HomeMy WebLinkAboutPacket, Pre PLANNER 4/4/2023Completeness Check
Meeting
Development and Public Works Department
Conference Room 616 & Zoom
COMPLETENESS CHECK MEETING DATE:
Friday, April 14, 2023
11:00 a.m. - 12:00 p.m.
DPW Conference Room 616 and Zoom
Completeness Check Mtg (Subdivision Tentative) #811 -23 -000058 -PRE 811-22-000126-PROJ
O=ood Properties A Street LLC
Assessor's Map: 17-02-35-42 TL: 200, 202, 300
Address: 7388 Main Street
Existing Use: vacant
Applicant has submitted plans to annex 35.05 ac parcel
Planner: Andy Limbird
Meeting: Friday, April 14, 2023 11:00— 12:00 via Zoom and Conference Rm 616
pizI
VICINITY MAP
811 -23 -000068 -PRE Completeness Check Meeting
17-02-35-42 TL 200 202 & 300
7388 Main Street
Oxwood Properties A Street LLC
IlCity of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Land Division Tentative Plan
Partition, Subdivision
SPgIN6P1l�
Application Type
(Applicant; check one
P:rrt n Tentative Pre -Submittal: LJSubdivision Tentative Pre -Submittal: -""®
Partition Tentative Submittal: LJ Subdivision Tentative Submittal: ❑
Required Project Information (Applicant: complete this section)
Applicant Name: Oxwood Properties A Street LLC Phone:( 41) 48S -405o ext 212
Company:
Fax:
Address: 886 Gentry St. Eugene, OR o2
Applicant's Rep.: Katie Keidel Associate Planner
Phone: (541)302-9830
Company: Metro Planning, Inc.
Fax:
Address: 8 6AStreet Springfield, OR
Property Owner: Oxwood Properties A Street LLC
Phone: b. 8 - o o ext 212
Company:
Fax:
Address: 8869S Gentry St. Eugene, OR gZ402
ASSESSOR'S MAP NO: 17-02-35-42
TAX LOT NOS :
200,202'oo
Property Address: Vacant - Main Street & 74th
Size of Property: 2.21 Acres X❑ Square Feet ❑
Proposed Name of Subdivision: Oxwood Subdivision
Pro osal• i'
Description of If you are filling In this form by hand, please attach your proposal description to this apJxt
ExistingUse: Vacant
#of Lots/Parcels:
Total acreage of parcels/
all..densit :2.21 ac6-1 no maximum
Proposed #
Dwell units 95F
Signatures: Please sign and print our name and date in theappropriate
Required Project Information (City Intake Staff.,
Associated Applications:
box on
complete this section)
Signs:
Pre -Sub Case No.:
Date:
Reviewed by:
Case No.:
Date;
Reviewed by:
Application Fee:
Technical Fee:
Postage Fee: $
TOTAL FEES: $ PROJECT NUMBER:
Revised 1/7/14 kl 1 of 10
DEVELOPMENT AND PUBLIC WORKS
SPRINGFIELD
OWL 225 FIFTH STREET
OREGON SPRINGFIELD, OR 97477
PHONE: 541.726.375353
FAX.541.726.1021
wwwspdngfield-orgov
STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK
-------------------------------- (Area below this line f Ifed out by Applicant) --------------------------------
(Please return to Clayton McEachern @ City ofSpringfield Development and Public Warks; Fax # 736-1021, Phone # 736-1036),
email: em ceachern@springfreld-or. gov
Project Name:
Oxwood Subdivision
Applicant:
A&O Engineering LLC
Assessors Parcel #:
17-02-35-42 - 200 & 202
Date:
04/25/2022
Land Use(s):
Residential
Phone #:
(541) 302-9790
Project Size (Acres):
1.56
Fax #:
Approx. Impervious
Area: 1.25
Email:
kylemorris(a@ao-engr.com
Project Description (Include a copy of Assessor's map):
Construct townhouse subdivision development with private drive and stormwater infrastructure.
Drainage Proposal (Public comuction(s), discharge location(s), etc. Attach additional sheets) if necessary:
Utilize infiltration if test results come back good. If overflow is necessary either construct weepholes
through curb from pump catch basins or construct new public stormline to existing catch basin north
of site at intersection of 74th Street and B Street.
Proposed Stormwater Best Management Practices:
Construct either individual stormwater planters on-site or pervious pavement for the driveway.
Potentially build underground rock chambers for infiltration after treatment if infiltration rates are
good.
----------------------------- (Area below this line fillet! out by the City and Returned to the Applicant)--------------�
-an -
(At a minimum, all boxes checked by the City on the front and back of this sheet shall be submitted
or an a
for application to be complete for submittal, although other requirements may be necessa
Drainaee Study Tyne (EDSPM Section 4.03.2): (Note, UH may be substituted for Rational Method)
V1 Small Site Study— (use Rational Method for calculations)
❑ Mid -Level Development Study — (use Unit Hydrograph Method for calculations)
❑ Full Drainage Development Study— (use Unit Hydrograph Method for calculations)
Environmental Considerations:
❑ Wellhead Zone: 99 year ❑ Hillside Development: n/a
❑ Wetland/Riparian: n/a ❑ Floodway/Floodplain: n/a
❑ Soil Type: part of the site is mapped as hydric soils. ❑ Other Jurisdictions n/a
Downstream Analysis: The catch basin/line at 74th and B is already overloaded -if the site can't be infiltrated
than a new storm drain line willneed to be extended from the manhole at 74th and B- 1
❑ N/A can't allow anything other than an overflow for a curb weephole here.
❑ Flow line for starting water surface elevation:
❑ Design HGL to use for starting water surface elevation:
❑ Manhole/Junction to take analysis to:
Return to Clayton McEachern @ City of Springfield, email: cmceachern@springfield-orgov, FAX: (541) 736.1021
COMPLETE STUDY ITEMS rel Offaal use ooly
* Based upon the information provided on the front ofthis sheet, the following represents a minimum of what is needed for an
application to be complete far submittal with respect to drainage, however, this list should not be used in lieu of the Springfield
Development Code (SDC) or the City's Engineering Design Manual. Compliance with these requirements does not constitute site
approval, Additional site specifre information may be required. Note: Upon scoping sheet submittal, ensure completed form has been
signed in the space provided below:
Interim Design Standards/Water Quality (EDSPM Chapter 3
Req'd N/A
0 ❑ All non -building rooftop (NBR) impervious surfaces shall be pre-treated (e.g. multi-chambered catchbasin want filtration
media) for stormwater quality. Additionally, a minimum of 50% of the NRR impervious surface shall be treated by
vegetated methods.
® ❑ Where required, vegetative stormwater design shall be consistent with design standards (EDSPM Section 3.02), set forth
in Chapter 2 of the Eugene Stormwater Management Manual.
QFor new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified
by the Eugene Stormwater Management Manual (Sec2A.1).
0 If a stomnwater treatment swale is proposed, submit calculations/specifications for sizing velocity, flow, side slopes,
bottom slope, and seed mix consistent with City of Springfield or Eugene's Stormwater Management Manual.
Water Quality calculations as required in Section 3.03.1 of the EDSPM.
All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall
V
U
Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon.
0
E]
A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map.
V1
1-1
Calculations showing system capacity for a 2 -year storm event and overflow effects of a 25 -year storm event.
E]
The time of concentration (Te) shall be determined using a l0 minute start time for developed basins.
Review of Downstream System EDSPM Section 4.03A.0
E]
A downstream drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the
Oregon Plumbing Specialty Code (OPSC). see notes on previous page.
Elevations of the HGL and flow lines for bath city and private systems where applicable.
Design of Storm Systems (EDSPM Section 4.04).
Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set
Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or
proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 lb toad
without failure of the pipe structure.
Manning's "n" values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to
Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing haw site
drains.
Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to
another.
Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of
residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to
the website: htto'//www.deg.state.or.us/wo/uic/uie.htrn for more information.
Z ❑ Detention ponds shall be designed to limit runoff to pre -development rates for tine 2 through 25 -year storm events.
*This form shall he included as an attachment, inside the front cover, of the slormwater study.
*IMPORTANT. ENGINEER PLEASE READ BELOWAND SIGN.t
As the engineer of record, i hereby certify the above required items are complete and included with the submitted stormwater study
and plan set. Signature Date
Form Version 5: June 2015
846 A STREET
SPRINGFIELD. OREGON 97AT
1541)302-9830
W W WMETROPIANNINGXOM
TENTATIVE SUBDIVISION APPLICATION FOR OXWOOD PROPERTIES A STREET LLC
Submittal No.
3
Document Date:
March 30, 2023
Applicant's Request:
Approval of Type 11 Tentative Subdivision
Plan to create g -Lot Subdivision
Property Owner/ Applicant:
Oxwood Properties A Street LLC
88695 Gentry St
Eugene, OR 97402
Applicant's Representative/
Metro Planning, Inc.
Planner/Project Coordinator:
Katie Keidel, Associate Planner
846 A Street
Springfield, OR 97477
(543)302-9830
Surveyor: EGR & Associates
2535 Prairie Rd
Eugene, OR 97402
(543) 688-8322
Civil Engineer: A&O Engineering
380 O Street, Suite zoo
Springfield, OR 97477
(543)302-9790
Subject property: Assesssor's Map Number 37-02-35-42
Tax Lots zoo, 202, and 300
Site Address/ Location: Vacant on Hwy 326 near 74`^ Street
Total Property Size: 2.23+/- acres
Base Land Use District/ R-3/ Low Density Residential
Metro Plan Designation:
Number of Lots Proposed: 9 Residential Lots
Background
This application requests approval of a Tentative Subdivision plan to create nine (g) new lots on Assessor's Map Number
17-02-35-42 Tax Lots zoo, 202, and 300, located in Springfield near Main Street and 74`^ Street ("subject property'l. The
subject property is approximately z.zi acres and is zoned Springfield R -i and designated Low Density Residential on
the Metro Plan.
This written statement intends to demonstrate for City staff review how the proposed Tentative Subdivision will
conform to all standards, regulations, and conditions of Land Divisions under SDC 5. iz-ii5 Tentative Plan —General;
SDC 5.12-12o Tentative Plan Submittal Requirements; and SDC 5.12-125 Tentative Plan Criteria. The Springfield
Development Code (SDC) sections are indicated by bold and/or italic typeface; applicant's responses are indicated by
plain typeface.
5.12.115 Tentative Plan —General.
Any residential land division shall conform to the following standards:
A. The lot/parcel dimensions shall conform to the minimum standards of this code. When lots7parcels are more than
double the minimum area permitted by the zoning district, the Director shall require that these lots7parcels be
arranged:
1. To allowredlvision; and
z. To allow for the extension of streets to serve future lots/parcels.
3. Placement of structures on the larger lots/parcels shall be subject to approval by the
Director upon a determination that the potential maximum density of the larger lot/parcel is not impaired. In
order to make this determination, the Director may require a Future Development Plan as specified in
SDC q.12.12 (E).
Response: The subject property is zoned R -i which maintains a minimum lot size requirement of 3,000sq ftfor all lots
designed for duplex dwellings, and 7,000 sq ftfor lots designed for triplex and fourp lex dwellings. Lots i-5 do not
exceed double the minimum area allowed; lots 6-9 do and therefore a Future Development Plan per SDC 5.12.i5o(E) is
included with this application.
B. Double frontage lots7parcels shall be avoided, unless necessary to prevent access to residential development from
collector and arterial streets or to overcome specific topographic situations.
Response: SDC currently maintains no R -i minimum frontage requirements for subdivision lots/parcels.
C. Panhandle lots/parcels shall comply with the standards specified in SDC a i.= and s i.sia(A),In the case of
multiple panhandles in Subdivisions, construction of necessary utilities to serve all approved panhandle lots/parcels
shall occur prior to recording the Plat.
Response: Proposed lots 2-5 are panhandle lots and share a z6' wide private access (handle portion). An easement is
provided via ajoint use easement that doesn't quite fit within the panhandle area. Further, the easement is also utilized
to access lots 6-9. Per SDC 4.2.120 (A)(i)(c) each panhandle lot has proposed access to A Street via an irrevocablejoint
use/access easement serving the subject property. Construction of necessary utilities shall occur prior to recording the
Final Plat.
D. Public street standards as specified in SDC c 2.10s.
Response: No new public streets are proposed.
5.12.12o Tentative Plan Submittal Requirements.
A Tentative Plan application shall contain the elements necessary to demonstrate that the provisions of this code
are being fulfilled.
EXCEPTION. In the case of Partition applications with the sole intent to donate land to a public agency, the Director,
during the Application Completeness Check Meeting, may waive anysubmittal requirements that can be addressed
as part of afuture development application.
A. General Requirements.
i. The Tentative Plan, including my required Future Development Plan, shall be prepared by an Oregon
Licensed Professional Land Surveyor on standard sheets of 18 inches x24 inches. The services of an Oregon
Licensed Professional Engineer may also be required by the City in order to resolve utility issues (especially
stormwater management, street design and transportation issues), and site constraint and/or water quality
issues.
Response: Ryan Erickson, PLS of EGR & Associates, Inc., an Oregon licensed land surveyor, has prepared the Tentative
Subdivision Plan included with this submittal on standard sheets Of 24" x 36".
Kyle Morris, PE ofA&O Engineering, an Oregon registered professional Engineer has designed the stormwater
management plan, and all other utility planning issues with this submittal on standard sheets Of 24"x 36".
See attached engineering Sheets C 1.0-4.0 from A&O Engineering, and existing and proposed Tentative Subdivision
Plan Set from Ryan Erickson, PLS of EGR & Associates.
]. The scale of the Tentative Plan shall be appropriate to the area involved and the amount of detail
and data, normally inch = So feet, s inch = loofeet, or s inch = 2oo feet.
Response: A scale Of 1": 20' is used on the A&O Engineering Plan Sheets and a scale Of "':30' is used on the EGR
Tentative Subdivision Plan Set.
3. A north arrow and the date the Tentative Plan was prepared.
Response: A north arrow and date are included on the Tentative Subdivision Plans included with this application.
y. The name and address of the owner, applicant, if different, and the Land Surveyor and/or Engineer who
prepared the Partition Tentative Plan.
Response: Owner/Applicant is Oxwood Properties A Street LLC. Surveyor and engineer who prepared the Tentative
Subdivision Plans are, respectively, Ryan Erickson, SLP from EGR & Associates, and Kyle Morris of A&O Engineering.
S. A drawing of the boundaries of the entire area owned bythe partitioner or subdivider of which the
proposed land division is a part.
Response: On the Tentative Subdivision Plans, a thicker black line is drawn around the subject property to easily show
the boundaries of the subject property.
6. Cityboundaries, the Urban Growth Boundary (UGB) and myspecial service district boundaries or railroad
right-of-way, which cross or abut the proposed land division.
Response: There are no special service district boundaries, city boundaries, or railroad rights-of-way that cross or abut
the proposed subdivision.
7. Applicable zoning districts and the Metro Plan designation of the proposed land division and of properties
within loo feet of the boundary of the subject property.
Response: The subject property is zoned City of Springfield R -i and designated Low Density Residential in the Metro
Plan. All adjacent properties to the north, east and west are also zoned R -i.
8. The dimensions (in feet) and size (either in square feet or acres) of each lot/parcel and the approximate
dimensions of each building site, where applicable, and the top and toe of cut and fill slopes to scale.
Response: Dimensions and sizes for each proposed lot are indicated in feet and square feet, respectively, on the
attached Tentative Subdivision Plan .
g. The location, outline to scale and present use of all existing structures to remain on the property after
platting and their required setbacksfrom the proposed new property lines.
Response: There are no existing structures on the subject property.
so. The location and size of existing and proposed utilities and necessary easements and dedications on and
adjacent to the she, including, but not limited to, sanitary sewer mains, stormwater management
systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points.
Response: All proposed utilities are located underground. Utility drop down to come from existing overhead electric and
utilities in A Street. Existing overhead electric utilities on Main Street to remain overhead. Natural gas,
communications, and power to be joint trenched within 7' PUE.
Lots 1-9 are to be served via individual laterals connected to an 8" proposed public mainline. Private ownership is
proposed to begin at easement boundary. Proposed wastewater manholes to be constructed per City of Springfield
standards.
Final utility design to be completed during building permitting process by franchise utility providers. Current utility
routings shown are preliminary.
See A&O Engineering Wastewater and Utilities Sheet C —4 i.
ss. The locations, widths and purpose of all existing or proposed easements on and abutting the proposed
land division; the location of anyexisting or proposed reserve strips.
Response: All proposed public and private access, utility, and maintenance easements are indicated on site plans,
including location, width, and purpose.
zz. The locations of all areas to be dedicated or reserved for public use, with the purpose, condition or
limitations of the reservations clearlyindicated.
Response: Tract A is proposed for stormwater detention and will be dedicated to the City of Springfield at the time of
Final Plat. Tract A and proposed PUEs are shown on the attached Tentative Subdivision Plan Set.
(B) A Site Assessment of the Entire Development Area. The Site Assessment shall he prepared by an Oregon
Licensed Landscape Architect or Engineer and drawn to scale with existing contours atz foot intervals and
percent of slope that preciselymaps and delineates the areas described below. Proposed modifications to
physical features shall be clearly indicated. The Director may waive portions of this requirement if there is a
finding that the proposed development will not have an adverse impact on physical features or water quality,
either on the site or adjacent to the site. Information required for adjacent properties may be generalized to
show the connections to physical features. A Site Assessment shall contain the following information.
Response: The attached Tentative Subdivision Plan include all the General Requirements, Site Assessment items, and
Stormwater items. The plan was prepared and signed by Ryan Erickson, PLS, an Oregon licensed land surveyor, and
Kyle Morris, of A&O Engineering, an Oregon registered Engineer.
s. The name, location, dimensions, direction of flow and top of bank of all watercourses that are shown on the
Water Quality Limited Watercourses (WOL W) Map on file in the Development and Public Works Department;
Response: There are no watercourses shown on the Water Quality Limited Watercourses Map that encumber the
subject property.
z. The zao year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood
Insurance Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision;
Response: According to FEMA Flood Insurance Rate Map Number 41039Cii62F, the subject site is located in Zone X, an
area determined to be outside of the Soo -year floodplain.
3. The Time of Travel Zones, as specified in SDC 3.3.zoo and delineated on the Wellhead Protection Areas
Map on file in the Development and Public Works Department;
Response: According to the Springfield Wellhead Protection Map, the majority of the subject property falls outside of
the Time of Travel Zone for wellhead protection. Northwestem area including Tract A and portion of Lot i are located
in the zo-gg combined ZOC.
y. Physical features including, but not limited to significant clusters of trees and shrubs, watercourses shown on
the WOLW Map and their riparian areas, wetlands, and rock outcroppings;
Response: There are no watercourses, riparian areas, wetlands, or rock outcroppings located within the boundaries of
the subject property. Types and diameters of trees on the site are indicated on attached site plans.
S. Soil types and water table information as mapped and specified in the Soils Survey of Lane County; and
Response: Soils types on the subject property are io8C Philomath Cobbly Silty Clay, 77B Marcola Cobbly Silty Clay
Loam, and io6A Pengra-Urban Land Complex. See attached Earth Engineer's Infiltration Test.
6. Natural resource protection areas as specified in SDC 4.y.11 .
Response: There are no natural resource protection areas present on the subject property.
(C) AStormwater Management Plan drawn to scale with existing contours at 1 -foot intervals and percent of slope
that precisely maps and addresses the information described below. In areas where the percent of slope is so percent
or more, contours may be shown at S foot intervals. This plan shall show the stormwater management system for
the entire development area. Unless exempt by the Director, the Cityshall require that an Oregon Licensed Civil
Engineer prepare the plan. Where plants are proposed as part of the stormwater management system, an Oregon
Licensed Landscape Architect may also be required. The plan shall include the following components:
z. Roof drainage patterns and discharge locations;
z. Pervious and impervious area drainage patterns;
3. The size and location of stormwater management systems components, including but not limited to: drain
lines, catch basins, dry wells and/or detention ponds; stormwater qualitymeasures; and natural
drainageways to be retained.
y. Existing and proposed site elevations, grades and contours; and
S. A stormwaterstudy and management system plan with supporting calculations and documentation as
required in SDC 4.a.zzo shall he submitted supporting the proposed system. The plan, calculations and
documentation shall be consistent with the Engineering Designs Standards and Procedures Manual to allow
staff to determine if the proposed stormwater management system will accomplish its purposes.
Response: A stormwater study including a report and management plan was designed by A & O Engineering. An existing
storm manhole is located at the intersection of B St and 74th St approximately 250 feet north of the property. It is
proposed to construct a new iz" public storm mainline within the 74th Street right-of-wayfrom this existing manhole tothe
subject property. The applicant is proposing to discharge runoff from new impervious areas into the proposed new public
storm main. To collect stormwater runoff on-site, the applicant is proposing to construct catch basins and roof downspouts
that will be directed to a new filtration rain garden on-site (Proposed Tract A). The filtration rain garden will then treat the
collected stormwater runoff from new impervious area and discharge into the proposed new public storm main. See
attached A&O Engineering Stormwater Report and Plan Sheet C —i.o Grading & Storm Drainage.
D. A response to transportation issues complying with the provisions of this code.
z. The locations, condition, e.g., fullyimproved with curb, gutter and sidewalk, AC mat, or gravel, widths and
names of all existing streets, alleys, or other rights-of-way within or adjacent to the proposed land division;
Response: All existing streets adjacent to the subject property are indicated on the Tentative Subdivision Plan.
z. The locations, widths and names of all proposed streets and other rights-of-way to include the approximate
radius of curves andgrades. The relationship of all proposed streets to any projected streets as shown on the
Metro Plan or Springfield Comprehensive Plan, including the SpringFiel d Transportation System Plan (including
the Conceptual Street Map) and, any approved Conceptual Development Plan;
Response: No streets or rights-of-way are proposed. Internal easements for access are dimensioned on the Tentative
Subdivision Plan.
3. The locations and widths of all existing and proposed sidewalks, multi -use paths, and accessways, including
the location, size and type of plantings and street trees in anyrequired planter strip;
Response: No sidewalks, multi -use paths, or accessways are proposed.
y. The location of existing and proposed traffic control devices, fire hydrants, power poles, transformers,
neighborhood mailbox units and similar public facilities, where applicable;
Response: Location of all existing and proposed fire hydrants, power poles, transformers, neighborhood mailbox units,
and similar public facilities are shown on the attached Tentative Subdivision Plan. See A&O Sheet C — z.o.
S. The location and dimensions of existing and proposed driveways demonstrating conformance with lot or
parcel dimensions and frontage requirements for single family and duplex lots7parcels established in
SDC a 2.2zs, and driveway width and separation specifications established in SDC c 2.z2o, whereapplicable;
Response: All proposed driveways and lot dimensions for both standard and panhandle lots meet minimum
requirements and are shown on the attached Tentative Subdivision Plan set. Internal driveway locations are unknown
at this time and will be finalized at the time of Building Permit process. Driveways to be constructed per City of
Springfield Standard Drawing 3-22. See A&O Sheets C —z.o and C-4. o.
6. The location of existing and proposed street trees, associated utilities along street frontage(s), and street
lighting: including the type, height and area of illumination;
Response: Existing street lights along A Street are Cobra style High -Pressure Sodium lamps. Proposed street lights will
be Autobahn ATBO Series LED fixtures. Proposed lights will be on fiberglass poles with a z5' mounting height. Street
tree locations to be finalized during Building Permit process but will be located no closer than zo'from street lights and
no closer than 5' from driveway approaches and utility features. See A&O Engineering Sheet C-4. o.
7. The location of existing and proposed transit facilities
Response: The nearest existing transit facility is the Thurston Station, located on the southeast corner of Main Street
and 58`h Street.
8. A copy of a Right -of -Way Approach Permit application where the propertyhasfrontage on an Oregon
Department of Transportation (ODOT)facility, and
Response: The subject property is adjacent to Main Street but there is no existing or proposed access from Main Street.
A Right -of -Way Approach Permit application is not required.
g. A Troffc Impact Studyprepared by a Oregon Licensed Traffic Engineer, where necessary, as specified in
SDC4.2.10 (A)(4).
Response: Based on the Institute of Transportation Engineers (ITE) Trip Generation Manual, ii`h Edition, the proposed
Tentative Subdivision generate well underthe i,000 trips per daythreshold requiring a Traffic Impact Study (TIS).
E. A Future Development Plan. Where phasing and/or lots/parcels that are more than twice the minimum lot/parcel
size are proposed, the Tentative Plan shall include a Future Development Plan that:
s. Indicates the proposed redivision, including the boundaries, lotiparcel dimensions and sequencing of each
proposed redivision in any residential district, and shall include a plot plan showing building footprintsfor
compliance with the minimum residential densities spec fed in SDC 3.2.20 q
z. Addresses street connectivity between the various phases of the proposed development based upon
compliance with the Springfield Transportation System Plan (including the Conceptual Street Map), the
Regional Transportation Plan (RTP), applicable Refinement Plans, Plan Districts, Master Plans, or this code;
3. Accommodates other required public improvements, including, but not limited to, sanitary sewer, stormwater
management, water and electricity;
4. Addresses physical features, including, but not limited to, significant clusters of trees and shrubs,
watercourses shown on the Water QualityLimited Watercourse Map and their associated riparian areas,
wetlands, rock outcroppings and historicfeatures; and
S. Discusses the timing and financial provisions relating to phasing.
Response: The Proposed Future Development Plan addressing applicable subsections 1-5, above, is attached.
F. Additional information and/or applications required at the time of Tentative Plan application submittal shall
include the following items, where applicable:
s. A brief narrative explaining the purpose of the proposed land division and the existing use of the property;
Response: The subject property is currently vacant. Property owner is requesting, with this application, to subdivide the
subject property into nine (g) residential lots, according to Springfield Development Code guidelines and requirements.
This written statement serves as a narrative expounding on the purpose of the proposed subdivision of the subject
property.
]. If the applicant is not the property owner, written permission from the property owner is required;
Response: The applicant, Oxwood Properties A Street LLC, is the property owner and has signed the attached
application form.
3. A Vicini[yMap drawn to scale showing bus stops, streets, driveways, pedestrian connections, fire hydrants,
and other tronsportation1fire access issues within zao feet of the proposed land division and all existing
Partitions or Subdivisions immediately adjacent to the proposed land division;
Response: A vicinity map is shown on the attached Tentative Subdivision Plan Set.
S. How the Tentative Plan addresses the standards of any applicable overlay district;
Response: No overlay districts apply to the subject property.
S. How the Tentative Plan addresses Discretionary Use criteria, where applicable
Response: The entirety of the subject property iszoned R -i, designated Low Density Residential. The proposed
Tentative Subdivision residential development plan within the R -i zone is a permitted use according to SDC 3.2-2io. No
Discretionary Use Permit is required.
6. A Tree Felling Permit as specified in SDC s.ig.ioo;
Response: No trees are proposed to be felled.
7. A Geotechnical Reportfor slopes of sS percent orgreater and as specified in SDC ?.?.sao" and/or if the
required Site Assessment in SDC 5.13.130(B) indicates the proposed development area has unstable soils and/or
high water table as specified in the Soils Survey of Lane County;
Response: There are no slopes greater than 15% on this site.
8. An Annexation application as specified in SDC S.7.ioo where a development is proposed outside of the city
limits but within City's urban growth boundary and can be serviced bysanitarysewer;
Response: The subject property is within the City of Springfield city limits.
g. A wetland delineation approved by the Department of State Lands shall be submitted concurrently where
there is a wetland on the property;
Response: There are no existing wetlands on the subject property.
so. Evidence that anyrequired Federal or State permit has been applied for or approved shall be submitted
concurrently;
Response: No Federal or State permits are required with this Tentative Subdivision application.
ss. All public improvements proposed to be installed and to include the approximate time of installation and
method of financing;
Response: The applicant proposes to initiate construction of this subdivision as soon as possible upon final approval of
subdivision plat, with private financing resources.
zz. Proposed deed restrictions and a draft of a Homeowner's Association Agreement, where appropriate;
Response: No deed restrictions or Homeowner's Association are proposed at this juncture.
13. Where the Subdivision of a manufactured dwelling park or mobile home park is proposed, the Director may
waive certain submittal requirements specified in subsections (A) through (M). However, the Tentative Plan
shall address the applicable standards listed under the park Subdivision approval criteria specified in
SDC 5.13.135.
Response: This application is not proposing the subdivision of a manufactured dwelling or mobile home park.
5.12•��5 Tentative Plan Criteria.
The Director shall approve or approve with conditions a Tentative Plan application upon determining that all
applicable criteria have been satisfied. If conditions cannot be attached to satisfy the approval criteria, the Director
shall deny the application. In the case of Partitions that involve the donation of land to a public agency, the Director
may waive any approval criteria upon determining the particular criterion can be addressed as part of a future
development application.
A. The request conforms to the provisions of this code pertaining to lot/parcel size and dimensions.
Response: The Applicant's request to subdivide the subject property's approximately 3.31 acres into a nine (g) lot
subdivision conforms with all provisions and mandatory minimum development standards for City of Springfield, R -i
zone, as specified in SDC 3.3-315.
• R -i minimum lot size requirements: 3, coo sf for sing le -family and duplex dwellings; 5, coo sf for triplex
dwellings; 7,000 sf for fourp lex dwellings. All nine (g) proposed lots meet the minimum lot size requirements.
See Tentative Subdivision Plan Set for exact lot dimensions.
• Lots 6-9 of the proposed Tentative Subdivision potentially exceed twice the minimum R -i allowable lot size and
are therefore required to be arranged according to the specifications in SDC 5.13-115.
• A Future Development Plan has been designed for Lots 6-9 according to specifications in SDC 5.13-13oE. See
Proposed Future Development Plan Sheet for exact dimensions.
B. The zoning is consistent with the Metro Plan diagram and/or applicable Refinement Plan diagram, Plan District
map, and Conceptual Development Plan.
Response: The subject property is zoned City of Springfield R -i, which is consistent with the Metro Plan diagram and
designation of Low Density Residential.
C. Capacityrequirements of public and private facilities, including but not limited to, water and electricity;
sanitary sewer and stormwater management facilities; and streets and traffic safety controls shall not be
exceeded and the public improvements shall be available to serve the site at the time of development, unless
otherwise provided for by this code and other applicable regulations. The Director or a utility provider shall
determine capacityissues.
Response: Preliminary engineering plans designed by A&O Engineering are included with this Tentative Subdivision
Application, and address the extension of public and private facilities, and related capacity. Public Improvement Plan
(PIP) drawings will be submitted to the City after Tentative Subdivision Plan approval.
D. The proposed land division shall comply with all applicable public and private design and construction
standards contained in this code and other applicable regulations.
Response: This proposed 9 -Lot Subdivision is and shall be in compliance with all applicable public and private design
and construction standards contained in this code and other applicable regulations.
E. Physical features, including, but not limited to: steep slopes with unstable soil orgeologic conditions; areas with
susceptibility of flooding; sign (cant clusters of trees and shrubs; watercourses shown on the WOLW Map and their
associated riparian areae other riparian areas and wetlands specified in SDC 4.3.11r, rock outcroppings; open
spaces; and areas of historic and/or archaeological significance, as maybe specified in SDC 3.3.900 or ORS
97.740.760.358.905.955 and39o.235.240, shall be protected as specified in this code Orin State or Federal law.
Response: The subject property is relatively flat with no unstable soil and some sloping at the south em property
boundary. This development site is located outside of the ioo-year floodplain. There are no significant clusters of trees,
watercourses, riparian areas, wetlands, rock outcroppings, or other historically/ archaeological significant features
within the boundaries of the proposed partition. See attached Tentative Subdivision Plan — Existing Conditions.
F. Parking areas and ingress -egress points have been designed to: facilitate vehicular traffic, bicycle andpedestrian
safety to avoid congestion; provide connectivity within the development area and to adjacent residential areas,
transit stops, neighborhood activity centers, and commercial, industrial and public areas minimize driveways on
arterial and collector streets as specified in this code or other applicable regulations and comply with the ODOT
access management standards for State highways.
Response: Parking areas to be finalized prior to final plat and shall comply with all criteria in this subsection. Driveways
shall be proposed along private drive complying with minimization of driveways on arterial and collector streets.
G. Development of anyremainder of the property under the same ownership can he accomplished as specified in this
code.
Response: The subject property is owned by Oxwood Properties A Street LLC, and all development of the subject
property is proposed in this Tentative Subdivision Plan.
H. Adjacent land can be developed or is provided access that will allowits development as specified in this code.
Response: Adjacent land is already developed.
L Where the Partition of property that is outside of the city limits but within the City's urbanizable area and no
concurrent annexation application is submitted, the standards specified below shall also apply.
s. The minimum area for the partitioning of land in the OF -10 Overlay District shall he 10 acres.
z. EXCEPTIONS:
a. Any proposed new parcel between 5 and so acres shall require a Future Development Plan as specified in
SDC 5.zz.zzo(E) for ultimate development with urban densities as required in this code.
h. In addition to the standards of subsection (1)(2)(a), above, any proposed new parcel that is less than 5
acres shall meet 1 of the following standards:
L The property to be partitioned shall be owned or operated by a governmental agency or public
utility; or
H. A majority of parcels located within loo feet of the property to be partitioned shall be smaller than
s acres.
W. No more than 3 parcels shall be created from s tract of land while the propertyremains within the
UF -10 Overlay District.
EXCEPTION. Land within the UF -10 Overlay District maybe partitioned more than once as long as no proposed
parcel is less than s acres in size.
Response: The subject property is located within the City of Springfield city limits.
J. Where the Subdivision of a manufactured dwelling park or mobile home park is proposed, the following
approval criteria apply.
s. The park was approved before Julyz, 2003 and is in compliance with the standards in SDC 3.2.2; or other
land use regulations in effect at the time the site was approved as a manufactured dwelling park or mobile home
park; or the park is an approved non -conforming use. In the latter case, a park is in compliance if the City has
not issued a notice of noncompliance on or before July z, zaoz.
z. The number of lots proposed shall be the same or less than the number of mobile home spaces previously
approved or legally existing in the park.
3. The external boundary or setbacks of the park shall not be changed.
4. The use of lots, as shown on the Tentative Plan, shall be limited to the
installation of manufactured dwellings; i.e., 'stick-built"houses are prohibited.
S. Any other area in the Subdivision other than the proposed lots shall be used as common property, unless park
streets have previously been dedicated to the City or there are public utilities in the park. All common property
shall be addressed in a Homeowners'Association Agreement.
a. Areas that are used for vehicle circulation (streets), driveways that serve more than z lots/parcels or
common parking areas, shall be shown in a Tract or easement on the Tentative Plan.
b. All other services and utilities that serve more than s lot shall be in a Tract or easement. Where a
service or utility serves only lot, but crosses another, that service or utility shall also be in an easement
shown on the Tentative Plan.
c. Existing buildings in the park used for recreational, meetings or other purposes for the park
residents shall be in a Tract shown on the Tentative Plan.
6. Any public utilities shall be within a public utility easement.
7. If public utilities or services are required to serve the Subdivision, the park owner shall sign and execute a
waiver of the right to remonstrate against the formation of a local improvement district to provide the public
utilities or services. (6443)
Response: This application is for a Tentative Subdivision but is not a subdivision of a manufactured dwelling
park/mobile home park. This criterion is not applicable.
10