Loading...
HomeMy WebLinkAboutPermit Plumbing 1998-10-16COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 SPRI^.GFI€LO JOB NUMBER ?a/%z INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK: ASSESSORS MAP:TAX LOT:./e zA2:61 lZ 'E Z, "27-sF= CITY: ADDRESS: OWNER: NEW - REMODEL ADDITION DEMOLISH OTHER VALUE -'fDESCRIPTION OF WORK ^EitEoA I or r rtrottll.:. EI EffiOIAA I . NAME ADDRESS PHONE EXPIFIES PHONEADDRESSCONTRACTOR'S NAME ARCHITECT: MECHANICAL: CONST. CONTRACTOR # PLU MBING NO.FEE CHARGF Single Fixture Relocated Bldg (new fix. addtl) Water Service 7l tt /.d." Sanitary Sewer q/ft tau Storm Sewer126? r,67a." )Backf low Device D.b TOTAL PERMIT 76e,'- MECHANICAL Nr)trtrF CHARGE Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - oFFtcE usE - LAND USE: ZONING* OF UNITS: HANDICAP ACCESS: LIGHTING POWER BUDGET:OCCY GROUP: * OF STORIES: OUAD AREA: * OF BLDGST CONSTR. TYPE: HEAT SOURCE:WATER HEATER: so. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY 8zo. go BUILDING PERMIT PLU M BI NG 760."DEMOLITION 5% State Surcharqe 5% State Su rc haroe ,3 3 r.'-2o -QD MECHANICAL FENCE VALUE $ 5% State Su rcharqe SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT, SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUOING ELECTRICAL )2-./r2^=2 SrArE: 43. ztPt 2/AS FLOOD PLAIN: REOUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, catt 726-3769 (recorder), state your City designated job number, iob address, type of inspeotion requested and when you will be ready lor lnepcotlon. Fl.qucrtr rccelved bclore 7:OO a.m. wlll bc mad6 thc same worklng dsy, requost. madc altcr 7100 a.m. wlll bo madc the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placlng concrete. CONCRETE SLAB: To be made after all inslab building service equi pment, cond uit, piping, accessories and other ancillary equipment items are in place but before any concrete lg placed. UNOERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathlng. POST & BEAM: To be made prior to lnstallation of floor lnsulation, decking or floor sheathlng. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work iS to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inlshed. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTU RAL CONCRETE: In excess of 2500 PS.l. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 t) HIGH STRENGTH BOLTING: During all bolt installation and ti ghtening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLINGT During earthwork. (306 a.11 .& Chapter 29) GLU.LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. sTDS. 25-10,11). STRUCTU RAL MASONRY: (306 a.7) 'ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting thls inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY D^rE 2/3'?9 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure wlthout permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the It card is located at the front of the property, and the approved set of plans will remain on the site at all Sig n atu re Date street, that the pe tion.times during AMOUNT RECETVED: €za, *,eVALIDATION RECEIPT #317"<RECEIVED BY: DATE PAID