Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2007-02-19Main Office P.O. Box 23814 Tigard, Oregon 97281 Phone (503) 684-3460 Fax (503) 684-0954 .- Salem Office 4060 Hudson Ave., NE Salem, Oregon 97301 Phone (503) 589-1252 Fax (503) 589-1309 Bend Office P.O. Box 7918 Bend, Oregon 97708 Phone (541) 330-9155 Fax (541) 330-9163 (/ Carlson Testing, Inc. Daily Report of Structural Steel Client:KAISER STEEL BUILDINGS Project: i{ooDCRAFrqBq JOB #1513 Jurisdiction: CTI Job #: SPRINGFIELD s0704513 CTI representative S. DqqGEB oBoA 523 wasonsitethisdate !'eb: 191 2007 to perform Special Inspection for: Pernlt coM2005-00309 DFS #(s)PO Number: SCOPE OF INSPECTION 1. Checked in with superintendent, client or shop rep. Name AKIM Company:KAISER STEEL 2. Inspection was "IBC" n Continuous I x I Periodic 3. Work performed: f] ,n the field El o, fab shop KAISER STEEL 4. If shop inspection do they have a fabrication and QC procedures?tr Yes No N/A INSPECTION Yes NoN/A WELDER INF'ORMATION Welders Name: ,lllvIES sl{EENY Certification #: ur9t2q2 PIECES (8)(5) COLi]MN SECT]ONS, -( 2) TUBE STEEL POSTS, (1) WIDE FLANGE POST. THE REPORT SUMMARY L Work inspected was: Jil Completed f] ,n progress 2. Completed work inspected was in compliance with Approved plans and specifications I Strop drawings RFI f] Design change Submittal N/A Document #(s)SEE NOTES Dated:SEE NOTES 3. Noncompliance item(s) were noted this date, details on following page(s). f] ves E *"NiA 4. Noncompliance item(s) were reinspected this date, details PROCESS USED IdAS SMAW USING E7018 ELECTRODES TEE Cq{lI,ElEq wElps MEEr rHE CRTTERTA FOR VTSUAL ACCEPTANCE PER AWS D1.1 _ NO EXCEPTIONS TAKEN ALL REPAIRS WERE MADE AT THE TIME oF INSPECTION Yes No N/A on following page(s). I Ves x No N/A Conform f-l Remain in progress Report(s) findings were discussed and left with of Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work olcontractors or subcontractors. Page 1 of 1 l. Reviewed previous inspection reports?X 2. Verified steel materials are in compliance by random samples of the mill test reports, steel markings or other documentation. revlewrng ID X 3. Verified weld filler materials conform.x 4. Checked steel members to see they were fabricated and erected in accordance with the workmanship and tolerances required. x 5. Checked welded studs and structural connections were installed as required.x 6. Verified high strength bolts and fasteners conform.x 7. Verified the quality of welds produced by welders, welding operators, and tackers conform.x 8. Verified steel frame joint details for bracing, stiffening, member locations, and application ofjoint details at each connection are in compliance by random sampling. x Verified the contractor's Welding Procedure Specifications are in conformance with AWS requirements. x 2. Verified the essential variables outlined in the Welding Procedure Specifi cations were employed during execution of the work.x 3. Verified the weldability of reinforcing steel othcr than ASTM A706 x I See additional report page(s) [Distribute attachments Address: q2_q lr 1tII_i_ aa _-_ SPBINGETEL!. qR Location of steel inspection [to include grid lines, elevations (floors) and drawing detailsl: ryqPEClEp lrryqlE r4ls Frrrl,Ers FoR rHE FoLLOWTNG tr Daily Report of Structural Steel cTI Job #: s0704513. For: 02/te/2oo7 Project:WOODCRAFTERS _ JOB #1513 Notes: DOCT]MENT #I513.5O/92/96 DATED OCTOBER 5, 2006, SEPTEMBER 25, 2006 AND oCToBER 3, 2OO5 In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, ,INC. Project Manager SLD/LND . KA]SER STEEL BUTLDINGS CITY OF SPRINGFIELD . BUILDING DEPARTMENT ANG ENGINEERING GROUP - MR JOK ANG PE CC RON SKAGGS