STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK
(Area below this huefdled outbyApplica n) __—
(Please return to Clayton A&Eamhern @ City ofSprb4gi2eld Development and Public Works, Fm # 736-1021, Phone # 736-1036),
enwd:cnaeurlern@sprirtglleldor.gov
Project Name:
Paradigm Marcola Apartments
Applicant:
Matt Keenan, PE KPFF Engineers
Assessors Parcel #:
1703251300800
Date:
01/10/2020
LandUse(s):
Residential
Phone#:
541.684.4902
Project Size (Acres):
4.7
Fax #:
Approx. Impervious
Area: 133,693 SF
Email:
1703251300800
Project Description (Include a copy of Assessor's map):
Project consist of construction of five new multi -family housing units, community center,
drive aisle, associated parking and other amenities.
Drainage Proposal (Public connedion(s), discharge location(s), etc. Attach additional sheet(s) if necessary:
Storm runoff will be collected on-site via roof drains, downspouts, area drains and trapped catch
basin. There is an existing 18" stub that will serve as the site connection point. The 18" stub is
located
Proposed Storrewater Best Management Practices:
Storm runoff will potentially be treated with vegetated facilities (rain gardens, storm water planters)
or a combination of vegetated facilities and mechanical tr atment. Additionally all catch basins
within vehicle pavements will be tr ped for oil/ rease se aration.
Areabelawahishne dledordb the C' mrdR edtatheA lk
(At a nundimn5 all boats checked by the City on the front and bekkoftlds sheet shall be submitted
or on application to be con Tete r subnuttal, akin h other irenwnb nay, be recess
Mechanical treatment (such as catch basin
❑ Small Site Study — (use Rational Method for calculations) Ittillers) allowed for meeting pre treatment
❑ Mid -Level Development Study— (use unit Hydrograph Method for calcu -tins quiremenls, not allowed to meet the 50
"king lot treatment requirement
❑ Full DIainage Development Study- (use Unit Hydrogmph Method for calcula ions)
Environmental Considerations:
jrWellheadZone: 1 year totz ❑ Hillside Development: n/a
❑ Wedand/Riparian: n/a ❑ Floodway/Floodplain: n�
❑ Soil Type: ❑ Other Jurisdictions n/a
Downstream Analysis:
8 N/A
❑ Flow line for starting water surface elevation:
❑ Design HGL to use for starting water surface elevation:
❑ Manhole/Junction to take analysis to:
Return to Clayton McEachem @ City of Springfield, email: cmceachem@spdngfeAd-orgov, FAX., (541) 736-1021
COMPLETE STUDY ITEMS
r Baredupon the tnfor nation provided on tie front ofdds sheet, the follou>ing represents a ndndnnou of uvh w it merkdfor on
application to be complete for subnddal with respect to drainage; however, this list should not be used in lieu ofde Sprirgtield
Development Cork (SDC) or the City's Engineering Design A3mma1. Connpltance with these requirements does not constitute site
appromol, Adebooml site specific information nary be required Note: Upon scoping sheet subndttal, ensure completedfornu has been
signed in the spare provickel below:
Interim Design Standards/Water Quality (EDSPM Chapter 3
Req'd N/A
7 ❑ All non -building rooftop (NBR) impervious surfaces shall be pre-treated (e. g. multi-chambered catchbasinw/oil filtration
media) for stonmvater quality. Additionally, aminimum of 50% of the NBR impervious surface shall be treated by
vegetated methods.
7 ❑ Where required, vegetative stommwater design shall be consistent with design standards (EDSPM Section 3.02), set forth
in Chapter 2 of the Eugene Stormrmer Management Manual.
Z❑ For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified
by the Eugene Stomrmvater Management Manual (Sec2A.1).
0 ❑ If a stormrmer treatment Swale is proposed, submit calculations/specifications for sizing, velocity, flow, side slopes,
bottom slope, and seed mix consistent with City of Springfield or Eugene's Stomrmvater Management Manual.
Z❑ Water Quality calculations as required in Section 3.03.1 of the EDSPM.
All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall
be provided with secondary containment or weather resistant enclosure.
Z❑
71
Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon.
Z
M
A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study map.
Z❑
Calculations showing system capacity for a 2 -year stoma event and overflow effects of a 25 -year stoma event
Private stommwater easements shall be clearly depicted on plans when private stommater flows from one property to
The time of concentration (Tc) shall be determined using a 10 minute start time for developed basins.
Review ofDownstream System EDSPM Section 4.03A.0
Z❑
A downstream drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the
Oregon Plumbing Specialty Code (OPSC).
Elevations of the HGL and flow lines for both city and private systems where applicable.
❑ n Design of Stoma Systems (EDSPM Section 4.04).
❑ ❑ Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set
❑ ❑ Minimum pipe cover shall be 15 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or
proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 50,000 lb load
without failure of the pipe structure.
❑ ❑ Manning's "n" values for pipes shall be consistent with Table 4-1 of the EDSP. All stoma pipes shall be designed to
Other/Miscethmeous
71
❑
Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site
drains.
❑
Private stommwater easements shall be clearly depicted on plans when private stommater flows from one property to
another.
Z❑
Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of
residential building roofs (EDSP Section 3.03A A). Additional provisions apply to this as required by the DEQ. Refer to
thewebsite: him/Avww.deo.state.or.ushvo/uic/uic.htm for more infomuation.
Detention ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events.
*Thisform simU be inchukd m nn Nhuhmen5 inside the frontcover, ofthe stormnsder shady.
* IAWORTANT..- ENGINEER PLEASE READ BEEOWAND SIGN'
As the engineer of record, I hereby certify the above required items are complete and included with the submitted stommater study
and plan set. Signature Date
Form Version 5: June 2015
FOR ASSESSMENT AND
TAXATION ONLY
vVV
SEE MAP i
17032521 I'
11
c3'000000000000 �
SW COR
FELIX SCOTT
DLC 51
1,
1
2700
I
1500
0i i
3AC
1
I'
1
1'
1
,1
3
4
I
1
11
I
1
1
1
I'
11
'F•
I'
A
11
300
1'
z, 1
11
I'
11
1
I'
1
Im
I�
11
1
I
1
11
1
2900
z
1'
1
I�
1
a
1
S.W.1/4 N.E.1/4 SEC. 25 T.17S. R.3W. W.M.
Lane County
1" = 100'
1501
3 3.9 AC
5.29998 a
LOT "K
344
O
NW COR
�.B-POWERS---------- _--------
i DLC 81
ii
500 i
- �
0.87A91'
, a /
—1
1 5.29008
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
i
- - -
/ +602
o
/ • J J 1
/ U S=5/
i>,1 --
/%�� 4-_ _________1______ I
o0 /P 702 700
i 701 1.43AC 4.49 AC
0.6 AC
i
i /
i
i /
' pce
a /
i' a
i i /
i ; e
/
i /
/
SE COR
oLc so
SEE MAP
17032512
1600
1 2.38 AC 1800
1.72 AC
PCL.2
1
I
I
1
1
1
I
1
1
1
i
1700
1.89 AC
PCL.1
5.29811 9
529717
A
m
5.34749
— — — — — — — — — — — — — --
SEE MAP
17032542
EUGENE -SPRINGFIELD HIGHWAY 1-105
1
0.1AC
A7
3600 el
0.13 AC
76
3500
0.21 AC
NIITIIAL s
s
4142W..
2700
1z0a5
1000
0i i
301
1300
0.34 AC
1
028 AC
1
2
3
4
I
1
3000���
I
1
1
1
0.1713 C
'F•
529008
A
? i
300
n
z, 1
0.04 AC
11
1
_
1
Im
I�
�ero',ee
1
I
1
3400
1
2900
z
0.18 AC-
1
1 '
400
1
3s
0.14 AC
74
I'
e9
f
O
NW COR
�.B-POWERS---------- _--------
i DLC 81
ii
500 i
- �
0.87A91'
, a /
—1
1 5.29008
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
i
- - -
/ +602
o
/ • J J 1
/ U S=5/
i>,1 --
/%�� 4-_ _________1______ I
o0 /P 702 700
i 701 1.43AC 4.49 AC
0.6 AC
i
i /
i
i /
' pce
a /
i' a
i i /
i ; e
/
i /
/
SE COR
oLc so
SEE MAP
17032512
1600
1 2.38 AC 1800
1.72 AC
PCL.2
1
I
I
1
1
1
I
1
1
1
i
1700
1.89 AC
PCL.1
5.29811 9
529717
A
m
5.34749
— — — — — — — — — — — — — --
SEE MAP
17032542
EUGENE -SPRINGFIELD HIGHWAY 1-105
1
0.1AC
A7
3600 el
0.13 AC
76
3500
0.21 AC
NIITIIAL s
s
,•etl
I
__________ ________
4142W..
2700
1z0a5
1000
1101Q�T
1200
1300
0.34 AC
1
028 AC
1
2
3
4
I
1
3000���
I
1
1
1
0.1713 C
1
1
1
1
0.11 AC
1
1
SEE MAP
I
170325111
I
1
_
1
Im
I�
�ero',ee
1
I
1
3400
1
2900
1
0.18 AC-
1
0.18AC
I
1
1
1
74
1
e9
f
I
1
I
1
1
1
1
I
1
i
,•etl
I
__________ ________
\�, S 1100_____
1 O.snc 1400
�. \1 027AC
28
.xe
"ly1 24s 2600
60
,m0
016ACA2300xp0]s721200
at2100a-00.14AC
2000012A
e
4 F �'
0.121 " 2 3 a 2500
1 a n,enc
32
3
2700
1z0a5
1000
1101Q�T
1200
1300
0.34 AC
Os8 AC
028 AC
1
pPo
2
3
4
3000���
C
0.1713 C
k
0.11 AC
COMMON ARA
\�, S 1100_____
1 O.snc 1400
�. \1 027AC
28
.xe
"ly1 24s 2600
60
,m0
016ACA2300xp0]s721200
at2100a-00.14AC
2000012A
e
4 F �'
0.121 " 2 3 a 2500
1 a n,enc
32
3
2700
1z0a5
1200
0.14 AC
72
T1
e]
w117
w',ve
3300
3000���
m.
0.1713 C
k
0.11 AC
COMMON ARA
0
2800E
A 0.19AC
_
�ero',ee
3400
2900
0.18 AC-
0.18AC
^F
74
e9
f
17032513
SPRINGFIELD
LCATSKP- 2021-12-3009:08
CANCELLED
100
101
104
105
106
107
108
200
201
600
601
602
900
REVISIONS
OL1&ID11- LCATIB,-CONVERT WP TO GIS
11.12-LCAT115- WN'R' STREET NTO TL 11M
12/30/2021-ICAT1M-LLABET MTL1101STL11W
SPRINGFIELD
17032513
Preliminary Stormwater Report
Marcola Apartments
Prepared for: Paradigm Properties
Prepared by: Mark Reyes, PE
Project Engineer: Matt Keenan, PE
February 2023 1 KPFF Project #2200316
KPFF'S COMMITMENT TO SUSTAINABILITY
As a member of the US Green Building Council,
a sustaining member of Oregon Natural Step,
and a member of the Sustainable Products
Purchasers Coalition, KPFF is committed to the
practice of sustainable design and the use of
sustainable materials in our work.
When hardcopy reports are provided by KPFF,
they are prepared using recycled and recyclable
materials, reflecting KPFF's commitment to
using sustainable practices and methods in all
of our products.
Table of Contents
Project Overview and Description
Project Size and Location .........
Existing vs. Proposed Condition.
Project Narrative ...........................
Proposed Stormwater System...
Water Quality Facilitie
Engineering Conclusions
Tables and Figures
Table 1: Pre -Development vs. Post -Development Flows ............................
Table 2: 24 -Hour Precipitation for Eugene, OR (NOAH Atlas 2, Volume X)
Table 3: Catchment and Facility Table (See Exhibit 2, Appendix 1)............
Appendices
Appendix 1
Basin Maps
Appendix 2
Stormwater Plans
Appendix 3
Existing Runoff Calculations
Appendix 4
Proposed Runoff, Water Quality and Calculations
Ma=Ia Apartments I KPFFC nsulting Engineers
PRELIMINARYSTORMWATER REPORT
Project Overview and Description
Project Size and Location
The Marcola Apartments project will be constructed on a 4.72 -acre site located along Marcola Road. The
projectis bound by Marcola Road to the north, 22nd Street and residential development to the east, Highway
126 to the south and commercial and residential development to the west. The project development consists
of six multi -family buildings.
Watershed and Soil Description
Springfield's stormwater basins are part of the larger Upper Willamette Basin. The site itself is located within
the City of Springfield's West Springfield Q Street Basin, per the City's 2010 Stormwater Management Plan.
The proposed stormwater system will connect to the City's stormwater system.
The site has been identified as having type C and D soils. Soil types C and D have poor infiltration rates and
no stormwater runoff will be infiltrated on site.
Existing vs. Proposed Conditions
Existing Conditions
The site is currently an undeveloped grassy field with a few groupings of trees on the north half of the site.
The site is relatively flat with site slopes generally in the 1 to 2 percent range. Grades across the site vary
from 1 to 2 feet except for the berm located on the site's southern boundary. There are no existing
stormwater facilities or current connections to any City public storm main.
Proposed Conditions
The proposed conditions will include six multi -family structures and a community center/gym. In addition,
the development will include connecting drive aisles, sidewalks, covered and uncovered parking spots, a
tennis court and a garage building. The project will treat site runoff according to City design standards
Chapter 3 stormwater quality. Vehicle impervious surfaces will be treated with a combination of vegetated
facilities and mechanical treatment (filters) with no more than 50 percent of the vehicle impervious area
being treated through mechanical means. Additionally, catch basins within the vehicle areas will feature pre-
treatment prior to conveying runoff to mechanical treatment. The site has been identified by the City as not
needing detention.
The proposed site includes 126,187 square feet of impervious area and 78,082 square feet of pervious area.
Of the 125,822 square feet of impervious area, 56,615 square feet is from structures, 19,936 square feet is
from pedestrian hardscape and 49,271 square feet is from vehicle pavement.
Project Narrative
The City of Springfield stormwater quality design criteria set forth in Chapter 4 calls for a water quality
design storm of 0.83 inches in 24 hours rain event.
Ma=Ia Apartments I RPFFC nsulting Engineers
PRELIMINARYSTORMWATER REPORT
Proposed Stormwater System
The impervious area on-site is divided between the building roof areas, asphalt parking, asphalt drive aisles
and site hardscape. See Appendix 1 for the drainage basin areas.
Vegetative filtration facilities and mechanical treatment have been selected for water quality treatment. On-
site new impervious surfaces from vehicle pavement such as drive aisles and parking spaces will be treated
through a filtration planter or mechanical treatment structure. Per City design standards, no more than 50
percent of the vehicle pavement will be treated through mechanical treatment. All facilities will be designed
per City of Springfield standards.
The filtration planters will have open storage at the surface ranging from 8 to 12 inches deep with a minimum
of 2 inches of freeboard. The planters will have 24 inches of growing media with landscaping planting for the
water quality management. They will also have a minimum of 12 inches of rock storage depth below the
facility. The filtration planters will treat the water quality storm and an overflow will collect larger storm
events to convey to the stormwater system.
The mechanical treatment will be a filter product such as BayFilter or Stormfilter. The product used will be
sized in accordance with the manufacturer's recommendation.
Table 1: Pre -Development vs. Poo -Development Flo e
Development CFS CF
CFS
CF
CFS
CF
CFS
CF
Existing Conditions
Proposed Conditions
Development
Existing Conditions
0.01 261.356 0.35 4,745 0.44 5,869 0.53 7,022
0.34 5,446 2.20 28,057 2.55 32,696 2.90 37,322
CFS CF
0.63 8,196
CFS CF
0.71 9,148
Proposed Conditions 3.24 41,975 3.52 45,722
Water quality Facilities
Basin 1 encompasses the buildings and the pedestrian hardscape not adjacent to the parking bays and drive
aisle. Run-off from the buildings will be collected via roof drains and downspouts. Run-off from the pedestrian
hardscape will be collected by area drains. The run-off will then be conveyed through the on-site storm
drainage system and discharged into the City system at the main located in 22nd Street.
Basin 2 encompasses the north section of the parking lot, drive aisle and the associated sidewalk adjected to
the parking bays. The run-off will sheet flow north where it will be captured by two catch basins. These catch
basins will filter and satisfy the pre-treatment requirement before sending run-off to a vault. The vault is
where mechanical treatment via filtration (BayFilter, Storm Filter or approved equal) will take place. After
treatment, run-off will be conveyed through the on-site storm system and discharge at the connection point
Ma=Ia Apartments I RPFFConsulting Engineers
PRELIMINARYSTORMWATER REPORT
in 22nd Street. The treated vehicle pavement area is approximately 43 percent of the total vehicle pavement
area.
Basin 3 encompasses a portion of the parking bays, drive aisle and adjacent sidewalk located in the middle
of the site. The run-off will sheet flow to the filtration planter located in the middle of the site via curb cut.
The planter will provide treatment via filtration and overflow run-off will be routed to the on-site storm
system via an overflow inlet. The treated run-off will be conveyed to the on-site stormwater system and then
to the connection point in 22nd Street.
Basin 3 encompasses a portion of the parking bays, drive aisle and adjacent sidewalk on the site's south side.
The run-off will sheet flow to the filtration planter via curb cut. The planter will provide treatment via
filtration and overflow run-off will be routed to the on-site storm system via an overflow inlet. The treated
run-off will be conveyed to the on-site stormwater system and then to the connection point in 22nd Street.
Flow Control
Per the City of Springfield Stormwater Scoping sheet, no detention is required for the project site.
Source Control
Source control is required for facilities that are highly likely to generate pollutants that are not addressed
through the implementation of vegetated stormwater facilities. There are a variety of trash areas located
throughout the development that will require source control measures. To meet these requirements, heavy-
duty sanitary drains located in the trash areas will be trapped, auto -primed, vented and connected to the
sanitary sewer system. These drains will not convey to the storm drainage system. Additionally, trash areas
will be covered and hydraulically isolated from the stormwater system.
Analysis
Water Quality Facilities
The run-off for the impervious areas has been calculated and the planters and rain garden have been sized
to meet or exceed the City of Springfield requirements. The calculations determine run-off using the Santa
Barbara Urban Hydrograph (SBUH) Method and NRCS 24 -Hour Type IA Hyetograph as outlined Chapter 4 of
the Engineering Design Standards and Procedures Manual. The facility capacity is based on the requirements
and facility details found in City of Eugene Stormwater Design Manual.
For analysis purposes, each basin required the following information as input data for the computer model:
• Impervious Area (Ai), in acres
• Curve Number (CNi), impervious
• Travel Time (Tc)
• Total Precipitation
Ma=Ia Apartments I RPFFConsulting Engineers
PRELIMINARYSTORMWAUR REPORT
Precipitation data for the respective City of Springfield design storms are shown in Table 2 below.
Table 2:24 -Hour Precipitation for Springfield, OR INOAA Atlas 2, Volume xl
Bazin 1 Ped "'14'1A5 73,489 1.69
2-YearM4.3
Hardsrape
10-Year10UYear
8asin2 (Example) 26,931 0.62 2,243 0.05
29,174 MT -1
(Example) 13.686 031 -13.686 -0.31
Bldgs &
Bazin 1 Ped "'14'1A5 73,489 1.69
136,634
Hardsrape
8asin2 (Example) 26,931 0.62 2,243 0.05
29,174 MT -1
(Example) 13.686 031 -13.686 -0.31
0
8asin4 (Example) 22,425 0.51 -22,425 I -0.51
0 FTP -2
To size each planter, the following information was needed:
• Bottom area, in square feet
• Bottom perimeter length or bottom width, in feet
• Storage depth, in inches
All the water quality facilities meet the City of Springfield water quality requirements. For full calculations
and results, see Appendix 4.
Engineering Conclusions
Based on the Engineering Design Standards and Procedures Manual requirements, the facilities and
conveyance components have enough capacity to handle the required storm events and should be approved
as designed.
2200316 -kg
Martola Apartments I UFFConsulting Engineers 5
PRELIMINARYSTORMWATER REPORT
Appendix 1
Basin Maps
Ma=Ia Apartmen4 I gPFFC nsul[ing Engineers
PRELIMINARYSTORMWAUR REPORT
5
I
I
I
T
r._. J
t
s EXISTING
AREA=205,565 SF
10"SS ° 10"55 10"55_ I
J
SHEET LEGEND
- - PROPERTY
�_____
UNE
STORMWATE
�.....L .............
® EXISTING STORMWATER
BASIN MAP
2
BASIN 4
AREA=23,962 SF
IMPERVIOUS AREA=22,425 SF
STORMWATER BASIN MAP
Appendix 2
Stormwater Plans
Ma=Ia Apartments I UFFC nsulting Engineers
MELIMINARYSTORMWAUR REPORT
CONNECT TO EXISTING 10" SANITARY LINE�r
S Co -4
IE 10" IN=457.37 (E) S -10' PVC
IE 6' IN457.37 (W) S - 6' PVC
FIELD VERIFY POINT
OF CONNECTION
i
14.00' SANITARY i
SEWER EASEMENT
I
I
10.00' EWEB WATER TRANSMISSION
EASEMENT. EWES SHALL BE PRESENT
WITH EXCAVATION OR INSTALLING
UTILITIES WITHIN EWEB'S EASEMENT.
COORDINATE WITH EWEB.
19:1
1.
J
O
J
m
0
101 -ss —
89 LF-15"SD—
SO MH -1
RIM=465.90
IE 10" IN=460.14 (N)
IE 10" IN=460.14 (S)
IE 15" OUT=459.77 (E)
FTP
1I►
a
II
97 LF -15'
r'2 CONNECT TO EXISTING STORM STRUCTURE
IE 15" IN=458.84 (W)
IE IN=456.95 (N) EX. 60"
IE IN=458.84 (E) EX 24"
IE OUT=456.68 (S) EX. 72"
FIELD VERIFY POINT
OF CONNECTION
NOT SURVEYED
0 UTILITY KEY NOTES
NOTE DESCRIPTION DETAIL
REF.
1 CONNECT TO EXISTING 10" SANITARY LINE. FIELD VERIFY
PIPE SIZE, INVERT ELEVATION AND LOCATION.
CONNECT TO EXISTING STORM STRUCTURE. FIELD
VERIFY INVERT ELEVATIONS AND LOCATION. RESTORE
2 TRENCH PER CITY OF SPRINGFIELD STANDARDS. MILL
AND OVERLAY 10 FEET BEYOND TRENCH IN EACH
DIRECTION.
TAP TO EXISTING 8" WATER MAIN. COORDINATE
CONNECTION TO EXISTING MAIN WITH SUB. SUB TO
PERFORM TAP, INSTALL FIRE PROTECTION TO
3 PROPERTY, AND INSTALL BOX AND METER.
CONTRACTOR TO COORDINATE SCHEDULE AND EXACT
LOCATION IN FIELD. CONTRACTOR TO POTHOLE PRIOR
TO CONSTRUCTION.
BWV BACKFLOW PREVENTION VAULT
CB GIBSON STEEL CATCH BASIN WITH FLO-GUARD FILTERS
FH FIRE HYDRANT
FTP FLOW-THROUGH PLANTER
WQ WATER QUALITY STRUCTURE
II UTILITY CROSSING. PROVIDE 12" MIN. CLEARANCE, U.N.O.
UTILITY LABEL LEGEND
STRUCTURE LABEL
FF"UTILITY TYPE ($D --STORM DRAINAGE)
RUCTURE TYPE CALLOUT
ID NUMBER (WHERE APPLICABLE)
XX XX -XX
X+XX.X RT X.X'—LOCATION (WHERE APPLICABLE)
RIM=
IE IN =XX.X^STRUCTURE INFO (WHERE APPLICABLE)
IE OUT = XX.X
PIPE LABEL
UTILITY LENGTH
UTILITY SIZE
F—TFUTILITY TYPE
XXLF-XX" XX
S=X.XX%
L__ SLOPE (WHERE APPLICABLE)
SHEET LEGEND
FP FIRE PROTECTION LINE
S SANITARY SEWER LINE
SD STORM WATER LINE
W
CF
1111191 14:441214
SCALE 1 INCH = 40 FEET
40 0 40 80
1Tff
800 Willamette Street, Suite 400
Eugene, OR 97401
0: 541.684.4902
F: 541.684.4909
w.W.koffcom
0
Paradigm
1
4
Revision Schedule
No. Description I Date
PRINT DATE THIS SET
3/01/2023
ISSUE DATES
Pricing
Pennit -
Construction -
Revision -
Misc. -
11M
DUSTRUD
architecture
1622 Pearl Street
Eugene, Oregon 97401
541.338.8544
d ustru darc hitecture. com
m o m ry
� N CONY, Fj
02 0
c m^ d a c a o m
w 1o`o'md 03«
I c L>15 E
c0! a E$ n Q
NEqpV $rnmono
O w E 8 5 E0 0 0 `n
m 5 o a E m d c
w E
m
E$F �aSn
DRAWN BY:
FU
CHECKED
BY: MR
0
O
U �
A' 0
W �
�a
SHEET TITLE
UTILITY
PLAN
SHEET NO.
C-200
Appendix 3
Existing Runoff Calculations
Ma=Ia Apartments I gPFFC nsulting Engineers
PRELIMINARYSTORMWAUR REPORT
SBUH Calculation Worksheet for City of Springfield Storm Events k l j j
Project Name: Marcola Apartments Date: 1/26/2023
Designer: MAR Basin: Ex. 1
User -Supplied Data
Pervious Area Impervbus Area
Pervious Area, SF
Pervious Area, Acres
Pervious Area Cu rve Num her, CNpery
Time of Con centratinn, TQ minutes
30,893
Impervious Area, SF
Impervious Area, Acres 0.00
I mpervious Area Cu rve Nu mher, CN imp 98
Note: minimum Tc isfive minutes
0.71
85
5
CIN of Eugene 24Hour Rainfall Depths (NRCS Type
1Adlstrlbutlon)
Recurrence Interval
WQ 1 2
1 5 30
1 25 50
1 100
Inches
1 0.83 1 3.3
1 3.8 1 4.3
1 4.8 1
1 5.2
Calculated Data
l Project Area, Acres
0]3
Total Project Area, Square Feet
30,893
urrence Interval
WQ
2
5
10 25 50
100
k Flo. Rate, Qpeak, as
I
OA0.35OA0.53
—WQ
0.63 0.00
0.71
l RunoffVolume, V, cubic feet
26
4,745
5,86
7,022 8,196 0
9148e
to Peak Runoff, hours
2A.
7.931
7331
7.83 783 0.00
7$3
Runoff Hydrogroph
0.80
—WQ
—2 -Year
0.74
—S -Year
—10 -Year
0.60
—25 -Year
—50 -Year
0.50
—100 -Year
0.40
e
7
rc
0.30
0.20
0.10
0.08
0 500 1000 1500 2000 2500
Time, mintMea
8[0Willamem,Su,t,5uu,4O Eugen,()R ] 1 511.f$4.4902 kpff. m
Appendix 4
Proposed Runoff, Water Quality and Calculations
Ma=Ia Apartments I UFFC nsulting Engineers
MELIMINARYSTORMWAUR REPORT
SBUH Calculation Worksheet for City of Springfield Storm Events kpff
Project Name: Marcola Apartments Date: 1/26/2023
Designer: MAR Basin:1
User -Supplied Data
PerviousArea Im ervbus Area
Pervious Area, SF
Pervious Area, Acres
Pervious Area Cu rve Num ber, CNpery
Time of Con centratir Ta, minutes
Impervious Area, SF 48,695
Impervious Area, Acres 1.12
I mpervious Area Cu rve No miner, CN imp 98
Note: minimum Tc isfive minutes
0.00
90
5
oru 4ur Rainfall Depths NRC6Trip
bne
—WQ
Total Project Area, Square Feet
4$695
erfeEnceIt
WQ 2 -Yr I
51r
I 10 -Yr
1 25 -Yr
1 50 -Yr
1 100 -Yr
Inches
1 0.83 1 3.3 1
3.8
1 4.3
1 4.8
1
1 5.2
Calculated Data
Total Proj ect Area, Acres
1.121
—WQ
Total Project Area, Square Feet
4$695
Recurrence Interval
WQ
2 Y
5 -Yr
10 -Yr
25 -Yr
50 -Yr
10D -Yr
Peak Flo. Rate, Qpeak, cis
Ru noff Vol ume, V, cu bic feet
Time to Peak Runoff, hours
0.20
0.96
1.11
1.26
SAS
0.00
1.53Total
2,544 12,446 14,46 16,493 18,518 0
20,139
783 7.83 783 7.83 783 0.00
7$3
Runoff Hydmgmph
1.80
—WQ
—2 -Year
1.60
—5 -Year
1.40
—10 -Year
—25 -Year
1.20
—50 -Year
100
—100 -Year
V
Zy
g 0.80
K
0.60
0.40
0.20
0.00
0 500 1000 ism 2000 2500
Time, minxMe s
8WWilbmUeSr,tSuu,400 Eurn,O89]01 XL W09@ kpff. m
SBUH Calculation Worksheet for City of Springfield Storm Events kpff
Project Name: Marcola Date: 1/26/2023
Designer: MAR Basin:2
User -Supplied Data
PerviousArea InnipentiousArea
Pervious Area, SF
Pervious Area, Acres
Pervious Area Curve Num ber,CNpery
Time of Con centratir Ta, minutes
Impervious Area, SF 26,931
Impervious Area, Acres 0.62
Impervious Area Curve Number CNimp 98
Note: minimum Tc isfive minutes
0.00
90
5
CI of Eu ne 24Hour Rainfall Depths NRC6T
eSAdlstrlbutbn
—WQ
Total Project Area, Square Feet
RequrrenceI It
WQ 2 -Yr I
51r
I 10 -Yr
1 25 -Yr
1 50 -Yr
1 100 -Yr
Inches
1 0.83 1 3.3 1
3.8
1 4.3
1 4.8
1
1 5.2
Calculated Data
Total Project Area, Acres
0.621
—WQ
Total Project Area, Square Feet
26,931
Recurrence Interval
WQ I
2 -Yr I
5 -Yr I
10 -Yr I
25 -Yr I
50 -Yr I
100 -Yr
Peak Flow Rate, Qpeak, cis
0.111
O.S31
0.611
0.70
0.7
O.ODI
085
Total Ru noff vol ume, V, cu bic feet
1,40
6,883
8,00
9,InJ
10,2421
01
11,138
Time to Peak Runoff, hours
783
7.83
783
7.83
783
0.1
783
Runoff Hydrogroph
0.90
—WQ
—2 -Year
0.80
—S -Year
0.70
—10 -Year
—25 -Year
0.69
—50 -Year
0.50
—100 -Year
V
Zy
g 0.40
K
0.30
0.20
0.10
0.00
0 500 1000 ism 2DDO 2500
rrEe, n:nulea
80]Willa eru,Sr,tSuite4 Eurn,OP9]01 XL W09@ kpff. m
SBUH Calculation Worksheet for City of Springfield Storm Events l J j j
Project Name: Marcola Date: 1/26/2023
Designer: MAR Basin:3
User -Supplied Data
PerviousArea InnipentiousArea
Pervious Area, SF
Pervious Area, Acres
Pervious Area Curve Number, CNpery
Time of Con centratir Tr, minutes
Impervious Area, SF 13,686
Impervious Area, Acres 0.31
Impervious Area Curve Number CNimp 98
Note: minimum Tc isfive minutes
0.00
8o
5
CI of Eu ne 24Hour Rainfall Depths NRC6T
eSAdlstrlbutbn
—WQ
Total Project Area, Square Feet
13,686
RequrrenceI It
WQ 2 -Yr I
51r
I 10 -Yr
1 25 -Yr
1 50 -Yr
1 100 -Yr
Inches
1 0.83 1 3.3 1
3.8
1 4.3
1 4.8
1
1 5.2
Calculated Data
Total Project Area, Acres
0.311
—WQ
Total Project Area, Square Feet
13,686
Recurrence Interval
WQ 1
2 Y I
5 -Yr I
17"_50
-Yr
10D -Yr
Peak Flo. Rate, Qpeak, ch
Total Runoff Volume,V, cubic feet
Time to Peak Runoff, hours
0.06
0.27
031
0.35
OAO.ODI
0.40
OA3
735 3,4991 4,06 4,MSI 5,2051 01
5,660
7$3 7.83 7331 7.83 7$3 O.W1
7$3
Runoff Hydrogroph
0.50
—WQ
—2 -Year
0.45
—5 -Year
0.40
—10 -Year
0.35
—25 -Year
—50 -Year
0.30
—100 -Year
C"
V
0.25
L
J
K
0.20
0.15
0.10
0.05
0.00
0 500 1000 ism 2000 2500
rrEe, n:nulea
8WWHlam to Sr,tSuu,400 Eurn,O89]01 XL W09@ kpff. m
Stormwater Facility Calculator
Instructions:
1. Choose Facility Type
2. Choose shape
3. Complete information in highlighted cells
Facility
Planter
Shape
Amoeba
Bottom Area:
262 sf
Bottom Perimeter:
68 ft
Vertical Sides
3,380
Storage Depth:
MYrinrltration
volume (co:
Growing Media:
�in
18 in
Surface Storage Capacity
131 cf
Infiltration Area
262 sf
GM Infiltration Rate
2.5 in/hr
Infiltration Capacity (avg)
0.015 cfs
Results
Below -Grade
WATER QUALITY EVENT PASS ROCK CAPACITY N/A
SURFACE CAPACITY 62%
Recurrance Peak Flow
Interval (cfs)
Volume
(cf)
Rock Capacity
Meets
Infiltration?
WQ 0.0152
634
N/A
Filtration Only
2 -Yr 0.2701
3,380
N/A
MYrinrltration
volume (co:
5 -Yr 0.3125
3,947
N/A
10 -Yr 0.3548
4,506
N/A
N/A
25 -Yr 0.3971
5,091
N/A
50 -Yr 0.0000
0
N/A
100-Yrl 0.43081
5,541
N/A
1201 Oak Street, Suite 100 Eu,ene,01197401 541.664.4902 kpa.cum
lqj f
Proje Name: Marw6
Basin:3
Date: 1/26/2023
Impermeable Liner
Water quality Event Surface Facility Modeling
0.0600
0.0500
0.0400
N
u 0.0300
0
0
c
Ic o.ozoo
0.0100
O.Wro ; I I�
0 500 1000 1500
Time, minutes
kpff
Project Name: Marcola
l3asin:3
Date: 1/26/2023
I%
Surface Inflow
0%
--— Infiltration Capacity
0%
Percolation to Subsurface
0%
iOX
--- Overflow
Surface Capacity 0%
80%
90%
100%
2000 2500
800 Willamette Street, Suite 400 EWene,OR97401 541.684.4902 kpa.wm
SBUH Calculation Worksheet for City of Springfield Storm Events kpff
Project Name: Marcola Date: 1/26/2023
Designer: MAR Basin:4
User -Supplied Data
PerviousArea InnipentiousArea
Pervious Area, SF
Pervious Area, Acres
Pervious Area Curve Num ber,CNpery
Time of Con centratir Ta, minutes
Impervious Area, SF 22,425
Impervious Area, Acres 0.51
Impervious Area Curve Number CNimp 98
Note: minimum Tc isfive minutes
0.00
RO
5
CI of Eu ne 24Hour Rainfall Depths NRCST
eSAdlstrlbutbn
—WQ
Total Project Area, Square Feet
22,429
RequrrenceI It
WQ 2 -Yr I
51r
I 10 -Yr
1 25 -Yr
1 50 -Yr
1 100 -Yr
Inches
1 0.83 1 3.3 1
3.8
1 4.3
1 4.8
1
1 5.2
Calculated Data
Total Project Area, Acres
0.51
—WQ
Total Project Area, Square Feet
22,429
Recurrence Interval
WQ
2 -Yr
5 -Yr
10 -Yr 25 -Yr 50 -Yr
10D -Yr
Peak Flow Rate, Qpeak, cis
0.0
OA4
OSI
O.SS 0.65 0.00
0.71
Total Ru noff Vol ume, V, cu bic feet
1,1]
S,732
6,
7,595 8,528 0
9,274
Time to Peak Ru noff, hou rs
]$
7.83
7331
7.931 7231 O.ODI
7$3
Runoff Hydrogroph
0.80
—WQ
—2 -Year
0.70
—S -Year
—10 -Year
0.60
—25 -Year
0.50
—50 -Year
—100 -Year
C"
V
0.40
L
J
K
0.30
0.20
0.10
0.00
0 500 1000 ism 2000 2500
rrEe, n:nulea
80]Willa eru,Sr,tSuite4 Eurn,OP9]01 XL W09@ kpff. m
Stormwater Facility Calculator
Instructions:
1. Choose Facility Type
2. Choose shape
3. Complete information in highlighted cells
Facility Planter
Shape
Amoeba
Bottom Area:
293 sf
Bottom Perimeter:
68 ft
Vertical Sides
956
Storage Depth:
12 in
Growing Media:
18 in
Surface Storage Capacity
293 cf
Infiltration Area
293 sf
GM Infiltration Rate
2.5 in/hr
Infiltration Capacity (avg)
0.017 cfs
Results
Below -Grade
WATER QUALITY EVENT PASS ROCK CAPACITY N/A
SURFACE CAPACITY 74%
Recurrance
Interval
Peak Flow
(cfs)
Volume
(cf)
Rock Capacity
Meets
Infiltration?
WQ
0.0170
956
N/A
Filtration Only
2 -Yr
0.4425
5,461
N/A
MYrinrltration
volume (co:
5 -Yr 0.5120
6,396 N/A
10 -Yr
0.5814
7,313
N/A
N/A
25 -Yr
0.6506
8,245
N/A
50 -Yr 0.0000
0 N/A
100-Yrl 0.70591
9,020 N/A
1201 Oak Street, Suite 100 Eu,ene,01197401 541.664.4902 kpa.cum
lqj f
Proje Name: Marwla
6asin:4
Date: 1/26/2023
Impermeable Liner
kpff
Project Name: Marcola
Basin -4
Water quality Event Surface Facility Modeling Bate: 1/16/2023
0.1000
Iss
Surface Inflow
0.0900
0%
0.0800
— —— Infiltration Capacity
0.0)00
IOX
Percolation to Subsurface
0.0600
0%
N
0.0500
10%
--- Overflow
0
0.0400
iovc
z
0.0300
—Surface Capacity '095
0.0 00
80%
0.0100
90%
0.0000 100%
0 500 1000 1500 2000 2500
Time, minutes