HomeMy WebLinkAboutStudies APPLICANT 1/27/2023Preliminary Stormwater Report
Marcola Apartments
Prepared for: Paradigm Properties
Prepared by: Mark Reyes, PE
Project Engineer: Matt Keenan, PE
January 2023 1 KPFF Project#2200316
KPFF'S COMMITMENT TO SUSTAINABILITY
As a member of the US Green Building Council,
a sustaining member of Oregon Natural Step,
and a member of the Sustainable Products
Purchasers Coalition, KPFF is committed to the
practice of sustainable design and the use of
sustainable materials in our work.
When hardcopy reports are provided by KPFF,
they are prepared using recycled and recyclable
materials, reflecting KPFF's commitment to
using sustainable practices and methods in all
of our products.
NO
MO WiNmMte Street, SURe 400, Eugene, OR 9)401 rl-r f
541-664-09021 w kPp.c -p y
Table of Contents
ProjectOverview and Description.....................................................................................................................2
ProjectSize and Location...............................................................................................................................2
Existing vs. Proposed Conditions....................................................................................................................2
ProjectNarrative................................................................................................................................................2
Proposed Stormwater System........................................................................................................................3
Water Quality Facilitie
Engineering Conclusions
Tables and Figures
Table 1: Pre -Development vs. Post -development Flows...................................................................................3
Table 2: 24 -Hour Precipitation for Eugene, OR (NOAA Atlas 2, Volume X) ......................................................5
Table 3: Catchment and Facility Table (See Exhibit 2, Appendix 1)...................................................................5
Appendices
Appendix
Basin Maps
Appendix 2
Stormwater Plans
Appendix 3
Existing Runoff Calculations
Appendix 4
Proposed Runoff, Water Quality, and Calculations
Proje Name I OFF Comuhing Engineers
REPORTME
Project Overview and Description
Project Size and Location
The Marcola Apartments development is to be constructed on the 4.72 -acre project site located long Marcola
Road. The project is bounded by Marcola Road to the north, 22n° street and a residential development to the
east, HWy 126 to the south and a commercial and residential development to the west. The project
development consists of 6 multi -family buildings.
Watershed and Soil Description
Springfield's stormwater basins are part of the larger Upper Willamette Basin. The site itself is located
within the City of Springfield's West Springfield Q Street Basin, per the City's 2010 Stormwater
Management Plan. The proposed stormwater system will connect to the City's stormwater system.
The site has been identified as having type C and D soils. Soil types C and D have poor infiltration rates and
no stormwater runoff will be infiltrated on site.
Existing vs. Proposed Conditions
Existing Conditions
The site currently an undeveloped grassyfield with a few groupings of trees on the north half of the site. The
site is relatively flat with site slopes generally being in the 1%-2%range. Grades across the site vary 1'-2' with
the exception of the berm located on the south boundary of the site. There are no existing stormwater
facilities or current connections to any City public storm main.
Proposed Conditions
The proposed conditions will include 6 multi -family structures, and a community center/gym. In addition, the
development will include connecting drive aisles, sidewalks, covered an uncovered parking spots, tennis
court and a garage building. The project will treat site runoff according to City design standards Chapter 3
Stormwater Quality. Vehicle impervious surfaces will be treated with a combination of vegetated facilities
and mechanical treatment (filters) with no more than 50% of the vehicle impervious area being treated
through mechanical means. Additionally, catch basins within the vehicle areas will feature pre-treatment
prior to conveying runoff to mechanical treatment. The site as been identified by the City as not needing
detention.
The proposed site includes 126,187 square feet of impervious area and 78,082 square feet of pervious area.
Of the 125,822 square feet of impervious area 56,615 square feet is from structures, 19,936 square feet from
pedestrian hardscape and 49,271 square feet from vehicle pavement.
Project Narrative
The City of Springfield stormwater quality design criteria set forth in Chapter 4 calls for a water quality
design storm of 0.83 inch in 24 hours rain event.
Proje Name I OFF Comuhing Engineers
REMRTWLE
Proposed Stormwater System
The impervious area on site is divided between the building roof areas, asphalt parking, asphalt drive aisles
and site hardscape. See Appendix 1 for the drainage basin areas.
Vegetative filtration facilities and mechanical treatment has been selected for water quality treatment. On-
site new impervious surfaces from vehicle pavement such as drive aisles and parking spaces will be treated
through either a filtration planter or through a mechanical treatment structure. Per City design standards,
no more than 50% of the vehicle pavement will be treated through mechanical treatment. All facilities will
be designed per City of Springfield standards.
The filtration planters will have an open storage at the surface ranging from 8 inches to 12 inches deep with
a minimum of 2 inches of freeboard. The planters will have 18 inches of growing media with landscaping
planting for the water quality management, and 12 -inch minimum of rock storage depth below the facility.
The filtration planters will treat the water quality storm and an overflow will collect larger storm events to
convey to the stormwater system.
The mechanical treatment will be a filter product such as BayFilter or Stormfilter. The product used will be
sized in accordance with the manufacturers recommended.
Table 1: Pre- a elopment vs. Postdewlopment Flows
Development
CFS CF
CFS CF
L -Tear DTorm
5 -Tear
DTorm
lu-Iea
KeDTorm
rflow
_Overflow
Overflow
Over
Development
CFS
CF
CFS CF
CFS
CF
CFS CF
Existing Conditions
0.01
261.356
0.35 4,745
0.44
5,869
0.53 7,022
Proposed
0,34
5,446
2.20 28,057
2.55
32,696
2.90 37,322
Conditions
Development
CFS CF
CFS CF
Existing Conditions
0.63 8,196
0.71 9,148
Proposed
Conditions
3.24 41,975
3.52 45,722
Water quality Facilities
Basin 1 encompasses the buildings and the pedestrian hardscape not adjacent to the parking bays and drive
aisle. Run-off from the buildings will be collected via roof drains and downspouts and the run-off from the
pedestrian hardscape will be collected by area drains. Run-off will then be conveyed through the on-site
storm drainage system and discharged into the City system at the main located in 22n° Street.
Basin 2 encompasses the north section of the parking lot, drive aisle and associated sidewalk that is
adjected to the parking bays. Run-off will sheet flow North where it will be captured by two catch basins.
Project Name I OFF Conuhing Engineers
REMRTWLE
These catch basins will filtered to satisfy the pre-treatment requirement before sending run-off to a vault
where mechanical treatment via filtration (BayFilter, StormFilter or approved equal) where water quality
treatment will take place. After treatment run-off will be conveyed through the on-site storm system and
discharge at the connection point in 22n° Street. The treated vehicle pavement area is approximately 43
percent of the total vehicle pavement area.
Basin 3 encompasses a portion of the parking bays, drive aisle and adjacent sidewalk located in the middle
of the site. Run-off will sheet flow to the filtration planter located in the middle of the site via curb cut. The
planter will provide treatment via filtration and overflow run-off will be routed to the on-site storm system
via an overflow inlet. Treated run-off will be conveyed to the on-site stormwater system and then to the
connection point in 22n° street.
Basin 3 encompasses a portion of the parking bays, drive aisle and adjacent sidewalk located on the south
side of the site. Run-off will sheet flow to the filtration planter via curb cut. The planter will provide
treatment via filtration and overflow run-off will be routed to the on-site storm system via an overflow
inlet. Treated run-off will be conveyed to the on-site stormwater system and then to the connection point
in 22n° street.
Flow Control
Per City of Springfield Stormwater Scoping sheet, no detention required for the project site.
Source Control
Source control is required for facilities that are highly likely to generate pollutants that are not addressed
through the implementation of vegetated stormwater facilities. There are a variety of trash areas located
throughout the development that will require source control measures. To meet these requirements, heavy-
duty sanitary drains located in the trash areas will be trapped, auto -primed, vented and connected to the
sanitary sewer system and will not convey to the storm drainage system. Additionally, trash areas will be
covered and hydraulically isolated from the stormwater system.
Analysis
Water Quality Facilities
The runoff for the impervious areas has been calculated and the planters and rain garden have been sized to
meet or exceed the City of Springfield requirements. The calculations determine runoff using the Santa
Barbara Urban Hydrograph (SBUH) Method and NRCS 24 -Hour Type 3A Hyetograph as outlined Chapter 4 of
the Engineering Design Standards & Procedures Manual. The facility capacity is based on the requirements
and facility details found in City of Eugene Stormwater Design Manual.
For analysis purposes, each basin required the following information as input data for the computer model:
• Impervious Area (Ai), in acres
• Curve Number (CNi), impervious
• Travel Time (Tc)
• Total Precipitation
Proje Name I OFF Comuhing Engineers
REPORTTITLE
Precipitation data for the respective City of Albany design storms are shown in Table 2 below.
Table 2: 24 -Hour Precipitation for Springfield, OR INOAA Alas 1, Volume xl
Ped 63,145 1.45 ]3,489 1.69
136,634 -
WQ
Hardsrape
ear
3.3
5 Year
10 -Year
4.3
25 -Year
0.62 2,243
100 -Year
5.2
Basin 1
Ped 63,145 1.45 ]3,489 1.69
136,634 -
j
Hardsrape
Basin 2
(Example)
26,931
0.62 2,243
0.05
29,1]4 MT -1
B
ample)
0
-1
Basin
(Example)
22,425
0.51 -22,425
-0.51
0 FTP -2
To size each planter, the following information was needed:
• Bottom area, in square feet
• Bottom perimeter length or bottom width, in feet
• Storage depth, in inches
All the water quality facilities meet the City of Springfield water quality requirements. For full calculations
and results, see Appendix 4.
Engineering Conclusions
Based on the requirements of the Engineering Design Standards & Procedures Manual the facilities and
conveyance components have enough capacity to handle the required storm events and should be approved
as designed.
Project Name I OFF Consuhing Engineers
REPORTTRLE
Appendix
Basin Maps
Proje Name I OFF muhing Engineers
REPORTME
5
I
I
I
T
r._. J
t
s EXISTING
AREA=205,565 SF
10"SS ° 10"55 10"55_ I
J
SHEET LEGEND
- - PROPERTY
�_____
UNE
STORMWATE
�.....L .............
® EXISTING STORMWATER
BASIN MAP
2
BASIN 4
AREA=23,962 SF
IMPERVIOUS AREA=22,425 SF
STORMWATER BASIN MAP
Appendix 2
Stormwater Plans
Proje Name I OFF muhing Engineers
REPORTME
CONNECT TO EXISTING 10" SANITARY LINE�r
S Co -4
IE 10" IN=457.37 (E) S -10' PVC
IE 6- IN457.37 (W) S - 6- PVC
FIELD VERIFY POINT
OF CONNECTION
C
I L/
10.00' EWEB WATER TRANSMISSION
EASEMENT. EWES SHALL BE PRESENT
WITH EXCAVATION OR INSTALLING
UTILITIES WITHIN EWEB'S EASEMENT.
COORDINATE WITH EWEB.
RG
FH
11 CONNECT TO EXISTING STORM STRUCTURE
O
RG
RG
I
+6
II
I
p IE IN=456.95(N) EX. 60"
ar.
IE IN=458.84(E)EX 24"
MARCOI-A ROAD
a
v
FIELD VERIFY POINT
P
OF CONNECTION
I =RM!�I�IIlI
55
10"55 10"55
10"55
0 89LF-15"SD—
_97LF-1S'SO
O
CONNECT TO EXISTING 10" SANITARY LINE�r
S Co -4
IE 10" IN=457.37 (E) S -10' PVC
IE 6- IN457.37 (W) S - 6- PVC
FIELD VERIFY POINT
OF CONNECTION
C
I L/
10.00' EWEB WATER TRANSMISSION
EASEMENT. EWES SHALL BE PRESENT
WITH EXCAVATION OR INSTALLING
UTILITIES WITHIN EWEB'S EASEMENT.
COORDINATE WITH EWEB.
i
_ s
11 CONNECT TO EXISTING STORM STRUCTURE
I
I
I
��
RG
I
+6
II
I
p IE IN=456.95(N) EX. 60"
ar.
IE IN=458.84(E)EX 24"
o IE OUT=456.66 (S) EX. 72" i
FIELD VERIFY POINT
P
OF CONNECTION
I =RM!�I�IIlI
55
10"55 10"55
10"55
0 89LF-15"SD—
_97LF-1S'SO
O
RSTRET
5=0.50°h
S�.50%
1
–
W METER
�-�
CONNECT TO EXISTING 10" SANITARY LINE�r
S Co -4
IE 10" IN=457.37 (E) S -10' PVC
IE 6- IN457.37 (W) S - 6- PVC
FIELD VERIFY POINT
OF CONNECTION
C
I L/
10.00' EWEB WATER TRANSMISSION
EASEMENT. EWES SHALL BE PRESENT
WITH EXCAVATION OR INSTALLING
UTILITIES WITHIN EWEB'S EASEMENT.
COORDINATE WITH EWEB.
19:1
I
RG
k
9
�+
o
_ s
11 CONNECT TO EXISTING STORM STRUCTURE
I
I
I
��
RG
I
N
II
I
p IE IN=456.95(N) EX. 60"
ar.
19:1
I
RG
k
9
�+
o
11 CONNECT TO EXISTING STORM STRUCTURE
��
IE 15" IN=456.84 (W)
N
II
-"
p IE IN=456.95(N) EX. 60"
Q�N
IE IN=458.84(E)EX 24"
o IE OUT=456.66 (S) EX. 72" i
FIELD VERIFY POINT
P
OF CONNECTION
55
10"55 10"55
10"55
0 89LF-15"SD—
_97LF-1S'SO
O
RSTRET
5=0.50°h
S�.50%
1
–
W METER
�-�
J
N
ISD MH -1
i RIM=465.89
f
IE 10" IN=460.14 (N)
IE 10' IN=460.14 (S)
I
15' OUT=459.77 (E)15" OUT=459.77 (E)
_IE
RG
o
o
FTWl
P- i j
I J
N
lWl�
m
O/W1�/1_y�11
6\FH
NOTSURVEYED
0 UTILITY KEY NOTES
NOTE DESCRIPTION DETAIL
REF.
1 CONNECT TO EXISTING 10" SANITARY LINE. FIELD VERIFY
PIPE SIZE, INVERT ELEVATION AND LOCATION.
2 CONNECT TO EXISTING 24" STORM LINE. FIELD VERIFY
PIPE SIZE, INVERT ELEVATION AND LOCATION.
TAP TO EXISTING 8" WATER MAIN. COORDINATE
CONNECTION TO EXISTING MAIN WITH SUB. SUB TO
PERFORM TAP, INSTALL FIRE PROTECTION TO
3 PROPERTY, AND INSTALL BOX AND METER.
CONTRACTOR TO COORDINATE SCHEDULE AND EXACT
LOCATION IN FIELD. CONTRACTOR TO POTHOLE PRIOR
TO CONSTRUCTION.
BWV BACKFLOW PREVENTION VAULT
FH FIRE HYDRANT
FTP FLOW-THROUGH PLANTER
RG RAIN GARDEN
II UTILITY CROSSING. PROVIDE 12" MIN. CLEARANCE, U.N.O.
UTILITY LABEL LEGEND
STRUCTURE LABEL
FFFUTILITY TYPE (SD=STORM DRAINAGE)
STRUCTURE TYPE CALLOUT
ID NUMBER (WHERE APPLICABLE)
XX XX -XX
X+XX.X RT X.X'—LOCATION (WHERE APPLICABLE)
RIM=
IE IN III: XX.X^STRUCTURE INFO (WHERE APPLICABLE)
IE OUT = XX.X
PIPE LABEL
UTILITY LENGTH
UTILITY SIZE
UTILITY TYPE
XXLF-XX" XX
S=X.XX%
SLOPE (WHERE APPLICABLE)
SHEET LEGEND
FP FIRE PROTECTION LINE
S SANITARY SEWER LINE
SD STORM WATER LINE
W
CF
UNL9X"91[H4791I�:7�ICI �
SCALE 1 INCH = 40 FEET
40 0 40 80
1Tff
800 Willamette Street, Suite 400
Eugene, OR 97401
0: 541.684.4902
F: 541.684.4909
www.koffcom
0
Paradigm
< �S�
Revision Schedule
No. I Description I Date
PRINT DATE THIS SET
1/27/20231'44:23 PM
ISSUE DATES
Pricing
Pennit -
Construction -
Revision -
Misc. -
11M
DUSTRUD
architecture
1622 Pearl Street
Eugene, Oregon 97401
541.338.8544
d ustru darc hitecture. com
m o m ry
� N CONY, Fj
02 N r' 0
�Y8�o`o Ado3«
m c 2> T E
c m a E$ n Q
rnan no
p % 41 c °Ci af°i = o w .
U w g
E0_ m E
d Te o o E w d o f
w m
E$F �aSn
DRAWN BY:
FU
CHECKED
BY: MR
O
U �
�a
SHEET TITLE
UTILITY
PLAN
SHEET NO.
C-200
Appendix 3
Existing Runoff Calculations
Proje Name I OFF muhing Engineers
REPORTME
SBUH Calculation Worksheet for City of Springfield Storm Events k l j j
Project Name: Marcola Apartments Date: 1/26/2023
Designer: MAR Basin: Ex. 1
User -Supplied Data
Pervious Area Impervbus Area
Pervious Area, SF
Pervious Area, Acres
Pervious Area Cu rve Num her, CNpery
Time of Con centratinn, TQ minutes
30,893
Impervious Area, SF
Impervious Area, Acres 0.00
I mpervious Area Cu rve Nu mher, CN imp 98
Note: minimum Tc isfive minutes
0.71
85
5
CIN of Eugene 24Hour Rainfall Depths (NRCS Type
1Adlstrlbutlon)
Recurrence Interval
WQ 1 2
1 5 30
1 25 50
1 100
Inches
1 0.83 1 3.3
1 3.8 1 4.3
1 4.8 1
1 5.2
Calculated Data
l Project Area, Acres
0]3
Total Project Area, Square Feet
30,893
urrence Interval
WQ
2
5
10 25 50
100
k Flo. Rate, Qpeak, as
I
OA0.35OA0.53
—WQ
0.63 0.00
0.71
l RunoffVolume, V, cubic feet
26
4,745
5,86
7,022 8,196 0
9148e
to Peak Runoff, hours
2A.
7.931
7331
7.83 783 0.00
7$3
Runoff Hydrogroph
0.80
—WQ
—2 -Year
0.74
—S -Year
—10 -Year
0.60
—25 -Year
—50 -Year
0.50
—100 -Year
0.40
e
7
rc
0.30
0.20
0.10
0.08
0 500 1000 1500 2000 2500
Time, mintMea
8[0Willamem,Su,t,5uu,4O Eugen,()R ] 1 511.f$4.4902 kpff. m
Appendix 4
Proposed Runoff, Water Quality, and Calculations
Proje Name I OFF muhing Engineers
REPORTME
SBUH Calculation Worksheet for City of Springfield Storm Events kpff
Project Name: Marcola Apartments Date: 1/26/2023
Designer: MAR Basin:1
User -Supplied Data
PerviousArea Im ervbus Area
Pervious Area, SF
Pervious Area, Acres
Pervious Area Cu rve Num ber, CNpery
Time of Con centratir Ta, minutes
Impervious Area, SF 48,695
Impervious Area, Acres 1.12
I mpervious Area Cu rve No miner, CN imp 98
Note: minimum Tc isfive minutes
0.00
90
5
oru 4ur Rainfall Depths NRC6Trip
bne
—WQ
Total Project Area, Square Feet
4$695
erfeEnceIt
WQ 2 -Yr I
51r
I 10 -Yr
1 25 -Yr
1 50 -Yr
1 100 -Yr
Inches
1 0.83 1 3.3 1
3.8
1 4.3
1 4.8
1
1 5.2
Calculated Data
Total Proj ect Area, Acres
1.121
—WQ
Total Project Area, Square Feet
4$695
Recurrence Interval
WQ
2 Y
5 -Yr
10 -Yr
25 -Yr
50 -Yr
10D -Yr
Peak Flo. Rate, Qpeak, cis
Ru noff Vol ume, V, cu bic feet
Time to Peak Runoff, hours
0.20
0.96
1.11
1.26
SAS
0.00
1.53Total
2,544 12,446 14,46 16,493 18,518 0
20,139
783 7.83 783 7.83 783 0.00
7$3
Runoff Hydmgmph
1.80
—WQ
—2 -Year
1.60
—5 -Year
1.40
—10 -Year
—25 -Year
1.20
—50 -Year
100
—100 -Year
V
Zy
g 0.80
K
0.60
0.40
0.20
0.00
0 500 1000 ism 2000 2500
Time, minxMe s
8WWilbmUeSr,tSuu,400 Eurn,O89]01 XL W09@ kpff. m
SBUH Calculation Worksheet for City of Springfield Storm Events kpff
Project Name: Marcola Date: 1/26/2023
Designer: MAR Basin:2
User -Supplied Data
PerviousArea InnipentiousArea
Pervious Area, SF
Pervious Area, Acres
Pervious Area Curve Num ber,CNpery
Time of Con centratir Ta, minutes
Impervious Area, SF 26,931
Impervious Area, Acres 0.62
Impervious Area Curve Number CNimp 98
Note: minimum Tc isfive minutes
0.00
90
5
CI of Eu ne 24Hour Rainfall Depths NRC6T
eSAdlstrlbutbn
—WQ
Total Project Area, Square Feet
RequrrenceI It
WQ 2 -Yr I
51r
I 10 -Yr
1 25 -Yr
1 50 -Yr
1 100 -Yr
Inches
1 0.83 1 3.3 1
3.8
1 4.3
1 4.8
1
1 5.2
Calculated Data
Total Project Area, Acres
0.621
—WQ
Total Project Area, Square Feet
26,931
Recurrence Interval
WQ I
2 -Yr I
5 -Yr I
10 -Yr I
25 -Yr I
50 -Yr I
100 -Yr
Peak Flow Rate, Qpeak, cis
0.111
O.S31
0.611
0.70
0.7
O.ODI
085
Total Ru noff vol ume, V, cu bic feet
1,40
6,883
8,00
9,InJ
10,2421
01
11,138
Time to Peak Runoff, hours
783
7.83
783
7.83
783
0.1
783
Runoff Hydrogroph
0.90
—WQ
—2 -Year
0.80
—S -Year
0.70
—10 -Year
—25 -Year
0.69
—50 -Year
0.50
—100 -Year
V
Zy
g 0.40
K
0.30
0.20
0.10
0.00
0 500 1000 ism 2DDO 2500
rrEe, n:nulea
80]Willa eru,Sr,tSuite4 Eurn,OP9]01 XL W09@ kpff. m
SBUH Calculation Worksheet for City of Springfield Storm Events l J j j
Project Name: Marcola Date: 1/26/2023
Designer: MAR Basin:3
User -Supplied Data
PerviousArea InnipentiousArea
Pervious Area, SF
Pervious Area, Acres
Pervious Area Curve Number, CNpery
Time of Con centratir Tr, minutes
Impervious Area, SF 13,686
Impervious Area, Acres 0.31
Impervious Area Curve Number CNimp 98
Note: minimum Tc isfive minutes
0.00
8o
5
CI of Eu ne 24Hour Rainfall Depths NRC6T
eSAdlstrlbutbn
—WQ
Total Project Area, Square Feet
13,686
RequrrenceI It
WQ 2 -Yr I
51r
I 10 -Yr
1 25 -Yr
1 50 -Yr
1 100 -Yr
Inches
1 0.83 1 3.3 1
3.8
1 4.3
1 4.8
1
1 5.2
Calculated Data
Total Project Area, Acres
0.311
—WQ
Total Project Area, Square Feet
13,686
Recurrence Interval
WQ 1
2 Y I
5 -Yr I
17"_50
-Yr
10D -Yr
Peak Flo. Rate, Qpeak, ch
Total Runoff Volume,V, cubic feet
Time to Peak Runoff, hours
0.06
0.27
031
0.35
OAO.ODI
0.40
OA3
735 3,4991 4,06 4,MSI 5,2051 01
5,660
7$3 7.83 7331 7.83 7$3 O.W1
7$3
Runoff Hydrogroph
0.50
—WQ
—2 -Year
0.45
—5 -Year
0.40
—10 -Year
0.35
—25 -Year
—50 -Year
0.30
—100 -Year
C"
V
0.25
L
J
K
0.20
0.15
0.10
0.05
0.00
0 500 1000 ism 2000 2500
rrEe, n:nulea
8WWHlam to Sr,tSuu,400 Eurn,O89]01 XL W09@ kpff. m
Stormwater Facility Calculator
Instructions:
1. Choose Facility Type
2. Choose shape
3. Complete information in highlighted cells
Facility
Planter
Shape
Amoeba
Bottom Area:
262 sf
Bottom Perimeter:
68 ft
Vertical Sides
3,380
Storage Depth:
MYrinrltration
volume (co:
Growing Media:
�in
18 in
Surface Storage Capacity
131 cf
Infiltration Area
262 sf
GM Infiltration Rate
2.5 in/hr
Infiltration Capacity (avg)
0.015 cfs
Results
Below -Grade
WATER QUALITY EVENT PASS ROCK CAPACITY N/A
SURFACE CAPACITY 62%
Recurrance Peak Flow
Interval (cfs)
Volume
(cf)
Rock Capacity
Meets
Infiltration?
WQ 0.0152
634
N/A
Filtration Only
2 -Yr 0.2701
3,380
N/A
MYrinrltration
volume (co:
5 -Yr 0.3125
3,947
N/A
10 -Yr 0.3548
4,506
N/A
N/A
25 -Yr 0.3971
5,091
N/A
50 -Yr 0.0000
0
N/A
100-Yrl 0.43081
5,541
N/A
1201 Oak Street, Suite 100 Eu,ene,01197401 541.664.4902 kpa.cum
lqj f
Proje Name: Marw6
Basin:3
Date: 1/26/2023
Impermeable Liner
Water quality Event Surface Facility Modeling
0.0600
0.0500
0.0400
N
u 0.0300
0
0
c
Ic o.ozoo
0.0100
O.Wro ; I I�
0 500 1000 1500
Time, minutes
kpff
Project Name: Marcola
l3asin:3
Date: 1/26/2023
I%
Surface Inflow
0%
--— Infiltration Capacity
0%
Percolation to Subsurface
0%
iOX
--- Overflow
Surface Capacity 0%
80%
90%
100%
2000 2500
800 Willamette Street, Suite 400 EWene,OR97401 541.684.4902 kpa.wm
SBUH Calculation Worksheet for City of Springfield Storm Events kpff
Project Name: Marcola Date: 1/26/2023
Designer: MAR Basin:4
User -Supplied Data
PerviousArea InnipentiousArea
Pervious Area, SF
Pervious Area, Acres
Pervious Area Curve Num ber,CNpery
Time of Con centratir Ta, minutes
Impervious Area, SF 22,425
Impervious Area, Acres 0.51
Impervious Area Curve Number CNimp 98
Note: minimum Tc isfive minutes
0.00
RO
5
CI of Eu ne 24Hour Rainfall Depths NRCST
eSAdlstrlbutbn
—WQ
Total Project Area, Square Feet
22,429
RequrrenceI It
WQ 2 -Yr I
51r
I 10 -Yr
1 25 -Yr
1 50 -Yr
1 100 -Yr
Inches
1 0.83 1 3.3 1
3.8
1 4.3
1 4.8
1
1 5.2
Calculated Data
Total Project Area, Acres
0.51
—WQ
Total Project Area, Square Feet
22,429
Recurrence Interval
WQ
2 -Yr
5 -Yr
10 -Yr 25 -Yr 50 -Yr
10D -Yr
Peak Flow Rate, Qpeak, cis
0.0
OA4
OSI
O.SS 0.65 0.00
0.71
Total Ru noff Vol ume, V, cu bic feet
1,1]
S,732
6,
7,595 8,528 0
9,274
Time to Peak Ru noff, hou rs
]$
7.83
7331
7.931 7231 O.ODI
7$3
Runoff Hydrogroph
0.80
—WQ
—2 -Year
0.70
—S -Year
—10 -Year
0.60
—25 -Year
0.50
—50 -Year
—100 -Year
C"
V
0.40
L
J
K
0.30
0.20
0.10
0.00
0 500 1000 ism 2000 2500
rrEe, n:nulea
80]Willa eru,Sr,tSuite4 Eurn,OP9]01 XL W09@ kpff. m
Stormwater Facility Calculator
Instructions:
1. Choose Facility Type
2. Choose shape
3. Complete information in highlighted cells
Facility Planter
Shape
Amoeba
Bottom Area:
293 sf
Bottom Perimeter:
68 ft
Vertical Sides
956
Storage Depth:
12 in
Growing Media:
18 in
Surface Storage Capacity
293 cf
Infiltration Area
293 sf
GM Infiltration Rate
2.5 in/hr
Infiltration Capacity (avg)
0.017 cfs
Results
Below -Grade
WATER QUALITY EVENT PASS ROCK CAPACITY N/A
SURFACE CAPACITY 74%
Recurrance
Interval
Peak Flow
(cfs)
Volume
(cf)
Rock Capacity
Meets
Infiltration?
WQ
0.0170
956
N/A
Filtration Only
2 -Yr
0.4425
5,461
N/A
MYrinrltration
volume (co:
5 -Yr 0.5120
6,396 N/A
10 -Yr
0.5814
7,313
N/A
N/A
25 -Yr
0.6506
8,245
N/A
50 -Yr 0.0000
0 N/A
100-Yrl 0.70591
9,020 N/A
1201 Oak Street, Suite 100 Eu,ene,01197401 541.664.4902 kpa.cum
lqj f
Proje Name: Marwla
6asin:4
Date: 1/26/2023
Impermeable Liner
kpff
Project Name: Marcola
Basin -4
Water quality Event Surface Facility Modeling Bate: 1/16/2023
0.1000
Iss
Surface Inflow
0.0900
0%
0.0800
— —— Infiltration Capacity
0.0)00
IOX
Percolation to Subsurface
0.0600
0%
N
0.0500
10%
--- Overflow
0
0.0400
iovc
z
0.0300
—Surface Capacity '095
0.0 00
80%
0.0100
90%
0.0000 100%
0 500 1000 1500 2000 2500
Time, minutes
Wa1nr nu.114 . Fmn1 A.1—fodn M.vinlinv
800 Willamette Street, Suite 400 EWene,OR97401 541.684.4902 kpa.wm