Loading...
HomeMy WebLinkAboutPermit Mechanical 1998-07-16COMM ERCIAL/ IN DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 SPRINGFIELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 nYo rE-7 LOCATION OF PROPOSED WOFIK: ASSESSOFIS MAP 11 0,L 39 21 0o Llo-A TAX LOT: hg.t'-vc-6 bm,:t zrp, 41411STATE:IP (,)H2EWJ-T PHONE: CITY:5'au'ur,/.rLil 17ia- 77ox AJ" bz*'oADDRESS: OWNER: NEW - REMODEL ADDITION DEMOLISH OTHER f2e 4o1r.@ DESCRIPTION OF WORK: 6p VALUE: NAME ADDRESS PHONE EXPIRESADDRESS PHON E 254oco CONTRACTOR'S NAME ARCHITECT: MECHANICAL: ELECTRICAL: CONST. CONTRACTOR # GENERAL: PLUM BI NG MECHANICAL Nrl trFF EHA RGF I Furnace/burner & vent <100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent from System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT Backf low Device TOTAL PERMIT ft ft. rm ft. tary Water rvlce Single Fixture Relocated Bld fix. addtl EUSE-40y /"o h /r I ZONING FLOOD PLAIN: LIGHTING POWER BUDGET: WATER HEATER:HEAT SOURCE coNOCCY GROUP: * OF STORIES: QUAD AREA: S OF BLDGS: SQ. FT.VALUE TOTAL VALUE OF PROJECT X x X SQ. FTG MAIN SO. FTG ACCESS SO. FTG OTHER DATEPLAN CHECK FEE RCPT#BY BUILDING PERMIT PLUMBING DEMOLITION 5% State Su rcharoe 5% State Su rcharoe MECHANICAL */s:,.' i/o FENCE VALUE $ 5% State Surcharqe ,?€ t-,'ff SIDEWALK FT. SUBTOTAL PE RM ITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT .N,*at,TOTAL PERMIT FEES EXCLUDING ELECTRICAL HANDICAP ACCESS: $/sQ. FT. REQUIRED INSPECTIONSIt is the responsibility of the permit holder to see that all in spections are made at the proper time. To request an inspection, call726-3769 (recorder), state your City designated job num ber,job address, type of inspection refor inspection. Requests received before 7:00 a m.ll bem ade the same working day, reques quested and when you will be readyits made after 7:0O a.m. will be madethe following work day. S]TE |NSPECT|ON: To be made after excavation, butprior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUN DATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are ln place but before any concrete is placed. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathlng. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof coverlng. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is tobe covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and a!l pipes, chirnneys and vents are complete and the rough electrical, plumblng and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board lnterior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plasterlng ls applied or before gypsum board Joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required fcr all concr.ete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel is inplace but prior to placing . asphalt or concrete. SPECIAL INSPECTTONS: tn accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be f urnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 t) HIGH STRENGTH BOLTING: During all bolt installation and ti ghteni ng operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) cLU.LAM BEAMS: tnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) 'ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMB!NG FINAL ELECTRICAL \/FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this I nspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanlcal and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS PLANS REVIEWED BY DATE By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUpANCy will be made of any structure without permission of the Buildlng Safety Divlslon. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times durlng construction Signature .Date Jil.t 13 i448'lt VALIDATION "lrb RECEIVED BY: DATE PAIDAMOUNT R BECEIPT *: