HomeMy WebLinkAboutItem 01 Street Lighting Energy Savings Performance Contract UpdateAGENDA ITEM SUMMARY
Meeting Date:
Meeting Type:
Staff Contact/Dept.:
Staff Phone No:
2/13/2023
Work Session
Brian Barnett/Scott
Miller/DPW
541.726.3681
Estimated Time: 30 Minutes
SPRINGFIELD Council Goals: Maintain and Improve
CITY COUNCIL Infrastructure and
Facilities
ITEM TITLE:
STREET LIGHTING ENERGY SAVINGS PERFORMANCE CONTRACT
UPDATE
ACTION Update on city-wide upgrade of street light fixtures to LED.
REQUESTED:
ISSUE
STATEMENT: The Council previously authorized a project to upgrade the City's street lighting
infrastructure to LED on June 6, 2022, using ARPA funding. Since that time, a
contract was executed with McKinstry Essention, LLC (McKinstry) to conduct a
Technical Energy Audit (TEA) and Project Development Plan (PDP). In the work
session Staff will provide an overview of past work and future actions needed to
complete the upgrade.
ATTACHMENTS: 1: Street Lighting Energy Savings Performance Contract Update Council Briefing
Memo
2: Street Lighting Energy Savings Performance Contract Update Presentation
DISCUSSION/ The City of Springfield's City Council previously authorized a project to upgrade
FINANCIAL street lighting infrastructure to LED on June 6, 2022, using ARPA funding and an
IMPACT: amount of up to $2.75M. The original budget was based on an initial rough estimate
of the project's costs. Since that time, a contract has been executed with McKinstry
Essention, LLC to conduct a Technical Energy Audit (TEA) and Project
Development Plan (PDP).
Following execution of the contract with McKinstry they completed the TEA and
PDP in accord with the Oregon Department of Energy ESCO model. Both the TEA
and PDP serve to validate any initial assumptions, audit the entire city inventory,
and create a proposal for the construction that includes a scope of work, a
maximum guaranteed price, and minimum guaranteed energy savings. These
guarantees serve as an assurance to the City by McKinstry that the project will
deliver the expected savings. The expected maximum guaranteed price for this
project is $3,230,830 and the minimum guaranteed energy savings is $135,261 per
year. Additionally, maintenance savings are expected to be approximately $42,720
per year, for a minimum total expected savings of $177,981 per year. Additionally,
a grant from SUB and Bonneville Power Administration will provide
approximately $63,800 to the project. $417,030 of ARPA funding will be added to
the initial allocation of $2.75M to fully fund this project. If the contract is
completed for less than the guaranteed maximum amount excess funds will revert
to the ARPA account.
MEMORANDUM City of Springfield
Date: 2/13/2023
To: Nancy Newton, City Manager COUNCIL
From: Brian Barnett, P.E., PTOE, City Traffic Engineer BRIEFING
Scott Miller, P.E., Traffic Operations Engineer MEMORANDUM
Subject: Street Lighting Energy Savings Performance
Contract Update
ISSUE: The Council previously authorized a project to upgrade the City's street lighting
infrastructure to LED on June 6, 2022, using ARPA funding. Since that time, a contract was
executed with McKinstry Essention, LLC (McKinstry) to conduct a Technical Energy Audit
(TEA) and Project Development Plan (PDP). In the work session Staff will provide an overview
of past work and future actions needed to complete the upgrade.
COUNCIL GOALS/
MANDATE:
Maintain and Improve Infrastructure and Facilities
BACKGROUND:
The City of Springfield's City Council previously authorized a project to upgrade street lighting
infrastructure to LED on June 6, 2022, using ARPA funding and an amount of up to $2.75M. The
original budget was based on an initial rough estimate of the project's costs. Since that time, a
contract has been executed with McKinstry Essention, LLC to conduct a Technical Energy Audit
(TEA) and Project Development Plan (PDP).
Audit Summary: The TEA performed by McKinstry revealed the following information about
the City's lighting system:
The City owns 5,048 street light facilities, including the following:
0 2,295 LED cobra head lights
0 1,978 HID cobra head lights
0 242 LED decorative lights
0 442 HID decorative lights
0 50 induction lights under City Hall that light A Street and 6'1i Street
0 41 poles on the McKenzie Levee Path with no electrical service cabinet, fixtures,
or wire
• 229 require other work: tree trimming, missing parts, damage, etc.
• 131 of the above cobra head lights are oriented inappropriately to the intersection and
must be rotated perpendicular to the roadway for proper lighting and to reduce light
trespass on private property (e.g. residences).
Project Development Plan Summary: The PDP developed by McKinstry includes the following
Energy Efficiency Measures which make up the scope of work of the project:
• Non -Decorative (primarily cobra -head) LED and control upgrades
o Upgrade all fixtures to LED if not already upgraded
o Provide and install a smart lighting control node on all fixtures
o Evaluate lighting levels (photometrics/lumen output) and adjust as necessary
• Decorative LED and control upgrades
o Upgrade all compatible fixtures to LED if not already upgraded
Attachment 1 Page 1 of 2
o Replace existing obsolete fixtures with city -provided upgraded fixtures where
necessary
o Provide and install a smart lighting control node on all fixtures
o Evaluate lighting levels (photometrics/lumen output) and adjust as necessary
Mast Arm Adjustment
o Rotate mast arms that are inappropriately aligned for LED lighting distribution
City Hall Induction Light Retrofit
o Upgrade all induction lights under city hall used to light A Street and 6t" Street to
LED
McKenzie Levee Path Lighting
o Provide and install new LED fixtures on all existing poles
o Provide and install a smart lighting control node on all fixtures
o Provide and install wiring
o Install city -provided service cabinet
o Install some form of wire theft deterrent
In addition to the specific measures mentioned above, the project scope includes the following
overhead items:
• $100,000 repair budget allocated primarily to known failed direct bury underground wire
Contingency of 5% of construction cost
• Traffic control
Commissioning of control system and nodes
• Development of a cloud -based portal to facilitate remote smart lighting controls
• Disposal of removed components
• Construction management/project management
• Final As -Constructed GIS data
• Measurement & Verification of energy savings at project completion and 1 year after
substantial completion
Project Budget: The maximum guaranteed price for this project is $3,230,830 and the minimum
guaranteed energy savings is $135,261 per year. Additionally, maintenance savings are expected
to be approximately $42,720 per year, for a minimum total expected savings of $177,981 per year.
Energy Savings Guarantee: The guaranteed prices are based on conservative assumptions. Most
likely, the actual project cost will be somewhat less than the guaranteed maximum. Also, while
the energy savings at 100% output can be reliably determined, significant additional savings can
be obtained through dimming and trimming. In the unlikely case that the performance
requirements are not met, McKinstry will be contractually required to repair/replace equipment
until the performance requirements are met or compensate the City for the difference.
Project Funding: $3,200,000 of ARPA funding has been reserved for this project. Additionally,
an approximately $63,800 grant will be provided as an energy savings incentive by SUB and
Bonneville Power Administration.
RECOMMENDED ACTION: Update only, no action requested.
Attachment 1 Page 2 of 2
IiiPIOREGOH
City of Springfield
Street Lighting Program Update
Brian Barnett, P.E., City Traffic Engineer
Attachment Page 1 of 13
Scott Miller, P.E., Traffic Operations Engineer
IiiPIOREGOH
Recap
•City owns 5,048 street lights
50% are LED
50% are HID
•Maintained by SUB due to utility
connection
•Current system is antiquated/aging and in
need of expensive and frequent repairs
Attachment 2 Page 2 of 13
IiiPIOREGOH
Recap
•Annual Energy Cost: $210,000
•Annual O&M Cost: $196,000
•Current SUB Deficit: $211,270
• LED lights use approximately 50% less
energy and need 75% less maintenance
• Improved lighting levels promotes safer
traffic and security
Attachment 2 Page 3 of 13
IiiPIOREGOH
SUB involvement
30% of street lights are on SUB poles.
• LED replacement would be contracted to a lineworker-
qualified contractor (Not performed by SUB).
SUB involvement is integral due to utility connection and
electrical code requirements. Routine maintenance will
remain with SUB.
• SUB deficit of $211,270 will be resolved through this
project.
Attachment 2 Page 4 of 13
IiiPIOREGOH
What is ars ESCO?
• Energy Services Company (ESCO), qualified through Oregon
Department of Energy
Delivery of Energy Savings Performance Contracts. A single
procurement is used to purchase a complete package of
services in which one contractor is accountable for:
Investigating existing conditions
Identifying energy saving opportunities
Designing energy conservation measures
Purchasing and installing equipment
Managing selection, on-site activities, and commissioning
Training
Guaranteeing the energy savings
Attachment 2 Page 5 of 13
SPRINGFIELD
L�
nQornN
Benefits of using an ESCO
Quick execution of this project has considerable financial
benefits ($178-200k savings per year)
• City lacks sufficient resources (staff/time) to self -deliver
this project
This is ESCO's specialty and their considerable experience
in this area will ensure project is delivered on time, on
budget, with better engineering, and with reduced risk
9 Preferred pricing on materials (30-40% less than SUB)
ESCO assistance with lighting controls selection
Attachment 2 Page 6 of 13
SPRINGFIELD
L�
nnr�nu
ESCO Selection
City contracted McKinstry as the Energy Services
Company (ESCO) to deliver this project through a
competitive RFP (Last year McKinstry delivered the
lighting retrofit on Main St./S. A St. for City/ODOT)
• Estimated project cost is $3.2M
• This project will save the City at approx. $178,000 per
year (escalating to $323,000 per year in 2043)
Attachment 2 Page 7 of 13
moi:
'�ftfUfl'!II -•
Springfield
Street Lighting
I
L:
...............................
........... -
...............................
� . !
• 40+ attributes collected at each location
• 5,048 Total Fixtures Identified
• 1,978 HID Cobrahead fixtures
• 2,295 LED Cobrahead fixtures
• 442 HID Decorative Fixtures
• 242 LED Decorative Fixtures
• 50 Lights at City Hall
• 41 Lights at McKenzie Levee Path
• 229 Identified Requiring Additional Work
• Tree trimming
• Missing parts
• Damage
$PRiNGFIELD
Attachment 2 Page 9 of 13 O.-TLV
OBE6DN
• Reduced Energy Costs
• Reduced 0&M Costs
• Long life LED technology on all City owned street lights
• Upgraded Lighting Controls
• Replaces obsolete, non-functional control system
• Improved remote visibility and control
• Dimming schedules (increased energy savings & extend fixture life)
• Automatic notifications
• Reduced reliance on resident notifications for outages
• Improved service with timely repairs.
SPRINGFIELD
Attachment 2 Page 10 of 13
(:),
1�Sltry
ur m r w trcr..o
OBf60N
2/1/2023 3/28/2023
4/1/2023 8/1/2023
8/1/2023 11/15/2023
11/15/2023 12/31/2023
SPRINGFIELD
Attachment 2 Page 11 of 13
orr or r:�r auro-r..v
OBf60N
• / I I �
•
4 •
UL
BEFORE
+ r
•
IL
i
+dl
IiiPIOREGOH
Questions?
Brian Barnett, P.E., City Traffic Engineer
• uual III1rfielu-uI.ru , 541-726-3681
Scott Miller, P.E., Traffic Operations Engineer
• smmer(«uspringfiem-or.gm, 541-726-3673