Loading...
HomeMy WebLinkAboutApplication APPLICANT 3/28/2023City of Springfield SPRINGFIELD Development & Public Works 225 Fifth Street Springfield, OR 97477 Minimum Development Standards OREGON (Applicant., Complete This Project Information Section) Applicant Name: Stefan Cushman Phone:727-771-3818 Company: Nantwich Associates, LLC Email: stefan.cushman@gmail.com Mailing Address: 200 2nd Ave South, #402, St. Petersburg, FL 33701 Applicant's Rep, James Robertson Phone: 541-912-3720 Company: Robertson Sherwood Architects pc Email: lrobertson@robertsonsherwood.com Mailing Address: 132 East Broadway, Suite 540 Eugene, OR 97401 Property Owner: Nantwich Associates, LLC Phone: 727-771-3818 Company: Email: stefan.cushman@gmail.com Mailing Address: 200 2nd Ave South, #402 St. Petersburg, FL 33701 Assessor's Map No: Map 170327100 Tax Lot 9300 Tax Lot No(s) Property Address: 1860 Laura Street Springfield, OR 97477 x City ❑ UGB Size of Property2.9 ® Acres ❑ Square Feet If you are filling in this form by hand please attach your proposal description to this application. Description of Proposal: Remodel an existing building to house a vending operations center The interior remodel would include having new remodeled offices and rooms, adding a coderRreeser at the warehouse portion of the building. Exterioralterations; would include adding loading docks on the north side of the building and new ramps on the east and south sides to improve accessibility into the building, and a new storm water treatment facility to treat the hard scare associated with the added loading docks at the north side of the building Existing Use: Mixed Use LMI & CC Required Project Information (Cfty� Complete This Section) Associated Cases: Signs: Case No.: Date: Reviewed By: Application Fee: $ Technical Fee: $ Notice Fee: $0.00 Total Fees: $ Project No.: Revised 08.12.2022 dl Signatures The undersigned acknowledges Mat the in fomaEon in this application is mmsct and acmrate. Applicant: James M Robertson"„.„=`"�=""-'""'°_--•. 03/27/2023 Signature James M Robertson Date The undersig c wledges Mat the ihfamnabon in this application is mmsct and ac nate. Owner: 03/21/2023 Signature Date Stefan Cushman, Authorized Signatory of Nantwich Associates, LLC Print Revised 08.12.2022 dl Minimum Development Standards Application Process As stated in SDC 5.15.100, the Minimum Development Standards (MDS) process is intended to minimize development review for minor additions, expansions, or changes in use; ensure compliance with applicable development standards; and protect the public health, safety, and welfare. 1. Applicant Submits Minimum Development Standards Application to the Development & Public Works Department • The application must conform to the Minimum Development Standards Submittal Standards as specified in SDC 5.15.115, as summarized on the SubmiltalStandar&Checkliston pages 5-6 of this application packet as well as the general provisions of SDC 5.1.200. • Planning Division staff screen the submittal at the front counter to determine whether the appropriate materials Submittal Standards are provided; a thorough Completeness Check will be completed as detailed below. • Applications missing required items will not be accepted for processing (see SDC 5.1.225). 2. City Staff Conduct Detailed Completeness Check • Complete Application: Once an application has been received a completeness evaluation will be conducted in conformance with SDC 5.1.405. An application will be deemed complete if the application submittal standards have been fully satisfied upon initial filing or through the procedures set forth in SDC 5.1.405 (E)(1)-(3). When the application is deemed complete, the applicant will be notified in writing. If the Director has not issued in writing a completeness determination within 30 days from the date the application is received by the Director, the application is automatically deemed complete on the 31st day after it was received. • Incomplete Application: If the application is incomplete, the City must notify the applicant in writing of exactly what information is missing within 30 days of receipt of the application and allow the applicant to submit the missing information. The application will be deemed complete for the purpose of SDC 5.1.410(1) upon receipt by the Director of. 1. All of the missing information; 2. Some of the missing information and written notice from the applicant that no other information will be provided; or 3. Written notice from the applicant that none of the missing information will be provided. 3. City Staff Review the Application and Issue a Decision • This Type 1 MDS application involves the ministerial review based on clear and objective standards. In general, potential impacts of development allowed through a Type 1 application have been recognized through the adoption of standards. The Type 1 procedure does not require interpretation or exercise of policy or legal judgement when evaluating development standards. A Type 1 determination is made by the Director without public notice or a hearing. • The Director's decision must address all the applicable approval criteria and/or development standards. The Director may approve, approve with conditions, or deny the application. • The Director's decision for a Type 1 application is the final decision of the City. The Director's decision is effective on the day it is mailed or otherwise provided to the applicant. 3 Revised 08.12.2022 dl • A Type 1 determination is not appealed at the City level except as otherwise provided in the Springfield Development Code or if found to constitute a permit and authorized by the Director. 4. Development in Accordance with Permit Approval In accordance with SDC 5.15.130, final approvals and/or occupancy is contingent upon the completion of all required site improvements. Development must not commence until the applicant has received all the appropriate land use and development approvals including but not limited to: Final Minimum Development Standards review approval, grading permits, and building permits. Construction of any public improvements must not commence until the City has approved all required public improvement plans (e.g., utilities, streets, public land dedication, etc.). The City may require the applicant to enter into an agreement (e.g., for phased developments and developments with required public improvements), and may require bonding or other assurances for improvements, in accordance with SDC 5.15.135, Bonding and Assurances for Development. Revised 08.12.2022 dl Minimum Development Standards Submittal Requirements Checklist NOTE: If you feel an item does not apply, please state the reason why and attach the explanation to this form. ❑ Application Fee - Refer to the Development Code Fee Schedule for the appropriate fee calculation formula. A copy of the fee schedule is available at the Development & Public Works Department. The applicable application, technology, and notice fees are collected at the time of complete application submittal. ❑ Minimum Development Standards Application Form ❑ State of Federal Permits Required —The applicant must demonstrate that an application has been submitted for any required federal or state permit and provide a copy of the application upon request. ❑ Narrative A separate written response describing how the Minimum Development Standards proposal meets the Approval Standards of SDC 5.15.125. ❑ One (1) paper copy and one (1) digital copy of the following Plan Sheets (See SDC 5.1.215 for details and exceptions): General Requirements: All plans submitted under this section must: 1. Be prepared by a design professional, licensed in the state of Oregon, when required by state law, such as an engineer, architect, landscape architect, land surveyor, or other qualified professional as determined by the Director. ❑ MDS Existing Conditions Plan: ❑ The plan must provide the name, location, and dimensions of all existing site features including, but not limited to, significant stands of trees, watercourses shown on the Water Quality Limited Watercourse Map and their riparian areas, wetlands, flood designations and slopes. ❑ The plan must be drawn to scale. Scale must be indicated and provided on the plan. ❑ The plan must show all the existing improvements. ❑ The plan must show the entire property, including property lines, gross area, and dimensions. ❑ Include labels of all elements on the plan. Include a legend or key. ❑ Show setbacks of all existing structures and dimensions. ❑ Show existing landscaping including irrigation and street trees. ❑ Show existing fencing. ❑ Show the waste storage location and enclosure, including dimensions and connections to sanitary sewer as applicable. ❑ Show the bicycle parking spaces including the number and location with dimensions and indicate the type of bicycle parking rack. ❑ Show the parking and vehicle circulation areas including the location, dimensions, number of spaces, typical striping, compact and disabled spaces, and aisles. ❑ Show the access to the public right of way including dimensions of the existing curb cuts and any curb cuts to be closed. ❑ Show pedestrian facilities including any existing sidewalks. 5 Revised 08.12.2022 dl ❑ Show any existing and proposed streetlight locations and type. ❑ Show any existing on-site lighting. ❑ Show connections to utilities including any existing easements, location and size of connection points. ❑ MDS Site Plan: ❑ The plan must be drawn to scale. Scale must be indicated and provided on the plan. ❑ The plan must show all the proposed improvements. ❑ Show the entire property, including property lines, gross area, and dimensions. ❑ Include labels of all elements on the plan. Include a legend or key. ❑ Show setbacks of all proposed structures and dimensions. ❑ Show proposed landscaped areas and dimensions, and a table listing the types and quantities of plant species. ❑ Show proposed landscaping including irrigation and street trees. ❑ Show proposed fencing. ❑ Show the waste storage location and enclosure, including dimensions and connection to sanitary sewer as applicable. ❑ Show the bicycle parking spaces including the number and location with dimensions and indicate the type of bicycle parking rack. ❑ Show the parking and vehicle circulation areas including the location, dimensions, number of spaces, typical striping, compact and disabled spaces, and aisles. ❑ Show the access to the public right of way including the dimensions of the existing and proposed curb cuts and any curb cuts to be closed. ❑ Show pedestrian facilities including any proposed sidewalks. ❑ Show any existing and proposed streetlight locations and type. ❑ Show any existing and proposed on-site lighting, including manufacturer's cut sheets for lighting fixtures to be used on the site. ❑ Show connections to utilities including any existing and proposed easements, location, and size of connection points. ❑ Utilities Improvement Plan: ❑ Show the location and width of all existing and proposed easements. ❑ Show the location and dimensions of all existing and proposed rights-of-way. ❑ Show the location of existing or proposed utilities and infrastructure on or within 150 feet of the subject site, including the following as applicable: stormwater management systems, sanitary sewer mains, power, water mains, gas, and communications connections including cable, internet, and television cable, etc. ❑ Show all stormwater drainage patterns and connection points, together with supporting documentation indicating how the proposed stormwater system will function. 6 Revised 08.12.2022 dl Approval Standards: In Order to grant MDS approval, the Director must verify compliance with all applicable standards specified in SDC 5.15.125 and listed below. 1. The proposed land use is a permitted use or is allowed as a discretionary use in the land use district. 2. If a use is allowed as a discretionary use, in addition to meeting the standards below, a Discretionary Use application must be approved in conformance with the standards in SDC 5.9.100. 3. A 5 -foot wide landscaped planter strip, including street trees, with approved irrigation or approved drought resistant plants in conformance with SDC 4.4.100 and 4.2.140 must be installed between the sidewalk and parking areas or buildings with the following exceptions: a. Where there is an unimproved street, a 4 -foot -wide landscaped area, in conformance with the applicable standards of SDC 4.4.105, Landscaping, must be provided along the frontage of the property. This landscape area is required to be set back 1 foot from the property line; b. Where there is not a 4 -foot wide area between existing improvements and the front property line for a landscaped area as required in subsection (A)(3)(a) above, due to existing buildings, street width, paved parking, changes of elevation, or location of utilities including catch basins, 1 of the following must be provided: i. Fencing along the front property line located immediately behind the property line in conformance with SDC 4.4.115, Fences. The fencing must be either wrought iron or masonry and is subject to the fence height standards of the applicable zoning district and the vision clearance setbacks of SDC 4.2.130; or ii. Provide a landscaped area, in conformance with the applicable standards of SDC 4.4.105, Landscaping, that is equivalent in square foot area to the amount required in subsection (A)(3)(a) above. This equivalent area must be placed at the property corners or other areas of the property that are visible from the street. 4. Waste storage must be screened with a fence or wall. The fence or wall must be: a. Between 5 and 6 feet in height. b. Made of wood, metal, masonry, or other permanent materials that are 100 percent sight obscuring on all sides except for a gate access area. c. A gate access to the waste storage must have at least 50 percent site -obscuring screening such as cyclone fencing with slats. d. On all sides of the screening structure, up to 12 inches measured from grade may be visually unobscured provided that the unobscured area is covered with a material that contains the debris within the structure, such as cyclone fencing. 5. The area under the waste storage, the "catchment area," must be hydraulically isolated and connected to the sanitary system. 6. The waste storage area must be covered. The cover must be: a. A permanent canopy, roof, or awning that completely covers the waste storage area. b. Constructed to cover the waste storage area so rainfall cannot come in contact with the waste materials being stored. Revised 08.12.2022 dl c. Sized relative to the perimeter of the hydraulically isolated activity area. Runoff from the cover must be directed to a stormwater destination that meets all applicable code requirements for stormwater discharge. 7. Any new outdoor storage areas must be screened. The screening must meet the standards of SDC 4.4.110. 8. Bicycle parking must be provided or upgraded to meet the standards specified in SDC 4.6.40, 4.6.145, 4.6.150, and 4.6.155. 9. Any new or modified motor vehicle parking, loading, and vehicle circulation areas must be provided, including paving, striping, and wheel stops as specified in SDC 4.6.110, 4.6.115, 4.6.120, 4.6.130, and 4.6.135. 10. The submitted storm water plan and supporting documentation, as part of the Utility Improvement Plan, must demonstrate that for any new paving and other new impervious surface area a stormwater facility will function in conformance with the stormwater management standards specified in SDC 4.3.110 and 4.3.115. 11. Access to the public right-of-way must comply with SDC 4.2.120. 12. Sidewalks must be installed or upgraded where the proposed development area abuts a curb and gutter street as specified in SDC 4.2.135. 13. Streetlights must be installed as specified in SDC 4.2.145. 14. Any proposed on-site lighting must be in conformance with SDC 4.5.100. 15. The development area must connect to public utilities as specified in SDC 4.3.105, 4.3.110, 4.3.120, 4.3.125 and 4.3.130 and comply with the Springfield Building Safety Codes, where applicable. 8 Revised 08.12.2022 dl cirrix I RightSignature SIGNATURE CERTIFICATE TRANSACTION DETAILS Reference Number OD8413139C-6169-4619-6E71-D5629F55E824 Transaction Type Signature Request Sent At 03/21/202316:16 EDT Executed At 03/21/2023 16:20 EDT Identity Method email Distribution Method email Signed Checksum M1503¢9a9fp5M6M6@0393UIdw..334 v.7 b1656969du9. ba Signer Sequencing Disabled Document Pass code Disabled SIGNERS SIGNER Name Stefan Cushman Email qefan.cushman@gmaii.com Components 2 AUDITS TIMESTAMP 03/21/202316:16 EDT 03/21/202316:16 EDT 03/21/202316:19 EDT 03/21/202316:20 EDT 03/21/202316:20 EDT p "o REFERENCE NUMBER OD84BB9C-6169-4619-BE71-D5B29F55E824 0 DOCUMENT DETAILS Document Name Bigfoot Vending - Mds Application Form Filename Bigfoot vending - ends _application _form _4895-9428-0536_v_l.pdf Pages 8 pages Content Type application/pdf File Size 230 KS Original Checksum naWz b lMftW 1n 1W pia% 10 7dftNV@ bwbeWc&7577594436444 E -SIGNATURE Status signed Multi -factor Digital Fingerprint Checksum 6abwnrs ead7da95 bt2e17107201 W6b2W 7& 7d 5Md1a1e&9b 348&95b IF Address 35.145.173.149 Device Safari via Mac Drawn Signature --V— Signature Reference ID S5ICEDE2 Signature Biometric Count 2 EVENTS Viewed At 03/21/2023 16:19 EDT Identity Authenticated At 03/21/2023 16:20 EDT Signed At 03/21/202316:20 EDT AUDIT Alexis Lejeune (lejeune@ccl.com) created document 'bigfoot_vending= _mtls_application_form_4895-9428-0536_v_l.pdr on Chrome via Windows from 24.140.150.2. Stefan Cushman (stefan.cushman@gmail.com) was emailed a link to sign. Stefan Cushman (stefan.cushman@gmail.com) viewed the document on Safari via Mac from 35.145.173.149. Stefan Cushman (stefan.cushman@gmail.com) authenticated via email on Safari via Mac from 35.145.173.149. Stefan Cushman (stefan.cushman@gmail.com) signed the document on Safari via Mac from 35.145.173.149. Bigfoot Beverages -Vending Operations Center 1860 Laura Street, Springfield, Oregon 97477 Minimum Development Standards Narrative Overview As illustrated in the attached plans, Bigfoot Beverages requests the approval to remodel an existing building to house their vending operations center. The site location of this remodel is 1860 Laura Street in Springfield, OR. The interior remodel would include renovation of the existing office area, adding a cooler/freezer at the warehouse portion of the building, and providing new loading docks on the North side. Exterior alterations would include adding paving for the new loading docks and new ramps on the east and south sides to improve accessibility into the building, and a new stormwater treatment facility to treat the hardscape associated with the added loading docks at the north side of the building. The subject site is within the existing parcel identified on County Assessor's Map 170327100 as Tax Lots 9300. Permitted Use The land use zone for the site is Mixed Use Light -Medium Industrial and Community Commercial (Mixed Use LMI & CC) with no specified Overlay Zone. The remodel to this building is a permitted use for the site (Development Code 3.2.420 & 3.2.320). The proposed project does not change the existing uses. Landscaping The existing site conditions includes a landscape strip with street trees between the parking lot and Shelley Street on the north side ofthe property. The original construction included landscape areas between the sidewalk and the parking area along Laura Street to the west side. The south and west sides lot lines include existing landscaped areas. The location of the irrigation valves serving all the landscaped area is included in the L-1 Landscape Plan. No changes to the lot perimeter landscape areas on the West and South are proposed for this application. Waste Storage In accordance with the Stormwater Management Manual, the newwaste storage area will be covered and hydraulically isolated, with roof drainage directed to storm and covered drainage inside the waste storage area directed to sanitary. The newwaste storage on this site will comply with all requirements per SDC 5.15.125.A. The new CMU walls are 8'-2" tall. The gates will have slats to provide required screening. Bike Parking According to SDC 4.6.155, Table 4.6.3, the categories that the building falls into are Offices and IndustdalNVholesale. There are a total of 22 employees at this site. The total square footage ofthe Offices part ofthe building is 4,438 SF. Based on this, required bicycle parking is: Office: 0.75 space per 4,000 SF= (4,438 / 4,000) x 0.75 = 0.83 = 1 IndustrialfWnolesale: 1/4 space per employee (22) = (1/4 / 22) x 1 = 5.5 = 6 Bicycle Parking Required= 7 spaces (75% long term/25% short term) = 5long term / 2 short term There will be 5long term bicycle parking spaces (2 standard size and 1 larger size racks) beside the trash enclosure. The new trash enclosure canopy will extend to also cover the bicycle racks. In front of the trash enclosure and bike racks there will be a 5'-0" stripped separation on the pavement to allow for separation between motor vehicles and bike parking. The 2 short term bicycle parking spaces (1 standard size rack) will be located on the east side of the building near the front entry. The rack will be partially covered by the existing building canopy. The existing 6-0" wide sidewalk that is located between the motor vehicle parking lot and the new bike rack acts as a barrier between the bike and motor vehicle parking lot. Motor Vehicle Parkino The property has one main parking lot. The parking lot is accessible from Laura Street and Shelley Street. The parking lot has 52 standard parking stalls and 3 accessible parking stalls. The 3 accessible parking stalls will be located close to the building's entry. This is a total of 55 parking stalls. According to SDC 4.6.125 Table 4.6.2, the categories that this building falls into is Warehouse commercial sales and Manufacture and assembly. Warehouse Commercial (Offices): 1 per 600 SF= (4,438/600 SF) = 7.39 spaces Manufacturer/Assembly (Warehouse / Assembly): 1 per 1,000 SF= (36,457/1,000 SF) = 36.48 spaces Vehicle Parking Required = 44 spaces The existing parking lot provide adequate number of spaces to meet the parking requirement. Stormwater Treatment A new vegetated stonnwater treatment facility is at the northeast corner of the site adjacent to Shelley Street and Laura Street. The new paving area on the north side of the building will be collected and piped to this facility. Refer to sheet C100. Access to the Public Right -of -Way There is one existing one-way curb and one existing two-way curb along Laura Street. There is one existing one-way curb along Shelley Street. Sidewalks There is an existing sidewalk along Shelley Street. The sidewalk will not be modified as part of this project. Streetlights The streetlights along Shelley and Laura Street are existing. No changes are proposed. On-site Lighting There will be added pole lights along the new fencing on the site. There will also be exterior wall mounted light fixtures placed on the South, North, and West sides ofthe building. All lighting will comply with the standards noted in SDC 4.5.100. Public Utility Connections The loading dock area will be covered and hydraulically isolated, with drainage directed to sanitary sewer. A spill control shut-off valve will be installed on the sanitary sewer line collecting this drainage. The existing site development includes connections to power, natural gas, storm water, domesticwater, and fire protection water lines. Refer to attached Sheet C100. Attachments: MDS Application Existing Conditions Survey Site Plan — A001 Civil Utility and Grading Plan —C100 Landscape Plan — L1 Bargain and Sale Deed