HomeMy WebLinkAboutPermit Building 1993-01-07PRIt\lcF!ELE)RCSII;NTIAL
PERMIT APPLICATION
lnspections: 726-3769
Office: 726-3759
JOB NUMBER
225 Fifth Street
Springfield, Oregon 97 477
2
h,
LOCATION OF PROPOSED WORK:24'
ASSESSORS MAP:/2 -=i4>> ?TAX LOT:2
LOT BLOCK:SUBDIVISION:
PHoNE: 7 26^ <Z?>'
STATE:ZIP:
.O
CITY:
ADDRESS:
OWNER:
OT ER
DESCRIBE
NEW REMO EL-DDITION
EXPIRES PHONE
7aPLUMBING:
MECHANICAL:
ELECTRICAL:
ADDRESS
I
CONTRACTOR'S NAME
GENERAL:
CONST.
CONTRACTOR #
I OF BDRMS:
- OFFICE USE _
ZONING CODE:
FLOOD PLAIN
RANGE:
QUAD AREA:
r OF BLDGS:
SECONDARY HEAT:
SQUAFIE FOOTAGE:
CONSTR. TYPE:
HEAT SOURCE:
LAND USE:
# OF UNITS
OCCY GROUP:
* OF STORIES:
To request an lnspectlon, you must call 726-3769. Thls ls a24hour recording. All lnspections requested before 7:00 a.m. will be
made the same worklng day, lnspectlons requested after 7:00 a.m. wlll be made the followlng work day.
REQUIRED INSPECTIONS
Temporary Electric Rough Mechanicat - Prior to
cover.
Site lnspection - To be made
after excavation, but prior to
setting forms.
Rough Electrical - Prior to Final Electrical - When all
electrical work is complete.cover.
Underslab Plumbing/ Electrical/
Mechanical - Prior to cover.Eleclrical Service - Must be
approved to obtain permanent
electrical power.
Final Mechanical - When all
mechanical work is complete.
n Footlng - After trenches are
excavated.W Final Building - When alt
required inspections have been
approved and building is
completed.
Fireplace - Prlor to faclng
materlals and framlng lnsp.Masonry - Steel location, bond
beams, grouting.l-fl Framing - Prior to cover.
Foundatlon - After forms are
erected but prior to concrete
placement.Wall/Ceiling lnsulatlon - Prlor to
cover.
Underground Plumbing - Prior
to filling trench.[--l Drywall - Prior to taping
MOBILE HOME INSPE TIONSUnderlloor Plumbing/ Mechanical
- Prior to insulation or decking.Wood Stove - After installation.
Post and Beam - Prior to floor
insulation or decking.lnserl - After fireplace approvgl
and installation of unit.
[-/l Blocking and Set.Up - When ail!A blocking ls compleie.
ffi Plumbing Connections - When
-{s' home has been connected to
water and sewer.
Floor lnsulatlon - Prior to
decking.Curbcut & Approach - After
forms are erected but prior to
placement of concrete.Sanitary Sewer - Prior to filling
trench.ffi Etectrical Connection - When
'-+ blocking, set-up, and plumbing
inspections have been approved
and the home is connected to
the service panel.
Slorm Sewer - Prior to filling
trench.
Sidewalk & Driveway - After
excavation is complete, forms
and sub-base material in place.
Water Llne - Prlor to fllllng
lrench.
Fence - When completed
Street Trees - When all required
trees are planted.
Final - After all required
inspections are approved and
porches, skirting, decks, and
venting have been installed.
Rough Plumbing - Prior to
cover.
w
57AL>
WATER HEAIER:
tl
E
E
E
E
E
E
E
tl
f-l Final Plumbing - When ail|J plumbing worl( is complete.
tl
Other
-
fl
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total height
Lot Type
-
lnterior
-
Corner
-
Panhandle
Cul-de-sac.
Setbacks
P.L.HSE GAR ACC
N
S
E
IS THE PFIOPOSED WORK Fi .IHE..
HISTORICAL OISTRICT, OFI ON
THE HISTORICAL REGISTER?
-
lf yes, this application must be signed
and approved by the Historical
Coordinator prior to permit issuance.
APPROVED
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
-+his
permit is granted on the express condition that the said
45nstruction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any tlme
upon violation of any provisions of said ordinances.
Plans Reviewed By Dale
Plan Check Fee
Date Paid:
Receipt Num
Received By:
X $/SQ. FT.VALUE@-r:-fuE
z4 2*-:
(A) 277b
Total Value
Building Permit Fee
State Surcharge
Total Fee
BUILDING PERMIT
ITEM SQ. FT.
Main
Garage
Carport
/-n
-r, - -6< art
SYSTEMS DEVELOPMENT CHARGE (SDC)3'69#-B;m"ia,'Systems Development Charge is due on all undeveloped
properties within the City limits which are being improved.
ITEM
Fixtures
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home6q.*ta<6*-za
FEE
.",
-^
(c)/<T
FT.
FT.
FT.
,/rQ
PLUMBING PERMIT
Plumblng Permit
State Surcharge
Total Charge
No
ADDITIONAL COMMENTS
Wood Stove/ lnsert/Fireplace Unit
Dryer Vent
(D)
N0Vent Fan
Mechanical Permit
lssuance
State Surcharge
Total Permit
MECHANICAL PERMIT
Furnace
Exhaust Hood By signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I f urther certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Sprlngfield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employees who
are in compliance with ORS 701.055 will be used on this
project.
I further agree to ensure that all required inspections are
requested at the proper time, that each address is readable
from the street, that the permlt card ls located at the front
of the property, and the approved set of plans will remain
on the site at all times during construction.
Date 7-73
Signature
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk
-
ft
Curbcut
-
ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)
,-25
2a O-
/zfr::
TOTAL AMOUNT DUE (exctuding etectricaD / 5 ?D
(A, B, C, Q and E Combined)
22//
aAMOUNT RECEIVED
RECEIVED BY
DATE PAID
VALIDATION:
RECEIPT NUMBER
/-r
7ffi
Permit No:a?z2z>22
/y'za 4t< ?'t37;'Address:
lssued by
1
2
R OFFICE USE ONLY
STATEMENT:
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS 701.055(4) , requires residential construction permit
applicants who are not registered with the Construction Contractors Board to
sign the following statement before the building permit can be issued. This state-
ment is required for residential building, electrical, mechanical, and plumbing
permits. Licensed Architect and Engineer applicants, exempt from registration
under ORS 701.010(7), need not submit this statement. This statement will be
filed with the permit.
Fill in the applicable blanks, and initial boxes 1 and 2, and either box 3A or 38:
I own, reside in, or will reside in the completed structure.
I understand that I must register as a construction contractor if the structure is sold
or offered for sale before or upon completion.
A My general contractor is ,
Contractor registration numbe
I will instruct my general contractor that all subcontractors who work on the struc-
ture must be registered with the Construction Contractors Board.
3.B I will be my own general contractor.
lf I hire subcontractors, lwill hire only subcontractors registered with the Construc-
tion Contractors Board. lf I change my mind and do hire a general contractor, I will
contract with a contractor who is registered with the Construction Contractors Board
and I will immediately notify the office issuing this building permit of the name of
the contractor.
I hereby certify that the above information is correct and that I have read and understand
the lnlormation Notice to Property Owners about Construction Responsibilities on the
reverse side of this form.
/-t -7s
nature rm pp cant Date
CONSTRUCTION CONTRACTORS BOARD
0244J 8191
Date
WHITE COPY TO ISSUING AGENCY PERMIT FILE
PINK COPY TO APPLICANT
3
OR
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
NOTE: Ihis lnficrmation Notice to Property Owners About Construction Responsibilities
was developed by the eonstruction Contractors Board in accordance with ORS 701.055(5),
. pa$rsed by t.he 1989 Oregon Legislature.
''If ircu are"acting as youi'6Vvn bontractor to construct a new home or make a substantial improrement to an
existing structure, you can prevent many problems by being aware of the following responsibilities and areas
of concern.
EMPLOYER RESPONSIBI LITIES:
lf you hire persons not registered with the Construction Contractors Board to do labor in constructing or assisting
in the construction or improvement of a residential structure, you will, in most instances, be ruled to be an
"employer" and the people you hire will be "employees". As the employer, you must comply with the following:
Oregon's Withholding Tax Law: As an employer, you
the time employees are paid. You will be liable for th
tax from your employees. For more information, cal
Unemployment lnsurance Tax: As an em ployer, you are required to pay a tax for unemployment insurance
purposes on the wages of all employees. ,For more information, call the Oregon Employment Division DHR
at 378-3224.
'V_orkers' Compensation lngglglgg As an employer, you are subject to the Oregon Workers' Compensation
Law, and must obtain workers' compensation insurance for your employees. lf you fail to obtain workers'
compensation insurance, you may be subject to penalties and will be liable for all claim costs if one of your
employees is injured on the job. For more information, call the Workers' Compensation Division DIF at g7g-7414.
U.S. lnternal Revenue Service: As an em ployer, you must withhold federal income tax from employees'wages.
You will be liable for the tax payment even if you didn't actually withhold the tax. For more information, call
the lnternal Revenue Service at 221-3960.
OTHER RESPONSIBILITIES AND AREAS OF CONCERN:
-ode Com pliance: As the permit holder for this project, you are responsible for resolving any failure to meet
.ode requrrem ents that may be brought to your attention through inspections.
!tr!{ty and Property Dama Contact your insurance agent to see if you have adequate insurance
coverage for accidents and omissions such as falling tools, paint overspray, water damage from pipe punc-
tures, fire, or work that must be re-done.
Time to Supervise Employees Make sure you have sufficient time to supervise your employees.
Expertise; Make sure you have the expertise to act as your own general contractor, to coordinate the work
of rough-in and finish trades, and to notify building officials at the appropriate times so they can perform
the required inspections.
lf you have additional questions, write to Construction Contractors Board
700 Summer St. NE, Suite 300
Salem, OR 97310-0151
Phone 5A3378-4621
must withhold income taxes from employee wages at
e tax payments even if you don't actually withhold the
I the Oregon Department of Revenue at 378-3390.
0244J 1At24t89
l-I i
:l
7q 7 '
',7,
I
I
t
I
it,,
I
i\d Sr
-S
\n
90
(,',
1Di
rl
I
eq
?
\
rraD
bd
o IIf
,
t
II
I
I
Iiv
is
I
ib
I
-rl
)
t
il?lF.'l,b
I
\
\
I
JLo
T
q 5TRtrtrT
>,.._.-;-
I
I
I
_d
I
,a aa
?.25 IIII.'TII STRI|III
sPruNGFIliLl), 0ltlicol{ 9747'l
INSPIfGI'I0N REQUIIST ? 72-6-3
oFI'ICE: 7?.6-3751)
1. LOCATION OI' INSTALLATION
LEGAL DESCRIPTION
a
JOB DESCRITTI
Pcrnrits arc non-tralrsfcrable and cxplre
lI vork is not started vlthin 180 days
o( issuance or if vork ls suspentled for
180 days.
2. CO}NTACTOR INSTALINTION ONLY
lilcc t rical Con t rac Ior
Add r:css
ci ty- l'hone
Supcrvi.sor License Ndnrbcr
Iixpiratiotr Date
Iixoiration Datc
Signaturc of Supcrvising Elcctrician
Ouners Natne
=
PLECTRICAL PIIITHIT APPLICATION
City Job Number ?
COHPLIiTIT PEII SCNIiDULE DI]LOV
Nev Residentlal-Single or
HuItl-Family per dvelling unit.
Service Incltrded:
Items Cost
1000 sq.ft. or less
Each addltlonal 500
sq. ft or portlon
thereo f
Each Hanuf 'd llome or
Hodular Dr.relIing
Service or Feeder
$ 85.00
$ 1s.oo
cl S 4o.oo
Scrvlces or Feeders
Installatlon, Alteratlons or
Rclocatlon:
E*Ai,
200 amps or less
201 anrps to 400 amps
-
401 amps to 600 amPs
-
601 amps to 1000 amps-
Over 1000 amps/volts
-
Reconnect Only
200 amps or less
201 amps to 400 amPs
-
Over /r01 to 600 amps _
0ver 600 amps or 1000 voltr
LPR
j.
't,6e
1 - I l-.l
A
Sum
%
D
C
D
5. ST'BTOTAL OT' ABOVB
5I State Surclrarge
TOTAI,
$300.00
$ 40.00
.00
.00
.00
s see rrBrr atrve
s 2.00
qa,are
z-*
Temporary Services or Feeders
InstaIIatlon, Alteration or Relocation
$ 50.00
s 60.00
$100.00
$130.00
$40
$ss
$80
Arld rcss
City
Dranch Clrcul ts
Nev, Alteratlon or Extcnslon Per Panel
One Cl rcul t
Ilaclr Addi t ional
Circui t or vi th Service
or Feeder Permi t
$ 35.00
- /-'
OVNNR IN:;'I'ALLATION
The installation is bcing made on
propcrty I ovn vhich is not intended
for sale, Icase or rent.
Ouncrs Slgnature:
fu>arhonc 7L
E l'liscellaneous (Servlce/feeder not lncluded)
-Each installation
Plrmp or irrigation
Sign/0u tline Liglr t lng-
Liml ted Energy/Res
s
s
$
s
00
00
00
00
40.
40.
20
36
oirr:
RNCIiIPT
ril.l('lirvlit) llY:
a-c
Con:;tr Corrtr. Number '
I
i
I