lanes, signed and marked for bike route." The project improvements are for signing, striping, and pavement marking at an estimated cost of $75,000. PB -54 is categorized as an "opportunity project". Opportunity projects are described as: Lower-cost and scale roadway, urban standards and pedestrian/bicycle projects that generally would not require additional right-of-way and the City could implement as opportunities arise (Table 4, Figure 5).5 The proposed zone change will not adversely impact the City's ability in the future to provide bike lanes and sign G Street as a bike route. The proposed zone change is consistent with the 2035 TSP. Findings demonstrating compliance with the Oregon Transportation Planning Rule are found in the Sandow, Engineering Traffic Impact Analysis provided under separate cover. Willamalane Comprehensive Plan The subject property is within a block of Willamalane Park. This 14 -acre park features basketball courts, tennis courts, softball/baseball fields, a playground, a skate park, and the Veterans Plaza. The park also contains the Willamalane Park Swim Center. The Willamalane Comprehensive Plan does not identify the subject property as a site planned for future park use. The proposed zone change is not in conflict with the Willamalane Comprehensive Plan. 4 Springfield 2035 TSP, Table 4. 5 Sorincfield 2035 TSP, page 49. CCSLC Zone Change Page 9 of 10 Qq BISHOW Written Narrative November 9, 2021 LS Eg CONSULTING Attachment 1, Page 11 of 36 3. The property is presently provided with adequate public facilities, services and transportation networks to support the use, or these facilities, services and transportation networks are planned to be provided concurrently with the development of the property. The subject property is within the Springfield city limits and is provided with adequate public facilities, services, and transportation networks to support the existing and planned development of the property. The Neighborhood Commercial zoning district standards will limit the intensity of future uses and development of the site. 4. Legislative Zoning Map amendments that involve a Metro Plan diagram amendments shall: a. Meet the approval criteria specified in Section 5.14-100; and b. Comply with Oregon Administrative Rule (OAR) 660-012- 0060, where applicable. This application is not a Legislative Zoning Map amendment and does not involve a Metro Plan diagram amendment. Although this approval criterion is not applicable, based on a request from City staff, the applicant retained Sandow Engineering to evaluate the proposed zone change for compliance with OAR 660-012-0060. Please refer to the Sandow Engineering Traffic Impact Analysis under separate cover. In closing, the proposed Zoning Map Amendment complies with applicable approval criteria. The written narrative, exhibits, plans, and reports provide substantial evidence to support approval of the application. If there are questions, please contact Teresa Bishow at 541-514-1029 or via e-mail at to resa (aD,b ishowconsu I ti ng. co m. Sincerely, 9'eresa 93ishow Teresa Bishow, AICP END OF WRITTEN STATEMENT CCSLC Zone Change Page 10 of 10 Qq BISHOW Written Narrative November 9, 2021 MA CONSULTING Attachment 1, Page 12 of 36 Attachment 1, Page 13 of 36 nli n - In I ! q LJ t- HcJ E Government and Education I I ! 1 rl17r- RiTn r L ITTIJ,!Ti1 CI 7 IsmM 7II_] M-edium Density, , TResidential ttlect —. f f L. Est Illlliil CATHOLIC COMMUNITY SERVICES METRO PLANscale1"= 4 0' ZONE CHANGE DESIGNATIONS a '® Map 17-03-35-11 Tax Lot 3500 EXHIBIT B uisizl Attachment 1, Page 14 of 36 JST x m 5T ST ST High Density Residential S hIFALI IiY vv f4 Public Land & Open Space S c Subject Property Neighborhood Commercial CATHOLIC COMMUNITY SERVICES EXISTING ZONINGscale1"=300' ZONE CHANGE u` M EXHIBIT C Map 17- 03- 35-11 Tax Lot 3500 11/5/20 11— Low Density Residential Zoning Mem Rmip Rngemni LlprrMe]lum imm pw N(POemlry XeaiM1n®i _Xea.]'IipWgy Mivee Ur ReeeantiY -$c1MHuryInGMMai HeflMvm UslG emiarp FmpMm.nLMAI.(GlenNpp]I Neg Mnatltonmertyl -9aYnJ(eAYMne¢lM fnnnump C—. Genamicox MeaNcdil LaiM1nlei®i -011waMlN0 Use1GkM.mn atJ MIUE Liu Rmiuiui -MehMSe Mma GmmerotiMVlGlemwn) ®WeMflMlvOpen[m. TuY IS MImIIIM LMIBLC WM¢yigeOpen Spv f CATHOLIC COMMUNITY SERVICES EXISTING ZONINGscale1"=300' ZONE CHANGE u` M EXHIBIT C Map 17- 03- 35-11 Tax Lot 3500 11/5/20 Attachment 1, Page 15 of 36 JST H_ALIHvwY ta ST ST ST Zoning LawLm¢y He¢Mem®I cmpn lNwNa MNlum sry Fe¢genl®I YgN-MCElum lnfu9lY rfHiBp CeMIVMasICenYel Hnry TJusOY MMtlU¢e Re¢itlena Spew)Heery 1.ie n. rtnsee Ur g;lemmptll Employ tMLL(GMmmoe1 mei Boi0r1¢ely MveO Ux CommuNh4emmwa G-1 p m Map omm a qAn M'uN Uu Glmrvaw MdM VUCmmm wll M¢alul5eni¢ea fn ner®IMLL(GMmwmp x" B Mlae Opereliom Mv eLM186 PU MIZMBfIpen Sp¢ce High Density Residential htvr Public Land & 1— Open Space In 2 0C> r Subject Property Neighborhood Commercial Low Density Residential w CATHOLIC COMMUNITY SERVICESNallY"=1 PROPOSED ZONING wn ZONE CHANGE EXHIBIT D Map 17-03- 35-11 Tax Lot 3500 11/5/20 Attachment 1, Page 16 of 36 V 4, Subj r I i rr ):{ ':.: CI['j.l ' y i}Y` iti1C2:lIIpiTy":Y'Erpr_'11 i.[+l IG Attachment 1, Page 17 of 36 scale 1-=10a o CATHOLIC COMMUNITY SERVICES ZONECHANGE Map 17-03-35-11 Tax Lo[ 3500 ASSESSOR'S MAP EXHIBIT F w5/21 Attachment 1, Page 18 of 36 RgUIN TO CASCADE TITLE CO. EXHIBIT "G” OW I.ION of Ck1.f D..utT Clark 2W4.049488La^e County D.". ..d R cor4. TITLE NO. 240/ 991 EEMM NO. BID, -, 279 31.00TTAXACCT. NO. 1403927D I lull lll 111 111 lu lu lull a 11 eee$E300200400e040E0020024 0612912004 11: 10: 44 AM RPR4990 C.L.l Stn.$ =HIER 07 10. 00 811.00 $10. 00 WARRANTY DEED -- STATUTORY FORM SPRINGFIELD CONEURITY DRVRLOPNENT CORP., an Oregon Coxporation, Di r. , Ccdveye and wa frant. to CATSOLIC CONNUNITT SERVICES OF LANE COUNTI, INC., Grantee, the following described real property free of encumbrances except as specifically set fnrth herein: SEE E%HIBIT A WHICH IS MAO£ A PART HEREOF BY THIS REFERENCE MIS INSTRUNDEN WILL NOT SLIM USE OF TNR PROPERTY DESCRIBED IN TRIS INSTRUEOiNT IN VIOLATION OF APPLICABLE LABII USE LAWS AND REGULATIONS. BEFORE SIGNING OR ACCEPTING MIS 1N8TAllA NT, THE PERSON ACQUIRING PEE TITLE TO THE PROPBRTY SHOULD m WITS TAB' APPROPRIATE CITY CR COBETT PLANNING DEPARIENT TO M.IPY APPROPHD USES AND TO SETERENER ANY LIMITS ON LAWSUITS AGAINST RAISING OR FOREST PRACTICES AS DEEMED IN ORS 30.930. Except the following encumbrances: Cnvenant9, Cnndr[ioh9, Reetriltiona, Easements and Rights of Nay of record, if any. The true Conliderati.h for this comeyanee 19 $274,984.52. Dated this 'L day of , 2,W1. BY; eSPRINGFIELD z= ENT CORP. - PRESIDENT STATE 'OF ORWON, County of 1, /1 )9e. This ...tr9ment w acknowledged before m l ttik 2g, 20 , by JIN PLtiMMER, as PRESIDENT, of SPRINGFIELD COMMUNITY DEVELOPMENT CORP., on bekalf of the grant r p OYYyy MHMY IIWMM Nocary iss is for Oregres: pON My commission expire a--I'l_03 / bmN6 NtlDOR8A9N,11.AN GRANTOR'S NAME AND ADDRESS CATHOLIC COPE4'JNITY SERVICES 945 WEST ILi AVENUE EUGENE, OR 97402 GRANTEE'S NAME AND ADDRESS CORP. Until a Change 1B requested all tax statements shall be sent to the following address: SAFE AS GRANTEE ... After recording return to: CASCADE TITLE CO. 911WILLAMETTE EUGENE, OR 97401 Attachment 1, Page 19 of 36 17-09.3541 EXHIBIT - PROPERTY DESCRIPTION PARCEL 1 Beginning at the point of intersection of the East line of 10th Street with the South line of G Street in Springfield, Lace County, Oregon, which said point is also 962. 48 feet North of the Northwest Corner Of Block 4 of BRATTAIN'6 ...ilON to Springfield, 1n Lane County, Oregon, as platted and orded in Book 9, Page 6; Lane County Oregon Plat Record.; thence Beat along the South line of G Street 240 feet; thence South parallel t0 the East line Of 10th Street 118 feet; thence West parallel to the South line of G Street 240 feet to the East line of 10th Street; and thence North 118 feet to the point of beginning, all in Lane County, Oregon. Beginning at a point on the South line of G Street 240 feet Easterly from the intersection of the South line of G Street with the East line of 10th street-; thence Easterly along The South line of c Street 120 feet; thence South 120 feet, more r leas, to the North line of the East-West alley between F Street and G street; thence westerly along the North line of said alley a distance of 110 feet; thence North parallel to the East line of 10th Street 120 feet, the place of begimi;y, in the City of Springfield, Lane County, Oregon. Attachment 1, Page 20 of 36 EXHIBIT "H" Buyer: TO COME PRELIMINARY REPORT FOR: Owner's Standard Policy $800, 500.00 Commercial Extended Loan Policy (SIMUL) $600, 500.00 PREMIUMS: Owner's Standard Premium $1,800.00 Commercial Extended Loa- Premium (SIMUL) $475.00 OTIRO Endorsement $TBD Gov. Lien/Inspect Fee $35. 00 We are prepared to issae 2006 (6/17/ 06) ALTA title insurance policy(ies) of OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY, in the usual form insuring the title to the land described as follows: Vestee: A T T A C H E D) CATHOLIC COMMUNITY SERVICES 0 LANE COUNTY, INC. Estate: FEE SIMPLE DATED AS OF: MAY 13, 2021 at 8:00 A.M. Schedule E of the policy(ies) to be issued will contain the following general and special exceptions unless removed prior to issuance: GENERAL EXCEPTIONS (Standard Coverage Policy Exceptions): 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; proceedings by a public agency which may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records. 2. Facts, rights, interests or claims which are not shown by the Public Records but which could be ascertained by an inspection of the Land or by making inquiry of persons in possession thereof. No liability is assumed hereunder until policy has been issued and full policypremium has been paid. MAIN OFFICE FLORENCE. OFFICE VILLAGE PLAZA OFFICE 811 WILLAMETTE ST. 715 HWY 101' FLORENCE, OREGON 97439 4750 VMAGE PLAZA LOOP SURE 100 EUGENE, OREGON 97401 MAILING: PO BOX 508" FLORENCE, OREGON 97439 EUGENE, OREGON 97401 PH: (541)687-2233"FAX: (541) 485-0307 PH: (541)997-8417IFAX: (541)997;3246 PH: (541)6538622*FAX: (541)8411626 luuIIIII VIiIlIIIVIIIVIIT ea. PRELIMINARY TITLE REPORT CASCADE ESCROW May 20, 2021 ATTN: CARYN ROSHTO Report No: 0327565 4750 VILLAGE PLAZA LOOP, SUITE 100 Your No: V221-0829 EUGENE, OR 97401 Seller: CATPOLIC COMMUNITY SERVICES LANE CO., Buyer: TO COME PRELIMINARY REPORT FOR: Owner's Standard Policy $800, 500.00 Commercial Extended Loan Policy (SIMUL) $600, 500.00 PREMIUMS: Owner's Standard Premium $1,800.00 Commercial Extended Loa- Premium (SIMUL) $475.00 OTIRO Endorsement $TBD Gov. Lien/Inspect Fee $35. 00 We are prepared to issae 2006 (6/17/ 06) ALTA title insurance policy(ies) of OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY, in the usual form insuring the title to the land described as follows: Vestee: A T T A C H E D) CATHOLIC COMMUNITY SERVICES 0 LANE COUNTY, INC. Estate: FEE SIMPLE DATED AS OF: MAY 13, 2021 at 8:00 A.M. Schedule E of the policy(ies) to be issued will contain the following general and special exceptions unless removed prior to issuance: GENERAL EXCEPTIONS (Standard Coverage Policy Exceptions): 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; proceedings by a public agency which may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records. 2. Facts, rights, interests or claims which are not shown by the Public Records but which could be ascertained by an inspection of the Land or by making inquiry of persons in possession thereof. No liability is assumed hereunder until policy has been issued and full policypremium has been paid. MAIN OFFICE FLORENCE. OFFICE VILLAGE PLAZA OFFICE 811 WILLAMETTE ST. 715 HWY 101' FLORENCE, OREGON 97439 4750 VMAGE PLAZA LOOP SURE 100 EUGENE, OREGON 97401 MAILING: PO BOX 508" FLORENCE, OREGON 97439 EUGENE, OREGON 97401 PH: (541)687-2233"FAX: (541) 485-0307 PH: (541)997-8417IFAX: (541)997;3246 PH: (541)6538622*FAX: (541)8411626 Attachment 1, Page 21 of 36 Order No. 0327565 Page 2 3. Easements, or claims of easement, not shown by the Public Records; reservations or excepti one in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 4. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that would be disclosed by an accurate and complete land survey of the Land. 5. Any lien, or right to a lien, for services, labor, material, equipment rental or workers compensation heretofore or hereafter furnished, imposed by law and not shown by the Public Records. SPECIAL EXCEPTIONS: 6. Taxes, including the current fiscal year, not assessed due to Charitable Property Exemption. If the exempt status is terminated under the statute prior to the date on which the assessment roll becomes the tax roll in the year which said taxes were assessed, additional taxes may be levied. 7. Easement, including tee terms and provisions thereof, granted to the Pacific Telep:^.one c Telegraph Company, by instrument recorded November 24, 1998, Reception No. B386 P195, and recorded December 7, 1948, Reception No. 8386 P687, Lane County Oregon Deed Records. 8. Deed of Trust, including the terms and provisions thereof, executed by Catholic Community Services of Lane County, Inc., an Oregon corporation, to Cascade Title Company, Trustee, for the benefit of Summit Bank, Beneficiary, dated December 23, 2010, recorded January 26, 2011, Reception No. 2011-004158, Lane County Deeds and Records, to secure payment of a note for $250,000.00. 9. Assignment of rents due or to become due and accruing from said property, including the terms and provisions the-eof, between Catholic Community Services of Lane County, Inc., an Oregon corporation, and Summit Bank, dated December 23, 2010, recorded January 26, 2011, Reception No. 2011-004159, Lane County Deeds and Records. 10. Deed of Trust, including the terms and provisions thereof, executed by Catholic Community Services of Lane County, Inc., an Oregon corporation, Grantor, to Cascade Title Company, Trustee, for the benefit of Summit Bank, Beneficiary, dated October 24, 2011, recorded November 1, 2011, Reception No. 2011-949363, Lane County Deeds and Records, to secure payment of a note in the amount of $521,500.00. 11. A certified copy of the Catholic Community Services of Lane County, Inc. Board of Directors' Resolution authorizing and directing the sale or mortgage of the subject property, should be provided prior to closing. 12. Prior to writing an ALTA MORTGAGEE'S policy, Cascade Title Company should be furnished with a statement as to parties in possession and as to any construction, alterations or repairs to the premises within the last 75 days. We also request that we be notified in the event that any funds are to be used for construction, alterations or repairs. Exception may be taken to such matters as may be shown thereby. NOTE: The property address as shown on the Assessor's Roll is: 1023 And 1025 G Street Springfield, OR 97477 NOTE: Taxes, Account No. 1401627, Assessor's Map No. 17 03 35 1 1, 83500, Code 19-00, 2020-2021, in tie amount of $ 0.00, EXEMPT. Attachment 1, Page 22 of 36 Order No. 032"]565 Page 3 NOTE: A judgment search has been made on the above named Vestee(s), and we find NONE except as set forth above. NOTE: According to the public record, the following deed (s) affecting the property herein described have been recorded within 24 months of the effective date of this report: NONE This report is preliminary to the issuance of a policy of title insurance and shall become null and void unless a policy is issued and the full premium paid. Cascade Title Co. at/rh: T:tle Officer: KURT BEATY Attachment 1, Page 23 of 36 Order No. 0327565 Page 4 PROPERTY DESCRIPTION PARCEL 1: Beginning at the point of intersection of the East line of 10th Street with the South line of G Street in Springfield, Lane County, Oregon, which said point in also 962.48 feet North of the Northwest corner of Block 4 of BRATTAIN'S ADDITION TO SPRINGFIELD, in Lane County, Oregon, as platted and recorded in Book 9, Page 6, Lane County Oregon Plat Records; thence East along the So'eth line of G Street 240 feet; thence South parallel to the East line of 10th Street 118 feet; thence West parallel to the South line of G Street 240 feet to the East line of loth Street; and thence North 110 feet to the point of beginning, all in Lane County, Oregon. PARCEL 2: Beginning at a point on the Soath line of G Street 240 feet Easterly from the ;rtersect'on of the South line of G Street with the East line of 10th Street; thence Easterly along the South line of G Street 120 feet; thence South 120 feet, more or less, to the North line of the East-West alley between F Street and G Street; thence Westerly along the North line of said alley a distance of 120 feet; thence North parallel to the East line of loth Street 120 feet, the place of beginning, in the City of Springfield, Lane Cou--ty, Oregon. Attachment 1, Page 24 of 36 Catholic Community Services OF LANE COUNTY March 15, 2021 Erin Fifield City of Springfield 225 Fifth Street, Suite 101 Springfield, OR 97477 Dear Erin, EXHIBIT I SPRINGFIELD: 1025 G Street I Springfield, OR 97477 EUGENE: 1464 West 6n Avenue I Eugene, OR 97402 541-345-3528 1 www.ccslc.org We appreciate the opportunity to apply for Community Development Block Grant funds for program year 2021-2022 and I have attached our project proposal in response to the City of Springfield's Request for Proposals. Our project proposal is to request financial support that will enable us to increase the size and program capacity at the Catholic Community Services of Lane County's Springfield Community Service Center, located at 1025 G Street. The proposed 1,600 square foot addition will allow CCSLC to house our OASIS program, currently located across our parking lot at First Baptist Church, at our Springfield Community Service Center. Thank you for your consideration of our request —we look forward to discussing this with the Committee Development Advisory Committee on March 31, 2021. Sincerely, mec_ Executive Director A Catholic Charities Agency Attachment 1, Page 25 of 36 Catholic SPRINGFIELD: 1025 G Street I Springfield, OR 97477 Community EUGENE: 1464 West 6" Avenue I Eugene, OR 97402 Services 541- 345-3628 1 v . ccslc.org OF LANE COUNTY Request for Proposal for City of Springfield Community Development Block Grant (CDBG) Funds Program Year 2021-2022 A Catholic Charities Agency Attachment 1, Page 26 of 36 LCI. PROJECT SUMMARY FORM See Attachment —Form A (page 7) 2. PROJECTDESCRIPTION This project proposal is to request financial support from the City of Springfield Community Development Block Grant Funds to increase the size and program capacity at Catholic Community Services of Lane County's (CCSLC) location at 1025 G St. The 1,600 square foot addition will allow CCSLC to house CCSLC's OASIS program, currently located across our parking lot at First Baptist Church, at the CCSLC Springfield Community Service Center (SCSC). The Board of Directors has approved the application for CDBG funds The need or problem your project will address CCSLC purchased the building at 10'h and G in 2004. Building operations include the Springfield Community Service Center Resource lobby, Food Pantry, Energy Assistance, Social Services Programs and Administration offices and are at full capacity. Due to spare limitations, the OASIS Program has been housed off-site at the First Baptist Church since its inception in 2016. The current location is not Ideal and a very large obstacle is that it is not ADA - compliant due to two sets ofstairs. This has been a hardship for clients who are handicapped, as well as for families with young children who cannot bring strollers upstairs. The CCSLC OASIS Manager often meets with clients outside due to this hindrance. During ourtenure at the First Baptist Church, many problems have arisen including a leaking roof and plumbing issues. These situations directly impacted OASIS and forced the program to relocate to the Springfield Community Service Center building for several weeks at a time. Other problems at the current location include the poor WI -Fl connection and dropped phone calls. The Case Manager needs to access the CCSLC server/database remotely and spotty WI=Fi is not ideal. Unfortunately, the First Baptist staff are not always availableto reset the Wi-Fi in a timely manner and, at times, the Case Manager is without internet access for days. Safety is yet another concern for CCSLC staff W the Case Manager is often alone with clients as staff at the First Baptist Church are located in another section of the building or not at work while OASIS is open. - OASIS clients regularly access services located atthe SCSC including food boxes, laundry services, free clothing and hygiene items, diapers and other basic needs assistance. At this time, an OASIS staff or volunteer must accompany andstay with the client to.open.and closethe building and laundry facilities. This is often Inconvenient for other clients as OASIS staff need to lockup the space at the First Baptist Church in order to assist at the main building. Describe how your project will address the identified need or problem, Including project background, project objectives, services to be provided by the project, the populations or areas to be served, and how the CDBG funds will be used; Project Background: G St. OASIS was formed in 2016 by Springfield Community Partners, many located on G St., to assist homeless families with a range of day time services including food preparation, laundry and case -managed support and referrals. OASIS is the only program available in the immediate Springfield area to provide this. CCSLC recently renamed the program to just OASIS (acronym for the mission: Opportunity Access Stability Initiative Success) as many of the initial partner agencies have relocated, and with an expansion of program services with newer partner agencies, OASIS is not only on G St. In addition, clients are no long able to access all oftheir needs within a short walking distance on G Street and the name has become confusing to the community. Addressing the need and problem: With the addition of a stand-alone building at the Springfield Community Service Center, OASIS will be able to provide clients with easy access to the agency's services. Case Managers and volunteers will be directly connected to existing CCSLC WI-Fi and the agency's server, eliminating technology Attachment 1, Page 27 of 36 problems. OASIS staff will be directly Integrated with all of the Social Services staff and will receive more readily available supervision and assistance if needed. Entrances and exits from the OASIS program will be ADA -compliant thus enhancing service delivery to clients. The CDBG funds will be used to design and build this 1,600 square foot bullding at the Springfield Community Service Center. Upon project completion, OASIS will be located Ina permanent location and have easy access to the wide amay of programs and services CCSLC provides to all who come for help. It will enable OASIS to serve all clients in the same manner, not limited by the current lack of ADA access. The project will help homeless families with children living 1n Springfield and assist them In finding affordable housing through case -managed support and referrals. Describe how your project will address the identified need or problem In a way or to a degree not already being achieved in the community. Please identify any other similar programs or projects and how your project will add to or improv: upon existing services; CCSLC offers a wide variety of programs to assist low-income & homeless Individuals and families and has a history of responding and developing new partnerships or creating new programs. Originating In 2016, OAS 15 was created to address the lack of a day center for homeless families with children In Springfield and to provide case -managed support to this population. OASIS community partners include CCSLC, Center for Community Counseling, City of Springfield, First Baptist Church of Springfield, FOOD for Lane County, Goodwill Industries, Head Start of Lane County, Springfield Public Schools/McKinney Vento Program, Springfield Shelter Rights Alliance, and Willamalane Park and Recreation District. The OASIS program Is the only one of Its kind in Springfield focusing on helping homeless families with children, providing a day center and an array of support (free food & a place to cook meals during the day, laundry, case - managed resources & referrals focused on finding housing, free hygiene & clothing items, etc,). The OASIS parking program. provides up to 6 homeless families with temporary housing in one of four Conestoga huts or two tiny houses who receive case -managed services during their stay. Having the OASIS program housed atCCSLC will greatly improve existing services because it will be ADAcompliant and easily accessible for all OASIS clients; all CCSLC services will be located in one location and other CCSLC staff will be available when the OASIS manager is Involved with another client. It will provide a more welcoming space for clients to prepare meals and interact with other families, as well as an easier way to do their laundry, access the CCSLC free Clothing Closet, etc. Describe the ways in which your project will have a long-term impact on the need or problem being addressed; The need for the OASIS program has continued to grow and improvements are continually being implemented. CCSLCis striving to respond tothis in a proactive and forward -thinking manner. The goal and the hope is that OASIS can truly be a vibrant and welcoming place for homeless families in Springfield to access the case -managed support and services needed to help them move out of homelessness and secure affordable housing with the help of CCSLC staff who can work with them every step of the way. Improved space would enable more clients to be served in a respectful way that ensures privacy and confidentiality when needed; as well as making it easier to access the basic needs assistance that is available at the Springfield Community Service Center. Please attach a map showing the project's location. If the project will serve a specific area, the boundaries of the area served should be shown. If the project Involves a specific site or a physical structure, include details about the site or structure, such as the size of the site, the floor area, the number and size of the residential units, the project amenities, the condition of any existing structures, and any proposed alterations to the site or structures. 19 Attachment 1, Page 28 of 36 See attachment (page 8) 3. POPULATION SERVED . The target papulation for programs and services offered at the CCSLC Springfield Community Service Center Includes homeless families and Individuals, unemployed and underemployed persons, and the working poor that meet the CDBG National Objective of at least 51% of beneficiaries must have low -moderate incomes. The needs that CCSLC addresses through all of its programs is poverty, and the destructive impact on children and families. According to data for 2019-2020, 84% of CCSLC clients served were below the Federal Poverty Level and 52% earned less than half of the Federal Poverty level. The OASIS program Is a day center providing one-on-one support for homeless families with children in Springfield with one fulltime case manager. During the most recent fiscal year (July 1, 2019 —June 30, 2020), 59 households and 189 individuals were served. 4. PROJECT READINESS A detailed work program and timeline, including anticipated start date and completion date for the project, and a list of tasks with estimated start and completion dates for each task; See Attachment (pages 9-10) A description of the agency's readiness to proceed with the project, Including when potential sources of funding and/or additional staff will be secured. CCSLC received approval from Its Board of Directors to proceed with this project at the February 25, 2021 meeting. The Board Program Assessment & Improvement Committee will assist in the implementation of this project if funding is approved. At this time, CCSLC will rely on existing staff to assist this committee and the construction firm that is hired. Should additional funding be required, the CCSLC Development Committee and Executive Director will evaluate donor Interest in supporting this project financially through a fundraising campaign. Designated donations for'where most needed' received this past year may also be accessed and $38,500 will be designated for matching CDBG funds. S. FINANCING A completed Budget Form Attachment See Attachment Form B (pages 11- 12)) A description whether you are requesting funds as a loan vs a grant. CCS is requesting CDBG funding as a grant. If requesting funds as a loan, outline your repayment terms. n/ a If requesting funds as a grant, explain why you are not able to take on a loan. CCS has limited funds available to take on this project without assistance from the City of Springfield. 3 Attachment 1, Page 29 of 36 A description of the assumptions used to determine the total project cost and the operating budget, including the sources consulted and how costs were determined To evaluate the options for moving OASIS to our Springfield Community Service Center, CCSLC contracted with McKenzie Commercial for $6,000 and they evaluated the property and determined the best location for the addition, provided a construction budget for this project by contacting subcontractors and hired an architect to assess land use and zoning restrictions. It has been determined that the current zoning is residential so CCSLC is moving ahead to submit a "Non -Conforming Use —Expansion/Modification Application" to the City of Springfield Development & Public Works Department. It has been determined that a 1,600 square foot stand-alone building will meet client and staff needs and provide a general area/meeting space, a kitchen/breakroom, handicap accessible restroom and office space, with a door leading to the existing laundry room located Inside the SCSC. A brief description of your agency's plan for funding the project after the first year, if applicable. N/A A statement regarding your agency's ability to proceed with the project without your requested CDBG funds, or with a CDBG award less than your requested amount If awarded CDBG funds are less than requested, CCSLC Board of Directors and Management Team are committed to this project and will continue to pursue other funding opportunities. During the past year dealing with the COVID pandemic, CCLSC has benefitted from a larger -than -normal number of donations from new donors and increased support from existing donors. Due to the large amount of Federal and State COVID CARES rental & energy assistance funds received through Lane County, CCSLC has not had the financial need to supplement these programs with general donations unless the donor specifically requested these programs. 6. PROJECT TEAM The agency's background, mission and semk:e history: CCSLC's'mission is to provide immediate help by providing food and other assistance to anyone in need and to instill hope by helping Lane County families take positive steps to move out of poverty. Founded in 1952, CCSLC has provided services for low income households In Lane County for 69 years. We have owned, operated and continue to develop two multi-purpose community service centers in Eugene and Springfield and recently paid offthe mortgage for the Springfield buildings. CCSLC provides basic needs assistance by providing food, clothing, personal rare Items, and direct assistance to homeless and low-income individuals and families. In addition, CCSLC provides energy assistance, emergency family shelter through Its cold weather motel shelter program, homeless prevention, short-term financial assistance and housing counseling services. CCSLC's Supportive Services program helps with strengthening, preserving and reunifying families through rental housing assistance for at -risk families, case -managed support for families whose children are at risk of placement in foster care and financial assistance to help homeless individuals and families make the transition to affordable rental housing. CCSLC operated one of the first emergency food pantries in Lane County and in recent years, CCSLC has distributed more of the food collected by FOOD for Lane County than any other organization in Lane County. In fiscal year 2019-2020, the Attachment 1, Page 30 of 36 two CCSLC community service centers distributed almost 56,000 emergency food boxes to 17,347 individuals, containing over 1. 3 million pounds of food valued at$1.56 million. A brief description of the agency's financial stability as it pertains to the agency's capacity to successfully complete the project, including a brief financial history and primary funding sources. Since the late 1980's, CCSLC has received continued funding support from Lane County, the cities of Eugene and Springfield, Catholic Charities of Portland and the State of Oregon in support of its mission to provide services to the low -come and disenfranchised families and individuals throughout Lane County. More recently, CCSLC's government funding sources include the Emergency Food and Shelter Program, HUD Continuum Housing Programs, the United States Conference of Catholic Bishops (Immigration services) and Catholic Charities USA (HUD Housing Counseling Programs). CCSLC also draws on a broad base of private support to provide services for low income households. Private and foundation funders Include the Oregon Community Foundation, Meyer Memorial Trust, the Collins Foundation, Cow Creek Indian Foundation, the Oregon Food Bank, several other grant -making foundations and more than 1,400 individual donors. Private support also includesin-kind donations from individuals, churches, schools, service groups and businesses and 300 CCSLC volunteers who provided more than 14,300 hours of volunteer service in 2019-2020. A list of key personnel that will be assigned to this project and their job titles and qualifications. Include the FTE hours each person will dedicate to the project. Sue Palement, Executive Director—estimated FTE.02 Suzanne Turner, Finance & Contracts Manager—estimated FTE.02 Chris Pickering, Operations Director—estimated FTE.05 Stefan! Roybal, Development Director—estimated FTE.02 Dennis Peterson, Facilities Manager—estimated FTE.OS Amy Wilson, OASIS Case Manager—estimated FTE .02 Proof of the agency's status as a private non-profit. See Attached IRS Letter (pages 13-14) Most recent program financial audit or review pursuant to 2 CFR Part 200 Subpart F See Attached 2019-2020 Audit (pages 15-43) A description of the agency s administrative capacity to complete the project, including its experience in implementing and managing activities similar to the proposed project. If capacity Is achieved through partnerships With or utilization of other organizations or agencies, describe the nature and status of these partnerships. CCSLC has been the recipient of many CDBG funds over the years; most recently from the City of Springfield for the improvement and repaving of our SCSC parking lot and the creation and ongoing support of the G Street OASIS program. In 2019, the City of Eugene awarded CCSLC a $222,600 CDBG grant to remodel the Eugene Community Service Center Resource lobby (floor, ceiling, windows, doors and lighting, and created a new meeting roam). This was coordinated by the CCSLC Facilities Manager who is still on staff. a Attachment 1, Page 31 of 36 Adescription of neighborhood and/or community support for the project. Attach letters of support or other evidence of neighborhood/communitysupport— See Attached letterfrom Peacerlealth (page 44) A description of the agency's familiarity with meeting the federal requirements listed in Section 411 and/or the agency's plan for ensuring that these requirements are satisfied. CCSLC is subject to Single Audits due to the amount of federal funding It receives including FEMA, Continuum of Care and Housing Counseling Funds. CCSLC is very aware of the rules and regulations for the use of federal funds. CCSLC has received COBG funds from Springfield and Eugene for over 25 years and has always complied with the terms of these funds. 7. OTHER INFORMATION E Attachment 1, Page 32 of 36 SPRINGFIELD City of Soringfield, Oregonaaeeon Project Name: OASIS Addition at Springfield Community Service Center Project Location: 1025 G Street, Springfield, Oregon 97477 Project Description: Remodel to add on a 1,600 square foot building at the CCSLC Springfield Community Service Center to enable us to house the OASIS Program and Day Center for Springfield homeless families with children on site. CD6G Funds 322,492.00Requested: ,ant: $ Loan: $ Applicant: Catholic Community Services of Lane County Address: - - 1025 G Street City, State & Zip: Springfield, Oregon 97477 Wabsite: www.ccslc.org DUNS number: 036468619 - Contact Person nameltitle):. Sue Paiement, Executive Director Phone Number. 541-345-3628, ext. 318 Email Address: spaiement@ccslc.org City of Wngfield 2021 lDBGRFP 7 Attachment 1, Page 33 of 36 W YCLQYQsLLLNQ) CYO D Lo4NO - 0NmOCL0 a` e Attachment 1, Page 34 of 36 PeaceHealth Sacred Heart Medical Center March 9, 2021 Regarding: Catholic Community Services for a Community Development Block Grant To Whom it May Concern, This letter is written in support of Catholic Community Services' pursuit of a Community Development Block Grant. PeaceHealth Oregon Network and Catholic Community Services of Lane County have partnered on multiple projects to the betterment of the Springfield neighborhood they currently serve. Our two organizations have been engaged in discussion for more than a year on a potential development of a more robust Catholic Community Services Community Center. This gathering place would include updated facilities, community outreach and programs that will help homeless and low-income residents and families live healthier lives. The resources provided by the award of a Community Block Development Grant to Catholic Community Services will be foundational In the development of a vibrant Springfield Community Center, where residents can be physically, mentally, emotionally, and spiritually healthy. Having the CCS OASIS program located onsite will greatly benefit those clients. PeaceHealth is honored to have the opportunity to be an involved and supportive partner of this project and encourages the City of Springfield to approve the application submitted by Catholic Community Services for a Community Development Block Grant. Sincerely, Todd Salnas Chief Executive Oregon Network 3333 RiverBend Ddvq Springfield, OR 9747 541-2=-730kl peacehealtb.org/sacred-heart-nverbend Attachment 1, Page 35 of 36 EXHIBIT 7 DEVELOPMENT AND PUBLIC WORKS DEPARTMENT 225 FIFTH STREETSPRINGFIELD SPRINGFIELD, 541 O2"7M541) ]283]53 4 F"(541) 728-3689 OReGON www'spring8eldocgov October 27, 2021 Sue Paiement, Executive Director Catholic Community Services of Lane County 1025 G Street Springfield, OR 97477 Dear Sue, Congratulationsl Catholic Community Services of Lane County's request for Community Development Block Grant (CDBG) funding through the City's 2021 CDBG Request for Proposals was approved. You have been awarded $322,492 in CDBG funds for the proposed addition to the Catholic Community Services of Lane County's Springfield community service center to house the OASIS program. These funds are contingent on a completed Environmental Review and a signed agreement between the City and Catholic Community Services of Lane County. As requested, this award includes all costs of development, including soft costs and development costs. Staff are working on completing the Environmental Review and drafting the CDBG agreement to be signed. All soft costs incurred after August 20, 2021 will be eligible for reimbursement. Construction can only begin after the CDBG agreement is signed. No changes to the site — even activities not paid for with CDBG funds—can occur until the Environmental Review has been completed. Thank you for your commitment to helping low-income Springfield residents. We look forward to helping see this project become a reality. If you have anyquestions, please reach out. Best, Erin 4M`-"-"` Fifield aim Erin FIFIELD, Community Development Analyst City of Springfield Attachment 1, Page 36 of 36 LOCATION OF PROPERTY SUBJECT TO PROPOSED ZONE CHANGE SITE  Attachment 2, Page 1 of 4 811-21-000294-TYP3 – PROPOSED ZONING MAP AMENDMENT FOR CATHOLIC COMMUNITY SERVICES 1025 G STREET (MAP 17-03-35-11, TAX LOT 3500) SITE CONTEXT MAP SITE Dos Rios Elementary School 9th Street G Street 10th Street F Street Attachment 2, Page 2 of 4 811-21-000294-TYP3 – PROPOSED ZONING MAP AMENDMENT FOR CATHOLIC COMMUNITY SERVICES 1025 G STREET (MAP 17-03-35-11, TAX LOT 3500) CURRENT ZONING Low Density Residential (LDR) Public Land and Open Space (PLO) Neighborhood Commercial (NC) SITE Dos Rios Elementary School 9th Street G Street 10th Street F Street Attachment 2, Page 3 of 4 811-21-000294-TYP3 – PROPOSED ZONING MAP AMENDMENT FOR CATHOLIC COMMUNITY SERVICES 1025 G STREET (MAP 17-03-35-11, TAX LOT 3500) PROPOSED ZONING Low Density Residential (LDR) Public Land and Open Space (PLO) Neighborhood Commercial (NC) SITE Dos Rios Elementary School 9th Street G Street 10th Street F Street Attachment 2, Page 4 of 4 SANDOWENGINEERING 160 MADISON STREET, SUITE A EUGENE, OREGON 97402 541.513.3376 TECH MEMO DATE: December 21, 2021 TO: City of Springfield Michael Liebler, PE FROM: Kelly Sandow, PE Sandow Engineering RE: TPR Analysis for 1025 G St, Springfield 1.0 PROJECT SITE The applicant, Catholic Community Services, is proposing to rezone the property located at 1025 G Street in Springfield, Oregon. The property is identified as Tax Lot 3500 of Assessor’s Map 17-03- 35-1. Figure 1 shows the site location. The site is approximately 0.989 acres and is currently in use for Catholic Community Services. Current access to the site is provided via G Street. The access on G Street is assumed to remain through the 20-year planning horizon. 2.0 PROPOSAL The site is currently zoned Low-Density Residential. The applicant is proposing a zone change to Neighborhood Commercial. 3.0 WORK SCOPE As per OAR 660-012-060, Transportation Planning Rule, an analysis of zone changes is required to determine if the zone change will have a significant effect on the surrounding transportation system. The evaluation is to consider trips added to the system by the reasonable “worst-case development scenario” allowed under the proposed zoning. The worst-case development scenario is the highest trip generator based on the use and size of buildings that are typically found in the area. The City of Springfield provided a work scope for this project that includes the following evaluation requirements: Attachment 3, Page 1 of 31 Technical Memorandum Kelly Sandow PE TPRA 1025 G St 12.21.21 1 x Worst case development impacts using Convenience Market as the use x Intersection evaluation to include: o G Street @ 10th Street o 10th Street @ Centennial x Evaluation of intersection LOS for the year 2035 during PM peak hour with and without the zone change The scoping letter from the City is provided in Appendix A. 4.0 STUDY AREA INTERSECTIONS The study is to evaluate impacts to the adjacent intersections of 10th St at G St and 10th St at Centennial Blvd. The intersections and roadways are described in the following, and Figure 2 provides an illustration depicting the intersection control and geometry. x Centennial Blvd at 10th St: This intersection is signalized. The eastbound and westbound approaches have shared through-right turn lanes and separated left turn lanes with permissive phasing. The northbound and southbound approaches are single shared left-through-right lanes. There are bike lanes striped on Centennial Blvd, and 10th St is shared bike-vehicle travel Lanes. There are pedestrian crossings on all four approaches. x 10th St at G St: This intersection is an all-way stop control with one lane approaches on all legs. There are no striped bike lanes. There are striped crosswalks on all four approaches. 5.0 DEVELOPMENT TRIPS 5.1 TRIP GENERATION Several lane use options were considered for this site when determining the reasonable worst- case development potential. The options considered uses allowed in the code, the typical size of each type of use, and what can fit on the 0.989-acre site given building square footage, parking, landscaping requirements, etc. For reference, the comparison is: x Gas Station with Convenience Market (8 fueling locations)- 81 x Drive through Coffee Shop (2.5 KSF)- 49 Attachment 3, Page 2 of 31 Technical Memorandum Kelly Sandow PE TPRA 1025 G St 12.21.21 2 x High Turn Over Restaurant (6 KSF)-54 x Drive Through Restaurant (3.5 KSF)- 58 x Convenience Store (3.5 KSF)- 84 As demonstrated above, the reasonable worst-case development proposal for the 0.989-acre site has been determined to be a 3,500-sf convenience store. The ITE Trip Generation Manual 11 ed. is used to estimate the PM peak hour trips generated by a 3,500-sf convenience store. The ITE Land Use that corresponds to this use is 851- Convenience Market. The trip rate is based on trips per thousand square feet of building area. This type of land use will generate a portion of the trips that are trips already on the street system that will stop by to use the convenience market between the original origin- destination. These are pass-by trips. As per the ITE Trip Generation Handbook 3rd Edition, the pass-by trip rate is 51% for this land use TABLE 1: TRIP GENERATION Land Use Size Rate Trips In Out 851- Convenience Market 3.5 ksf 49.11 172 (51%) 88 (49%) 84 Pass-By 51% -88 45 43 Total New Trips on System 84 43 41 5.2 TRIP DISTRIBUTION The development trips are assigned to the street network using reasonable origins/destinations, shortest path travel routes, and existing travel patterns. The trips are estimated on the system as: x 10% west on G x 25% east on G x 20% south on 10th x 45% north on 10th Figure 3 provides the trip generation for this site. Attachment 3, Page 3 of 31 3 Technical Memorandum Kelly Sandow PE TPRA 1025 G St 12.21.21 6.0 TRAFFIC VOLUMES 6.1 TURNING MOVEMENT COUNTS PM peak hour turning movement counts were collected December 8 and 9, 2021 for the time period of 4:00-6:00 PM for the study intersections. The counts illustrate that the peak hour occurs from 4:00-5:00 pm for the study area. 6.2 COUNT ADJUSTMENTS The turning movement counts are adjusted to reflect peak season traffic volumes. The City requested the use of ODOT Seasonal Adjustment Methodology to determine peak season volumes. As per the ODOT Methodology, the season trend table is to be used. The study area is predominantly commuter traffic. Therefore, the data for the commuter trend is the most appropriate. The peak season for commuter traffic occurs in the latter half of June. Therefore, the December counts are adjusted to reflect the June counts. The seasonal adjustment factor for the December counts is 1.19. Figure 4 provides the year 2021 seasonally adjusted traffic volumes. 6.3 FUTURE BASE VOLUMES The 2021 seasonally adjusted volumes are “grown” to represent 2035 traffic volumes. The growth rate is calculated using the growth rate found within the Springfield TSP for the area. The growth rate for the area is 2.5%. The development trips are added to the year 2035 background to represent the year 2035 with the zone change. Figure 5 provides the year 2035 background traffic volumes, and Figure 6 illustrates the year 2035 traffic volumes with zone change. Appendix B contains the traffic counts. 7.0 INTERSECTION ANALYSIS 7.1 PERFORMANCE MEASURES The measure of performance for the site access and intersections is Level of Service (LOS). LOS is a measure of performance for intersections in this analysis is based on the Highway Capacity Manual (HCM). LOS is a concept developed to quantify the degree of comfort (including such Attachment 3, Page 4 of 31 Technical Memorandum Kelly Sandow PE TPRA 1025 G St 12.21.21 4 elements as travel time, number of stops, total amount of stopped delay, and impediments caused by other vehicles) afforded to drivers as they travel through an intersection or along a roadway segment. It was developed to quantify the quality of service of transportation facilities. LOS is based on average delay, defined as the average total elapsed time from when a vehicle stops at the end of a queue until the vehicle departs from the stop line. The average delay is measured in seconds per vehicle per hour and then translated into a grade or “level of service” for each intersection. LOS ranges from A to F, with A indicating the most desirable condition and F indicating the most unsatisfactory condition. The City of Springfield uses a LOS D as a standard. The LOS criteria, as defined by the Highway Capacity Manual for signalized intersections, are provided in Table 2. TABLE 2: HCM LEVEL OF SERVICE FOR INTERSECTIONS Stopped Delay Per Vehicle (Seconds per Vehicle) hŶƐŝŐŶĂůŝnjĞĚ/ŶƚĞƌƐĞĐƟŽŶƐ ^ŝŐŶĂůŝnjĞĚ/ŶƚĞƌƐĞĐƟŽŶƐ A d 10.0 d 10 B > 10.0 and d 15.0 > 10 and d 20 C > 15.0 and d 25.0 > 20 and d 35 D > 25.0 and d 35.0 > 35 and d 55 E > 35.0 and d 50.0 > 55 and d 80 F > 50.0 > 80 7.2 INTERSECTION EVALUATION A performance analysis was conducted for the studied intersections for the Year 2035 existing conditions and conditions with the zone change for the PM peak hour. The intersection evaluation was performed using Synchro 10 following HCM 6 critical movement methodology outlined in ODOT’s analysis procedures manual. The results are shown in Table 3. The SYNCHRO outputs are provided in Appendix C. Attachment 3, Page 5 of 31 Technical Memorandum Kelly Sandow PE TPRA 1025 G St 12.21.21 5 TABLE 2: INTERSECTION EVALUATION RESULTS Intersection Standard LOS 2035 Background 2035 w/Zone Change G @ 10th D A A 10th @ Centennial D A A G St at Access D N/A B As demonstrated in Table 2, the intersection standard is met for the study area intersections and the site access connection. 8.0 CONCLUSIONS As demonstrated in this evaluation, the LOS standards are met. Therefore, the criteria of OAR- 060-012-0060 are demonstrated to be met. There is not a significant effect on the transportation system from the proposed zone change. Attachment 3, Page 6 of 31 ENGINEERING Fiugre 1: Site Location and Vicinity MapG St TPRA Springfield, ORSANDOW160 Madison Street Suite A Eugene, Oregon 97402 - 541.513.3376 - sandowengineering.com WillametteRiverPion eer P k w y G StCentennial Blvd 5th St 10th St Hwy126Main StMohawkBlvdSouth AF StE StD StC StB StA StAttachment 3, Page 7 of 31 ENGINEERING Figure 2: Lane configuration and Trafic ControlG St TPRA Springfield, ORSANDOW160 Madison Street Suite A Eugene, Oregon 97402 - 541.513.3376 - sandowengineering.com WillametteRiverPi o ne er P k wy G StCentennial Blvd 5th St 10th St Main StMohawkBlvdF StA St121. 10th @Centennial2. 10th @GSTOPSTOPSTOPSTOP STOP Attachment 3, Page 8 of 31 ENGINEERING Figure 3: Trip DistributionG St TPRA Springfield, ORSANDOW160 Madison Street Suite A Eugene, Oregon 97402 - 541.513.3376 - sandowengineering.com WillametteRiverPi o ne er P k wy G StCentennial Blvd 5th St 10th St Main StMohawkBlvdF StA St1231. 10th @Centennial2. 10th @G3. Access @G668866-1131304184-1119-1123-11656321Negative numbersdenote pass-by tripsAttachment 3, Page 9 of 31 ENGINEERING Figure 4:Year 2021 No Build Peak Hour Traffic VolumesG St TPRA Springfield, ORSANDOW160 Madison Street Suite A Eugene, Oregon 97402 - 541.513.3376 - sandowengineering.com WillametteRiverPi o ne er P k wy G StCentennial Blvd 5th St 10th St Main StMohawkBlvdF StA St121. 10th @Centennial2. 10th @G114918252922122012501003464523544265464230Attachment 3, Page 10 of 31 ENGINEERING Figure 5:Year 2035 Background Peak Hour Traffic VolumesG St TPRA Springfield, ORSANDOW160 Madison Street Suite A Eugene, Oregon 97402 - 541.513.3376 - sandowengineering.com WillametteRiverPi o ne er P k wy G StCentennial Blvd 5th St 10th St Main StMohawkBlvdF StA St121. 10th @Centennial2. 10th @G156624343930162713681404586104755757386341Attachment 3, Page 11 of 31 ENGINEERING Figure 6: Year 2035 Peak Hour Traffic Volumes With Zone ChangeG St TPRA Springfield, ORSANDOW160 Madison Street Suite A Eugene, Oregon 97402 - 541.513.3376 - sandowengineering.com WillametteRiverPi o ne er P k wy G StCentennial Blvd 5th St 10th St Main StMohawkBlvdF StA St1231. 10th @Centennial2. 10th @G3. Access @G0105861053557581949.471555556443481631135733922354656321Attachment 3, Page 12 of 31 SANDOW ENGINEERING APPENDIX $:SCOPE OF WORKTPRA 1025 G Street Attachment 3, Page 13 of 31 TRAFFIC IMPACT STUDY SCOPE OF WORK Date: December 6, 2021 Consultant: Kelly Sandow, P.E. Sandow Engineering LLC 160 Madison St. Suite A, Eugene, OR 97402 Project Assumptions:  Project Name: Catholic Community Services Zone Change TPR analysis  Location: 1025 G Street  Land Uses: Low Density Residential = ITE Code 210 – Single-Family Detached Housing Neighborhood Commercial Worst Case = ITE Code 851 - Convenience Market  Size: 0.989 Acres  Access: Via G Street.  Analysis Year: TSP Horizon Year 2035 General: - This scope is intended to support the zone change application and address Transportation Planning Rule (TPR) findings of significant affect. Analysis provided shall ensure that the zone change will not change the functional classification or degrade facilities below adopted thresholds as identified within the City of Springfield’s Transportation System Plan (TSP) in line with TPR requirements. Trip Distribution and Assignment: Applicants submitted trip distribution and assignment was used in scoping extents of TIA for analysis locations according to SDC 4.2-195 B (4). Study Locations:  G Street and 10th Street  10th Street and Centennial Analysis: LOS Analysis Methods Use 2016 Highway Capacity Manual methodology. Use ODOT Seasonal Trend Tables for Count Adjustment Use LCOG Transportation Model for Growth Rate Period(s) – Analysis Year Scenarios PM Peak Hour – 2035 No-Build, Build 2035 Signalized LOS Analysis Assumptions Ideal Saturation Flow Rate = 1,900 vphpl Peak Hour Factor = 0.95 for all movements Area Type = Other (Not CBD) Attachment 3, Page 14 of 31 Include this Scope of Work in the appendix of the Traffic Impact Study Attachment 3, Page 15 of 31 SANDOW ENGINEERING APPENDIX B:TRAFFIC VOLUMESTPRA 1025 G Street Attachment 3, Page 16 of 31 1 City: Date:Total of All Vehicles Right Thru Left Approach Total Right Thru Left Approach Total Right Thru Left Approach Total Right Thru Left Approach Total SB WB NB EB 16:00 16:15 3 17 5 25 7 5 3 15 2 13 0 15 0 7 2 9 64 0 3 0 0 16:15 16:30 2 6 2 10 5 10 8 23 0 9 0 9 0 4 3 7 49 0 0 0 016:30 16:45 2 8 4 14 3 6 5 14 6 11 1 18 1 5 3 9 55 1 1 0 0 16:45 17:00 3 13 5 21 7 5 4 16 1 12 1 14 0 2 3 5 56 224 1 1 1 017:00 17:15 5 13 10 28 6 4 2 12 0 16 0 16 0 10 5 15 71 231 1 0 0 017:15 17:30 3 9 5 17 5 6 3 14 1 8 0 9 0 5 3 8 48 230 0 0 1 117:30 17:45 3 9 9 21 4 9 4 17 0 9 1 10 1 2 0 3 51 226 0 0 0 017:45 18:00 1 13 8 22 1 3 2 6 0 7 0 7 0 3 1 4 39 209 0 0 0 018:00 18:15 0 1 0 1 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 0 018:15 18:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018:30 18:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18:45 19:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 022894839483110853238204353521 Right Thru Left Approach Right Thru Left Approach Right Thru Left Approach Right Thru Left Approach SB WB NB EB104416702226206894525611811302240000 0.83 0.65 0.80 0.70 0.79 0.65 0.63 0.74 0.38 0.87 0.50 0.78 0.25 0.64 0.92 0.83 0.880000100000100%0%0%0%4%0%0%0%0%0%6%0% Count Period Total % TrucksTrucks PM Peak Hour Count SummarySouthbound Westbound Northbound Eastbound Pedestrians Peak Volumes PHF Hourly Volume Pedestrians15 Minute Volume Intersection: 1: 10th @ G St Springfield, OR Counter: Sandow Engineering Wednesday, December 8, 2021 Time Period Southbound Westbound Northbound Eastbound Attachment 3, Page 17 of 31 14.10%62.82%23.08%%R T L PED11149180%Ped 0 25 R 32.89%36.36%L 12 29 T 38.16%60.61%T 20 22 L 28.95%3.03%R 1 0 Ped %0 2 50 10PedLTR Adjustment Factor %3.2%80.6%16.1% 1.120 249134 Northbound 72 62 124 33 48 76 165 78 87 Seasonally Adjusted Peak Hour Southbound 42 Eastbound1: 10th @ G St Westbound75 Attachment 3, Page 18 of 31 1: 10th @ G St Pedestrians and Cars Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left 4:00 PM 3 17 5 7 4 3 2 13 7 2 63 4:15 PM 2 6 2 5 10 8 9 4 3 49 4:30 PM 2 8 4 3 6 5 6 11 1 1 5 3 55 4:45 PM 3 13 5 7 5 4 1 12 1 2 3 56 2235:00 PM 5 13 10 6 4 2 16 9 5 70 230 5:15 PM 3 9 5 5 5 3 1 8 5 3 47 2285:30 PM 3 9 9 4 9 4 9 1 1 2 0 51 2245:45 PM 1 13 8 1 3 2 7 3 1 39 2076:00 PM 1 1 0 0 2 1396:15 PM 0 926:30 PM 0 416:45 PM 0 2Total02289480394631010853023720Peak Hour 0 13 43 24 0 0 21 20 14 0 0 8 47 2 0 0 1 21 14 0 228 681 Trucks Right Thru Left Right Thru Left Right Thru Left Right Thru Left4:00 PM 1 14:15 PM 0 04:30 PM 0 04:45 PM 0 0 15:00 PM 0 1 1 1 5:15 PM 1 1 2 5:30 PM 0 2 5:45 PM 0 26:00 PM 0 16:15 PM 0 06:30 PM 0 06:45 PM 0 0Total000020000010Peak Hour 0 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 2 4 Bikes Right Thru Left Right Thru Left Right Thru Left Right Thru Left4:00 PM 1 1 1 0 3 0 04:15 PM 0 0 0 04:30 PM 1 1 1 1 0 04:45 PM 1 1 1 1 1 1 05:00 PM 1 1 0 0 05:15 PM 1 1 0 0 1 15:30 PM 0 0 0 05:45 PM 0 0 0 06:00 PM 0 0 0 06:15 PM 0 0 0 06:30 PM 0 0 0 06:45 PM 0 0 0 0Total021131020010Peak Hour 0 2 1 0 0 2 0 0 0 2 0 0 0 1 0 3 2 2 1 Left Right Total Left Right Total Left Right Total Left Right Total4:00 PM 0 1 1 0 1 3 4 1 0 3 14:15 PM 1 1 1 1 0 2 2 0 2 2 04:30 PM 0 1 1 0 0 0 1 0 04:45 PM 2 2 0 0 0 0 0 2 05:00 PM 0 0 0 0 0 0 0 0 05:15 PM 0 1 1 1 1 0 1 0 0 15:30 PM 0 0 0 1 1 0 0 0 15:45 PM 1 1 0 2 2 0 2 0 1 06:00 PM 0 0 0 0 0 0 0 06:15 PM 0 0 0 0 0 0 0 06:30 PM 0 0 0 0 0 0 0 06:45 PM 0 0 0 0 0 0 0 0Total3142242132574383Peak Hour 2 0 2 0 1 1 2 0 0 1 1 0 0 0 0 1 1 2 1 EB Hourly Volume Time Period Southbound Westbound Northbound Eastbound SB WB NB Time Period Southbound Westbound Northbound Eastbound 15 Minute Volume Time Period Southbound Westbound Northbound Eastbound 15 Minute Volume Hourly Volume Pedestrians Time Period NE NW SW SE SB WB NB EB Attachment 3, Page 19 of 31 City: Date:Total of All Vehicles Right Thru Left Approach Total Right Thru Left Approach Total Right Thru Left Approach Total Right Thru Left Approach Total SB WB NB EB 16:00 16:15 0 1 0 1 2 127 6 135 11 1 17 29 10 104 1 115 280 0 0 0 016:15 16:30 0 0 0 0 1 111 7 119 6 0 11 17 13 113 0 126 262 0 1 0 016:30 16:45 0 0 1 1 2 112 11 125 3 0 15 18 6 102 3 111 255 0 0 0 016:45 17:00 0 2 3 5 1 102 11 114 10 1 21 32 25 107 0 132 283 1080 1 0 0 117:00 17:15 0 0 0 0 1 93 4 98 7 0 20 27 4 97 0 101 226 1026 0 0 0 117:15 17:30 0 1 0 1 0 96 5 101 6 0 8 14 11 124 3 138 254 1018 0 0 0 117:30 17:45 1 0 2 3 0 94 9 103 7 0 14 21 15 119 1 135 262 1025 0 0 0 017:45 18:00 0 0 0 0 2 63 8 73 5 0 4 9 18 104 1 123 205 947 0 0 0 018:00 18:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018:15 18:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018:30 18:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 018:45 19:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0146979861552110102870920271103 Right Thru Left Approach Right Thru Left Approach Right Thru Left Approach Right Thru Left Approach SB WB NB EB03476452354933026496544264484108000000.00 0.38 0.33 0.35 0.75 0.89 0.80 0.91 0.68 0.50 0.76 0.75 0.54 0.94 0.33 0.92 0.950000100000500%0%0%0%0%0%0%0%0%0%1%0% Count Period Total % TrucksTrucks PM Peak Hour Count SummarySouthbound Westbound Northbound Eastbound Pedestrians Peak Volumes PHF Hourly Volume Pedestrians15 Minute Volume Intersection: 2: 10th @ Centennial Springfield, OR Counter: Sandow Engineering Thursday, December 9, 2021 Time Period Southbound Westbound Northbound Eastbound Attachment 3, Page 20 of 31 1%1% 0.00%42.86%57.14%%R T L PED2034048%%Ped 0 6 R 1.22%46%0.83%L 4 452 T 91.68%88.02%T 426 35 L 7.10%45%11.16%R 54 0 Ped %43%0 64 2 30PedLTR Adjustment Factor %66.7%2.1%31.3% 1.120 1080 9%9%188 Northbound 92 96 953 484 460 493 19 7 12 Seasonally Adjusted Peak Hour Southbound 516 Eastbound2: 10th @ Centennial Westbound1000 Attachment 3, Page 21 of 31 2: 10th @ Centennial Pedestrians and Cars Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left 4:00 PM 1 2 127 6 11 1 17 10 104 1 280 4:15 PM 0 1 110 7 6 11 12 113 260 4:30 PM 0 1 2 111 11 3 15 6 102 3 254 4:45 PM 1 3 1 102 11 10 1 21 25 105 280 10745:00 PM 0 1 93 4 7 20 4 95 224 1018 5:15 PM 1 96 5 6 8 11 123 3 253 10115:30 PM 1 2 94 9 7 14 15 119 1 262 10195:45 PM 2 63 8 5 4 18 103 1 204 9436:00 PM 0 7196:15 PM 0 4666:30 PM 0 2046:45 PM 0 0 Total 0 1 3 6 0 9 796 61 0 55 2 110 0 101 864 9Peak Hour 0 0 2 4 0 0 4 402 31 0 0 26 1 64 0 0 46 425 6 0 1011 3103 Trucks Right Thru Left Right Thru Left Right Thru Left Right Thru Left4:00 PM 04:15 PM 1 0 14:30 PM 1 14:45 PM 0 2 2 45:00 PM 2 2 65:15 PM 1 1 65:30 PM 0 0 55:45 PM 1 1 46:00 PM 0 26:15 PM 0 16:30 PM 0 16:45 PM 0 0Total000010000160Peak Hour 0 0 0 0 0 1 0 0 0 0 0 0 0 5 0 0 6 16 Bikes Right Thru Left Right Thru Left Right Thru Left Right Thru Left4:00 PM 0 0 0 04:15 PM 1 0 0 1 0 04:30 PM 0 0 0 0 04:45 PM 1 1 1 0 0 15:00 PM 1 0 0 0 15:15 PM 1 0 0 0 15:30 PM 0 0 0 05:45 PM 0 0 0 06:00 PM 0 0 0 06:15 PM 0 0 0 06:30 PM 0 0 0 06:45 PM 0 0 0 0Total010010000030Peak Hour 0 1 0 0 0 0 0 0 0 0 0 0 0 3 0 1 0 0 3 Left Right Total Left Right Total Left Right Total Left Right Total4:00 PM 1 1 1 1 1 1 0 0 1 1 14:15 PM 1 1 0 0 1 1 0 0 0 1 0 1 4:30 PM 1 1 2 2 0 2 2 2 1 2 0 4:45 PM 0 0 0 0 0 1 1 0 0 0 15:00 PM 0 1 1 0 0 0 1 1 0 1 1 05:15 PM 0 1 1 0 1 1 0 0 1 0 1 5:30 PM 1 1 1 1 1 1 2 0 2 1 0 15:45 PM 0 0 0 0 1 1 0 0 0 16:00 PM 0 0 0 0 0 0 0 06:15 PM 0 0 0 0 0 0 0 06:30 PM 0 0 0 0 0 0 0 06:45 PM 0 0 0 0 0 0 0 0 0Total1343361452354646Peak Hour 0 1 1 0 2 2 4 0 0 1 1 0 1 3 4 2 3 3 2 EB EB Pedestrians Time Period NE NW SW SE SB WB NB Hourly Volume Time Period Southbound Westbound Northbound Eastbound SB WB NB Time Period Southbound Westbound Northbound Eastbound 15 Minute Volume Time Period Southbound Westbound Northbound Eastbound 15 Minute Volume Hourly Volume Attachment 3, Page 22 of 31 78 87 7 122021RTLPED2021RTL PED2114918010340Ped025R76Ped0 6 R 49342L1229T516L4452TT2022L48T42635L46033R10Ped484R540Ped025010064230PedLTRPedLTR72622499296 EDIT Highlighted 2035 PM Volumes BackgroundBase Year 2021Target Year 2035Years of Growth 14Growth Rate Per Year 0.025Growth Factor 1.35 105 117 9 16RTLPEDRTL PED1156624010450Ped034R103Ped0 8 R 66657L1639T697L5610TT2730L65T57547L62145R10Ped653R730Ped036814086341PedLTRPedLTR9784124130 1: 10th @ G St 2: 10th @ Centennial 2: 10th @ Centennial1: 10th @ G St Attachment 3, Page 23 of 31 TREND 1-Jan 15-Jan 1-Feb 15-Feb 1-Mar 15-Mar 1-Apr 15-Apr 1-May 15-May 1-Jun 15-Jun 1-Jul 15-Jul 1-Aug 15-Aug 1-Sep 15-Sep 1-Oct 15-Oct 1-Nov 15-Nov 1-Dec 15-Dec INTERSTATE URBANIZED 1.0672 1.0684 1.0922 1.1160 1.0605 1.0050 0.9923 0.9796 0.9781 0.9767 0.9615 0.9463 0.9517 0.9571 0.9551 0.9531 0.9674 0.9816 0.9850 0.9884 1.0045 1.0206 1.0322 1.0438 0.9463 INTERSTATE NONURBANIZED 1.2426 1.2883 1.3750 1.4616 1.2645 1.0673 1.0382 1.0092 0.9798 0.9504 0.9005 0.8506 0.8322 0.8139 0.8221 0.8302 0.8719 0.9135 0.9441 0.9747 1.0178 1.0608 1.1123 1.1638 0.8139 COMMUTER 1.0850 1.0875 1.1183 1.1492 1.0880 1.0268 1.0014 0.9759 0.9705 0.9650 0.9503 0.9355 0.9470 0.9585 0.9509 0.9433 0.9528 0.9623 0.9614 0.9604 0.9938 1.0272 1.0474 1.0676 0.9355COASTAL DESTINATION 1.1885 1.1712 1.2001 1.2289 1.1242 1.0194 1.0316 1.0437 1.0080 0.9723 0.9347 0.8972 0.8612 0.8252 0.8205 0.8159 0.8686 0.9214 0.9689 1.0164 1.0660 1.1156 1.1580 1.2005 0.8159COASTAL DESTINATION ROUTE 1.3445 1.3248 1.4108 1.4968 1.2858 1.0747 1.0911 1.1076 1.0274 0.9473 0.8941 0.8409 0.7820 0.7231 0.7218 0.7205 0.8016 0.8827 0.9669 1.0511 1.1133 1.1754 1.2480 1.3206 0.7205AGRICULTURE1.4583 1.4827 1.5763 1.6700 1.4596 1.2492 1.1487 1.0482 0.9747 0.9011 0.8579 0.8146 0.8058 0.7970 0.7922 0.7873 0.7772 0.7670 0.8288 0.8905 0.9947 1.0989 1.2462 1.3934 0.7670RECREATIONAL SUMMER 1.5848 1.6474 1.7861 1.9247 1.6595 1.3942 1.2973 1.2004 1.0517 0.9029 0.8256 0.7484 0.7018 0.6552 0.6708 0.6864 0.7393 0.7922 0.8898 0.9874 1.1242 1.2610 1.3965 1.5320 0.6552RECREATIONAL SUMMER WINTER 0.8736 0.8525 0.9330 1.0135 1.0146 1.0158 1.1492 1.2825 1.1763 1.0700 0.9760 0.8821 0.8005 0.7190 0.7305 0.7420 0.8897 1.0374 1.2010 1.3645 1.5212 1.6778 1.3812 1.0847 0.7190 RECREATIONAL WINTER 0.6997 0.6389 0.6561 0.6733 0.7219 0.7704 1.0580 1.3455 1.3746 1.4038 1.2832 1.1625 0.9985 0.8344 0.8600 0.8857 1.0560 1.2262 1.4100 1.5937 1.8758 2.1580 1.5328 0.9076 0.6389 SUMMER 1.2151 1.2357 1.3129 1.3901 1.2520 1.1139 1.0620 1.0100 0.9718 0.9336 0.8976 0.8615 0.8457 0.8299 0.8354 0.8410 0.8743 0.9077 0.9357 0.9638 1.0273 1.0908 1.1322 1.1737 0.8299 SUMMER < 2500 1.3035 1.3186 1.3817 1.4448 1.2869 1.1289 1.0598 0.9906 0.9480 0.9053 0.8720 0.8387 0.8237 0.8086 0.8229 0.8373 0.8616 0.8859 0.9233 0.9607 1.0428 1.1249 1.2016 1.2783 0.8086 * Seasonal Trend Table factors are based on previous year ATR data. The table is updated yearly.* Grey shading indicates months were seasonal factor is greater than or less than 30%* February 2019 snow event causing lower seasonal factors 1Seasonal Trend Table: The 2020 table is based on 2019 values due to the irregularity caused by the Covid epidemic shutdown during the 2020 count year. Summer Commuter December 1.0474Peak 0.9355 1.119644 Seasonal Trend Peak SEASONAL TREND TABLE (Updated: 7/20/2021 )1 Attachment 3, Page 24 of 31 SANDOW ENGINEERING APPENDIX C:SYNCHRO OUTPUTSTPRA 1025 G Street Attachment 3, Page 25 of 31 HCM 6th AWSC 3: G St & 10th St 12/21/2021 TPRA 12/21/2021 2035 Background Synchro 10 Report Page 1 Intersection Intersection Delay, s/veh 7.9 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 16 27 1 30 39 34 3 68 14 24 66 15 Future Vol, veh/h 16 27 1 30 39 34 3 68 14 24 66 15 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles, %0 1 0 0 1 0 0 0 0 0 0 0 Mvmt Flow 17 28 1 32 41 36 3 72 15 25 69 16 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 7.8 7.9 7.8 8 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, %4% 36% 29% 23% Vol Thru, %80% 61% 38% 63% Vol Right, %16% 2% 33% 14% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 85 44 103 105 LT Vol 3 16 30 24 Through Vol 68 27 39 66 RT Vol 14 1 34 15 Lane Flow Rate 89 46 108 111 Geometry Grp 1 1 1 1 Degree of Util (X)0.106 0.058 0.128 0.132 Departure Headway (Hd)4.276 4.523 4.258 4.304 Convergence, Y/N Yes Yes Yes Yes Cap 841 794 845 836 Service Time 2.289 2.538 2.271 2.317 HCM Lane V/C Ratio 0.106 0.058 0.128 0.133 HCM Control Delay 7.8 7.8 7.9 8 HCM Lane LOS A A A A HCM 95th-tile Q 0.4 0.2 0.4 0.5 Attachment 3, Page 26 of 31 HCM 6th Signalized Intersection Summary 6: 10th St & Centennial 12/21/2021 TPRA 12/21/2021 2035 Background Synchro 10 Report Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 5 575 73 47 610 8 86 3 41 5 4 0 Future Volume (veh/h) 5 575 73 47 610 8 86 3 41 5 4 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1826 1900 1900 1885 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 5 605 77 49 642 8 91 3 43 5 4 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 5 0 0 1 0 0 0 0 0 0 0 Cap, veh/h 396 840 107 357 983 12 373 37 122 329 227 0 Arrive On Green 0.53 0.53 0.53 0.53 0.53 0.53 0.25 0.25 0.25 0.25 0.25 0.00 Sat Flow, veh/h 794 1587 202 771 1858 23 898 147 478 763 893 0 Grp Volume(v), veh/h 5 0 682 49 0 650 137 0 0 9 0 0 Grp Sat Flow(s),veh/h/ln 794 0 1790 771 0 1881 1523 0 0 1656 0 0 Q Serve(g_s), s 0.2 0.0 12.1 2.1 0.0 10.3 1.9 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 10.5 0.0 12.1 14.2 0.0 10.3 2.9 0.0 0.0 0.1 0.0 0.0 Prop In Lane 1.00 0.11 1.00 0.01 0.66 0.31 0.56 0.00 Lane Grp Cap(c), veh/h 396 0 947 357 0 995 532 0 0 556 0 0 V/C Ratio(X)0.01 0.00 0.72 0.14 0.00 0.65 0.26 0.00 0.00 0.02 0.00 0.00 Avail Cap(c_a), veh/h 500 0 1183 459 0 1243 995 0 0 1044 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 10.8 0.0 7.5 12.9 0.0 7.1 12.6 0.0 0.0 11.6 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.0 1.6 0.2 0.0 0.9 0.3 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 3.0 0.3 0.0 2.5 0.9 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 10.9 0.0 9.1 13.0 0.0 7.9 12.8 0.0 0.0 11.6 0.0 0.0 LnGrp LOS B A A B A A B A A B A A Approach Vol, veh/h 687 699 137 9 Approach Delay, s/veh 9.1 8.3 12.8 11.6 Approach LOS A A B B Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 15.1 26.5 15.1 26.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 23.5 27.5 23.5 27.5 Max Q Clear Time (g_c+I1), s 4.9 14.1 2.1 16.2 Green Ext Time (p_c), s 0.6 6.4 0.0 5.8 Intersection Summary HCM 6th Ctrl Delay 9.1 HCM 6th LOS A Attachment 3, Page 27 of 31 HCM 6th AWSC 3: G St & 10th St 12/21/2021 TPRA 12/21/2021 2035 With Zone Change Synchro 10 Report Page 1 Intersection Intersection Delay, s/veh 8.2 Intersection LOS A Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 16 31 1 48 43 64 3 57 33 55 55 15 Future Vol, veh/h 16 31 1 48 43 64 3 57 33 55 55 15 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles, %0 1 0 0 1 0 0 0 0 0 0 0 Mvmt Flow 17 33 1 51 45 67 3 60 35 58 58 16 Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0 Approach EB WB NB SB Opposing Approach WB EB SB NB Opposing Lanes 1 1 1 1 Conflicting Approach Left SB NB EB WB Conflicting Lanes Left 1 1 1 1 Conflicting Approach Right NB SB WB EB Conflicting Lanes Right 1 1 1 1 HCM Control Delay 8 8.4 7.9 8.4 HCM LOS A A A A Lane NBLn1 EBLn1 WBLn1 SBLn1 Vol Left, %3% 33% 31% 44% Vol Thru, %61% 65% 28% 44% Vol Right, %35% 2% 41% 12% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 93 48 155 125 LT Vol 3 16 48 55 Through Vol 57 31 43 55 RT Vol 33 1 64 15 Lane Flow Rate 98 51 163 132 Geometry Grp 1 1 1 1 Degree of Util (X)0.118 0.065 0.195 0.165 Departure Headway (Hd)4.329 4.659 4.297 4.508 Convergence, Y/N Yes Yes Yes Yes Cap 829 769 835 796 Service Time 2.351 2.686 2.318 2.53 HCM Lane V/C Ratio 0.118 0.066 0.195 0.166 HCM Control Delay 7.9 8 8.4 8.4 HCM Lane LOS A A A A HCM 95th-tile Q 0.4 0.2 0.7 0.6 Attachment 3, Page 28 of 31 HCM 6th Signalized Intersection Summary 6: 10th St & Centennial 12/21/2021 TPRA 12/21/2021 2035 With Zone Change Synchro 10 Report Page 2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 5 575 81 53 610 8 94 9 47 5 10 0 Future Volume (veh/h) 5 575 81 53 610 8 94 9 47 5 10 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1900 1826 1900 1900 1885 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 5 605 85 56 642 8 99 9 49 5 11 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 5 0 0 1 0 0 0 0 0 0 0 Cap, veh/h 389 828 116 344 982 12 359 54 126 201 372 0 Arrive On Green 0.53 0.53 0.53 0.53 0.53 0.53 0.26 0.26 0.26 0.26 0.26 0.00 Sat Flow, veh/h 794 1566 220 765 1858 23 849 204 478 349 1415 0 Grp Volume(v), veh/h 5 0 690 56 0 650 157 0 0 16 0 0 Grp Sat Flow(s),veh/h/ln 794 0 1786 765 0 1881 1531 0 0 1764 0 0 Q Serve(g_s), s 0.2 0.0 12.8 2.6 0.0 10.8 2.3 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 11.0 0.0 12.8 15.4 0.0 10.8 3.5 0.0 0.0 0.3 0.0 0.0 Prop In Lane 1.00 0.12 1.00 0.01 0.63 0.31 0.31 0.00 Lane Grp Cap(c), veh/h 389 0 944 344 0 994 539 0 0 574 0 0 V/C Ratio(X) 0.01 0.00 0.73 0.16 0.00 0.65 0.29 0.00 0.00 0.03 0.00 0.00 Avail Cap(c_a), veh/h 474 0 1137 427 0 1198 961 0 0 1049 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh11.3 0.0 7.8 13.8 0.0 7.3 12.9 0.0 0.0 11.8 0.0 0.0 Incr Delay (d2), s/veh 0.0 0.0 2.0 0.2 0.0 1.0 0.3 0.0 0.0 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.0 0.0 3.4 0.4 0.0 2.8 1.1 0.0 0.0 0.1 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 11.3 0.0 9.8 14.0 0.0 8.3 13.2 0.0 0.0 11.8 0.0 0.0 LnGrp LOS B A A B A A B A A B A A Approach Vol, veh/h 695 706 157 16 Approach Delay, s/veh 9.8 8.8 13.2 11.8 Approach LOS A A B B Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 15.9 27.3 15.9 27.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 23.5 27.5 23.5 27.5 Max Q Clear Time (g_c+I1), s 5.5 14.8 2.3 17.4 Green Ext Time (p_c), s 0.7 6.2 0.0 5.4 Intersection Summary HCM 6th Ctrl Delay 9.7 HCM 6th LOS A Attachment 3, Page 29 of 31 HCM 6th TWSC 9: Site Access 12/21/2021 TPRA 12/21/2021 2035 With Zone Change Synchro 10 Report Page 3 Intersection Int Delay, s/veh 3.2 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 54 65 23 92 63 21 Future Vol, veh/h 54 65 23 92 63 21 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 0 1 0 1 0 0 Mvmt Flow 57 68 24 97 66 22 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 125 0 236 91 Stage 1 - - - - 91 - Stage 2 - - - - 145 - Critical Hdwy - - 4.1 - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy - - 2.2 - 3.5 3.3 Pot Cap-1 Maneuver - - 1474 - 757 972 Stage 1 - - - - 938 - Stage 2 - - - - 887 - Platoon blocked, % - -- Mov Cap-1 Maneuver - - 1474 - 744 972 Mov Cap-2 Maneuver - - - - 744 - Stage 1 - - - - 938 - Stage 2 - - - - 872 - Approach EB WB NB HCM Control Delay, s 0 1.5 10.1 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)790 - - 1474 - HCM Lane V/C Ratio 0.112 - - 0.016 - HCM Control Delay (s) 10.1 - - 7.5 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.4 - - 0.1 - Attachment 3, Page 30 of 31 SANDOW ENGINEERING 160 Madison Street, Suite A Eugene, Oregon 97402 541.513.3376 sandowengineering.com Attachment 3, Page 31 of 31 nnn First Baptist Church of Springfield 1175 G Street, Springfield, Oregon 97477-4109 541-746-6031 Fax: 541-746-5096 fbcspringfield@gmail.com www.fbcspringfieldor.com Rev. Sam Brink, Interim Pastor January 4, 2022 To whom it may concern: My name is Sam Brink and I am the interim pastor of the First Baptist Church in Springfield. I am writing on behalf of the congregation, to encourage your support of the efforts of OASIS to bring together in one location their outreach to the community through building a new service space. In 2015, we, as a congregation, made the choice to open up part of our campus for office and service space for OASIS. We had sensed a need to help unhoused families, first in our neighborhood and then in the wider Springfield community. This is a ministry need that we could not handle on our own and so we were eager to join with Catholic Community Services in helping them reaching out into the community. Through this partnership, we have provided not only office space and service space, but we have helped them through the use of our parking lot for temporary housing for individuals and small families. We have been glad to provide space for the community shower trailer when it is available and working with them in other ways as the need arises. It has been a great and effective partnership. As you know, life during COVID has not been easy for any of us. But I have watched as the OASIS staff has continued to figure out how to meet the needs presented to them and yet keep the staff and the people they are serving, safe. I believe that the proposed new service space will provide an easier way to meet people’s needs as well as continue to keep people safe. Social ministry is difficult enough on its own, but when you have a staff spread out over different locations and the people who need service have to move between locations just to receive help it increases the level of difficult and decreases the effectiveness. We think it makes perfect sense to try to consolidate the service onto one campus setting. A new building will enable OASIS to easily share staffing needs when they arise. It will allow them to create a space that can be shaped to make their service easier as well as more efficient. While they have made our space work as best it can, there is always shortcomings to having to live in space not created for your need. Again, I, along with the members and friends of First Baptist, encourage you to approve the building of the new service center. You will be helping not only the people they serve, but the community you serve and together, we will make the Springfield community better. Sincerely, Sam Brink, Interim Pastor First Baptist Church, Springfield Attachment 4, Page 1 of 1 Attachment 5, Page 1 of 1 BEFORE THE PLANNING COMMISSION OF SPRINGFIELD, OREGON FINAL ORDER FOR: AMENDMENT TO THE SPRINGFIELD ZONING MAP TO REZONE APPROXIMATELY 0.99 ACRES ] 811-21-000294-TYP3 OF LAND IDENTIFIED AS 1025 G STREET (ASSESSOR’S MAP 17-03-35-11, TAX LOT 3500) FROM ] LOW DENSITY RESIDENTIAL (LDR) TO NEIGHBORHOOD COMMERCIAL (NC) ] NATURE OF THE PROPOSAL Proposed amendment to the Springfield Zoning Map: ▪ Rezone approximately 0.99 acres of property located at the southeast corner of the intersection of 10th and G Streets and addressed as 1025 G Street (Map 17-03-35-11, Tax Lot 3500) from Low Density Residential to Neighborhood Commercial. The subject property is generally depicted and more particularly described in Exhibit A to this Order. Timely and sufficient notice of the public hearing has been provided, pursuant to SDC 5.2-115. On February 1, 2022, the Springfield Planning Commission held a public hearing, and on March 1, 2022 the Planning Commission conducted deliberations on the proposed Zoning Map amendment. The staff report, written comments, and testimony of those who spoke at the public hearing via online meeting platform were entered into the record. CONCLUSION On the basis of this record, the proposed Zoning Map amendment is consistent with the criteria of SDC 5.22-115. This general finding is supported by the specific findings of fact and conclusions as stated in the staff report and findings attached hereto as Exhibit B to this Order. ORDER/RECOMMENDATION It is ORDERED by the Springfield Planning Commission that Case Number 811-21-000294-TYP3, Zoning Map Amendment, be approved. This ORDER was presented to and approved by the Planning Commission on March 1, 2022. ____________________________ ____________________ Planning Commission Chairperson Date ATTEST AYES: NOES: ABSENT: ABSTAIN: Attachment 6, Page 1 of 14 EXHIBIT A PROPERTY REZONED FROM LOW DENSITY RESIDENTIAL TO NEIGHBORHOOD COMMERCIAL LEGAL DESCRIPTION PARCEL 1 Beginning at the point of intersection of the East line of 10th Street with the South line of G Street in Springfield, Lane County, Oregon, which said point is also 962.48 feet North of the Northwest corner of Block 4 of BRATTAIN'S ADDITION TO SPRINGFIELD, in Lane County, Oregon, as platted and recorded in Book 9, Page 6, Lane County Oregon Plat Records; thence East along the South line of G Street 240 feet; thence South parallel to the East line of 10th Street 118 feet; thence West parallel to the South line of G Street 240 feet to the East line of 10th Street; and thence North 118 feet to the point of beginning, all in Lane County, Oregon. PARCEL 2 Beginning at a point on the South line of G Street 240 feet Easterly from the intersection of the South line of G Street with the East line of 10th Street; thence Easterly along the South line of G Street 120 feet; thence South 120 feet, more or less, to the North line of the East-West alley between F Street and G Street; thence westerly along the North line of said alley a distance of 120 feet; thence North parallel to the East line of 10th Street 120 feet, the place of beginning, in the City of Springfield, Lane County, Oregon. Brattain House Two Rivers/Dos Rios Elementary School First Baptist Church of Springfield SITE Exhibit A, Page 1 of 1 Attachment 6, Page 2 of 14 Staff Report and Findings Springfield Planning Commission Zone Change Request Public Hearing Date: February 1, 2022 Report Date: March 1, 2022 Case Number: 811-21-000294-TYP3 Applicant: Chris Pickering, Catholic Community Services Applicant’s Representative: Teresa Bishow, Bishow Consulting Property Owner: Catholic Community Services of Lane County Inc. Site: Southeast corner of the intersection of 10th & G Streets; addressed as 1025 G Street (Assessor’s Map 17-03-35-11, Tax Lot 3500). Request Rezone approximately 0.99 acres of Low Density Residential (LDR) to Neighborhood Commercial (NC). Site Information The property that is subject of the Zone Change request is comprised of a rectangular, 0.99-acre parcel located at the southeast corner of the intersection of 10th and G Streets. The property is across the street to the south from the Brattain House and Two Rivers-Dos Ríos Elementary School. The subject property contains a 15,200 ft2 two-story building that houses the Catholic Community Services of Lane County administrative offices. Charitable services and community centers are not listed uses in the LDR District and therefore the facility is considered an existing non-conforming use. The subject site has corner frontage on 10th Street along the western boundary and G Street along the northern boundary. The properties across the street to the north and northwest are developed with public school facilities and are zoned Public Land and Open Space (PLO). On the south side of G Street, properties to the west, south and east are zoned Low Density Residential. Background In March 2021, representatives of the applicant Catholic Community Services (CCS) approached the City about a planned building expansion on the site. In response to initial guidance from City planning staff, CCS submitted an expansion of non-conforming use application in September 2021. Subsequently, City staff conducted a more in-depth review of the history and type of uses on the site. City staff and CCS were unable to find any documented planning approval for the existing charitable services use operating on the site. The building ceased to be used as a church in 1998 and subsequent occupants had not re-established its use as a church. Churches are a listed use in the Low Density Residential district subject to a Type III Discretionary Use permit process. However, although the property is owned and operated by a religious organization, it is not functioning as a center of religious worship, nor is this use planned in the future. Therefore, establishing a church use on the property through a Discretionary Use permit still does not accommodate the existing use nor does it facilitate the proposed building expansion. Without any documentation that the charitable services use on the site was originally established through a planning approval, expansion of a non-conforming use is not a viable process. As a result, CCS withdrew Exhibit B, Page 1 of 12 Attachment 6, Page 3 of 14 their September 2021 application on the basis of City planning staff’s recommendation that it would not be approvable. Staff provided input to CCS regarding alternative options that CCS might pursue to establish the charitable services use on the site, including rezoning from Low Density Residential to another land use district. CCS elected to pursue rezoning of the site because it provides a clear path forward to establish the use currently operating on the site and subsequently allow for expansion of that use. Application The Zoning Map amendment application was initiated on November 9, 2021 and was considered complete upon receipt of the supporting Traffic Analysis on December 23, 2021. The initial Planning Commission public hearing on the matter of the Zone Change request was held February 1, 2022. The applicant is proposing the zone change from LDR to Neighborhood Commercial (NC) to bring the facility into conformity with the provisions of the commercial (NC) zoning district and to facilitate future expansion of the charitable services stationed on the site. In accordance with provisions of the Metro Plan, the Springfield Comprehensive Plan and Section 3.2-305 of the City’s Development Code, Neighborhood Commercial sites can be established on residentially-designated sites. The intent of the NC zoning is to provide small-scale sites offering commercial services to neighborhoods and localized areas, and to accommodate commercial uses that enhance neighborhood character. Notification and Written Comments Notification of the February 1, 2022 Planning Commission public hearing was sent to all property owners and residents within 300 feet of the site on January 18, 2022. Newspaper notice of the public hearing meeting was published in the legal notices section of the Register Guard on January 24, 2022. Staff received two letters in support of the proposal from the First Baptist Church of Springfield (1175 G Street) and Springfield Public Schools on behalf of the McKinney-Vento Liaisons for the OASIS program. The letters of support are included in the Planning Commission AIS packet for this application. A letter opposing the proposed Zoning Map amendment was received on January 27, 2022 (after the report packet for the Planning Commission meeting was prepared) and provided to the Planning Commissioners in advance of the meeting. On April 16, 2020, the Governor issued Executive Order 20-16, which requires governing bodies to hold public meetings and hearings by telephone, video, or through other electronic or virtual means whenever possible. On June 30, 2020, Oregon Legislature enacted House Bill 4212 (HB 4212) which waives requirements under the Oregon Public Meetings Law and other statutes to facilitate public meetings online or by phone. Under HB 4212, the governing body must make available a method by which the public can listen to or virtually attend the public meeting or hearing at the time it occurs. House Bill 4212 allows governing bodies to accept public testimony by telephone or video conferencing technology, or to provide a means to submit written testimony (including email or other electronic methods) that the governing body can consider in a timely manner. House Bill 4212 overrides conflicting requirements for quasi-judicial public hearings in state law or in the Springfield Development Code or Metro Plan. Since issuance of the Executive Order and adoption of HB 4212, the City of Springfield has conducted regular and public hearing meetings of the Planning Commission and City Council using online virtual meeting platforms. The February 1, 2022 Planning Commission public hearing will be conducted as an online meeting via Zoom which allows members of the public to observe and listen to the meeting online. Members of the public are able to provide testimony to the Planning Commission prior to the meeting by emailing comments to staff, using the http://springfieldoregonspeaks.org web portal, or by joining the online meeting remotely. The public is also able to provide testimony to the Planning Commission by phone. Details regarding how to join the online meeting were provided in the notification letter mailed to adjacent residents and property Exhibit B, Page 2 of 12 Attachment 6, Page 4 of 14 owners, in the posted public hearing notices, in the Planning Commission meeting agenda, and posted on the City’s website. Summary of Testimony Provided at the Public Hearing Verbal testimony was provided at the public hearing by respondents favoring, opposing, and neutral to the proposal. A respondent who had submitted written comments opposing the zone change requested to rescind the letter after he had spoken with a representative of Catholic Community Services and had questions and concerns satisfactorily addressed. The respondent instead spoke in favor of the proposal at the public hearing meeting. At the public hearing meeting, three respondents expressed concerns about trash, loitering, vandalism, drug activity, and other occurrences within the alley behind 1025 G Street and on nearby streets. The respondents expressed concerns about negative activities conflicting with the family-friendly nature of the neighborhood and posing a risk to children at the elementary school across the street. One respondent also commented that rezoning the property to a commercial district could invite new and more intensive development on the property should the charitable services use be discontinued. The applicant answered questions of the respondents and Planning Commission and committed to addressing the issues identified in the public hearing testimony. The applicant also clarified that Catholic Community Services had owned the property for more than 17 years and were intending to invest time and capital into a building expansion to accommodate an existing program that is stationed on the site (the OASIS program). Staff Response to Testimony Much of the testimony provided at the public hearing consisted of concerns with past and currently ongoing activities on or adjacent to the site. The testimony regarding trash, drug activity, loitering and other negative activities is not relevant to the criteria of approval for a zone change. However, testimony regarding site redevelopment and the potential for more intensive uses to locate on the site in the future – once it is rezoned to a commercial use – are valid comments that relate to criterion C.3 (below). Criteria of Approval Section 5.22-100 of the Springfield Development Code (SDC) contains the criteria of approval for the decision maker to utilize during review of Zoning Map amendment requests. The Criteria of Zoning Map amendment approval criteria are: SDC 5.22-115 CRITERIA C. Zoning Map amendment criteria of approval: 1. Consistency with applicable Metro Plan policies and the Metro Plan diagram; 2. Consistency with applicable Refinement Plans, Plan District maps, Conceptual Development Plans and functional plans; and 3. The property is presently provided with adequate public facilities, services and transportation networks to support the use, or these facilities, services and transportation networks are planned to be provided concurrently with the development of the property. 4. Legislative Zoning Map amendments that involve a Metro Plan Diagram amendment shall: a. Meet the approval criteria specified in Section 5.14-100; and Exhibit B, Page 3 of 12 Attachment 6, Page 5 of 14 b. Comply with Oregon Administrative Rule (OAR) 660-012-0060, where applicable. Proposed Findings In Support of Zone Change Approval Criterion: Zoning Map amendment criteria of approval: 1. Consistency with applicable Metro Plan policies and the Metro Plan diagram; Applicant’s Narrative: “The Metro Plan diagram designates the subject property ‘Low Density Residential’. (Refer to Exhibit ‘B’ — Metro Plan Designations). As stated in the Metro Plan text (page II -G-4), the Metro Plan diagram does not depict neighborhood commercial zoning.1 The Metro Plan text describes the purpose of neighborhood commercial facilities not shown on the Metro Plan Diagram and establishes minimum location standards and site criteria.2 The Metro Plan standards and site criteria are listed below in italics following by findings demonstrating compliance. 1. Within convenient walking or bicycling distance of an adequate support population. For a full-service neighborhood commercial center at the high end of the size criteria, an adequate support population would be about 4,000 persons (existing or anticipated) within an area conveniently accessible to the site. For smaller sites or more limited services, a smaller support population or service area may be sufficient. The Metro Plan does not define ‘adequate support population’ for smaller sites or ‘an area conveniently accessable [sic] to the site’. The subject property is conveniently located at the edge of a residential area and close to public schools and major employment areas such as the McKenzie Willamette Medical Center. The subject property is only about one acre is size and is considered a smaller site. Based on the general density of people living, working, and going to school in the area, the site has a sufficient support population. 2. Adequate area to accommodate off-street parking and loading needs and landscaping, particularly between the center and adjacent residential property, as well as along street frontages next door to outdoor parking areas. The subject property is a 0.99-acre parcel on a corner rectangular shaped lot. The size and configuration of the lot are suitable for uses permitted in the Neighborhood Commercial zone. Due to the 14-foot wide alley to the south of the subject property, the site is not adjacent to any property in residential use. 3. Sufficient frontage to ensure safe and efficient automobile, pedestrian and bicycle access without conflict with moving traffic at intersections and along adjacent streets. 1 The Metro Plan, page II-G-2, describes why certain zones are not depicted on the Metro Plan diagram as follows: ‘Certain land uses are not individually of metropolitan-wide significance in terms of size or location because of their special nature or limited extent. Therefore, it is not advisable to account for [most] of them on the Metro Plan Diagram. The Diagram’s depiction of land use designations is not intended to invalidate local zoning or land uses which are not sufficiently intensive or large enough to be included on the Metro Plan Diagram.’ 2 Metro Plan, page II-G-5 Exhibit B, Page 4 of 12 Attachment 6, Page 6 of 14 The subject property is on a corner rectangular shaped lot with an alley along the south side. The lot provides sufficient frontage for safe and efficient automobile pedestrian and bicycle access without creating conflicts with traffic at the intersection or along adjacent streets. 4. The site shall be no more than five acres, including existing commercial development. The exact size shall depend on the number of establishments associated with the center and the population to be served. The proposed Neighborhood Commercial site is 0.99 acres. The First Baptist Church adjacent to the subject property is located on 1.45 acres. If the church was considered ‘existing commercial development’, it would bring the total neighborhood commercial site up to 2.44 acres, less than the maximum size allowed in the Metro Plan. The Metro Plan text also provides3: ‘In certain circumstances, convenience grocery stores or similar retail operations play an important role in providing services to existing neighborhoods. These types of operations which currently exist can be recognized and allowed to continue through such actions as rezoning.’ Since 2004, [Catholic Community Services of Lane County] has provided vital safety-net services to the neighborhood. Services include immediate assistance with food, clothing, and energy & housing assistance. Approval of the zone change will allow these charitable services to continue to be offered on the site. The NC zoning will also allow a 1,600 square foot building addition to house the OASIS Program on-site.” Finding 1: Staff concurs with the applicant’s findings in the italicized narrative above and in the subsections to follow. The subject property meets the criteria for size, location and use as described in the project narrative and qualifies as a site zoned for Neighborhood Commercial use. Finding 2: Metro Plan Chapter II, Pages II-G-5 & 6 states in part: “The determination of the appropriateness of specific sites and uses or additional standards is left to the local jurisdiction…[neighborhood commercial] operations which currently exist can be recognized and allowed to continue through such actions as rezoning.” While the focus of these Metro Plan provisions is on local retail and convenience grocery stores, the same process is applicable to the subject property. The applicant is requesting the rezoning action in order to allow the site to be recognized and allowed to continue. Catholic Community Services of Lane County acquired the subject property and began operating in 2004. According to the Lane Council of Governments, the Metro Plan was last updated and published in June 2019. Therefore, the commercial use can be considered “currently existing” for the purpose of this review. Because the Metro Plan specifically identifies Neighborhood Commercial sites as small-scale entities that are not shown on the overall Metro Plan diagram, this criterion has been met. Finding 3: The proposed zone change is consistent with provisions of the Metro Plan whereby zoning can be monitored and adjusted as necessary to meet current urban land use demands. The requested change from LDR to NC would bring the site into conformity with provisions of the Metro Plan and the City’s Development Code. The rezoning action would also facilitate the future review and approval of modifications to the site. Finding 4: In accordance with Policy A.4 of the Metro Plan, the City shall use annexation, provision of adequate public facilities and services, rezoning, redevelopment, and infill to meet the 20-year projected housing demand. Currently, the property is zoned Low Density Residential and the 3 Metro Plan, page II-G-6 Exhibit B, Page 5 of 12 Attachment 6, Page 7 of 14 applicant is not proposing to change the comprehensive plan designation of the site. The proposed rezoning does not affect the ability of the City to address projected housing demand and the need for adequate public facilities and services to serve new development areas elsewhere within Springfield. Finding 5: The subject property is in the central core of the City and the site is classified as “developed” and is not tabulated as land with development potential in the City’s acknowledged Residential Lands and Housing Needs Analysis (ref. Table 3-3). The applicant’s stated intent for the proposed rezoning of approximately 0.99 acres is to accommodate the existing charitable services offices and to facilitate future modifications to the site. Therefore, the proposed rezoning will recognize and accommodate an existing “commercial” use within the neighborhood and will not remove approximately one acre from the developable residential lands inventory. Finding 6: The policies of the Springfield 2030 Comprehensive Plan – Residential Land Use and Housing Element and Economic Element also apply to the subject site. The Residential Land Use and Housing Element of the City’s 2030 Comprehensive Plan updates and refines, but does not replace, the Residential Land Use and Housing Element of the Metro Plan. Finding 7: There are no specific policies of the Springfield 2030 Comprehensive Plan – Residential Land Use and Housing Element that apply to this site. Because the site is retaining its residential designation but changing zoning there is no net effect on the amount of buildable residential land or number of dwelling units in the city. Finding 8: The applicant is proposing to rezone the property to accommodate the existing commercial use of charitable services, and to facilitate future expansion of the building and associated services on the site. A future expansion of the building on the site would qualify as an infill development near the downtown core of Springfield. The proposal is consistent with Policy E.1. Finding 9: In accordance with the Springfield 2030 Comprehensive Plan – Economic Element, Policy E.6, the City must: “Facilitate short term and long term redevelopment activity and increased efficiency of land use through the urban renewal program, updates to refinement plans and the development review process.” Finding 10: The subject rezoning request does not require a comprehensive plan amendment and is therefore subject to the development review process. Additionally, future expansion of the building or services offered on the site would be subject to a separate land use approval process. Based on these findings staff concludes that the proposal is consistent with Policy E.6. Finding 11: In accordance with the Springfield 2030 Comprehensive Plan – Economic Element, Policy E.7, “Where possible, concentrate development on sites with existing infrastructure or on sites where infrastructure can be provided relatively easily and at a comparatively low cost.” Finding 12: To address the above policy, staff finds that the subject site is within a mature neighborhood on the edge of the downtown core with all available utilities and services along the property frontages. It is not expected that future modifications or expansions to the building would require additional or upgraded public infrastructure. Therefore, based on the above findings, staff concludes that the proposal is consistent with Policy E.7. Exhibit B, Page 6 of 12 Attachment 6, Page 8 of 14 Finding 13: In accordance with Springfield 2030 Comprehensive Plan – Economic Element, Policy E.23, the City must “identify and target commercial activities that will generate living-wage employment opportunities and/or meet daily needs of local residents.” Finding 14: The existing commercial use on the site provides charitable services to residents of Springfield and the rest of Lane County. Many of the services are specifically for low-income and disadvantaged individuals or in response to local emergencies and natural disasters. Based on the applicant’s project narrative, these services are offered both on-site and at other locations within the community. The subject site provides a centralized and accessible location for the provision of charitable services in the community. The proposal is consistent with Policy E.23. Finding 15: In accordance with Springfield 2030 Comprehensive Plan – Economic Element, Policy E.25, the City must “update plans and zoning to create more opportunities for mixing compatible commercial uses within employment zones in ways that preserve the industrial land supply, minimize vehicular trips and traffic congestion, and promote convenience and walkability for employees.” Finding 16: The subject site is located immediately adjacent to a large cluster of public agency and school facilities along 10th and G Streets that include Two Rivers-Dos Ríos Elementary School, Springfield High School, the Brattain House, and Willamalane Park Swim Center. These facilities are long-standing education and employment centers and focal points of community activity. Additionally, some of the target groups for charitable services offered by Catholic Community Services include school-aged children, youth, and families. For these reasons the subject property is strategically located within the community and rezoning to a commercial use recognizes the current and future activities occurring on the property. The proposal is consistent with Policy E.25. Conclusion: Rezoning the subject property from LDR to NC is consistent with provisions of the adopted Metro Plan, the Springfield 2030 Comprehensive Plan – Residential Land Use and Housing Element, and the Springfield 2030 Comprehensive Plan – Economic Element. 2. Consistency with applicable Refinement Plans, Plan District maps, Conceptual Development Plans and functional plans; Applicant’s Narrative: “The subject property is not located in an area with an adopted Refinement Plan, Plan District map or Conceptual Development Plan. The Zoning Map Amendment is consistent with the applicable functional plans as described below. Springfield 2035 Transportation System Plan (TSP) The Springfield 2035 TSP provides a framework for how the City should maintain and improve the transportation network to meet growth within Springfield' s Urban Growth Boundary (UGB). The 2035 TSP includes a recommended set of transportation improvements for the 20-year planning horizon. The subject property has frontage on G Street and North 10th Street. The 2035 TSP functional classification for both streets is ‘Major Collector’. As set forth in the Metro Plan, the location of Neighborhood Commercial sites greater than 1.5 acres must abut a Collector or Arterial. In this case, the Neighborhood Commercial site is only about an acre and abuts two streets with a Collector classification. The subject property is also located on a transit line with a bus stop abutting the property. The 2035 TSP contains one project relevant to the subject property - PB-54 G Street 5th St to 28th St.4 The project is described as ‘G Street will be restriped with bike lanes, signed and marked 4 Springfield 2035 TSP, Table 4. Exhibit B, Page 7 of 12 Attachment 6, Page 9 of 14 for bike route.’ The project improvements are for signing, striping, and pavement marking at an estimated cost of $75,000. PB-54 is categorized as an ‘opportunity project’. Opportunity projects are described as: Lower-cost and scale roadway, urban standards and pedestrian/bicycle projects that generally would not require additional right-of-way and the City could implement as opportunities arise (Table 4, Figure 5).5 The proposed zone change will not adversely impact the City's ability in the future to provide bike lanes and sign G Street as a bike route. The proposed zone change is consistent with the 2035 TSP. Findings demonstrating compliance with the Oregon Transportation Planning Rule are found in the Sandow Engineering Traffic Impact Analysis provided under separate cover. Willamalane Comprehensive Plan The subject property is within a block of Willamalane Park. This 14-acre park features basketball courts, tennis courts, softball/baseball fields, a playground, a skate park, and the Veterans Plaza. The park also contains the Willamalane Park Swim Center. The Willamalane Comprehensive Plan does not identify the subject property as a site planned for future park use. The proposed zone change is not in conflict with the Willamalane Comprehensive Plan.” Finding 17: Staff concurs with the applicant’s findings stated in the italicized project narrative above. The property is not within an adopted neighborhood Refinement Plan or Plan District so these sub- elements are not applicable to the proposed rezoning action. However, the proposed rezoning is consistent with the applicable functional plans as stated in the applicant’s narrative and described herein. Conclusion: Rezoning the subject property from LDR to NC is consistent with the provisions of the City’s adopted functional plans. 3. The property is presently provided with adequate public facilities, services and transportation networks to support the use, or these facilities, services and transportation networks are planned to be provided concurrently with the development of the property. Applicant’s Narrative: “The subject property is within the Springfield city limits and is provided with adequate public facilities, services, and transportation networks to support the existing and planned development of the property. The Neighborhood Commercial zoning district standards will limit the intensity of future uses and development of the site.” Finding 18: The property requested for Zone Change has frontage on G Street along the northern boundary and 10th Street along the western boundary. Both public streets are classified as collector streets. The intersection of 10th and G Streets is 4-way stop controlled. As noted in the previous criterion, there is a future TSP project for bicycle facilities on G Street. No other near-term or long- term improvements for either 10th or G Streets are identified for the year 2035 horizon. Finding 19: Access to the site is via multiple driveways onto G Street beginning approximately 260 feet east of the intersection with 10th Street. The driveways access a shared parking lot and driving aisles for Catholic Community Services and the First Baptist Church of Springfield located at the corner of G and 12th Streets. The applicant is not currently proposing to modify the site access or parking configuration. 5 Springfield 2035 TSP, page 49. Exhibit B, Page 8 of 12 Attachment 6, Page 10 of 14 Finding 20: At the public hearing meeting on February 1, 2022, a respondent asked about potential redevelopment or a change of occupancy occurring on the site after it is zoned for commercial use. Redevelopment or a change of use on the property under the proposed Neighborhood Commercial zoning could result in at least four possible scenarios, depending upon the nature of the proposed changes: In the first scenario, an applicant proposes to re-use the existing building in accordance with the NC zoning provisions. No land use approvals would be required if another tenant moves onto the site and continues the charitable services activities already occurring within the building, or the use changes to another allowable use within the NC district (for example, the building is converted to a community center, church, or public offices). The proposed change of building tenancy would not require notification to the neighborhood or a public hearing. In the second scenario, an applicant proposes to modify the existing building and/or site to accommodate a use that is listed in the NC district. The proposed changes to the building and/or site would require land use approval, including notification to the adjacent property owners and residents, but it would not require a public hearing. In the third scenario, an applicant proposes to demolish the existing building and redevelop the site. Site Plan Review approval would be required for the proposed development and the applicant would need to demonstrate that the site meets all applicable criteria of the City’s Development Code. Public notification of the proposed development would be provided to adjacent property owners and residents, but it would not require a public hearing. In the fourth scenario, an applicant proposes a use that is listed as a Discretionary Use in the NC District. The proposal could include either partially or fully re-using the existing building, or completely redeveloping the site. Public notification of the proposed development would be provided to adjacent property owners and residents, and the development plans would be reviewed and approved through a public hearing process. Under any of the development scenarios listed above, the ultimate use of the site is predicated on the availability of utilities and infrastructure to serve the property. The applicant has demonstrated through their project narrative and traffic analysis that rezoning the property to a commercial district does not adversely impact the local street network – even if the site were to redevelop under the “reasonable worst-case scenario” (in this case a convenience store). Utilities necessary to serve the property are also available along the street frontages or in the rear alley behind the site. Depending on the nature and magnitude of changes proposed for the site, the adjacent neighborhood may or may not be notified and provided an opportunity to comment once the site is rezoned to commercial use. With the adoption of new Development Code provisions anticipated later in 2022, public notification may not be provided for site redevelopment if the proposal adheres to clear and objective standards and employs the Minimum Development Standards (MDS) process. If the property is zoned for commercial use, it is eligible for using the MDS process for future modifications to the building and site. Finding 21: The surrounding neighborhood is fully developed with public streets and utilities that are available to serve future modifications on the site. A full suite of public utilities and services with sufficient capacity to support the requested rezoning from Low Density Residential to Neighborhood Commercial are available within or on the perimeter of the subject property including the following: Exhibit B, Page 9 of 12 Attachment 6, Page 11 of 14 • Sanitary Sewer: There is an existing 8-inch sanitary sewer line that runs east-west along the mid-block alley behind the subject site. Multiple service laterals branch from this public sewer line to serve the existing buildings on the site. The public sewer line has adequate capacity for future modifications to the site that would incrementally increase the amount of sewer flows originating from the property. • Storm Sewer: There are existing public storm sewer lines and curb inlets along the west side of the property in 10th Street. Concurrent with any future modifications to the site, under the proposed Neighborhood Commercial zoning the property owner or applicant would be responsible for installing adequate facilities to manage and treat stormwater runoff before it reaches the public system in 10th Street. • Water: Springfield Utility Board (SUB) Water service is located along the public street frontages of the property. There is an existing 8-inch water line running east-west along G Street in front of the subject property and another 8-inch water line running north-south along the 10th Street frontage of the site. Additionally, there is an existing fire hydrant at the northwest corner of the property at the intersection of 10th and G Streets. The existing water lines and fire hydrant provide sufficient coverage for the subject property as it is currently configured. The applicant or developer would be responsible for ensuring that water system capacity is sufficient for any future modifications to the site under the proposed Neighborhood Commercial zoning. • Electricity: SUB Electric has overhead electrical facilities along the west side of 10th Street and within the mid-block alley that runs behind the subject site. The existing electrical facilities are adequate for the current use. However, the applicant or developer would be responsible for ensuring that electric system capacity is sufficient for any future modifications to the site under the proposed Neighborhood Commercial zoning. • Telecommunications: Comcast and CenturyLink have telecommunication facilities along the 10th and G Street frontages of the property. The existing facilities are suitable for the current use and future modifications to the site under the proposed Neighborhood Commercial zoning. Finding 22: Any future modifications or redevelopment of the subject site with commercial uses would be subject to the land use approval process outlined in SDC 5.17-100 (Site Plan Review). The Site Plan Review procedures will detail the design and configuration of the commercial site and associated building(s), the location of utility connections, and conformance with the criteria of approval for Site Plan Review. Conclusion: Based on the above findings and the existing transportation and utility network serving the site, the proposed zoning change to Neighborhood Commercial can be accommodated without required upgrades or extensions to public infrastructure. 4. Legislative Zoning Map amendments that involve a Metro Plan Diagram amendment shall: 1. Meet the approval criteria specified in Section 5.14-100; and 2. Comply with Oregon Administrative Rule (OAR) 660-012-0060, where applicable. Applicant’s Narrative: “This application is not a Legislative Zoning Map amendment and does not involve a Metro Plan diagram amendment. Although this approval criterion is not applicable, based on a request from City staff, the applicant retained Sandow Engineering to evaluate the proposed zone change for compliance with OAR 660-012-0060. Please refer to the Sandow Engineering Traffic Impact Analysis under separate cover.” Exhibit B, Page 10 of 12 Attachment 6, Page 12 of 14 Finding 23: The applicant is not proposing to change the comprehensive plan designation of Low Density Residential for the property. Therefore, a Metro Plan diagram amendment has not been initiated and the approval criteria of SDC 5.14-100 are not applicable. Finding 24: The Transportation Planning Rule (TPR), Oregon Administrative Rule OAR 660-12-0060, requires local governments to put in place mitigation measures as provided in the TPR whenever an amendment to a functional plan, an acknowledged comprehensive plan, or land use regulation (including a zone change) would “significantly affect” an existing or planned transportation facility. Finding 25: Under the TPR, a plan amendment or zone change may result in a “significant affect” under OAR 660-012-0060(2)(a) and (b) by changing the functional classification of an existing or planned transportation facility or by changing the standards implementing a functional classification system. The subject application proposes to change the property from Low Density Residential (LDR) to Neighborhood Commercial (NC) zoning. The proposed zoning map amendment does not alter the functional classification of any facility or change any standards for implementing the functional classification system and therefore does not result in a “significant effect” under OAR 660-012- 0060(2)(a) or (b). Finding 26: Under the TPR, a plan amendment or zone change may also result in a “significant affect” if it would result in any of the effects listed under OAR 660-012-0060(2)(c) “based on projected conditions measured at the end of the planning period identified in the adopted TSP.” Finding 27: Under the TPR, a “significant affect” occurs if the proposed amendment(s) would result in types or levels of travel or access that are inconsistent with the identified function classification of the existing or planned transportation facilities, that degrade the performance of an existing or planned transportation facility such that it would not meet performance standards identified in the TSP, or that degrade the performance of an existing or planned transportation facility that is otherwise not projected to meet the performance standards identified in the TSP. Finding 28: When determining whether a proposed functional plan or land use amendment has a significant effect, OAR 660-012-0060(4)(a) states that local governments must rely on existing transportation facilities and services and on the planned transportation facilities and services set forth under subsections (4)(b) and (4)(c) of the rule. Finding 29: OAR 660-012-0060(4)(b)(E) states that improvements to regional and local roads, street, or other facilities that are included in a regional or local transportation system plan are considered planned facilities, improvements or services when the responsible local government provides a written statement that the facilities, improvements, or services are “reasonably likely to be provided by the end of the planning period.” Finding 30: As required by SDC 5.22-110, the applicant has submitted a Traffic Impact Study (TIS) addressing traffic impacts associated with the proposed zone change from Low Density Residential to Neighborhood Commercial to show compliance with the TPR at OAR 660-012-0060. Finding 31: The scope of the applicant’s TIS complies with the requirements in SDC 4.2-105.B.4 and the City of Springfield Standard Operational Procedures and Policies. The intersections and driveways scoped in the applicant’s TIS are reasonable, appropriate, and relevant to the potential impacts of the proposed zone change. Exhibit B, Page 11 of 12 Attachment 6, Page 13 of 14 Finding 32: The City’s Transportation Planning Engineer concurs with the applicant’s trip generation methodology and findings. The applicant’s TIS provides Trip Generation scenarios for the proposed plan designation and zoning. The trips generated by a convenience market under ITE land use 851 represent the “reasonable worst case scenario” under the proposed Neighborhood Commercial zoning and complies with the TPR. Finding 33: The applicant’s TIS analyzes traffic impacts in year 2035. Under the TPR, a plan amendment or zone change results in a “significant affect” if its results listed under OAR 660-012- 0060(2)(c) are “based on projected conditions measured at the end of the planning period identified in the adopted TSP.” The end of the planning period in the Springfield TSP is the year 2035. Finding 34: The applicant’s TIS demonstrates that the proposed zoning of Neighborhood Commercial will not result in any study intersections failing to meet City of Springfield mobility standards in the projected 2035 analysis period. Thus, the applicant’s TIS demonstrates that, through the end of the planning period in 2035, the proposed zoning map amendment will not degrade the performance of an existing or planned facility such that is does not meet the performance standards in the Springfield TSP. Thus, the proposed zoning map amendment does not result in a “significant affect” under OAR 660- 012-0060(2)(c). Conclusion: Based on the above findings, the subject application proposal to change the zoning to Neighborhood Commercial will not significantly affect an existing or planned transportation facility. Therefore, the proposed zoning map amendment is consistent with OAR 660-012-0060 and SDC 5.22- 115C.4.b, and no additional mitigation is required under the TPR. Conclusion: Based on the above-listed criteria, the criteria for rezoning have been met. Conditions of Approval SDC Section 5.22-120 allows for the Approval Authority to attach conditions of approval to a zone change request to ensure the application fully meets the criteria of approval. The specific language from the Code section is cited below: 5.22-120 CONDITIONS The Approval Authority may attach conditions as may be reasonably necessary in order to allow the Zoning Map amendment to be granted. No Recommended Conditions of Approval. Staff advises that the zone change request was initiated in accordance with provisions of the City’s Development Code. The Planning Commission is requested to review and deliberate on the totality of the submitted information and to vote on the Final Order attached hereto. The Planning Commission’s decision is the final decision on this requested Zoning Map Amendment. Exhibit B, Page 12 of 12 Attachment 6, Page 14 of 14