Loading...
HomeMy WebLinkAboutPlan, Tentative APPLICANT 3/30/2023EC CARES MODULAR SITE PLAN REVIEW / DISCRETIONARY USE VICINITY MAP ZONING MAP / ADJACENT LAND USE N X Co ARCHITECT ROWELL BROKAW ARCHITECTS 1203 WILLAMETTE, SUITE 210 EUGENE OR, 97401 541485-1003 CONTACTS. LORRINELSON lom@rowellbrokaw. com CIVIL ENGINEER KPFF 800 WILLAMETTE STREET, SU 400 EUGENE OR, 97401 541-684-4909 CONTACTS: ANNA BACKUS Anna.Backus@kpff.com PROJECT DESCRIPTION - NARRATIVE SITE AND SITE UTILITIES PREPARATION FOR THE INSTALLATION OF A NEW MODULAR CLASSROOM BUILDING BY OTHERS. ALSO INCLUDES CONSTRUCTION OF NEW RAMPS/STAIRS, PLAYGROUND AREA AND COVERED PLAY STRUCTURE. EC Cares (Early Childhood CARES) UNIVERSITY OF OREGON, COLLEGE OF EDUCATION, WILL OCCUPY THE BUILDING - UTILIZING ON-SITE AND STREET PARKING AND BUS DROP-OFF AT G STREET CURB.. THE BUILDING WILL CONSIST OF TWO CLASSROOMS, TWO OFFICES, STORAGE, PREP KITCHEN FOR WARMING SNACKS AND RESTROOMS. THE MODULAR WILL NOT INCLUDE A SPRINKLER SYSTEM. STAND ALONE FIRE ALARM SYSTEM VEHICLE PARKING PARKING NOT REQUIRED ON SITE BUT 2 STANDARD SPACES AND ONE ADA SPACE ARE PROVIDED BIKE PARKING (4) SPACES PROVIDED ELECTRICAL ENGINEER KCL ENGINEERING 296 E STH AVE, SU 501 EUGENE, OR 97401 503-212-4612 CONTACT: SITYLA KEAYS-GOODMAN skgmdrnan@kclengineering. com 2023-02-21 MODULARCOMPANY MODERN BUILDING SYSTEMS 9493 PORTER RD SE AUMSVILLE, OR 97325 503-749-4949 CONTACT: DOUG SMITH dsmith@modernbuildingsystems. corn DRAWING INDEX G-01 COVER -GENERAL INFO - SHEET INDEX C-1.0 CIVIL NOTES C-1.1 CIVILNOTES C-1 2 EXISTING CONDITIONS C-2.0 HORIZONTAL CONTROL PLAN C-3.0 C-4.0 GRADING & DRAINAGE PLAN UTILITY PLAN C-5.0 EROSION CONTROL PLAN C-6.0 CIVIL DETAILS C-61 CIVIL DETAILS L-1.0 L-2.0 SITE PLAN PLANTING PLAN W -Yo MODULAR -COVER SHEET X-0.1 A-1.0 A-2.0 MODULAR - FIRE & LIFE SAFETY PLAN MODULAR - FLOOR PLAN MODULAR -EXTERIOR ELEVATIONS A-111 COVERED PLAY- PLANS & SECTION A-112 COVERED PLAY - DETAILS E-000 ELECTRICAL GENERAL NOTES & SYMBOLS E-001 ELECTRICAL GENERAL NOTES & SYMBOLS E-002 ELECTRICAL GENERAL NOTES & SYMBOLS .. E-100 ELECTRICAL SITE PLAN E-101 _ TELECOM - FIRE ALARM FLOOR PLAN E-200 ELECTRICAL ONE LINE DIAGRAM E-201 TELECOMMUNICATION DETAILS E-202 ELECTRICAL GROUNDING RISER Nc i,wY 1203 Willamette Street Suite 210 Eugene,Oregon 92401 541 48S IO03 rowellbrokaw.com Architecture. Design. Strategy. STAMP v� �IERD.L4� tC1 r ENE, OREGON 6Q03 .S) OF (` REVISIONS TO THIS SHEET REV. DATE SETISSUE DATE SPR/DISCRETIONARY USE 2023-02-20 PRE SUBMITTAL SPR/DISCRETIONARYUSE 2023-03-21 SUBMITTAL PROJECT TRACKING RBA #: 2234 P.I.C: Chris Andrejko PM / PA: Lord Nelson Project Name EC CARES Springfield Map & Tax Lt B 17-03-35-12-06700106800 Pmject Address G Street Springfield, OR COVER SHEET G-01 EC CARES SPRINGFIELD SITE PLAN REVIEW ABBREVIATIONS SEPARATION STATEMENT L ALL WATER MAIN CROSSINGS SHALL CONFORM TO THE OREGON STATE HEALTH DEPARTMENT, CHAPTER 333. WATER MAINS SHALL CROSS OVER SANITARY SEWERS WITH A 18" MINIMUM CLEARANCE BETWEEN OUTSIDE DIAMETERS OF PIPE WITH ALL PIPE JOINTS EQUIDISTANT FROM CROSSING. HORIZONTAL SEPARATION BETWEEN WATER MAINS AND SANITARY SEWERS IN PARALLEL INSTALLATIONS SHALL BE 10'. MAINTAIN 12" MINIMUM VERTICAL DISTANCE FOR ALL OTHER UTILITY CROSSINGS AND 12" HORIZONTAL PARALLEL DISTANCE. IN CASES WHERE IT IS NOT POSSIBLE TO MAINTAIN THE MINIMUM 10' HORIZONTAL SEPARATION, THE WATER MAIN SHALL BE LAID ON A SEPARATE SHELF IN THE TRENCH 18" INCHES ABOVE THE SEWER. NOTICE TO EXCAVATORS: ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0100. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503)-232-1987). POTENTIAL UNDERGROUND FACILITY OWNERS Call before you dig. or 800-332-2344 CIVIL SHEET INDEX Sheet Number AC ASPHALT CONCRETE P/L PROPERTY LINE CIVIL NOTES AD AREA DRAIN PED PEDESTRIAN C3.0 BLDG BUILDING PM PARKING METER EROSION CONTROL PLAN BOW BACK OF WALK P.U.E PUBLIC UTILITY EASEMENT BS BOTTOM OF STAIR PVC POLYVINYL CHLORIDE BW BOTTOM OF WALL PVMT PAVEMENT CB CATCH BASIN PVT PRIVATE CL CENTERLINE R RIM CO CLEANOUT RD ROOF DRAIN COTG CLEANOUT TO GRADE R.O.W RIGHT-OF-WAY CP CONTROL POINT S SLOPE (FT/FT) D/W DRIVEWAY SD STORM DRAIN E EASTING SDMH STORM DRAIN MANHOLE EXISTJEX EXISTING SHT SHEET FDC FIRE DEPARTMENT CONNECTION SS SANITARY SEWER FF FINISH FLOOR ELEVATION SSMH SANITARY SEWER MANHOLE FG FINISH GRADE ST STREET FH FIRE HYDRANT STA STATION FL FLOWLINE STD STANDARD FND FOUNDATION S/W SIDEWALK G GUTTER TC TOP OF CURB GB GRADE BREAK TG TOP OF GROUND GL GAS LINE TP TOP OF PAVEMENT GV GATE VALVE TRANS. TRANSFORMER HCP HANDICAP PARKING SPACE TS TOP OF STAIR IE INVERT ELEVATION TW TOP OF WALL o INV INVERT TYP TYPICAL U MH MANHOLE LINO UNLESS NOTED OTHERWISE MIN MINIMUM W WATER ~ N NORTHING WM WATER METER O1 OF OUTFALL OVH/OH OVERHEAD U 0 I 7 N M 0 0 N N 3 W v L ALL WATER MAIN CROSSINGS SHALL CONFORM TO THE OREGON STATE HEALTH DEPARTMENT, CHAPTER 333. WATER MAINS SHALL CROSS OVER SANITARY SEWERS WITH A 18" MINIMUM CLEARANCE BETWEEN OUTSIDE DIAMETERS OF PIPE WITH ALL PIPE JOINTS EQUIDISTANT FROM CROSSING. HORIZONTAL SEPARATION BETWEEN WATER MAINS AND SANITARY SEWERS IN PARALLEL INSTALLATIONS SHALL BE 10'. MAINTAIN 12" MINIMUM VERTICAL DISTANCE FOR ALL OTHER UTILITY CROSSINGS AND 12" HORIZONTAL PARALLEL DISTANCE. IN CASES WHERE IT IS NOT POSSIBLE TO MAINTAIN THE MINIMUM 10' HORIZONTAL SEPARATION, THE WATER MAIN SHALL BE LAID ON A SEPARATE SHELF IN THE TRENCH 18" INCHES ABOVE THE SEWER. NOTICE TO EXCAVATORS: ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0100. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503)-232-1987). POTENTIAL UNDERGROUND FACILITY OWNERS Call before you dig. or 800-332-2344 CIVIL SHEET INDEX Sheet Number Sheet Title C1.0 CIVIL NOTES C1.1 CIVIL NOTES C1.2 EXISTING CONDITIONS & DEMOLITION PLAN C2.0 HORIZONTAL CONTROL PLAN C3.0 GRADING AND DRAINAGE PLAN Ca,O UTILITY PIAN C5.0 EROSION CONTROL PLAN C6.0 CIVIL DETAILS C6.1 CIVIL DETAILS ROWELL w.. OKAW 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 rowel IItrokaw.com Architecture, Design, Strategy, ��U\5,� b PN OF sj-,ods 88168 l DIGITALLY SIGNED 2023 .03.16 13:10:11-oroo' OREGON 9y �4r20 1 0 1Jh y9��TTRELLBP� EXPIRATION DATE. 12/31/2023 REVISIONS TO THIS SHEET REV. DATE SETISSUE DATE SITE PLAN REVIEW 2023-03-16 PROJECT TRACKING RBA #: 2234 PE/DP RR PM / PA: AB Project Name EC CARES Springfield Map & Tax Lot N 17-03-35-12-06800 Project Address XXX 8TH Street Springfield, OR CIVIL NOTES C100 GENERAL NOTES 1. SURVEY PROVIDED BY BRANCH ENGINEERING, DATED 10/25/2022. ELEVATIONS ARE BASED ON RTK GPS OBSERVATIONS TAKEN OLN OCT. 10, 2022 USING THE OREGON REAL-TIME GEODETIC NETWORK AND GEOID 12A(NAVD88). 2. CONSTRUCTION LAYOUT (ALL ACTUAL LINES AND GRADES) SHALL BE STAKED BY A PROFESSIONAL SURVEYOR, REGISTERED IN THE STATE OF OREGON, BASED ON COORDINATES, DIMENSIONS, BEARINGS, AND ELEVATIONS, AS SHOWN, ON THE PLANS. 3. PROJECT CONTROL SHALL BE FIELD VERIFIED AND CHECKED FOR RELATIVE HORIZONTAL POSITION PRIOR TO BEGINNING CONSTRUCTION LAYOUT, 4. PROJECT CONTROL SHALL BE FIELD VERIFIED AND CHECKED FOR RELATIVE VERTICAL POSITION BASED ON THE BENCHMARK STATED HEREON, PRIOR TO BEGINNING CONSTRUCTION LAYOUT. 5. WHEN DIMENSIONS AND COORDINATE LOCATIONS ARE REPRESENTED - DIMENSIONS SHALL HOLD OVER COORDINATE LOCATION. NOTIFY THE CIVIL ENGINEER OF RECORD IMMEDIATELY UPON DISCOVERY OF ANY DISCREPANCIES. 6. CONTRACTOR SHALL PRESERVE AND PROTECT FROM DAMAGE ALL EXISTING MONUMENTATION DURING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING FOR THE REPLACEMENT OF ANY MONUMENTS DAMAGED OR REMOVED DURING CONSTRUCTION. NEW MONUMENTS SHALL BE REESTABLISHED BY A LICENSED SURVEYOR. 7. CONTRACTOR TO REFERENCE INFILTRATION REPORT BY BRANCH ENGINEERING DATED 11/28/2022 FOR THE SITE SOILS CONDITIONS. 8. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THESE PLANS, THE PROJECT SPECIFICATIONS AND THE APPLICABLE REQUIREMENTS OF THE 2021 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION, THE 2021 OREGON PLUMBING SPECIALTY CODE AND REQUIREMENTS OF THE CITY OF SPRINGFIELD. 9. THE COMPLETED INSTALLATION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, ORDINANCES AND REGULATIONS. ALL PERMITS, LICENSES AND INSPECTIONS REQUIRED BY THE GOVERNING AUTHORITIES FOR THE EXECUTION AND COMPLETION OF WORK SHALL BE SECURED BY THE CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION. 10. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987). EXCAVATORS MUST NOTIFY ALL PERTINENT COMPANIES OR AGENCIES WITH UNDERGROUND UTILITIES IN THE PROJECT AREA AT LEAST48 BUSINESS -DAY HOURS, BUT NOT MORE THAN 10 BUSINESS DAYS PRIOR TO COMMENCING AN EXCAVATION, SO UTILITIES MAY BE ACCURATELY LOCATED. 11. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE FOR INFORMATION ONLY AND ARE NOT GUARANTEED TO BE COMPLETE OR ACCURATE. CONTRACTOR SHALL VERIFY ELEVATIONS, PIPE SIZE, AND MATERIAL TYPES OF ALL UNDERGROUND UTILITIES PRIOR TO COMMENCING WITH CONSTRUCTION AND SHALL BRING ANY DISCREPANCIES TO THE ATTENTION OF KPFF CONSULTING ENGINEERS, 72 HOURS PRIOR TO.START OF CONSTRUCTION TO PREVENT GRADE AND ALIGNMENT CONFLICTS. v 12. THE ENGINE FR OR OWNER IS NOT RESPONSIBLE FOR THE SAFETY OF THE CONTRACTOR OR HIS CREW. ALL m O.S.H.A. REGULATIONS SHALL BE STRICTLY ADHERED TO IN THE PERFORMANCE OF THE WORK. I - pt 13. TEMPORARY AND PERMANENT EROSION CONTROL MEASURES SHALL BE IMPLEMENTED. THE CONTRACTOR a SHALL ADHERE TO CITY OF CITY OF SPRINGFIELD FOR MINIMUM EROSION CONTROL MEASURES. THE ESC > FACILITIES SHOWN IN THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. U DURING THE CONSTRUCTION PERIOD, ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED o STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT LEAVE THE SITE. v M 14. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL ROADWAYS, KEEPING THEM CLEAN AND FREE OF $ CONSTRUCTION MATERIALS AND DEBRIS, AND PROVIDING DUST CONTROL AS REQUIRED. Cu Cu 3 15. TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. CONTRACTOR CIO SHALL PROVIDE A TRAFFIC CONTROL PLAN TO THE CITY OF SPRINGFIELD FOR REVIEW AND APPROVAL PRIOR > TO COMMENCING CONSTRUCTION. y 16. CONTRACTOR SHALL MAINTAIN ALL UTILITIES TO ADJACENT BUILDINGS ATALL TIMES DURING CONSTRUCTION. E N 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND SCHEDULING ALL WORK WITH THE k OWNER. F. STORMWATER NOTES r 1. PER THE STORMWATER OPERATIONS AND MAINTENANCE PLAN, THE OWNER HAS MAINTENANCE RESPONSIBILITY £ FOR OPERATING AND MAINTAINING THE SYSTEM AND MUST BE DISTRIBUTED TO ALL PROPERTY OWNERS AND a N TENANTS OF THE SITE PURSUANT TO SDC 4.3-110.8. +, 2. TO ENSURE A FULLY FUNCTIONING WATER QUALITY SYSTEM AND MEET OBJECTIONS OF SDC 4.3-110.13 AS WELL AS B THE CITY'S MS4 STORMWATER PERMIT AND EDSPM, THE PROPOSED RAIN GARDENS MUST BE FULLY INSTALLED to N AND FULLY FUNCTIONING FOR STORMWATER MANAGEMENT MITIGATION. THE SYSTEM MUST BE INSPECTED AND APPROVED BY THE CITY PRIOR TO BUILDING OCCUPANCY ISSUANCE.. i8 ov "0 L 0 �a CONSTRUCTION NOTES GENERAL 1. SUBGRADE AND TRENCH BACKFILL SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D-698. FLOODING OR JETTING THE BACKFILLED TRENCHES. WITH WATER IS NOT PERMITTED. 2. SPECIAL INSPECTION REQUIRED FOR ALL COMPACTION TESTING. DEMOLITION 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND DISPOSAL OF EXISTING AC, CURBS, SIDEWALKS AND OTHER SITE ELEMENTS WITHIN THE SITE AREA IDENTIFIED IN THE PLANS. 2. EXCEPT FOR MATERIALS INDICATED TO BE STOCKPILED OR TO REMAIN ON OWNER'S PROPERTY, CLEARED MATERIALS SHALL BECOME CONTRACTOR'S PROPERTY, REMOVED FROM THE SITE, AND DISPOSED OF PROPERLY. 3. ITEMS INDICATED TO BE SALVAGED SHALL BE CAREFULLY REMOVED AND DELIVERED STORED AT THE PROJECT SITE AS DIRECTED BY THE OWNER. 4. ALL LANDSCAPING, PAVEMENT, CURBS AND SIDEWALKS, BEYOND THE IDENTIFIED SITE AREA, DAMAGED DURING THE CONSTRUCTION SHALL BE REPLACED TO THEIR ORIGINAL CONDITION OR BETTER. 5. CONCRETE SIDEWALKS SHOWN FOR DEMOLITION SHALL BE REMOVED TO THE NEAREST EXISTING CONSTRUCTION JOINT. 6. SAWCUT STRAIGHT MATCHLINES TO CREATE A BUTT JOINT BETWEEN THE EXISTING AND NEW PAVEMENT. UTILITIES 1. ADJUST ALL INCIDENTAL STRUCTURES, MANHOLES, VALVE BOXES, CATCH BASINS, FRAMES AND COVERS, ETC. TO FINISHED GRADE. 2. CONTRACTOR SHALL ADJUST ALL EXISTING AND/OR NEW FLEXIBLE UTILITIES (WATER, TV, TELEPHONE, ELEC., ETC.) TO CLEAR ANY EXISTING OR NEW GRAVITY DRAIN UTILITIES (STORM DRAIN, SANITARY SEWER, ETC.) IF CONFLICT OCCURS. 3. CONTRACTOR SHALL COORDINATE WITH PRIVATE UTILITY COMPANIES FOR THE INSTALLATION OF OR ADJUSTMENT TO GAS, ELECTRICAL, POWER AND TELEPHONE SERVICE. 4. BEFORE BACKFILLING ANY SUBGRADE UTILITY IMPROVEMENTS CONTRACTOR SHALL SURVEY AND RECORD MEASUREMENTS OF EXACT LOCATION AND DEPTH AND SUBMIT TO ENGINEER AND OWNER. 5. ALL WORK TO CONFORM TO THE 2021 OREGON PLUMBING SPECIALTY CODE STORM AND SANITARY 1. CONNECTIONS TO EXISTING STORM AND SANITARY SEWERS SHALL CONFORM TO THE 2018 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION, SECTION 00490, -WORK ON EXISTING SEWERS AND STRUCTURES". 2. BEGIN LAYING STORM DRAIN AND SANITARY SEWER PIPE AT THE LOW POINT OF THE SYSTEM, TRUE TO GRADE AND ALIGNMENT INDICATED WITH UNBROKEN CONTINUITY OF INVERT. THE CONTRACTOR SHALL ESTABLISH LINE AND GRADE FOR THE STORM AND. SANITARY SEWER PIPE USING A LASER. 3. ALL ROOF DRAIN AND CATCH BASIN LEADERS SHALL HAVE A MINIMUM SLOPE OF 2 PERCENT UNLESS NOTED OTHERWISE IN THE PLANS. 4. ALL HORIZONTAL CONNECTIONS TO THE SANITARY OR STORM SEWERS SHALL BE OF THE'WYE' BRANCH TYPE. WATER 1. ALL WATER AND FIRE PROTECTION PIPE SHALL HAVE A MINIMUM 36 -INCH COVER TO THE FINISH GRADE. 2. ALL WATER AND FIRE PRESSURE FITTINGS SHALL BE PROPERLY RESTRAINED WITH THRUST BLOCKS PER DETAIL. 3. ALL WATER MAIN /SANITARY SEWER CROSSINGS SHALL CONFORM TO THE OREGON STATE HEALTH DEPARTMENT REGULATIONS, CHAPTER 333. EARTHWORKS 1. CONTRACTOR SHALL PREVENT SEDIMENTS AND SEDIMENT LADEN WATER FROM ENTERING THE STORM DRAINAGE SYSTEM. 2. TRENCH BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE PIPE BEDDING AND BACKFILL DETAIL, THE PROJECT SPECIFICATIONS AND AS REQUIRED IN THE SOILS REPORT. FLOODING OR JETTING THE BACKFILLED TRENCHES WITH WATER WILL NOT BE PERMITTED. ■ 1203 V herette Street Suite 210 Eugene, Oregon 97401 54T48570Q3 roWellbrokaW.com Architecture, Design. Strategy. �\S�ERED PN EFFss��y R4 �A R� 88768 DOTAUY SIGNED P 3.0316 13X9:47 -07D? OREGON A7�TT RELL OP Ek711MIM DATE: 12/3112023 REVISIONS TO THIS SHEET REV. DATE SETISSUE DATE SITE PLAN REVIEW 2023-03-16 PROJECT TRACKING RBA #: 2234 PE/DP RR PM / PA: AB Project Name EC CARES Springfield Map 8 Tax Lot # 17-03-35-12-06800 Project Address XXX 8TH Street Springfield, OR CIVIL NOTES C1 F e r ° SET MAG NAIL SET MAG NAIL ° N 110426.10 N 110421.91 E 203575.19 E 203741.59 — ----- -FF ------ Cr < .v"" . SET MAG NAIL SPIKE N 110270.39 E 203666.69 EXISTING SEWER PIPE (TYP.) 64) EXISTING FENCE TO BE REMOVED AND REPLACED (TYR: EXISTING CONCRETE SURFACING TO BE REMOVED. EXISTING CONCRETE SIDEWALK TO BE REMOVED AND REPLACED. U s I a r h83'5 9iV 64.00 n 88'54'03 "W ..fi9 s ` �t f } 32' ROW TO CL -- 28' ROW TO CL' EXISTING SIDEWALK TO REMAIN, UNO. 60'ROWWIDTH , I�24'CURB� TO CURB i C I~!• EXISTING OVERHEAD ELECTRIC LINE TO BE Nw .REMOVED. n h �P N 0 o — EXISTING STOP SIGN AND STREET SIGNS TO REMAIN. k c { EXISTING FIRE HYDRANT r I) I. EXISTING WATER PIPE (TYP.) '2 J ° u —oaf -1 4e. �y - - S&54'09'e64 6o k / (457) J m _ " EXISTING TREE TO REMAIN i U EXISTING CONCRETE SURFACING TO BE EXISTING CONCRETE - �— REMOVED. SURFACING TO BE G STREET REMOVED. o M U U EXISTING CURB CUT I m _ _... Tn RF RPhAnVPrl L r {E)U—(E) EXISTING BIKE ROUTE I SIGN TO REMAIN S' (458) (458)— (458) 1 EXISTING STREET LIGHT ._ SCALE 1 INCH = 20 FEET 20 0 20 40 I ��lu� V � R uuumpuuu uuu nil BROKAW SII 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 rowellbrokaw.com Arthltecturo. Design.Strategy scow o°�wne weep s�rce wa Eugene, OR 9]001 o sal esaagaz v sal ED FN FFFs�ioyq DIGITALLY SIGNED 2023.03.16 13:10:53-OT00' OREGON qy;P SAY20 1"N 4;P V �2#TT REIT O VIRATIONDATE 12/31/2021 REVISIONS TO THIS SHEET REV. DATE SET ISSUE DATE SITE PLAN REVIEW 2023-03-16 PROJECT_ TRACKING RBA #: 2234 PE/DP RR PM / PA: AB P.I Name EC CARES Springfield Map & Tax Lot 9 17-03-35-12-06800 Fr,jw Address XXX 8TH Street Springfield, OR EXISTING CONDITIONS & DEMOLITION PLAN C1.2 3 C N a c 0 L L L 2 5' N 110332.72 E 203805 01 N 110335.63 E 203819.77 N 110307.63 E 203819.55 SHEET NOTES 1. ALL DIMENSIONS ARE TO FACE OF CURB OR FACE OF WALL. 2. FOLLOW CITY OF SPRINGFIELD STANDARDS FOR ADDITIONAL SIGNAGE AND STRIPING. OX KEY NOTES # DESCRIPTION DETAIL REF. 1 CURB RAMP 4106.0 SHEET LEGEND t .a PROVIDE YELLOW PAINT ON EXISTING CURB EASEMENT SCALE 1 INCH = 20 FEET 20 0 20 40 4 OWELL * r Oa 1203 Willamette Street 'Suite 210' Eugene, Oregon 97401 5414851003 rowellurokaw.com Architecture, DesigmStrategy kPff -. -. \S��REO PNOFFSS/o 'vV Po FF yq 88168 9 ! DI61TA SIGne, 2023.03.16 13'081407W' OREGON qy+r 2a ta`` ,tidy y9��TTREIIea` EX%RATION DATE: 12/31/2023 REVISIONS TO THIS SHEET REV. DATE SETISSUE DATE SITE PLAN REVIEW 2023-03-16 PROJECT TRACKING #: 2234 PEW RR PM / PA: AB Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06800 Prejeq Address XXX 8TH Street Springfield, OR HORIZONTAL CONTROL PLAN CIO PROPERTY LINE SAWCUT T' CONCRETE SIDEWALK 2 6.0 4 I - = ASPHALT 4 I Cfi.O xC SOAKAGE TRENCH - ! I WOODCHIPS j I si RAIN GARDEN FILTER -j STRIP PROVIDE YELLOW PAINT ON EXISTING CURB EASEMENT SCALE 1 INCH = 20 FEET 20 0 20 40 4 OWELL * r Oa 1203 Willamette Street 'Suite 210' Eugene, Oregon 97401 5414851003 rowellurokaw.com Architecture, DesigmStrategy kPff -. -. \S��REO PNOFFSS/o 'vV Po FF yq 88168 9 ! DI61TA SIGne, 2023.03.16 13'081407W' OREGON qy+r 2a ta`` ,tidy y9��TTREIIea` EX%RATION DATE: 12/31/2023 REVISIONS TO THIS SHEET REV. DATE SETISSUE DATE SITE PLAN REVIEW 2023-03-16 PROJECT TRACKING #: 2234 PEW RR PM / PA: AB Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06800 Prejeq Address XXX 8TH Street Springfield, OR HORIZONTAL CONTROL PLAN CIO __---------- _ __ SHEET NOTES 1. SLOPES PROVIDED ON SLOPE ARROW ARE FOR REFERENCE ONLY. 2. LANDINGS ON ACCESSIBLE ROUTES SHALL NOT EXCEED 2% IN ANY DIRECTION. 3. ALL ACCESSIBLE ROUTES SHALL COMPLY WITH CURRENT ADA - - - - - ----- -- ACCESSIBILITY GUIDELINES FOR BUILDING AND FACILITIES(ADAAG). r— GRADING LABEL LEGEND - ^ -„;,q; _ ��� / ,i+�” ' •r CALLOUT DESCRIPTION [X.X%I SLOPE ORIENTATION INDICATING DIRECTION OF MAXIMUM GRADE (DOWNHILL) SPOT ELEVATION 4 4 OF RAIN GARDEN I DESCRIPTION LISTED BELOW. 456.15 FG r -� I NO DESCRIPTION MEANS TP OR TG ky ' / . fXX.XX XX •AMU e, BS BOTTOM OF STEP EG EXISTING GRADE FF FINISHED FLOOR }� a"' r '•' `\- : l: RIM RIM OF STRUCTURE TC TOP OF CURB ag._^' (459.3±) k'+� TG TOP OF GROUND (458.1±) TP TOP OF PAVEMENT (458.4±) TS TOP OF STEP / ir _ w W00(i)EXISTING GRADE r+. (MATCH WHERE APPLICABLE) PROPOSED MODULAR m SHEET LEGEND 1 BuaolNc IIS 1 ; m 1 FF=459.45 DRAINAGE FLOW DIRECTION SAWCUT (457.91) ( I 1 - - - 49 - - EX. CONTOUR MINOR � r� ( 50 _ __ EX. CONTOUR MAJOR (457.8±) a9 CONTOUR MINOR (FG) ' 50 CONTOUR MAJOR (FG) (as7s+) `NSe� (a57s±) i --- -- (457 6+) -- (457.6±) — r 4 �,, .7 �. / / c SOAKAGE TRENCH r )w - 7n rC{r}w e, 3 as7) -------- _ h (457.7t) - (457.7±) (457.7±) (457 8+) (457.5±) .. - -. ' _ ' _ ' _ ' _RAIN GARDEN 2 (457.3±) (457.1±) (4525±) (457) .5± C6. (457.1±) ��� (457.3±) w J — _r x G STREET 4 _ i I SCALE 1 INCH - 20 FEET 20 0 20 40 1203 Willamette Street Suite 217.. Eugene, Oregon 97407' 5414851003 rowellbrokavecom ArchitectD7e,Design. Strategy. 11Tff ; ��\S��HED RN EF�S�'0 �` 88168 a ! DIGITALLY9GNED 2023.«5.16 t 3:0924-07'00' OREGON qyy y4Y 10 10�� `'FJ`a �7�T iREll OP ExpileTION DATE. 12731/2023 REVISIONS TO THIS SHEET_ REV. DATE SETISSUE DATE SITE PLAN REVIEW 2023.03-16 _-PROJECT TRACKING RBA #: 2234 PE/DP RR PM / PA: AB Projed Name EC CARES Springfield Map & Tax �t # 17-03-35-12-06800 Pmjed Addmss XXX 8TH Street Springfield, OR GRADING AND DRAINAGE PLAN CIO IN OX UTILITY KEYNOTES NOTE DESCRIPTION 1 CONNECT TO EXISTING 10" SEWER MAIN. POTHOLE TO VERIFY IE PRIOR TO CONSTRUCTION. 2 CONNECT TO EXISTING WATER MAIN. FP CONNECT TO FIRE PROTECTION SYSTEM. SIZE AS NOTED. SEE PLUMBING PLANS FOR CONTINUATION. RG RAIN GARDEN S CONNECT TO WASTE LINE. SEE PLUMBING PLANS FOR CONTINUATION. SIZE AS NOTED. SD DOWNSPOUTS TO CONNECT TO SOAKAGE TRENCH. TE TRASH ENCLOSURE. SEE PLUMBING PLANS FOR SANITARY DRAIN CONTINUATION. W CONNECT TO COLD WATER SYSTEM. SEE PLUMBING PLANS FOR CONTINUATION. SIZE AS NOTED. UTILITY LABEL LEGEND STRUCTURE LABEL ROWELL DETAIL REF. BROKAW UTILITY TYPE (S=SANITARY SEWER, W=WATER, FP=FIRE PROTECTION) STRUCTURE TYPE CALLOUT XX XX -XX ID NUMBER (WHERE APPLICABLE) X+XX.X RT X.X' LOCATION (WHERE APPLICABLE) RIM= IE IN = XX.X j STRUCTURE INFO (WHERE APPLICABLE) IE OUT = XX.X PIPE LABEL UTILITY LENGTH �UTILITY SIZE � UTILITY TYPE XXLF-XX"XX S=X.XX°A -- SLOPE (WHERE APPLICABLE) STRUCTURE TYPE CALLOUT DESCRIPTION DETAIL REF. CB CATCH BASIN CO CLEANOUT TO GRADE GM GAS METER GV GATE VALVE MH MANHOLE OF OUTFALL OV OVERFLOW INLET PLUG PLUG RG RAIN GARDEN RP REDUCED PRESSURE BACKFLOW ASSEMBLY IN ABOVE -GRADE ENCLOSURE STUB STUB TB THRUSTBLOCK TD TRENCH DRAIN TEE TEE CONNECTION WM WATER METER SHEET LEGEND 1203 Willamette Street. Suite 210 Eugene, Oregon 97401'. 541 435 1003 rowel Ibrokaw:¢am Architecture. Design. Strategy. Eug-, OR 97401 01 1qTff �RR_Al�;_�­ - 11- - 1011ED PN eFess/oyr 88168 9 r OIGITMLY SIGNED 2023.03.16 1311 150700' OREGON 9$yq *4 20 767TRE1.0* exvlw,TI DaTE 7/37023 REVISIONS TO THIS SHEET A I "l—AW SETISSUE DATE SITE PLAN REVIEW 2023-03-16 PROJECT TRACKING RBA #: 2234 PE/DP RR PM / PA: AB Project Name SOAKAGE TRENCH EC CARES Springfield RAIN GARDEN Map BTax LolN 17-03-35-12-06800 4sk43xc ,i{,. -,..+i* .e+7 FILTER STRIP Projece Address mm ��' XXX 8TH Street Springfield, OR UTILITY PLAN SCALE 1 INCH = 20 FEET C 4 ■ O 20 0 20 40 a L _ (458) f' E 458 t MATERIAL STOCKPILE ANDql EQUIPMENT STORAGE > `^ f n .ten � V - ir 1 a I�� i I / --- i • a c 41 PROPOSED MODULARn • " BUILDING 4 \ IJ 1 4 l • 458 CONSTRUCTION TRAILERS&STAGING'^• -_-- 1xc" r -_ Rau i �r� n ROWELL BROKAW SHEET NOTES 1203 Willamette Street 1. CUT: 170 CY FILL: 55 CY Suite 210 2. SITE SOIL IS TYPE C- MALABON-URBAN LAND COMPLEX Eugene, Oregon 97401 5414851003 3. PROJECT IS LOCATED AT THE EDGE OF THE 20 YEAR WELLHEAD rowellbrokaw.Com TIME OF TRAVEL ZONE. Architecture. Design. Strategy, 4. ADDITIONAL SOIL INFORMATION CAN BE FOUND IN THE INFILTRATION TEST REPORT FROM BRANCH ENGINEERING, INC DATED 1112812022. 5. FLOOD NOTE: THE PROPERTY SHOWN HERON APPEARS TO LIE 800 Wniemeae Street suite 400 WITHIN OTHER AREAS ZONE X PER FIRM PANEL 41039C1 142F. ALL e°se"° o sjp1 O 59168M1 M1N2 OF THE DISTURBED AREA IS WITHIN FLOOD ZONE X. 1q)ff r sol cea av0s mm -- THERE ARE NO SPRINGS OR WETLANDS LOCATED ON THE PROPERTY. -- THERE ARE NO DRINKING. WATER SOURCE AREAS ON OR NEAR THE PROPERTY. SHEET LEGEND ��\S��aEO?EREFFssioyq — — PROPERTY LINE 88168 N r DIGITALLY SIGNED 202308.16 49 EX. CONTOUR MINOR ' OREGON h -- -"- -- _ EX. CONTOUR MAJOR yy y�yau,m/ ,FJ as ��(/TTREIC6 PROP. CONTOUR MINOR 50 71'1 1I0NI7 11 UA213/20Y3 PROP. CONTOUR MAJOR EXTENT OF WORK -. REVISIONS TO THIS SHEET SEDIMENT CONTROL FENCE. ----- PLACE AT PROPERTY LINES, UNO REV. DATE (SHOWN OFFSET FOR CLARITY). ® INLET PROTECTION .tea DRAINAGE FLOW DIRECTION TREE PROTECTION FENCE --- -' SET ISSUE DATE CONCRETE WASHOUT. INSTALL 20' FROM ANY STORM FACILITY OR SITE PLAN REVIEW 2023-0316 INLET. CONSTRUCTION ENTRANCE PROJECT TRACKING RBA #: 2234 PE/DP RR N MATERIAL STOCKPILE, EQUIPMENT PM / PA: AB �!�` ��`STORAGE. TYPE AS SHOWN. SEE LtiaQ.-.�\1�l NOTE3.. Proiec[Name EC CARES Springfield Map & Tax Loi # 17-03-35-12-06800 ProjecLAdd.S XXX 8TH Street Springfield, OR EROSION CONTROL PLAN SCALE 1 INCH = 20 FEET ■ 20 0 20 40 1 Rau i �r� n ROWELL BROKAW SHEET NOTES 1203 Willamette Street 1. CUT: 170 CY FILL: 55 CY Suite 210 2. SITE SOIL IS TYPE C- MALABON-URBAN LAND COMPLEX Eugene, Oregon 97401 5414851003 3. PROJECT IS LOCATED AT THE EDGE OF THE 20 YEAR WELLHEAD rowellbrokaw.Com TIME OF TRAVEL ZONE. Architecture. Design. Strategy, 4. ADDITIONAL SOIL INFORMATION CAN BE FOUND IN THE INFILTRATION TEST REPORT FROM BRANCH ENGINEERING, INC DATED 1112812022. 5. FLOOD NOTE: THE PROPERTY SHOWN HERON APPEARS TO LIE 800 Wniemeae Street suite 400 WITHIN OTHER AREAS ZONE X PER FIRM PANEL 41039C1 142F. ALL e°se"° o sjp1 O 59168M1 M1N2 OF THE DISTURBED AREA IS WITHIN FLOOD ZONE X. 1q)ff r sol cea av0s mm -- THERE ARE NO SPRINGS OR WETLANDS LOCATED ON THE PROPERTY. -- THERE ARE NO DRINKING. WATER SOURCE AREAS ON OR NEAR THE PROPERTY. SHEET LEGEND ��\S��aEO?EREFFssioyq — — PROPERTY LINE 88168 N r DIGITALLY SIGNED 202308.16 49 EX. CONTOUR MINOR ' OREGON h -- -"- -- _ EX. CONTOUR MAJOR yy y�yau,m/ ,FJ as ��(/TTREIC6 PROP. CONTOUR MINOR 50 71'1 1I0NI7 11 UA213/20Y3 PROP. CONTOUR MAJOR EXTENT OF WORK -. REVISIONS TO THIS SHEET SEDIMENT CONTROL FENCE. ----- PLACE AT PROPERTY LINES, UNO REV. DATE (SHOWN OFFSET FOR CLARITY). ® INLET PROTECTION .tea DRAINAGE FLOW DIRECTION TREE PROTECTION FENCE --- -' SET ISSUE DATE CONCRETE WASHOUT. INSTALL 20' FROM ANY STORM FACILITY OR SITE PLAN REVIEW 2023-0316 INLET. CONSTRUCTION ENTRANCE PROJECT TRACKING RBA #: 2234 PE/DP RR N MATERIAL STOCKPILE, EQUIPMENT PM / PA: AB �!�` ��`STORAGE. TYPE AS SHOWN. SEE LtiaQ.-.�\1�l NOTE3.. Proiec[Name EC CARES Springfield Map & Tax Loi # 17-03-35-12-06800 ProjecLAdd.S XXX 8TH Street Springfield, OR EROSION CONTROL PLAN SCALE 1 INCH = 20 FEET ■ 20 0 20 40 IN LANDSCAPE AREA CURB AT BACK OF RAMP TO TOP OF CURB FLUSH RETAIN GROUND WHERE WITH TOP OF SHOWN ON PLANS SIDEWALK 6" CURB F EXP. 6" CURB 6' MIN. (UNO) 4' MIN. (UNO) 6' MIN. (UNO) EXP. CURB EXP. VARIES 0" CURB EXP. CURB EXP. VARIES CEMENT CONCRETE PLAN COMPACT SUBGRADE 3" OF BASE COURSE NOTES: 1. -CONSTRUCT CONTRACTION JOINTS AT 15' MAX. SPACING AND AT RAMPS, 6" CURB - CONSTRUCT EXPANSION JOINTS AT 200' MAX. SPACING AT POINTS OF EXP. TANGENCY AND AT ENDS OF EACH DRIVEWAY. 2. PROVIDE MEDIUM TO COARSE BROOM FINISH. _,'N� CONCRETE PAVEMENT SECTION CURB AT BACK OF RAMP WHERE SHOWN ON PLANS �, { jj -► Q r 3" BASE COURSE ( ( 4' CONCRETE SIDEWALK LANDING SPACE CF('TlnlJ A CURB RAMP SCALE: NTS 3" BASE COURSE `— COMPACTED SUBGRADE SECTION B SCALE: NTS I SEE PLAN CONCRETE SIDEWALK 1.5°h 4' MIN. THICKNESS d a. 3" SUBBASE COURSE NOTES: 1. CONSTRUCT CONTRACTION JOINTS AT 15' MAX. SPACING AND AT RAMPS. CONSTRUCT EXPANSION JOINTS AT 200' MAX SPACING, AT POINTS OF TANGENCY AND AT ENDS OF EACH DRIVEWAY, UNLESS NOTED OTHERWISE. CONCRETE SIDEWALK SCALE: NTS AC SURFACE COURSE: 3" OF 1/2" DENSE GRADED, LEVEL HMAC •"��,ao ou° oo aaoo p°r r 6 a ,II i i i COMPACTED x-10" OF BASE SUBGRADE COURSE ASPHALT PAVEMENT SECTION SCALE: NTS 1203 Willamette. Street Suite 210 Eugene, Oregon 97401' 5414851003 rowel lbrokew.com Architecture. Design. Strategy. 5 16.4 lqpff __`G11 __­ - .11- - 0�881168 N E�FSS/��9 P l DIGITALLY SIGNED 2,1e 03-16 13'09'010]'00' OREGON syy9 `Ar 2u 10`' �y ��TTREII�@ RSPIRATION DATE: 12/37/2023 REVISIONS TO THIS SHEET _ REV. DATE SET ISSUE DATE SITE PLAN REVIEW 2023-03-16 PROJECT TRACKING RBA #: 2234 PE/DP RR PM / PA: AB Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06800 Project Address XXX 8TH Street Springfield, OR CIVIL DETAILS C6eO 4" THICK PORTLAND TOP OF CURB FLUSH CEMENT CONCRETE WITH TOP OF SIDEWALK a- •-_° 'ed CONCRETE a •a• < rSIDEWALK . _ COMPACT SUBGRADE 3" OF BASE COURSE NOTES: 1. -CONSTRUCT CONTRACTION JOINTS AT 15' MAX. SPACING AND AT RAMPS, 6" CURB - CONSTRUCT EXPANSION JOINTS AT 200' MAX. SPACING AT POINTS OF EXP. TANGENCY AND AT ENDS OF EACH DRIVEWAY. 2. PROVIDE MEDIUM TO COARSE BROOM FINISH. _,'N� CONCRETE PAVEMENT SECTION CURB AT BACK OF RAMP WHERE SHOWN ON PLANS �, { jj -► Q r 3" BASE COURSE ( ( 4' CONCRETE SIDEWALK LANDING SPACE CF('TlnlJ A CURB RAMP SCALE: NTS 3" BASE COURSE `— COMPACTED SUBGRADE SECTION B SCALE: NTS I SEE PLAN CONCRETE SIDEWALK 1.5°h 4' MIN. THICKNESS d a. 3" SUBBASE COURSE NOTES: 1. CONSTRUCT CONTRACTION JOINTS AT 15' MAX. SPACING AND AT RAMPS. CONSTRUCT EXPANSION JOINTS AT 200' MAX SPACING, AT POINTS OF TANGENCY AND AT ENDS OF EACH DRIVEWAY, UNLESS NOTED OTHERWISE. CONCRETE SIDEWALK SCALE: NTS AC SURFACE COURSE: 3" OF 1/2" DENSE GRADED, LEVEL HMAC •"��,ao ou° oo aaoo p°r r 6 a ,II i i i COMPACTED x-10" OF BASE SUBGRADE COURSE ASPHALT PAVEMENT SECTION SCALE: NTS 1203 Willamette. Street Suite 210 Eugene, Oregon 97401' 5414851003 rowel lbrokew.com Architecture. Design. Strategy. 5 16.4 lqpff __`G11 __­ - .11- - 0�881168 N E�FSS/��9 P l DIGITALLY SIGNED 2,1e 03-16 13'09'010]'00' OREGON syy9 `Ar 2u 10`' �y ��TTREII�@ RSPIRATION DATE: 12/37/2023 REVISIONS TO THIS SHEET _ REV. DATE SET ISSUE DATE SITE PLAN REVIEW 2023-03-16 PROJECT TRACKING RBA #: 2234 PE/DP RR PM / PA: AB Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06800 Project Address XXX 8TH Street Springfield, OR CIVIL DETAILS C6eO RIP -RAP SHALL BE 4" TO 8" QUARRY SPALLS PER WSDOT ST. SPECS 0,13.6 UNDISTURBED SOIL - END CAP TOPSOIL. SEE PLANS FOR TOPSOIL & FACILITY DEPTH FINISHED GRADE SURFACE A TO BE INSTALLED LEVEL 26 — 6" SD PIPE FROM SEDIMENT TRAP 6"PERFORATED PIPE DRAINAGE FILL SIDE VIEW DRAINAGE FABRIC TOPSOIL 2' i6' 2'FINISHED GRADE SURFACE RIP-RAPSHALL BE PER WSDOT ST. SPECS 9-13.66T0 BE INSTALLED LEVEL Fj 4" TO 8"QUARRY SPALLS ARIES, 6" MIN UNDISTURBED SOIL SOAKAGE TRENCH N.T.S. IN SECTION A RESURFACING MATCH EXISTING PAVEMENT SECTION EXISTING AC SAWCUT — PAVEMENT LINE Z J � J U i' Z M Z W Y io0 LL¢¢ Mz m N W LL_ z= z w z ¢ D/2 PAVED UNPAVED \ AREAS AREAS DETECTABLE WARNING TAPE 6" MIN. TYPICAL PIPE BEDDING SCALE: NTS y _ 6" MIN. D BACKFILL STORAGE DEPTH 8" MAX. (TO OVERFLOW INLET RIM) t BTM OF BASIN (LEVEL) . SEE PLAN TRACER WIRE U ?O v� zo O KEY NOTES I INSTALL GEOJUTE PLUS OR COCONUT FIBER MATTING, 2" THICK LAYER OF PEA GRAVEL OR OTHER NON -FLOATING MULCH. 2 STORMWATER FACILITY GROWING MEDIA PER SPECS. 3 DRAINAGE LENS COURSE it'- NO.4 OPEN GRADED AGGREGATE). 4 DRAINAGE FILL PER SPECS. 5 PLANTING SEE LANDSCAPE PLANS. 6A DRAINAGE FABRIC, WRAP UP SIDES AND OVERLAP TOP DRAINAGE LENS 12" MIN. 6B 30 MIL IMPERMEABLE LINER, WHERE SHOWN ON PLAN. 7 4" PVC PERF. PIPE, ORIENT WITH HOLES FACING DOWN. %7� TYPICAL STORMWATER FACILITY SECTION SCALE: NTS 1203 Willamette Street quite 210 Eugene, Oregon 97401 541 4851003 rowellbrokaw.com Architecture. Design. Strategy. 1q3ff800 WIII-Me6 6Erett. SUIe 400 on 4942 o s41 sse esoz wz see.evos wwwk"/(.m �U\SS�aED P%Ne ,N Q 88 D�itfA[tY StQN€D. tam: 0316 13:11:39-0]'00' OREGON ��#TTREl�BP — EXPIRATION DATE: 12/31/2023 REVISIONS TO THIS SHEET REV. DATE SET ISSUE DATE SITE PLAN REVIEW 2023A3-16 _ PROJECT TRACKING RBA #: 2234 PE/DP RR PM / PA: AB Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06800 Project Address XXX 8TH Street Springfield, OR CIVIL DETAILS C6.1 a � o 0 D 0 0 o D 0 'O PI O KEY NOTES I INSTALL GEOJUTE PLUS OR COCONUT FIBER MATTING, 2" THICK LAYER OF PEA GRAVEL OR OTHER NON -FLOATING MULCH. 2 STORMWATER FACILITY GROWING MEDIA PER SPECS. 3 DRAINAGE LENS COURSE it'- NO.4 OPEN GRADED AGGREGATE). 4 DRAINAGE FILL PER SPECS. 5 PLANTING SEE LANDSCAPE PLANS. 6A DRAINAGE FABRIC, WRAP UP SIDES AND OVERLAP TOP DRAINAGE LENS 12" MIN. 6B 30 MIL IMPERMEABLE LINER, WHERE SHOWN ON PLAN. 7 4" PVC PERF. PIPE, ORIENT WITH HOLES FACING DOWN. %7� TYPICAL STORMWATER FACILITY SECTION SCALE: NTS 1203 Willamette Street quite 210 Eugene, Oregon 97401 541 4851003 rowellbrokaw.com Architecture. Design. Strategy. 1q3ff800 WIII-Me6 6Erett. SUIe 400 on 4942 o s41 sse esoz wz see.evos wwwk"/(.m �U\SS�aED P%Ne ,N Q 88 D�itfA[tY StQN€D. tam: 0316 13:11:39-0]'00' OREGON ��#TTREl�BP — EXPIRATION DATE: 12/31/2023 REVISIONS TO THIS SHEET REV. DATE SET ISSUE DATE SITE PLAN REVIEW 2023A3-16 _ PROJECT TRACKING RBA #: 2234 PE/DP RR PM / PA: AB Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06800 Project Address XXX 8TH Street Springfield, OR CIVIL DETAILS C6.1 N V N X 00 QTY Latin Name (Common Name) SIZE SPACING 2 Boutsloua graelis'Blonde Ambition' 1gal. 15"oc 2 .1, (Blue Gamma Grass) Ginko bitane Princeton Sentry' 1.5" cal 3 @ OCamellia japonid'Budennint' 39.1, 48'.c, Halesia mention (Butlennint Camellia) (Carolina SBverbell) 6 Cornus Alba'Bulbalo' 3 gal. 4' oc (Ivory Halo Dogwood) 20 (Little L me Hytlmngea) Y6;1: 36" oc 1 o Juncus Patens 4- 12" oc (Patens Rush) 41 0 Pannisetum alopecuroitles igal. 24'oc (Hameln Fountain Grass) gPennisetum alopecuroitles 1gal. 36"oc i� (Fountain Grass) 98 O Prunus laurocemsus'Mt Vernon 3ga1. 30" 0c (Mt Vernon Laurel) g OPrunus lavea msus'Otto Luyken' 3 gal. 36" oc (Otto Luyken Laurel) 9. a, Rudbeea. 1gal. 18"oc (Black Eyed Susan) 13 Spiraes Betulitolia ® 1 gal. Y oc (Slum, Load Spire.) 1 Syringa xoblata'Ludwig Spaeth' 3 al. g (Lutlwig Spaeth lilac) B OViburnum davldii 3 gal. 30" oc (David Viburnum) TREE LIST QTY Latin Name (Common Name) SIZE Acer sacchmm a'Lagacy' 2 (Legacy Sugar Maple) 2 .1, 2 Ginko bitane Princeton Sentry' 1.5" cal (Princeton Sentry Ginko) 2 Halesia mention 2" cel (Carolina SBverbell) 3 Magnolia stellate'Royal Star 1„cal (Royal Star Magnolia) LEGEND ........ _'r. _:..... :. WOOD PLAYGROUND CHIPS LAWN i 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5 41 485 1003 rowetlbrokaw.corl Architect ire. Ges'tgrr:.Strategy. STAMP ®, LORRI A NELSON r- 0910912013 OREGON �w ti s�qPF REVISIONS TO THIS SHEET REV. DATE SET ISSUE DATE SPR/DISCRETIONARY USE 2023-02-20 PRE -SUBMITTAL SPR/DISCRETIONARY USE 2023-03-21 SUBMITTAL PROJECT TRACKING RBA #. 2234 P.I.C. Chris Andrejko PM / PA: Lorri Nelson Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06700106800 Project Address G Street Springfield, OR PLANTING PLAN L-2.0 GENERAL NOTES TYPICAL SYMBOLS LEGEND SHEET INDEX iRN p A00 Cwrent Rev. TIPS-UO/E C S P R I N G F I E L D BHe Name Re IaepeaBy N ALL STATES IT SHALL APPLY TO THE CURRENT COVER SHEET 2. ALL CONTROLS AND HARDWARE SHALL BE ACCESSIBLE TO 1 gIDt 1 ELEVATION BUBBLE A20 'FIRE &LIFE SAFETY PLAN THE INTERNATIONAL BUILDING CODE (IBC)AS AMENDS➢ BY NORTH ARROW No FLOOR PIAN O SM1L EDITION OF THE UK OR IBC AS ADOPTED BY THAT STATE. EXTER OR PERSONS WITH DISABILITIES. FINISH NOTES AND DETAILS FINISH NOTES ANO pETAILG 42' x 64' MODULAR DAYCARE WHEREREQDINACCORTANEFWTHOFCECTIONON Rat A40 INTERIPANELS&LOAD RE INSTALLED IN ACCORDANCE IRE EXTINGUISHERS C SECTION 908 E 01 INTERIOR PANELS & LOAD CALCS SIM E1.0 ELECTRICAL & LIGHTING PIANS 4, PER WAC 296-1501 TOILET FACILITIES IN AN ADJACENT 1 SECTION BUBBLE M10 HVAC PLAN AND NOTES FACILITY SHALL BE NOTED ON THE PLAN SUBMITTAL AND p 10 PLUMBING PLAN &NOTES THAT THE REQUIREMENTS OF IBC CHAPTER 29, SECTION. -- 2902.1 AND SECTION 2902.2 OF THE STATE BUILDING CODE MUSTBEVERIFIEDBY THE LOCAL JURISDICTION SOLOING �\ BIM.. OFFICIAL AND SHOWN ON THE HLEA. �A1101 �.. DETAIL BUBBLE PER OAR 9186]40015, REQUIR€D TOILET FACRJTIES MAYBE \- L LOCATED IN AN ADJACENT FACILITY PER IBC CHAPTER 2B, SIM SECTION 2902.33 AND THE LOCAL JURISDICTION BUILDING AI 101 DETAIL CALLOUT " c OFFICIAL SHALL VERIFY THAT ADEQUATE FACILITIES ARE �- J AVAILABLE BASED ON THE OVERALL OCCUPANT LOAD OF THE ENTIRE COMPLEX. (p 'j GRID BUBBLE (BY OTHCABIE, FIRE PER SYSTEM 90BE3,FIELDGR INSTALLED Table (BY OTHERS) PER OSSCIIBC SECTION 901.2.9, GROUP E SEE _ {a'.s - ? :% � A 1 -#.`^Y- � 5 .✓2 T1 EIEGFRIGALPIANFOR DEVICERLOC LAUTUOEAJARM N21UB S, ELEVATION LEVEL JURISDICTION. APPROVAL PER LOCPI AUTHORITY HAVING EIBVBiIOD JURISDICTION. MOD A' MODULE TAG III tee,ggqN�� }}} & IBE F PROVIDELEFIRESERPRIORTOCE CERTIFICATE 1 OCCUPANCY PER OWNERP SECTION CERTIFICATE OF Yv OCCUPANCY PER OFCOFC SECTION 403 O WALL TAG D L ]. AN ACCEBSI.. ROUTE SHALL BE PROVIDED TO THE 101 DOOR TAG BUILDING AREA AS REQUIRED IN OS IBC SECTION 1104 r' B. WHERE FLOOR LIVE LOAD EXCEEDS 50 PSF, A SURABLE SIGN /.l WINDOW TAG SHALL BE CONSPICUOUSLY POSTED BY THE OWNER IN THE r'J `I - L L� Jfr II 1i PART OF THE BUILDING WHERE THIS INCREASED FLOOR LIVE DESIGN PROFESSIONAL LOAD OCCURS PER OSSCIIBC SECTION 108.1 Al REVISION TAG MICHAEL C, LEWIS P.E.�.� _ -�' ------___— — - - TL MODERNEMS INC. = CENTERLINE N93 PORTER RD.BE ALI O R 9]325 }]491849 KEYNOTE levna§moaemwaam9ays+ema.wm. p _ DISTANCE TO PROPERTY ' LINE GREATER THAN I9.0" ------------ IANOING(BYOTHERS- VERIFY LOCATION) I \ o o MODA d v - - - 2022-46-1A - DISTANCETO/ \ - PROPERTY I- __..-_._'----- ------ ----------- -LINE GREATER THAN 1P -W MOD B 2022-064 B I p ,l ELEC. PANELS --------------- ------------- .._-.-- MOD C _MODC 1 2022-4&1C ' O.B. HB, c / h i — CRAWL ACCESS LANDING (BY OTHERS- ' VERIFY LOCATION) DISTANCE TO PROPERTY ------ LINE GREATER THAN I9 -Y CR____i _____i MODULE TO BE SET BY: ANE �_ --_- ______________L SITE LAYOUT V �L PLAN REDUCED- SEE FLOOR PLAN FOR DIMFNSIC TIS ENERGY CODE NOTES SYSTEM COMMISSIONING NOTES 1. PRIOR TO CONSTRUCTION, A COMMISSIONING PLAN SHALL BE DEVELOPED TO INSURE PROPER INSTALLATION AND TESTING OF BUILDING SYSTEMS AS FOLLOWS: A.) MECHANICALSYSTEMPERASHRAE6,9.2 NOT REQUIRED (EXCEPTION 012, PER ASHRAE 4.2.5.2) SERVICE WATER HEATING PER ASHRAE 79.2 NOT REQUIRED (EXCEPTION Y2 PER ASHRAE 42.52). LIGHTING AND CONTROLS PER ASHRAE 9.9.2 NOT REQUIRED (EXCEPTION 42, PER ASHRAE 4.2.52) OTHER EQUIPMENT CONTROLS PER ASHRAE 10.9.2 NOT REQUIRED(E)CEPTION IS. PER ASHRAE 42.5 2) CUSTOMER APPROVAL 7 APPROVED G APPROVED EXCEPT AS NOTED D REVISE AS NOTED AND RESUBMIT BY DATE PLEASE RENEW AND COMMENT ON THESE DOCUMENTS. PLEASE RETURN APPROVED SET ORCOMMENTSBY 03101120M FAILURE TO RESPOND BY THIS DATE COULD CAUSE DELAYS, INCREASED COSTS, INABILITY TO INCORPORATE YOUR CHANGES OR ALL OF THE ABOVE FLOOR DRAIN E OREGON ENERGY COMPLIANCE IS PROVIDED PER OEESC AND ASHRAE 4.2.1d(a) ANCHORSOLT 2 ALL BUILDING THERMAL ENVELOPE INSULATION SHALL SE MARKED IN ACCORDANCE WITH ASHRAE 5.8.11 AND DOCUMENTED PER ASHRAE 5.8.1.11 ADJUSTABLE 3. WALL AND FLUOR INSULATION SHALL BE INSTALLED PER MANUFACTURER'S TRUCK INSTRUCTIONS. FLOOR CAVITY INSULATION SHALL REMAIN IN CONTACT WITH ABOVE FINISH FLOOR UNDERSIDE OF FLOOR SHEATHING PER ASHRAE 5 8,15 END > 4. PENETRATIONS OF THE AIR BARRIER SHALL BE CAULKED, GASKETED OR SEALED ALUMINUM PERASHRAESA.3.1.2 MFR. 5, OREGON AIR BARRIER COMPLIANCE: ALL AIR BARRIER MATERIALS SHALL BE ASTM BRONZE ANODIZED 22178 RATED AS LISTED IN ASHRAE TABLE 58.3.1 FOOTNOTE (a) ITEMS 1-13 FIBERGLASS 6. ALL FENESTRATION ASSEMBLIES SHALL BE LABELED BY THE MANUFACTURER PER BOARD ASHRAE5.B.2.2 ]. AIR ECONOMIZER SHALL BE CAPABLE OF PROVIDING 100°.6 OUTSIDE AIR PER BLOCK ASHRAE 6.5.1.1.1 SIM. SIMILAR 0. ECONOMIZER HIGHMUMIT SHUTOFF CONTROL IS ELECTRONIC ENTHALPY PER TRASH MANUFACTURERS SPECIFICATIONS, ASHRAE 6.5.1.13 ENCLOSURE BOT. _ BY OTHERS 9, MECHANICAL VENTIIATIM SYSTEM SHALL HAVE THE CAPABILITY TO REDUCE THE TRUCK OUTSIDE AIR SUPPLY TO THE MINIMUM REQUIRED PER ASHRAE 6.5.321 AND B53.9(a) END FRT FACE OF FRAMING BV. BOTTOM VENT 10. OUTSIDE AIR AND EXHAUST AIR DAMPERS SHALL BE RATED PER ASHRAE TABLE &4.9.4.3 TO INCLUDE CLASS I MOTORIZEO DAMPERS WITH MAXIMUM AIR LEAKAGE CEDAR RATE OF 10 CFMIFIF(GRAVITY BACKARAFi DAMPER MAY SE USED FOR RESTROOM - EXHAUST FANS WHEN AIR FLOW IS LESS THAN 300 CFM) DISTANCE TO 11. COMPLIANCE WITH ASHRAE 54 3 3 VESTIBULES TO BE PER GREGG E3OIGh ) PROPERTY _ CL LINE GREATER SAW THAN 19-0' CLO, CEILING ABBREVIATIONS SYSTEM COMMISSIONING NOTES 1. PRIOR TO CONSTRUCTION, A COMMISSIONING PLAN SHALL BE DEVELOPED TO INSURE PROPER INSTALLATION AND TESTING OF BUILDING SYSTEMS AS FOLLOWS: A.) MECHANICALSYSTEMPERASHRAE6,9.2 NOT REQUIRED (EXCEPTION 012, PER ASHRAE 4.2.5.2) SERVICE WATER HEATING PER ASHRAE 79.2 NOT REQUIRED (EXCEPTION Y2 PER ASHRAE 42.52). LIGHTING AND CONTROLS PER ASHRAE 9.9.2 NOT REQUIRED (EXCEPTION 42, PER ASHRAE 4.2.52) OTHER EQUIPMENT CONTROLS PER ASHRAE 10.9.2 NOT REQUIRED(E)CEPTION IS. PER ASHRAE 42.5 2) CUSTOMER APPROVAL 7 APPROVED G APPROVED EXCEPT AS NOTED D REVISE AS NOTED AND RESUBMIT BY DATE PLEASE RENEW AND COMMENT ON THESE DOCUMENTS. PLEASE RETURN APPROVED SET ORCOMMENTSBY 03101120M FAILURE TO RESPOND BY THIS DATE COULD CAUSE DELAYS, INCREASED COSTS, INABILITY TO INCORPORATE YOUR CHANGES OR ALL OF THE ABOVE FLOOR DRAIN A.B. ANCHORSOLT FO ADJ, ADJUSTABLE FON TRUCK AF F. ABOVE FINISH FLOOR F.E. END > AL ALUMINUM F.E.C. MFR. SA BRONZE ANODIZED FGL FIBERGLASS W. BOARD R.R. ELK. BLOCK FIN. SIM. SIMILAR B.O. BOTTOM OF F,O.FIN. MARRIAGE LINE BOT. BOTTOM F.OFRM iLECTRICAL BRCH BIRCH FRT FACE OF FRAMING BV. BOTTOM VENT FS CDR. CEDAR FTAO CT CAN SMETER w CONTROLJOINT GA. MIXING VALVE CL CENTERLINE SAW NLC. CLO, CEILING G.C.C. GAUGE CUR. CLEAR TMP TEMPERED SAFETY GLAZING CMU CONCRETE MASONRY UNIT GLB T.O. TOP OF C.O. CLEAN OUT GYP. NOT TO SCALE GONG CONCRETE HB OBS CONT. CONTINUOUS HC TRUCK CPT CARPET HE END DBL DOUBLE HM BE DRINKINGFOUNTAIN HSS INSTALLED VCT VINYL COMPOSITION TILE DIA DIAMETERINFU. DPP. WATER GM DIMENSION INSUL. OSA GS DOWNSPOIi INT. HOLLOW METAL DTL DETAIL KD OW DISHWASHER L. WC WATER CLOSET EA. EACH IAV PUNCH &DIMPLE ELEC ELECTRICAL LH PF ELEV.. ELEVATIONS LHOS INTERIOR EQUIP. EQUIPMENT LVL EXIST. EXISTING PLACES M. EXTERIOR PLYWD PLYWOOD E.W. EACH WAY LAVATORY SYSTEM COMMISSIONING NOTES 1. PRIOR TO CONSTRUCTION, A COMMISSIONING PLAN SHALL BE DEVELOPED TO INSURE PROPER INSTALLATION AND TESTING OF BUILDING SYSTEMS AS FOLLOWS: A.) MECHANICALSYSTEMPERASHRAE6,9.2 NOT REQUIRED (EXCEPTION 012, PER ASHRAE 4.2.5.2) SERVICE WATER HEATING PER ASHRAE 79.2 NOT REQUIRED (EXCEPTION Y2 PER ASHRAE 42.52). LIGHTING AND CONTROLS PER ASHRAE 9.9.2 NOT REQUIRED (EXCEPTION 42, PER ASHRAE 4.2.52) OTHER EQUIPMENT CONTROLS PER ASHRAE 10.9.2 NOT REQUIRED(E)CEPTION IS. PER ASHRAE 42.5 2) CUSTOMER APPROVAL 7 APPROVED G APPROVED EXCEPT AS NOTED D REVISE AS NOTED AND RESUBMIT BY DATE PLEASE RENEW AND COMMENT ON THESE DOCUMENTS. PLEASE RETURN APPROVED SET ORCOMMENTSBY 03101120M FAILURE TO RESPOND BY THIS DATE COULD CAUSE DELAYS, INCREASED COSTS, INABILITY TO INCORPORATE YOUR CHANGES OR ALL OF THE ABOVE FLOOR DRAIN MAX. MAXIMUM SC SOLIDCORE FOUNDATION MOO MEDIUM DENSTY OVERLAY SF STOREFRONT FIRE EXTINGUISHER MECH. MECHANICAL SH SINGLE HUNG FIRE EXTINGUISHER CABINET MFR. MANUFACTURER SHT. SHEET FIBERGLASS MIN. MINIMUM SHTG. SHEATHING FLOOR MISC. MISCELLANEOUS. SIM. SIMILAR FINISH M.L. MARRIAGE LINE SIMP. SIMPSON FACE OF FINISH MOD. MODULE SO. SQUARE FACE OF FRAMING MPL MAPLE S.S. STAINLESS STEEL FIRE-RESISTANTTREATED MTL. METAL STN. STAIN FLOOR SINK MV MIXING VALVE STRUCT. STRUCTURAL FORCE TRANSFER AROUND OPENINGS NLC. NOT IN CONTRACT TIM. TIMELY GAUGE NOM. NOMINAL TMP TEMPERED SAFETY GLAZING GALVANIZED NRW NARROW (LITE) T.O. TOP OF GENERAL CONTRACTOR COORDINATE WE NOT TO SCALE TTP TAPE, TEXTURE & PAINT (NOT BY MODERN - SITE INSTALLED) OBS OBSCURE TYP. TYPICAL GLULAM BEAM O.C, ON CENTER U,NO. UNLESS NOTED OTHERWISE GYPSUM OFCI OWNER FURNISHED CONTRACTOR INSTALLED OR URINAL HOSE BIB OFO OWNER FURNISHED OWNER INSTALLED VCT VINYL COMPOSITION TILE HOLLOW CORE DPP. OPPOSITE VC. MNYLCOATED HEM FIR OSA OUTSIDE AIR VWS VINYL WRAP SURROUND HOLLOW METAL QS.B. ORIENTED STRAND BOARD WI WITH. HOLLOW STRUCTURAL SECTION OVHG OVERHANG WC WATER CLOSET INFORMATION PD PUNCH &DIMPLE VO WOOD INSULATION PF PREFINISHED WH WATER HEATER INTERIOR PLANT PLASTIC LAMINATE KNOCKDOWN PLCS PLACES LONG PLYWD PLYWOOD LAVATORY PNT PAINT LEFT HAND P.T. PRESSURETREATED LEFT HAND OUT SWING REFRIG REFRIGERATOR SANITARY PLUMBING WARNING&DISCLAIMER SANIAR DISCIUIDSITE LAMINATEDVENEER LUMBER RECD REQUIRED CiI hasTHEN CIVIL IpRMTE3 0.p tlIN THE NEEDS --- RH RIGHT HAND yy99 I IMFIC laca9R rteleva. RHOS RIGHT HAND OUT SWING ata Tbererore Motlem sM1aA lwl be respols blefw atltlh rol wMs aM �$ \ tt R.O. ROUGHOPENING h tlNeys �Mlp to Ble cannechon MbuM�san9eryl b stiff ATL- 4�4 sa011arymse Atltl i mmi was and time aeIWY may be imsaTed by Giem IN REGARDS TO DESIGN, EXCAVATION FOUNDATION, PLUMBING AS WELL AS OTHER ITEMS. LbltAT 2�' 1 IT, I A 20 21 T EE. .n KITCHEN \ T 1 B /STORAGEA STORAGI - - C-- --------- 20._8.._ _ _ _ _ _ 20'.6• � I J �- �.. CLASSROOM CLASSROOM B A RES TR OOM ) 11- lb l l-1 � r D\ T OFFICE A /E� I STAF� RJR L/ I I OFFICE B 1 j E V I E 19-T �L _p -- - - - - -- / ENTRY ^-- - - - - -- 20'-2'- - I, m FIRE AND LIFE SAFETY PLAN NOTES ajj-FiREx LIFE SAFETY PLAN- PI -AN REoucFe- sFF FLOOR PLAN FORDIMENSIONS 1. FIRE DEPARTMENT KEY BOX AND LOCATION TO BE PROVIDED SY OTHERS 2. FIRE EXTINGUISHERSTO BE5LS 2A 108C, BYOTHERS 3. BUILDING ADDRESS IDENTIFICATION ANO LOCATION TO BE PROVIDED AND MAINTAINED BY OTHERS FIRE AND LIFE SAFETY SYMBOLS LEGEND OCGGROUP=^ % X'.X° COMMON PATH DISTANCE OCC. LOAD - %%�-%_ — EXIT ACCESS DISTANCE 10 EXIT LOAD - -- PATH OF EGRESS EGRESSSTARTPOINT EGRESS DIRECTION Fel FIREEXTINGUISHER (BY OMER) REV.iMSCRIPTION DESIGN CRITERIA GENERAL. CONSTRUCTIONTYPE VB(NON-SPRINKLERED) OCCUPANCY GROUP (ISO CH. 3) E( ELEMENTAROPRESCHOOL AND KINDERGARTEN) BUILDING AREA I STORES (18C TABLE 504, 5)6.2) I ALLOWABLE 9500 SO FT. 1(2) STORY ACTUAL'. SR7 SQ FT 1(1) STORY DISTANCE TO PROPERTY LINE OR ASSUMED PROPERTY LINE NORTH: IO MIN Loe- Factor SOUTH: 10'MIN CLVSSROOMA EAST: IO MIN ]]9 SF WEST: 10 MIN. EXTERIOR WALL RATING (IRS TABLE 802) FIRE SEPARATION DISTANCE 19 OR GREATER, NO RATING REQUIRED OCCUPANCY LOAD (IBC TABLE 1004.5) 81 OCCUPANTS, SEE SUMMARY ON SHEET A 0.1 FIRE RESISTIVE RATING REQUIRMENTS NONE REQUIRED ATTIC DRAFTBTOPPING (ISG BEC. 118.4) NOT REQUIRED NUMBER OF EXITS (IBC SEC. 1006) REQUIRED: (1), PROVIDED: (2) COMMON PATH OF EGRESS (IBC TABLE IDO6 21) ALLOWABLE 75 FET, ACTUAL 67 FEET MAX. TWO EXITS OR EXIT ACCESS DOORWAYS (IBC SEC. 1007) N4 EXIT ACCESS TRAVEL DISTANCE (IBC TABLE 1008.53(2),109:2) ALLOWABLE 200 FEET ACTUAL: S]FEET MAX. CORRIDOR CONSTRUCTION (IBC TABLE IWO.1) NA CORRIDOR WIDTH (BE TABLE 1020.2) NA ELECTRICAL TC ELECTRICAL SERVICE LOAD (2) 200A/ 120C40V )1 PH. et 82.1 kVA MECHANICAL VENTILATION OCCUPANCY LOAD LIMO TABLE 4933.1.¶ R? OCCUPANTS, SEE SUMMARY ON SHEET MIO_ 4C CLIMATEZONE HEATING SPV/HP _.- AIR CONDITIONING VES PLUMBING. PLUMBING OCCUPANCY LOAD (ISO TABLE 1004.5, 2902.1) 82 (41 MALE 141 FEMALE) PLUMBING FIXTURES REQUIRED (IBC TABLE 2902,1) WC (2). LAV (2) PLUMBING FIXTURES PROVIDED WC (4) MALE: I-Ni(4) QUANTITY OF PLUMBING FIXTURES (9) STRUCTURAL REQUIRED SPECIAL INSPECTIONS STEEL COLUMN WELDING SDSPENDED CEILING W/BERG CLIPS ROOF SNOW LOAD M PSF .FLOOR LIVE LOAD 50 ESE Lambtla=1.00 VIA =120 MPH Need -93 MPH) 3 SECOND GUST EXP B WIND LOAD SEISMIC BEARINGWAILSYSTEM: Ss=LLGC, F,=1.265 Sos = 0.564 RISK CATEGORY II 6 = 10 SEISMIC DESIGN CATEGORY D, SITE CLASS D THIS SET OF PLANS PREPARED AND SUBMITTED FOR APPROVAL UNDER THE FOLLOWING CODES'. BUILDING 2019 OSSC MECHANICAL 20190MSC FIRE 2019 OFC PLUMBING 2921 OPSC ENERGY 2021 GORE ELECTRICAL 20210EESCASHRAE 909-2019 ACCESSIBLITY ICCA19.1-2009 OCCUPANT LOAD SCHEDULE _____-__--o¢OPam Function Of $0. Arae Loe- Factor Lo li CLVSSROOMA ]]9 SF 29 39 li CLASSROOMB _ _ Ae SF 20 39 KITCHEN 141 SF 200_ 1 OFFICER _ 105 SIF17F 158 1 OFFICE B 106 SF 150 1 TC et _ L FC I I MIN ,(OCI]F _ TI CLEAR TN _ KITCHEN 4 L1 A4.0) 461M I13 g a 8 A4.0) `- IRANGE(OFCI) 6 m A4.0 0 FMO A] _ ooD CFcpL- OPCI) Q REF I 0 - I ROOF (-4) �1� 12 \ _ $TORAGEA STORAGES ._ - _- - — - - - - - - - - — TYR m r a _ J CLASSROOM W 2 CLASSROOM B o MECH A CA RE�TROOM e �0) v UNRB [MOD B MECNITR LO 2 '�A PANEL -I LZONE PAN _ AS \ NI I A_ EI - D p 6'. m^ s' -z' STAFF RIR -\ F TVP. TYP. �l6 1 � � � � i�A4.o vv CL I MOD C yI OFFICER o AtQ OPFICEBI� CIG z� C 73 - / EN TRY_ O / oG Na �61 C T / - _ - os. 3.0' 4'.0' 31.0' 4' 4• 4" 4'- 0• 2'-16" 2' -10' 4'-0" 1'. P 4'.4" 5. 0" 3' 6'• r2) 3' -S' 4-1- C3 23'-lV' 4. 0'_2'• 4-2,• 23'-10" 4' 0" e'-4' 2' -d' 8-0' W-0. S' -1O° 8' 6" _ - Kill FLOOR PLAN 3'.%' 5'.10' 6' 0' Y 0" 6' D.S. OA 0.��) I i � ( HB, i l,3) � �^J lJ D.S. _ L FC I I MIN ,(OCI]F _ TI CLEAR TN _ KITCHEN 4 L1 A4.0) 461M I13 g a 8 A4.0) `- IRANGE(OFCI) 6 m A4.0 0 FMO A] _ ooD CFcpL- OPCI) Q REF I 0 - I ROOF (-4) �1� 12 \ _ $TORAGEA STORAGES ._ - _- - — - - - - - - - - — TYR m r a _ J CLASSROOM W 2 CLASSROOM B o MECH A CA RE�TROOM e �0) v UNRB [MOD B MECNITR LO 2 '�A PANEL -I LZONE PAN _ AS \ NI I A_ EI - D p 6'. m^ s' -z' STAFF RIR -\ F TVP. TYP. �l6 1 � � � � i�A4.o vv CL I MOD C yI OFFICER o AtQ OPFICEBI� CIG z� C 73 - / EN TRY_ O / oG Na �61 C T / - _ - os. 3.0' 4'.0' 31.0' 4' 4• 4" 4'- 0• 2'-16" 2' -10' 4'-0" 1'. P 4'.4" 5. 0" 3' 6'• 3' -S' 4-1- 3' 0" 131. IV, 18' 4" 13-10 W-0. FLOOR PLAN PLAN REDUCED- SEE FLOOR PLAN FOR DIMENSIONS SHEAR WALL TYPE IS BEARING WALL SYSTEM USING LIGHT -FRAME (WOOD) WALLS SHEATHED WITH WOOD STRUCTURAL PANELS. ALL EXTERIOR WALL PIERS WITH MAXIMUM ASPECT RATIO OF 2'.1 ARE CONSIDERED AS ENGINEERED SHEAR WALLS ENLARGED PLAN NOTES 1. PLUMBING FIXTURE DIMENSIONS z� ARE FROM FACE OF FINISH SJ N.C.) 2. SLOPE FLOOR 4'-4' DIA. AROUND T4FLOOR DEAN, MIN. 1/1T SLOPE. ADD " 16-4" 4- 2x(FLAT)SLOCKATALLEDGES- TTP. ri WALL - C sA 1 I RESTROOM 11 10) F0.1 / b' 2 x6 PLUMBING 5'-0" T -DWI I' 3'-0516" WALL I FURRING WALL 1'-6" L 5'-1314' 3'-1516' I'-6316 I. I c CL � C 4 ENLARGED RESTROOM PLAN 21 -- - I �2xe3MBING WALLi �E� 6 MOP SINK 11 A4a 1z �L_ - I 2x 5 PLUMBING - ) STAFF RIR WALL m �FO-1[ 40 GAL. WATER / HEATER 5 5" z' -S' L 11 m z 3- CE 4 _ c n ENLARGED STAFF FIR PLAN TRIM T SIMILAR (SITE INSTALL) GRIDS DIEE 12� SITE INSULATE ��•V� C �V B'/) -- STL. COLUMNS t C / V A& IUR SIMWi AT A TRIM Oti 4x6 (SITE INSTALLED) SIDING INTERIOR FINISH STUDS AT 16" O.C. � V.0. GYP. BOARD 12'LBLKRIPPED TO FIT AT 113 PTS 7I18" 0.5.B. SHEATHING (SITE INSTALLED) WALL- EXT. MARRIAGE q-15� WALL iNT. COLUMN GRIDS 6/C YROUGH OPENING= CALLSIZE+2-114" STL COLUMNS y �. 7116'O.S.S. - � V.C. GYP. BOARD / _T WALL INT COLUMN GRIDS D/E T INTERIOR WINDOW JAMB LS�1 {) _-- U 1ift"=1.-0" T� 1/\l2 j \J ROOFCAP-TYR i3; Y 4"'R GUTTER-TYP. Roaf / 118 Pr, 1/8 DOWNSPOUT. TYR _ _Fio-Floc. r r 0-0, V 45SAT DOORWAY PIACEOFOFFSETRIM-TYP. A BIICI D)IE� FI E.4DSIGN �F��oNEn.nECR.uw,� �D� �C A ` iP x iT WALL LOUVER tY'x12'WALL LOWER \ \ \`-� FOR OU(SIDEAIR BOFPLY� ` � FOR OUTSIDE AIR SUPPLY O ERV MODGATTWIC R00.5 OFMATS'O.C.-TYR ALO t2 2� 2 - IIit IIr J,7 s nill I- RM 1P1le /t8e" ll WINDOW TRIM-TYP, i o z _ I Fm -Floor a i ,'... -Flo., F Dor i 0' -ate' _1 - i :..- ',.. _ FDID s I _ m 2, NORTH ELEVATION 8 SOUTH ELEVATION Roof / Plt1 8'-itate/8�' 7 CORNER BATT -TYR WORWAY (4)EAST ELEVATION ,mm�� PI -AN REDUCED - SEE FI -00k PLAN FOR DIMENSIONS Fin -Floor A 0'-0" 1� W_ --���OPSIGNCRITPRN MICKNESS INSPECTION EDGE NNLING OSSC CODE CODE OR FREQUENCY SYSTEM OR MATERIAL REMARKS dry N�V7XYY4i F '1]�i". " NONE STANDARD REFERENCE REFERENCE CONTINUOUS PERIODIC OBSERVE STRUCTURAL STEEL ALSO 360 ASS MATERIAL VEREICATGN OF WELD ✓aNSr AISC 360 N32 p MANUFACTURER'S FILLER MATERIALS TABLE TIm2 APPLICABLE AWS CERTIFIED TEST REPORTS AS DOCUMENTS SINGLE PASS FILLET WELDS �T"oz-:srrmn REQUIRED SPECIAL INSPECTIONS MICKNESS INSPECTION EDGE NNLING OSSC CODE CODE OR FREQUENCY SYSTEM OR MATERIAL REMARKS IDC@ITC.O NONE STANDARD REFERENCE REFERENCE CONTINUOUS PERIODIC OBSERVE STRUCTURAL STEEL ALSO 360 ASS MATERIAL VEREICATGN OF WELD AISC 360 N32 p MANUFACTURER'S FILLER MATERIALS TABLE TIm2 APPLICABLE AWS CERTIFIED TEST REPORTS AS DOCUMENTS SINGLE PASS FILLET WELDS GREATER THAN N16" X ALL WELDS VISUALLY INSPECTED '-- TABLE I7o52 AWS PERAWSD1.ia9 SINGLE SS LESS SECTION6 SECTION THAN EQUAL TO 511WDB THAN OR EODALT05116" X WOOD CONNECTIONS FOR OVPHRAGM CHORDS, COLLECTORS, 1M&11.2 X ALL FASTENER&CONNECTIONS BRACING, AND SHEAR WALL VISUALLY INSPECTED ANCHOPAGE AND HOLDOWNS GEOTECHNICAL VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE X ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACm' TABLEt105.6 PRESCIPTIVE LOAD BEARING VALUES PER TABLE 1606.2 FOR VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTHX SILTYSAND SOIL AND HAVE REACHED PROPER MATERIAL ROOF SHEATHING SCHEDULE MICKNESS APASPAN RAZING EDGE NNLING REM NAILING BLACKING NOTES 1-LB 4SQ4 MIN. IW@6"0.C. IDC@ITC.O NONE 2' RUBBER PLAYGROUND PROTECTIVE SURFACING ON 5" SLAB ON GRADE WI 18"D THICKENED SLAB EDGES. PROVIDE 4" MIN. COMPACTED SUB BASE ----- 3" DIA. DOWNSPOUT. PROVIDE BRACKETS FASTENED TO HSS POSTAT60"O.C. - STORM DRAIN/. REFER TO CIVIL UTILITY PLAN , 1 112" 112" ALT #1 Covered play structure, rubber surfacing, and footings shown on sheets A-111 & A-112. Concrete slab to be included in base bid, see Civil. n COVERLAY AEA ED PRSECTION 1.0' 3 A-111 -0" 44' DASHED LINES INDICATE PLYWOOD SHEATHING 24" NGONCRE EPIER ICONS � B. IO.. IB TVP, 38'-0" T-V� 4L-0' Y-4 0" 4 0 4'7g. 4'- 4'-(Y' 4'-0 ti 4' 4-0' 3•-U" 1 - GALVANIZED("SCH40 , (STD) POSTS, TYP. A-112 I a--- i i I 1 3 I I _ .. i �_�_.I. _s__ ,• �-- A-112 N — GLB 3.1/8"%13.5 TYP { -- I I I I II, I'. II. I I ROOF FRAMING '7 118" = 1'-0" RUBBER SURFACING TRANSITION CORRUGATED METAL ROOFING OVER HIGH -TEMP, SELF ADHERED MEMBRANE UNDERLAYMENT. 3-- T.O. POST432 6 HIGHGA GB-118"X5BEAMS ` @HIGH AND LOW END - -�-- GLB3-116"X73.5"RAFTER, TYP. 11"r 4 .BROKAW 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 rowelibrokaw.com Architecture. Design. Strategy STAMP ALIGNSIABWITH ADJACENTSIDEWALK dN T.O. SLAB REF. GRADING PLANTg- _ T.O. FOOTING - a1,-4„ fi REVISIONS TO THIS SHEET IIII—il II REV. DATE FOUNDATION / SLAB PLAN A -n1 118" = 1`-0" SET ISSUE DATE SPRIDISCRETIONARY USE 2023-02-20 PRE -SUBMITTAL SPR/DISCRETIONARY USE 2023-03-21 SUBMITTAL -- COORDINATE EDGE OF SLAB WITH MOW STRIP AT (E) FENCE LINE PROJECT TRACKING -S 3" DIA. DOWNSPOUT. PROVIDE RBA #: 2234 REFER TOCIVuUTILITYTILITY PLAN PIC: JOHN ROWELL SLEEVE THROUGH FOR STORM CONNECTION. PM/PA: LORRINELSON , I� Project Name (E)FENCE EC CARES SPRINGFIELD - CONCRETE MOW STRIP COVERED PLAY AREA BELOW iE) FENCE; REFER TO LANDSCAPE DETAILS Pmject Address SLAB ON GRACE CONTROLJOINTS 812 G Street DASHED Springfield, OR COVERED PLAY AREA e - PLANS & SECTION A-111 ALT #1 CORRUGATED METAL ROOFING Covered play structure, rubber surfacing, and footings shown on sheets A-111 & A-. O2 - FASTEN FLASHING @ 112 g EVERY RIB OR I2"O.G.ff 11 Concrete slab to be included in base bid, see Civil TOP CLOSURE SET 10d@60C 3.0 � rjr' � IN SEALANT GAB RAFTER W/ NOTCHED ENDS \\ _ 2 — - _ - 16dT OENAI BLOCKING,BEVEL TOP -Tr - _ Ir BROKAW LAP ROOF UNDERLAYMENT PEAK FLASHING OVER GUTTER - II OVER RCLEATOOF ERLAYMENT 1' WIDEGUTYERSTRAP@� �� � __ _ - - _ � � OVER CLEAT 1203 Willamette Street O.C. FASTEN GUTTER STRAP �� - - - _� _ --- Suite 210 IV RIB OF METAL ROOFING --- _ \ _ - - L- - - --- _ — �� - - -_ -`- - - - - _1= - coer.2x FASCIA FAsrEND Eugene, Oregon0397401 TO CONT. SHEET METAL GUTTER - -- � - _ 2X BLOCKING BETWEEN RAFTERS - - F RAFTER OXTENSI R 5414851003 " RAFTER EXTENSION I - _ 1 ,\ rowellbrokaW.com _ J -,- _ ---- REMOVE TOP OF GL BEAM SO NOTCH TOP OF BEAM SO THAT RAFTER EXTENSION IS CONT. 2X FASCIA FASTENED X/ 1L-- - - RAFTER IS CONTINUOUS - _- CONTINUOUS Architecture. Design. Strategy. TO ENDS OF GLULAM RAFTER 3" DIA. PREFINISHED DOWNSPOUT y CLR "�� CONCEALED RANGE, FACE \ CONCEALED FLANGE, FACE ALUMINUM DOWNSPOUT - --- MOUNT HANGER. FLANGE, ---- NONCE HANGER. FLANGE, HUC3.25N PEAK FLASHING&CLEAT HUC3.25/9 AT POST. TVR 4112' } 1 PI -1W BEAM SADDLE WASH R&NUTOP OF - GUTTER PLASHING -� PL1WAP AT 4) 11Y' GALV. BOLTS, I - ''. POSTS, TYP STAMP 5 ROOF EDGE / GUTTER DETAIL — A-112 - ROOF EDGE DETAIL 6 -- - - A-112 --�-d- 17_ou CORRUGATED METAL ROOFING REVISIONS TO THIS SHEET - -- FULL COVERAGE, SELF ADHERED O B / ROOFING UNDERLAYMENT REV. DATE CENTER PLYWOOD SHEATHING JOINT PLYWOOD SHEATHING; PER ON GLULAM BEAM. LAYOUT PER ROOF /A SHEATHING SCHEDULE FRAMING PIAN ON A-111 I /BEAM SADDLE DETAIL M III GLUCAN RAFTER CONCEALED FLANGE RAFTER HANGER L ` 1/4"PL STEEL SADDLE, BOTH SIDES OF BEAM �- 1/4" PL STEEL POST CAP - - ---- 6"SCH 40 POST #4 TIES AT S" O.C. T O q u.. .1L Y CONCRETE PIER DETAIL - ---- A-112 1.1 _ 11-01. 2 SET ISSUE DATE 6"SCH40 POST BEYOND RUBBER PLAYGROUND \ PROTECTIVE SURFACE SPR/DISCRETIONARY USE 2023-02-20 5'SL460N GRADE WITH #4 16' O.C. EA. wnv -- 2'-0„ PRE -SUBMITTAL THICKENED SLAB EDGE --------- /— RUBBER FALL SURFACE � I TRANSITION AT SIDEWALK SPR/DISCRETIONARY USE 2023-0321 ® �I SUBMITTAL AT SLAB CL --- SIDEWALK #4@18"O.C. 6Lrzyll- yi PROJECT TRACKING (2)1/2"X15"THREADED ROD -1 l W1 NUT EA SIDE, (1) EA. WAY RBA #: 2234 AT TOP AND BOTTOM OF I POSTEMBEDMENr P.I.C: JOHN ROWELL ' = 419.33� PM / PA: LORRI NELSON Project Name -%i EC CARES SPRINGFIELD a�> COVERED PLAY AREA � - I 2 , .,L J L!_ J. i = Pmjed Address 1, I I I (� 812 G Street L f t N Springfield, OR (8) VERTICAL #4 BARS i °- _ #4 TIES AT 6'O.C. °( COVERED PLAY AREA LII 11 - DETAILS -RUN i itll H Am112 1 TYPICAL FOOTING & SLAB EDGE DETAIL % - FASTEN ROOF WITH NEOPRENE WASHER SCREW AT VALLEYS PER ROOF j --- MANUFACTURER RECOMMENDATIONS. FASTEN FLASHING 24" O.C. SET @ ON CONTINUOUS STRIP OF BUTYL - TAPE AT BOX RIB ), ROOF EDGE FLASHING o LAP ROOF UNDERLAYMENT OVER CLEAT EDGE FLAS4,ING&CLEAT CONT. 2X FASCIA FASTEND TO UNDERSIDE OF ROOF SHEATHING r ---_- GLUCAN RAFTER 77 r� ry r N � o N m o ROOF EDGE DETAIL - RAKE L A-112 #4 TIES AT S" O.C. T O q u.. .1L Y CONCRETE PIER DETAIL - ---- A-112 1.1 _ 11-01. 2 SET ISSUE DATE 6"SCH40 POST BEYOND RUBBER PLAYGROUND \ PROTECTIVE SURFACE SPR/DISCRETIONARY USE 2023-02-20 5'SL460N GRADE WITH #4 16' O.C. EA. wnv -- 2'-0„ PRE -SUBMITTAL THICKENED SLAB EDGE --------- /— RUBBER FALL SURFACE � I TRANSITION AT SIDEWALK SPR/DISCRETIONARY USE 2023-0321 ® �I SUBMITTAL AT SLAB CL --- SIDEWALK #4@18"O.C. 6Lrzyll- yi PROJECT TRACKING (2)1/2"X15"THREADED ROD -1 l W1 NUT EA SIDE, (1) EA. WAY RBA #: 2234 AT TOP AND BOTTOM OF I POSTEMBEDMENr P.I.C: JOHN ROWELL ' = 419.33� PM / PA: LORRI NELSON Project Name -%i EC CARES SPRINGFIELD a�> COVERED PLAY AREA � - I 2 , .,L J L!_ J. i = Pmjed Address 1, I I I (� 812 G Street L f t N Springfield, OR (8) VERTICAL #4 BARS i °- _ #4 TIES AT 6'O.C. °( COVERED PLAY AREA LII 11 - DETAILS -RUN i itll H Am112 1 TYPICAL FOOTING & SLAB EDGE DETAIL GENERALNOTES- ELECTRICAL A. ELECTRICAL DRAWINGS ARE ONLY A PORTION OF THE COMPLETE SET OF PLANS AND CONTRACT DOCUMENTS. THE ELECTRICAL SCOPE OF WORK IS DEFINED BY THE COMPLETE SET OF CONTRACT DOCUMENTS. THIS INCLUDES BUT ISNOT LIMITED TO REFERENCING: CML PLANS FOR ADDITIONAL SITE UTILITY INFORMATION, MODULAR BUILDING CONTRACT DRAWINGS FOR EQUIPMENT TERMINATION LOCATIONS AND ROUGH -IN REQUIREMENTS. B. INTERIOR DISTRIBUTION EQUIPMENT, POWER DEVICES, EQUIPMENT CONNECTIONS, LIGHTING, AND LIGHTING CONTROLS ARE FURNISHED AND INSTALLED BY THE MODULAR BUILDING SUPPLIER. COORDINATE ROUGH -IN LOCATIONS WITH THE FINAL SUBMITTED AND APPROVED MODULAR BUILDING PLANS PRIOR TO PROCUREMENT AND INSTALLATION. CODE NOTES - ELECTRICAL A. PROVIDE ELECTRICAL INSTALLATION IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL CODES. B. THE CURRENT ADOPTED EDITION OF THE ELECTRICAL CODE SHALL BE THE STANDARD FOR THE ELECTRICAL INSTALLATION. VERIFY WITH LOCAL OFFICIALS WHEN PERMITS ARE OBTAINED. NOTIFY DESIGN TEAM OF ANY DISCREPANCIES BETWEEN THE PROJECT MANUAL OR DRAWINGS AND THE GOVERNING CODE. C. REFER TO PROJECT MANUAL AND PROJECT CODE REVIEW SHEET FOR LIST OF APPLICABLE CODES. INSTALLATION NOTES - ELECTRICAL A. CONTRACTOR IS RESPONSIBLE FOR OPENINGS IN WALLS CREATED BY THEIR WORK PENETRATIONS SHALL BE SEALED IN ACCORDANCE WITH THE RATINGS OF THE AFFECTED WALL. OPENINGS IN EXTERIOR WALLS SHALL BE MADE WATERTIGHT. REFER TO ARCHITECTURAL CODE PLAN FOR RATED WALLS. ELECTRICAL ABBREVIATIONS A DEVICE MOUNTED +8" ABOVE NIC NOT IN CONTRACT xxx X EQUIPMENT IDENTIFICATION TAG. REFER TO EQUIPMENT CONNECTION SCHEDULE COUNTER TOP (VERIFY LOCATION) NM NONMETALLIC SHEET REFERENCE AFF ABOVE FINISHED FLOOR NTS NOT TO SCALE ATS AUTOMATIC TRANSFER SWITCH OC ON CENTER C CEILING OFCI OWNER FURNISHED UTILITY METER CB CIRCUIT BREAKER SPD CONTRACTOR INSTALLED �Q CT CURRENTTRANSFORMER OFOI OWNER. FURNISHED, PANELBOARD-RECESSED IN WALL E EXISTING ITEM TO REMAIN OWNER INSTALLED EC ELECTRICAL CONTRACTOR R EXISTING ITEM TO BE REMOVED EM EMERGENCY LIGHT FIXTURE RR EXISTING ITEM TO BE REMOVED AND ER NEW LOCATION OF EXISTING ITEM RELOCATED F ROUGH IN FOR FUTURE DEVICE RN EXISTING ITEM TO BE REMOVED AND FAAP FIRE ALARM ANNUNCIATOR PANEL REPLACED WITH NEW FACP FIRE ALARM CONTROL PANEL SCCR SHORT CIRCUIT CURRENT RATING FSD FIRE SMOKE DAMPER T .TAMPER PROOF DEVICE G GROUND FAULT CIRCUIT INTERRUPTER TCC TEMPERATURE CONTROL CONTRACTOR GND GROUND TV TELEVISION KVA KILO -VOLT-AMPERES TYP TYPICAL KW KILOWATTS UPS UNINTERRUPTIBLE POWER SUPPLY MC MECHANICAL CONTRACTOR V VOLTS MCB MAIN CIRCUIT BREAKER VA VOLT-AMPERES MDP MAIN DISTRIBUTION PANEL WG WIREGUARD COVER MLO MAIN LUGS ONLY WP WEATHERPROOF DEVICE N NEW DEVICE IN EXISTING LOCATION WR WEATHER RESISTANT DEVICE'. +24" INDICATES MOUNTING HEIGHT CENTER LINE OF DEVICE TO FINISHED FLOOR GENERALSYMBOLS ECONDUIT SLEEVE JQ JUNCTION BOX, CEILING OR FLOOR MOUNTED. JUNCTION BOX, WALL MOUNTED, ELEVATION AS NOTED. 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 rowellbrokaw.com Architecture. Design. Strategy. KCL 296 E. 5th Ave, Suite 501 Eugene OR 97401 ENGINEERING 503-2124612 STAMP REVISIONS TO THIS SHEET REV. DATE _REV -01 _. ___.....2021-03-29_— SETISSUE DATE SPR/DISCRETIONARYUSE 2023-02-20 PROJECT TRACKING RBA #: CIRCUIT HOMERUN, CONCEALED CONDUIT OR CABLE ® KEYNOTE xxx X EQUIPMENT IDENTIFICATION TAG. REFER TO EQUIPMENT CONNECTION SCHEDULE ' SIM DETAIL DRAWING REFERENCE TAG, SIM -SIMILAR, TYP-TYPICAL, OPP-OPPOSITE Alol SHEET REFERENCE POWER SYMBOLS JUNCTION BOX. WITH PULLSTRING, WALL MOUNT, Y Y REFER TO PLAN OR DETAIL FOR MOUNTING HEIGHT GROUND BAR T❑ UTILITY TRANSFORMER UTILITY METER SPD SURGE PROTECTIVE DEVICE �Q SAFETY DISCONNECT SWITCH PANELBOARD-SURFACE MOUNTED s PANELBOARD-RECESSED IN WALL SURFACE MOUNTED ELECTRICAL DISTRIBUTION EQUIPMENT 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 rowellbrokaw.com Architecture. Design. Strategy. KCL 296 E. 5th Ave, Suite 501 Eugene OR 97401 ENGINEERING 503-2124612 STAMP REVISIONS TO THIS SHEET REV. DATE _REV -01 _. ___.....2021-03-29_— SETISSUE DATE SPR/DISCRETIONARYUSE 2023-02-20 PROJECT TRACKING RBA #: 2234 P.I.C: Chris Andrejko PM / PA: Lorri Nelson Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06700/06800 Project Address G Street Springfield, OR ELECTRICAL GENERAL NOTES $ SYMBOLS E000 IN x TELECOMMUNICATIONS CABLING SCHEDULE SYSTEM SERVED UNSHIELDED TWISTED PAIR CATEGORY HORIZONTAL CABLE COLOR DATA JACK COLOR PATCH CORD COLOR STATION CORD COLOR FIRE DETECTION AND ALARM CATEGORY 6 RED RED - RED RED DATAA/OICE CATEGORY 6A BLUE BLUE BLUE BLUE WIRELESS ACCESS POINT CATEGORY 6A WHITE WHITE WHITE. WHITE NOTE: ALL CABLING SHALL BE PROVIDED A 10 FOOT SERVICE LOOP ON EACH END OF THE HORIZONTAL RUN. MANAGE ALL CABLING WITH HOOK AND LOOP TYPE FASTENERS. USE OF ZIP TIES SHALL NOT BE ACCEPTED. TECHNOLOGY GENERAL NOTES A. COORDINATE LOCATION/INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WITH ALL OTHER TRADES. NO ASPECT OF A SYSTEM INSTALLATION OR ITS ROUGH -IN SHALL COMMENCE UNTIL PROPER AND TIMELY COORDINATION WITH ALL TRADES ASSOCIATED WITH THE INSTALLATION HAS TRANSPIRED. ITEMS TO BE COORDINATED SHALL INCLUDE BUT NOT BE LIMITED TO: BUILDING STRUCTURE, SHEET METAL, ALL PIPING SYSTEMS, LIGHT FIXTURES, CONDUITS, CABLE TRAYS, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT. ANY REWORK OF INSTALLED EQUIPMENT WILL BE AT THE CONTRACTOR'S EXPENSE. B. INCORPORATE INTO INSTALLATION COMMUNICATIONS AND LIFE SAFETY/SECURITY SYSTEM SPECIFICATIONS, DRAWINGS, STATE AND LOCAL CODES, AND OTHER APPLICABLE REQUIREMENTS. C. EACH TRADE IS RESPONSIBLE TO MAKE PENETRATIONS WHERE REQUIRED IN EXISTING OR NEW WALLS, FLOORS, AND CEILINGS. PENETRATIONS SHALL BE NEAT. ANY OVERCUT SHALL BE CONCEALED OR CAULKED. OPENINGS IN EXTERIOR WALLS SHALL BE MADE WATERTIGHT, D. ALL NEW CONDUITS SHALL BE PROVIDED WITH A FULL LENGTH NYLON PULL STRING TO ALLOW EASE OF CABLE INSTALLATION. TELECOMMUNICATIONS DISTRIBUTION NOTES A. PROVIDE PENETRATIONS AND PATHWAYS AS REQUIRED TO ROUTE ALL CABLING INFRASTRUCTURE ILLUSTRATED IN THE DRAWINGS. TREAT EACH NEW PENETRATION AS A 1 -HOUR FIRE RATED WALL UNLESS OTHERWISE NOTED. PROVIDE REQUIRED FIRE STOPPING TO MAINTAIN THIS RATING. B. REAM CONDUIT TO REMOVE BURRS AND ROUGH EDGES. PROVIDE A PROTECTIVE BUSHING AT THE END OF ANY CONDUIT STUB TO PROTECT CABLING INFRASTRUCTURE, C. PROVIDE CABLE SUPPORT FOR ROUTING ALL NEW INFRASTRUCTURE. INSIDE OF ABOVE ACCESSIBLE CEILING SPACES, CABLING CAN BE FLOWN FREE-AIR UTILIZING J -HOOKS, BRIDLE RINGS AND OTHER ACCESSORIES TO SUPPORT CABLING. CABLE SHALL NOT BE ALLOWED TO REST ON TOP OF CEILING TILES OR TO UTILIZE GRID SUPPORT SYSTEM. D. ALL OPEN CEILING AREAS SHALL HAVE CABLING CONCEALED IN CONDUIT. EXPOSED CABLING SHALL NOT BE ACCEPTED. E. ROUTE CONDUIT SERVING WORK AREA DATA OUTLETS VERTICALLY, CONCEALED WITHIN THE WALL FROM OUTLET BOXES TO ABOVE ACCESSIBLE CEILING. PROVIDE PROTECTIVE BUSHINGS AT THE CONDUIT TERMINATIONS FOR CABLING PROTECTION. EQUIPMENT ROOM FITTINGS NOTES A. TELECOMMUNICATIONS CABINET LOCATION SHALL BE APPROVED BY THE OWNER AND MODULAR BUILDING CONTRACTOR PRIOR TO ANCHORING OR INSTALLING EQUIPMENT. PROVIDE A PRE -CONSTRUCTION COORDINATION MEETING AND INCLUDE DESIGN TEAM AND OWNER TO ENSURE PROPER CONFIGURATION OF SCHEDULED EQUIPMENT. ROOM LAYOUT ILLUSTRATED IN THE DRAWINGS IS FOR BID PURPOSES ONLY. B. BIDDING CONTRACTOR SHALL HAVE THE FOLLOWING OPTIONS FOR TELECOMMUNICATION ROOM WALL COVERINGS: a. PROVIDE AC GRADE PLYWOOD THAT IS PAINTED ON ALL SIDES WITH TWO COATS OF A WHITE FIRE -RETARDANT PAINT. b. PROVIDE FIRE-RETARDANTAC GRADE PLYWOOD THAT IS PAINTED WHITE BUT LEAVING THE FIRE RETARDANT MARKINGS/SEAL EXPOSED FOR INSPECTION PURPOSES. C. ANCHOR RACK(S) TO THE FLOOR OR WALL UTILIZING MANUFACTURER APPROVED HARDWARE. D. PROVIDE ALL REQUIRED CABLE TRAY/RUNWAY ACCESSORIES INCLUDING BUT NOT LIMITED TO: WATERFALL RADIUS DROP, OFFSETS, BRACKETS, AND RACK ATTACHMENT HARDWARE. E. CLEAN ALL SURFACES OF ROOM PRIOR TO OWNER'S INSTALLATION OF ACTIVE NETWORK EQUIPMENT. CABLING NOTES A. CATEGORY CABLING SERVING DATA AND VOICE APPLICATIONS SHALL BE TESTED TO ENSURE ALL ELECTRICAL CHARACTERISTICS ARE COMPLIANT WITH THE SPECIFIED CLASSIFICATION (6 AND/OR 6A). UTILIZE FLUKE DSX EQUIPMENT OR EQUIVALENT AND PROVIDE ELECTRONIC RESULTS DURING CLOSEOUT PROCEDURES. ANY INSTANCE OF CABLING FAILING THE PERFORMANCE TEST SHALL BE RECTIFIED BY THE CONTRACTOR THROUGH RE -TERMINATION OR RUNNING NEW CABLING AT NO COST TO THE OWNER. B. PROVIDE A CERTIFIED INSTALLATION BY THE MANUFACTURER. ENSURE THE WARRANTY IS PROVIDED AS THE SPECIFICATIONS REQUIRE. C. WILD RETURN AIR IS EXPECTED IN THE PLENUM SPACES OF THIS PROJECT. THEREFORE, PROVIDE PLENUM RATED CABLING FOR ALL FLOWN INFRASTRUCTURE IN THE ABOVE ACCESSIBLE CEILING SPACES. TECHNOLOGY RESPONSIBILITY MATRIX PROVISION RESPONSIBILITIES DEFINED OFOI COMMUNICATIONS- TELECOM SYSTEMS: ROUGH -IN, PATHWAYS AND SLEEVES RACKS, FRAMES AND ENCLOSURES CABLE MANAGEMENT UNINTERRUPTIBLE POWER SUPPLIES (RACK MOUNT) • PLYWOOD BACKBOARDS _. _..----_------- OPTICAL FIBER BACKBONE CABLING COPPER HORIZONTAL CABLING OPTICAL FIBER HORIZONTAL CABLING DATA COMMUNICATIONS SWITCHES AND HUBS DATA COMMUNICATIONS WIRELESS ACCESS POINTS VOICE COMMUNICATIONS SWITCHING AND ROUTING EQUIPMENT SAFETY- FIRE DETECTION AND ALARM: ROUGH -IN, PATHWAYS AND SLEEVES INITIATING FIELD DEVICES (SMOKE, MANUAL PULL, MONITOR MODULES) NOTIFICATION APPLIANCES (HORNS, STROBES, SPEAKERS) MISCELLANEOUS DEVICES (RELAYS, TEST STATION, ANNUNCIATOR) - OFCI I CFCI 1 MBC 0 w OFOI OWNER FURNISHED & OWNER INSTALLED OFCI OWNER FURNISHED & CONTRACTOR INSTALLED CFCI CONTRACTOR FURNISHED & CONTRACTOR INSTALLED MBC FURNISHED AND INSTALLED BY MODULAR BUILDING CONTRACTOR GENERAL NOTE: A. MATRIX IS NOT INTENDED TO BE EXHAUSTIVE TO COVER ALL MATERIALS NECESSARY FOR SCOPE AND SHOULD ONLY BE USED TO QUICKLY IDENTIFY SYSTEMS AND RELATED INFRASTRUCTURE INSIDE AND OUTSIDE THE BID OF THIS PROJECT. ANY ITEMS FURNISHED OR INSTALLED BY THE BIDDING CONTRACTOR SHALL COVER ALL REQUIRED APPURTENANCES NECESSARY FOR A COMPLETE SYSTEM. THIS SHALL INCLUDE BUT NOT BE LIMITED TO, EQUIPMENT, ACCESSORIES, TERMINATIONS, TERMINATION COMPONENTS, ALL FINAL CORDAGE CONNECTIVITY, SOFTWARE, PROGRAMMING, AND THE LABOR TO INSTALL. TELECOMMUNICATIONS INFRASTRUCTURE SYMBOLS v DATA CABLING - SEE SCHEDULE FOR EXACT REQUIREMENTS WAP WIRELESS ACCESS POINT- SEE SCHEDULE FOR EXACT REQUIREMENTS Q CABLE TELEVISION LOCATION - RADIO GRADE CABLING SEE RISER DIAGRAMS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS GROUNDING AND BONDING SYMBOLS n—a GROUNDBAR TMGB I Toe I TELECOMMUNICATIONS MAIN GROUND BAR TELECOMMUNICATIONS GROUND BAR SEE RISER DIAGRAM AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS J TELECOMMUNICATIONS GROUNDING & BONDING NOTES A. INSTALLATION OF THE COMMUNICATIONS GROUNDING AND BONDING SYSTEM SHALL BE COMPLIANT WITH TIA-607-D. REFER TO SPECIFICATION 27 05 26 FOR ADDITIONAL INFORMATION. B. THE TBC SHALL NOT EXCEED 30 FEET AND SHALL BE EQUAL IN SIZE (GAUGE) TO THE LARGEST TELECOMMUNICATIONS BONDING BACKBONE.(TBB) CONDUCTOR.. CONTRACTOR IS ENCOURAGED TO INSTALL THE PRIMARY BONDING BACKBONE (PBB) INSIDE THE MAIN ELECTRICAL ROOM TO KEEP TBC DISTANCES SHORT. C. APPLY ANTI-CORROSION/OXIDATION COMPOUND TO THE LUG AND LUG SURFACE OF EACH TELECOMMUNICATIONS BUSBAR. ROW p Rrz W 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 rowellbrokaw.com Architecture. Design. Strategy. KCL 296 E. 5th Ave, Suite 501 Eugene OR 97401 ENGINEERING 503-2124612 STAMP REVISIONS TO THIS SHEET REV. DATE BEV1N _- _. 2021-,Q3-29_____ - SETISSUE DATE SPR/DISCRETIONARY USE 2023-02-20 PROJECT TRACKING RBA #: 2234 P.I.C: Chris Andrejko PM / PA: Lord Nelson Projed Nam EC CARES Springfield Map & Tax Lot # 17-03-35-12-06700/06800 Proal Address G Street Springfield, OR ELECTRICAL GENERAL NOTES & SYMBOLS E001 FIRE DETECTION AND ALARM SYMBOLS [] MANUAL FIRE ALARM PULL STATION SMOKE DETECTOR DUCT SMOKE DETECTOR O HEAT DETECTOR COMBINATION HORN WITH STROBE - WALL MOUNTED COMBINATION HORN WITH STROBE -CEILING MOUNTED C STROBE - WALL MOUNTED A STROBE -CEILING MOUNTED 1�1 HORN -WALL MOUNTED LHJ� HORN -CEILING MOUNTED AIM ADDRESSABLE INPUT MODULE AOM ADDRESSABLE OUTPUT MODULE OM SD FAN SHUT DOWN RELAY -ADDRESSABLE OUTPUT MODULE FACP FIRE ALARM CONTROL PANEL+ EMERGENCY COMMUNICATIONS PANEL r_FAAj FIRE ALARM REMOTE ANNUNCIATOR ROWELL BROKAW 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 rowellbrokaw.com Architecture, Design. Strategy. KCL 296 E. 5th Ave, Suite 501 Eugene OR 97401 ENGINEERING 503-212-4612 STAMP REVISIONS TO THIS SHEET REV.,k DATE RFV -n1 9091-09-99 FIRE DETECTION & ALARM NOTES A. FIRE ALARM SYSTEM (DEFERRED APPROVAL): FIRE ALARM ITEMS AND DEVICES ARE SHOWN IN SUGGESTED LOCATIONS. CONTRACTOR SHALL EXTEND EXISTING FIRE ALARM SYSTEM TO SERVE NEW DEVICES AS REQUIRED BY APPLICABLE CODES AS SUITABLE FOR THE BUILDING OCCUPANCY AND IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS AND EQUIPMENT LISTINGS. SUBMIT FIRE ALARM DRAWINGS, SET ISSUE DATE DIAGRAMS, PROGRAMMING, AND CALCULATIONS FOR APPROVAL. COORDINATE DEVICE - - -- `— LOCATIONS WITH OTHER SYSTEMS. B. EXISTING FIRE DETECTION AND ALARM SYSTEM MUST REMAIN OPERATIONAL WITH NO SPR/DISCRETIONARY USE 2023-02-20 DOWNTIME TO THE SYSTEM. C. INTERFACE NEW DEVICES WITH NEW MECHANICAL EQUIPMENT FOR FAN SHUT DOWN, SMOKE DAMPER AND COMBINATION FIREISMOKE DAMPER PURPOSES, WHERE REQUIRED BY CODE. D. EXTEND THE EXISTING NOTIFIER FIRST COMMAND NFS-320 FIRE DETECTION AND ALARM PROJECT TRACKING SYSTEM TO LOCATIONS ILLUSTRATED ON THE DRAWINGS RBA #: 2234 E. FIRE ALARM ITEMS AND DEVICES ARE SHOWN IN SUGGESTED LOCATIONS. FINAL P.LC: Chris Andreiko LAYOUTS, LOCATIONS, AND QUANTITIES SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND EQUIPMENT LISTINGS. PM / PA: Lord Nelson COORDINATE LOCATIONS WITH LIGHTING AND AIR HANDLING SYSTEMS. F. ALL FIRE ALARM CIRCUITRY IN EXPOSED CEILING SPACES SHALL BE IN W CONDUIT PER Project Name SPECIFICATIONS. EXPOSED CABLING SHALL NOT BE ACCEPTED. A A� ^ A G. ALL CONCEALED, ACCESSIBLE CEILING TILE LOCATIONS SHALL BE ALLOWED TO HAVE EC (C CARES OPEN AIR CABLING INSTALLED. PROVIDE J -HOOKS, BRIDLE RINGS AND ASSOCIATED Springfield rn CABLE SUPPORTS TO KEEP INFRASTRUCTURE MANAGED AND OFF OF THE CEILING TILE. p g H. ELECTRICAL CONTRACTOR SHALL PROVIDE FIRESTOPPING ATALL RATED Map & Tax Lot# PENETRATIONS PER THE SPECIFICATIONS. PENETRATIONS AT EXTERIOR WALLS SHALL ]-Q.3-.3rJ-1 2-067OO/O6HOO BE MADE WATERTIGHT. Project Address G Street Springfield, OR ELECTRICAL GENERAL NOTES & SYMBOLS E002 s { APPROX. LOCATION OF EXISTING UTILITY POLE A XX fK UTILITYTRANSFORMER 3 C X, y-/AB/OVE GROUND SECONDARYBOX r �x, >k I F< �" UTILITY SECONDARY CONDUIT — �, j r x r'fMIN 36 BELOW GRADE s x s "MISSING ITEMS LJICSPARE TO (1) 1"C (FIBER) OWNERS ISECONDARY BOX I I 7- INTERNET PROVIDER 14-,1 .. k MIN 18" BELOW GRADE x {� x I k l� (1) i'CSPARE I i n (E) UTILITY POLE - t d�/ EC CARES / CLASSROOM BUILDING CT CABINETAND METER BASE — s. ^ - - SECONDARY BOX , {` - ,`�} j r X - - - X \3/ 1 NEW ELECTRICAL SITE PLAN_.-__ I = 20'-0" ELECTRICAL GENERAL NOTES A. ELECTRICAL SITE UTILITIES AND INFRASTRUCTURE SHOWN ARE SCHEMATIC. UTILITY INFRASTRUCTURE AND MATERIALS INCLUDING CONDUITS, PADS, CONNECTIONS, METERING EQUIPMENT, PULL BOXES, AND OTHER REQUIRED SERVICE PROVISIONS SHALL BE INSTALLED BY THE CONTRACTOR PER UTILITY COMPANY REQUIREMENTS. CONTRACTOR SHALL CONTACT THE UTILITY COMPANY REPRESENTATIVE TO OBTAIN UTILITY DESIGN DRAWINGS AND TO SCHEDULE MILESTONE INSPECTIONS. CONTACT: SPRINGFILED UTILITY BOARD (SUB) DAVE KANDLE (541) 736-3296 DAVEKA@SUBUTIL.COM B. CONDUIT ROUTES AND LOCATIONS ON ELECTRICAL SITE PLAN ARE SCHEMATIC. REFER TO CIVIL AND LANDSCAPE DOCUMENTS FOR COORDINATION OF SITE UTILITIES AND DIMENSIONAL LOCATIONS. MAINTAIN PROPER SEPARATION OF DRY AND WET UTILITIES PER CML REQUIREMENTS. CALL UNDERGROUND LOCATING SERVICES 48 HOURS IN ADVANCE AND PRIOR TO WORK. FIELD LOCATE, TRACE AND MARK EXISTING UNDERGROUND UTILITIES AND PROTECT IN PLACE EXISTING UTILITIES TO REMAIN. COORDINATE WITH CIVIL AND LANDSCAPE SITE PLANS FOR ROUTING AND LOCATIONS OF EQUIPMENT, VAULTS, PAVEMENT, PATHWAYS AND OTHER SITE ELEMENTS AND UTILITIES. C. REFER TO ONE -LINE DIAGRAM ON E200 FOR CONDUIT SIZES AND ADDITIONAL REQUIREMENTS RELATED TO ELECTRICAL UTILITY PROVISIONS. D. ROUTE UTILITIES IN SHARED TRENCH WHERE FEASIBLE. MAINTAIN MINIMUM 12" SEPARATION BETWEEN ELECTRIC SERVICE CONDUITS AND OTHER UTILITIES. REFER TO CIVIL ENGINEERED DOCUMENTS FOR ADDITIONAL REQUIREMENTS. E. CONTRACTOR SHALL PROVIDE DESIGN/BUILD PACKAGE TO BORE ELECTRICAL SERVICE BETWEEN EXISTING UTILITY POLE AND TRANSFORMER PADNAULT. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DESIGN, PRODUCTS, AND CONSTRUCTION TO INSTALLED BORED UTILITY, INCLUDING CASINGS, AS REQUIRED, AND CONNECTIONS TO EXISTING AND NEW SYSTEMS BEYOND THE BORING LIMITS AS INDICATED ON THE DRAWINGS. CONTRACTOR SHALL SUBMIT DESIGN/BUILD PACKAGE FOR REVIEW BY DESIGN TEAM AND AS A DEFERRED SUBMITTAL FOR PERMITTING. WHERE EXCAVATIONS ARE REQUIRED, CONTRACTOR SHALL RESTORE, REPAIR, AND RETURN EXCAVATED AREAS AND FINISHED SURFACES TO MATCH EXISTING CONDITION. WHERE EXISTING SIDEWALKS ARE REMOVED, SAWCUT AND REPLACE FULL PANELS TO MATCH EXISTING CONDITION. F. FOR BURIED SERVICES, PROVIDE WARNING TAPE 12" FROM BELOW FINISHED GRADE, RUNNING THE ENTIRE LENGTH OF THE SERVICE CONDUIT. G. PROVIDE A COMPLETE FIBER OPTIC INFRASTRUCTURE SOLUTION THAT EXTENDS THE SCHOOL'S WIDE AREA NETWORK TO THE NEW EC CARES CLASSROOM BUILDING. PROVIDE 25FT CABLING LOOP ON. EACH END. REFER TO TELECOMMUNICATIONS RISER DIAGRAM FOR ADDITIONAL REQUIREMENTS. ROWELL BROKAW 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 '�- _ rowelthrokaw.com Architecture. Design. Strategy. -- -. KCL 296 E. 5th Ave, X x Suite 501 Eugene OR 97401 ENGINEERING 503-2124612 STAMP KEYNOTES 1 PROVIDE AND INSTALL 24" RADIUS 3" ELBOWS FROM POLE. 2 PROVIDE 1"C SPARE CONDUIT FOR SUB FIBER. REVISIONS TO THIS SHEET REV. DATE REV -01 2021-03-29 - SETISSUE DATE SPR/DISCRETIONARY USE 2023-02-20 PROJECT TRACKING RBA #: 2234 P.I.C: Chris Andrejko PM / PA: Lorri Nelson Project Name EC CARES Springfield Map & Tax Lot # 17-03-35-12-06700/06800 Project Address G Street Springfield, OR ELECTRICAL SITE PLAN E100 r - ELECTRICAL GENERAL NOTES A. ROUGH -IN BOXES AND CONDUIT PATHWAYS FOR DEVICES SHOWN ARE FURNISHED AND INSTALLED BY MODULAR BUILDING CONTRACTOR. B. PROVIDE J -HOOKS AS NEEDED FOR CABLING DISTRIBUTION ABOVE ACCESSIBLE CEILINGS. KEYNOTES 1 NOTE 2 3 NOTE 4 NOTE 5 NOTE 6 /'T\ ELECTRICAL AND TELECOM / FIRE ALARM FLOOR PLAN 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414851003 rowellbrokaw.com Architecture. Design. Strategy KCL 296 E. 5th Ave, Suite 501 Eugene OR 97401 ENGINEERING 503-212.4612 STAMP REVISIONS TO THIS SHEET REV. DATE .REV -01 __.. - 202L-03-29 SETISSUE DATE SPR/DISCRETIONARY USE 2023-02-20. PROJECT TRACKING RBA #: 2234 P.I.C: Chris Andrejko PM / PA: Lord Nelson Project Name EC CARES Springfield Map &Tax Lot# 17-03-35-12-06700/06800 Project Address G Street Springfield, OR ELECTRICAL AND TELECOM / FIRE ALARM FLOOR PLAN E101 GRADE NOTTOSCALE IN (E) UTILITY POLE. TRANSFORMER#4P1960 240D/120YV. I PHASE. )URRENT 9470 AMPS RISER DIAGRAM GENERAL NOTES RISER DIAGRAM KEYED NOTES: ROWELL A. DIAGRAM INDICATES GENERAL LAYOUT OF ELECTRICAL 1. 6 -JAW CT METER BASE WITH PROVISIONS FOR MOUNTING A TEST DISTRIBUTION SYSTEM. REFER TO FLOOR PLANS FOR SWITCH BLOCK WITH METER CLIP CONFIGURATION AS DIRECTEDBROKAW EQUIPMENT LOCATIONS. BY UTILITY. - - B. REFER TO SITE PLAN FOR ADDITIONAL REQUIREMENTS AND 2. PROVIDE SECONDARY BOX PER UTILITY REQUIREMENTS. UTILITY CONTACT INFORMATION. 1203 Willamette Street 3. VAULT AND LID PROVIDED BY UTILITY, DELIVERED AND INSTALLED Suite 210 C. ALL WIRING SHALL BE IN RACEWAY AS NOTED. REFER TO BY CONTRACTOR. Eugene, Oregon 97401 SPECIFICATIONS FOR CONDUIT APPLICATION REQUIREMENTS. 541 4851003 4. BORE CONDUIT UNDER BUS LOOP DRIVEWAY. COORDINATE D. INSTALL UTILITY TRANSFORMER PAD, VAULT, CT CAN, TERMINATION LOCATION WITH UTILITY. REFER TO SITE PLAN FOR rowellbrokaw.com METERING EQUIPMENT, AND SERVICE ENTRANCE CONDUIT IN ADDITIONAL INFORMATION. ACCORDANCE WITH UTILITY COMPANY REQUIREMENTS: Architecture. Design, Strategy. 5. FURNISHED AND INSTALLED BY MODULAR BUILDING E. ELECTRICAL EQUIPMENT, FEEDERS, AND BRANCH CIRCUITING CONTRACTOR. COORDINATE WORK WITH MODULAR BUILDING SERVING THE MODULAR BUILDING ARE FURNISHED AND SYSTEMS. INSTALLED BY THE MODULAR BUILDING CONTRACTOR, UNLESS OTHERWISE NOTED, CONTRACTOR SHALL CONTACT THE 6. SINGLE-PHASE CT CABINET (CTS BY UTILITY). MODULAR BUILDING REPRESENTATIVE TO OBTAIN BUILDING 296 E. 5th Ave, DESIGN DRAWINGS AND TO COORDINATE INSTALLATION OF 7. PROVIDE AND INSTALL 24" RADIUS 3" ELBOWS FROM POLE TO Suite 501 WORK INCLUDED IN THIS CONTRACT. SECONDARY BOX KCL Eugene OR 97401 CONTACT: 8, PROVIDE 1"C FOR SPARE CONDUIT FOR SUB FIBER. ENGINEERING 503-212A612 MODULAR BUILDING SYSTEMS (MBS) DOUG SMITH (503)509-8408 STAMP DSMITH@MODERNBUILDINGSYSTEMS.COM COPPER FEEDER SCHEDULE TAG PHASE/NEUTRAL GROUND CONDUIT 4003P BY UTILITY - (1) 2" 4003S BY UTILITY - (2) 3" O REVISIONS TO THIS SHEET REV. #k DATE SET ISSUE DATE SPR/DISCRETIONARY USE 2023-02-20 PROJECT TRACKING RBA #: 2234 P.I.C: Chris Andrejko PM ! PA: Lord Nelson PANELA PANELB 1 I Project Name i 14000 1d 120/24„v EC CARES 4r10A 200A c6 NICS Springfield Map 8 Tax Lot # 17-03-35-12-06700/06800 Pmje Address 5 $ G Street E2o2 E202 Springfield, OR ELECTRICAL ONE -LINE DIAGRAM E200 TELECOMMUNICATIONS RISER GENERAL NOTES: A. REFER TO FLOOR PLANS AND SPECIFICATIONS FOR CABLING AND SYSTEM DESCRIPTIONS, AND ADDITIONAL REQUIREMENTS, B. PROVIDE OPTICAL TIME DOMAIN (OTDR) TESTING ON EACH STRAND OF NEW FIBER OPTIC INFRASTRUCTURE TO CONFIRM INTEGRITY. C. INTERIOR. — — ---_ '' MODEL r I IDF ROOM itIW ' ,T'i@GJ hlbC CION WALL MOUNTED i' TO WIDTH EQUIPMENT 64 FsIENln'?Y MrYF I ----. ----. --_ � ---III ' #12-24 SCREW HOLES OWNERSFIBER',. UPS AS INDICATED COLOR NETWORK l\ i TERMINATION HORIZONTAL MANAGEMENT AS EQUIPMENT' (�)0 6A (EXISTING) PATCH CABLING I PANELS IDF ROOM- VENETA ELEMENTARY SCHOOL TELECOMMUNICATIONS RISER KEYED NOTES: 1. (1)12 -STRAND INDOOR/OUTDOOR RATED SINGLE -MODE OS2 FIBER OPTIC CABLE FURNISHED BY CONTRACTOR, FIBER SHALL BE ROUTED IN INNERDUCT THROUGH CONDUIT FROM EXISTING OF TO NEW IDF: REFER TO TECHNOLOGY SITE PLAN AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 2. FIBER TERMINATION EQUIPMENT FURNISHED BY CONTRACTOR. PROVIDE (1) LC - STYLE CASSETTE AND ADAPTER PANEL. PROVIDE (1) 1U RACK MOUNT ENCLOSURE TO HOST FIBER CASSETTE, PANDUIT FRME1 U, OR APPROVED EQUAL. 3. COORDINATE THE INSTALLATION OF NEW FIBER CABLING AND TERMINATION EQUIPMENT IN EXISTING IDF RACK WITH IT DEPARTMENT. MECHANICAL TERMINATION OF FIBER STRANDS WILL NOT BE ACCEPTED. F- — — — — — — — — — — — INTERIOR OFFICE B MODEL FIBEROWNER'S MOUNT WALL MOUNTED TERMINATION NEWORK _ 24.00" WIDTH EQUIPMENT DEPTH 24 O VERTICAL RAIL O #12-24 SCREW HOLES POWER UPS AS INDICATED COLOR BLACK - MGMT. HORIZONTAL MANAGEMENT AS CATEGORY 6ACATEGORY 6A PATCH CABLING PANELS WAP C 6A CABLING OSPUNDERGROUND CONDUIT MODULAR BUILDING ROWELL >I.Ir O �,. i 1203 Willamette Street Suite 210 Eugene, Oregon 97401 5414$51003 rowellbrokaw.com Architecture. Design. Strategy. KCL 296 E. 5th Ave, Suite 501 Eugene OR 97401 ENGINEERING 503-212-4612 STAMP REVISIONS TO THIS SHEET REV. DATE r` ) TELECOMMUNICATIONS RISER DIAGRAM 2021-O3-29 UJ NOT TO SCALE (TMGEh �� U c K0 T o BONDING CONDUCTOR FOR L TELECOMMUNICATIONS - (BCT) TO ELECTRICAL SYSTEM GROUND BAR AT BUILDING DISCONNECT 1 TO EXPOSED STRUCTURAL STEEL TO ALL EXPOSED CONDUIT SLEEVES TO AC ELECTRICAL PANEL BOARDS TELECOMMUNICATIONS BONDING CONDUCTOR -- (TBC) GROUNDING AND BONDING RISER DIAGRAM GENERAL NOTES: A. THIS DETAIL IS INTENDED TO SHOW CONNECTIVITY REQUIREMENTS FOR THE COMMUNICATIONS GROUNDING AND BONDING SYSTEM. SIZE ALL CONDUCTORS IN COORDINATION WITH THE NEC AS WELL AS THE TIA-607-C RECOMMENDATIONS. SEE SPECIFICATION SECTION 27 0526 FOR ADDITIONAL INFORMATION REGARDING CONDUCTORS, SIZES AND CONNECTIVITY REQUIREMENTS. B. SIZE EACH TELECOMMUNICATIONS GROUND BAR APPROPRIATELY TO HOST ALL REQUIRED CONNECTIONS. C. ALL CONNECTIONS TO AND WITHIN THE AC GROUNDING ELECTRODE SYSTEM SHALL BE MADE UTILIZING EXOTHERMIC WELDING. ALL OTHER CONNECTIONS SHALL BE DONE UTILIZING IRREVERSIBLE COMPRESSION - TYPE CONNECTIONS. TELECOMMUNICATIONS GROUNDING NOT TO SCALE SWITCH" - WIRE MANAGEMENT - -UPS, -.- h IDF-EC.CARES NOT TO SCALE NEW RACK SCHEDULE (DENT. — --- IDF.EC-CARES CHATSWORTH PRODUCTS, INC. MODEL CUBE IT 11840.X24 _ MOUNT WALL MOUNTED HEIGHT _ 24.00" WIDTH - DEPTH 24 O VERTICAL RAIL HOLES #12-24 SCREW HOLES POWER UPS AS INDICATED COLOR BLACK - MGMT. HORIZONTAL MANAGEMENT AS INDICATED. RACK DIAGRAM GENERAL NOTES: A. COORDINATE FINAL EQUIPMENT LAYOUT WITH OWNER PRIOR TO ORDERING & INSTALLATION. B. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. C. ' INDICATES OWNER PROVIDED EQUIPMENT. SETISSUE DATE SPR/DISCRETIONARY USE 2023-02-20 PROJECT TRACKING RBA #: 2234 P.LC: Chris Andrejko PM / PA: Lorri Nelson Project Name EC CARES Springfield Map & Tax Lot # 17-03-36-12-06700/06800 Project Addmss G Street Springfield, OR TELECOMMUNICATIONS DETAILS E201 COLD WATER PIPE ENTRY WATER METER WATER PIPE GROUND CLAMP WATER PIPE GROUND CLAMP #2 CU BARE WIRE BOND ACROSS SEPARATION IN BUILDING STRUCTURES. INCLUDE FIRE WALLS, EXPANSION JOINTS, ETC. �� EXOTHERMIC WELD TO �y � �; _ � BUILDING STRUCTURAL 1 TELECOMMUNICATIONS GROUND BAR �#4 CU EXOTHERMIC WELD TO CONNECT STEEL NONMETALLIC / ROD TO COPPER PROTECTIVE SLEEVE CONDUCTOR - CONCRETE FOUNDATION BUILDING ROWELL PM / PA: MAIN ---- REINFORCING ROD INCOMING FEEDER ----,\ DISCONNECT RODS EQUALLY REFER TO BUILDING EXOTHERMIC WELD LAY CABLE IN CIRCLE FEEDER INFORMATION PATTERN BETWEEN GROUND ROD BROKAW ON ONE -LINE DIAGRAM. �\ REFER TO TELECOMMUNICATIONS DETAILS FOR ADDITIONAL GROUNDING NEUT REQUIREMENTS 1203 Willamette Street #1/6 CU Suite 210 ' INSULATED Eugene, Oregon 97401 MAIN BONDING 5414851003 JUMPER ** GND rowellbrokaW.COm ®®a0@0 GND WATER METER WATER PIPE GROUND CLAMP WATER PIPE GROUND CLAMP #2 CU BARE WIRE BOND ACROSS SEPARATION IN BUILDING STRUCTURES. INCLUDE FIRE WALLS, EXPANSION JOINTS, ETC. �� EXOTHERMIC WELD TO �y � �; _ � BUILDING STRUCTURAL 1 TELECOMMUNICATIONS GROUND BAR �#4 CU EXOTHERMIC WELD TO CONNECT STEEL NONMETALLIC / ROD TO COPPER PROTECTIVE SLEEVE CONDUCTOR - CONCRETE FOUNDATION CONCRETE ENCASED ELECTRODE BUILDING STRUCTURAL STEEL -- MULTI -GROUND #2 BARE COPPER ROD ASSEMBLY CONDUCTOR 36" BELOW GRADE. 20' *SIZE GROUNDING ELECTRODE CONDUCTOR AND BONDING PER NEC 250.66 AND TABLE BELOW. IN LENGTH MIN. 5� ALL CONDUCTORS TO BE COPPER. (TYP.) p� TABLE BASED ON NEC 2017 o *� TABLE 250.66 GROUNDING ELECTRODE CONDUCTOR FOR ALTERNATING -CURRENT SYSTEMS o v Q SIZE OF LARGEST UNGRUDGING CONDUCTOR OR EQUIVALENT SIZE OF GROUNDING ELECTRODE Q. AREA FOR PARALLEL CONDUCTORS (AWG/KCMIL) CONDUCTOR (AWG/KCMIL) '\ COPPER ALUMINUM OR COPPER -CLAD AL COPPER #2 OR SMALLER #1/0 OR SMALLER #B NOTES -- - ---.-----_--- — A. ALL AVAILABLE GROUNDING ELECTRODES WHICH ARE PRESENT AT THE BUILDING OR #1 OR #1/0 #2!0 OR #3/0 #6 STRUCTURE SHALL BE BONDED TOGETHER TO FORM THE GROUNDING ELECTRODE #2/0 OR #3/0 94/0 OR 250 1#4 SYSTEM (GES). ADDITIONAL CODE -REQUIRED GROUNDING CONNECTIONS NOT - - - - - - - SHOWN SHALL BE PROVIDED. CONNECTIONS WHICH ARE ENCASED, UNDERGROUND, OVER #3/0 THROUGH 350 OVER 250 THROUGH 500 #2 _ _ _ _ OR INACCESSIBLE SHALL BE EXOTHERMIC WELD. OVER 350 THROUGH 600 OVER 500 THROUGH 900 #1/0 B. ALL BONDING JUMPERS CONNECTING GROUNDING ELECTRODES TO THE GES SHALL _.. BE SIZED EQUAL TO THE GROUNDING ELECTRODE CONDUCTOR (GEC) IN OVER 600 THROUGH 1100 OVER 900 THROUGH 1750 #2/0 ACCORDANCE WITH NEC 250.53(C). OTHER BONDING JUMPERS SHALL BE SIZED AS - ------ OTHERWISE DESCRIBED IN NEC ARTICLE 250. CONDUCTORS SHALL BE BARE OVER 1100 OVER 1750 #310 COPPER UNLESS OTHERWISE NOTED. - - C. REFER TO SPECIFICATIONS FOR ADDITIONAL PRODUCT AND MATERIAL *�F SIZE BONDING JUMPER PER NEC 250.102. USE TABLE ABOVE FOR ALL CONDUCTORS BETWEEN #2 REQUIREMENTS. GROUNDING AND BONDING METHODS AND MATERIALS SHALL AND 1100. ALL INCOMING CONDUCTORS OVER 1100 CU OR 1750 AL SHALL BE SIZED PER THE TABLE COMPLY WITH NEC ARTICLE 250. 250.102(C). SERVICE EQUIPMENT SHALL BE SUPPLIED WITH BONDING JUMPER FROM THE D. REFER TO TECHNOLOGY DETAILS FOR ADDITIONAL REQUIREMENTS RELATED TO MANUFACTURER. TELECOM GROUNDING. i.1 GROUNDING ELECTRODE SYSTEM "-:i NOT TO SCALE 0 Architecture, Design: Strategy, KCL 296 E. 5th Ave, Suite 501 Eugene OR 97401 ENGINEERING 503.212.4612 STAMP REVISIONS TO THIS SHEET REV. DATE r � r SET ISSUE DATE SPR/DISCRETIONARYUSE 2023-02-20 PROJECT TRACKING RBA #: GROUNDING ELECTRODE T#2 CU #4 AWG BARE COPPER PM / PA: 20'-D" MIN OR 1/2" STEEL ---- REINFORCING ROD 5/8" X 10'-0" GROUND RODS EQUALLY SPACED, EXOTHERMIC WELD LAY CABLE IN CIRCLE TO #2 BARE COPPER PATTERN BETWEEN GROUND ROD GROUND RODS (TYPJ CONDUCTOR(rYP.) CONCRETE ENCASED ELECTRODE BUILDING STRUCTURAL STEEL -- MULTI -GROUND #2 BARE COPPER ROD ASSEMBLY CONDUCTOR 36" BELOW GRADE. 20' *SIZE GROUNDING ELECTRODE CONDUCTOR AND BONDING PER NEC 250.66 AND TABLE BELOW. IN LENGTH MIN. 5� ALL CONDUCTORS TO BE COPPER. (TYP.) p� TABLE BASED ON NEC 2017 o *� TABLE 250.66 GROUNDING ELECTRODE CONDUCTOR FOR ALTERNATING -CURRENT SYSTEMS o v Q SIZE OF LARGEST UNGRUDGING CONDUCTOR OR EQUIVALENT SIZE OF GROUNDING ELECTRODE Q. AREA FOR PARALLEL CONDUCTORS (AWG/KCMIL) CONDUCTOR (AWG/KCMIL) '\ COPPER ALUMINUM OR COPPER -CLAD AL COPPER #2 OR SMALLER #1/0 OR SMALLER #B NOTES -- - ---.-----_--- — A. ALL AVAILABLE GROUNDING ELECTRODES WHICH ARE PRESENT AT THE BUILDING OR #1 OR #1/0 #2!0 OR #3/0 #6 STRUCTURE SHALL BE BONDED TOGETHER TO FORM THE GROUNDING ELECTRODE #2/0 OR #3/0 94/0 OR 250 1#4 SYSTEM (GES). ADDITIONAL CODE -REQUIRED GROUNDING CONNECTIONS NOT - - - - - - - SHOWN SHALL BE PROVIDED. CONNECTIONS WHICH ARE ENCASED, UNDERGROUND, OVER #3/0 THROUGH 350 OVER 250 THROUGH 500 #2 _ _ _ _ OR INACCESSIBLE SHALL BE EXOTHERMIC WELD. OVER 350 THROUGH 600 OVER 500 THROUGH 900 #1/0 B. ALL BONDING JUMPERS CONNECTING GROUNDING ELECTRODES TO THE GES SHALL _.. BE SIZED EQUAL TO THE GROUNDING ELECTRODE CONDUCTOR (GEC) IN OVER 600 THROUGH 1100 OVER 900 THROUGH 1750 #2/0 ACCORDANCE WITH NEC 250.53(C). OTHER BONDING JUMPERS SHALL BE SIZED AS - ------ OTHERWISE DESCRIBED IN NEC ARTICLE 250. CONDUCTORS SHALL BE BARE OVER 1100 OVER 1750 #310 COPPER UNLESS OTHERWISE NOTED. - - C. REFER TO SPECIFICATIONS FOR ADDITIONAL PRODUCT AND MATERIAL *�F SIZE BONDING JUMPER PER NEC 250.102. USE TABLE ABOVE FOR ALL CONDUCTORS BETWEEN #2 REQUIREMENTS. GROUNDING AND BONDING METHODS AND MATERIALS SHALL AND 1100. ALL INCOMING CONDUCTORS OVER 1100 CU OR 1750 AL SHALL BE SIZED PER THE TABLE COMPLY WITH NEC ARTICLE 250. 250.102(C). SERVICE EQUIPMENT SHALL BE SUPPLIED WITH BONDING JUMPER FROM THE D. REFER TO TECHNOLOGY DETAILS FOR ADDITIONAL REQUIREMENTS RELATED TO MANUFACTURER. TELECOM GROUNDING. i.1 GROUNDING ELECTRODE SYSTEM "-:i NOT TO SCALE 0 Architecture, Design: Strategy, KCL 296 E. 5th Ave, Suite 501 Eugene OR 97401 ENGINEERING 503.212.4612 STAMP REVISIONS TO THIS SHEET REV. DATE r � r SET ISSUE DATE SPR/DISCRETIONARYUSE 2023-02-20 PROJECT TRACKING RBA #: 2234 P.1.C: Chris Andrejko PM / PA: Lorri Nelson Project Name EC CARES Springfield Map & Tax Lot # 17-03-36-12-06700/06800 Project Add.ss G Street Springfield, OR ELECTRICAL GROUNDING RISER E202