HomeMy WebLinkAboutPermit Building 1997-05-05t
COM M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Frtfi Street, Springfield, Oregon 97477
SPRI'{GFIELO JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:tbtL, N3OII! &
o TAX LOT:/D /9 fASSESSORS MAP
PHONE:
ZIP:/,vSTATE:CITY:\k,^rdha,:
ADDRESS:
OWNER:
NEW
-
REMODEL X ADDITION DEMOLISH OTHER VALUE
PHONENAMEADDRESS
EXPI RES PHONE
*t tA
VJ
CONTRACTOR'S NAME
ARCH ITECT:
GENERAL:
PLUM BI NG:
MECHANICAL:
ELECTRICAL:
CONST.
CONTRACTOR #
PLU MBIN G
NO.FEE CHARGE
)Single Fixture /o /D9
Relocated Bldg.
(new fix. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer
ft
Backflow Device
TOTAL PERMIT ,??ta),/5,*
MECHANICAL
NO FFF EHA RGF
Furnace/burner & vent
<100,000 BTUs
Furnace/burner & vent
>100.000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
- OFFICE USE -
LAND USE:
ZONING
HANDICAP ACCESS:
LIGHTING POWER BUDGET:
WATER HEATER:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
C OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
$/SQ. FT.VALUESQ. FT.
TOTAL VALUE OF PROJ
X
X
X
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE BYDATE
2-o
BUILDING PERMIT PLUMBING-*/6-,'-DEMOLITION
5% State
Su rcharoe 3111.?!1',i, t7f+,4 r l,?o
MECHANICAL FENCE
VALUE S
5% State
Surcharge
SIOEWALK
FT.
SUBTOTAL
PERMITS
PAVI NG CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
? 7f 7.-
a41 -sPgr-)
DESCRTpI6N oF woFrK, AYl,xq FOf',n ?1t|-\ (rl.wrr.'tz * Nt.J Stu t< trr{? s*Du 4ru-t4
Dtree.".. Rn\tre 7 q3B'tL 4 ltt-
WrA
ADDRESS
/rn.(r€rra r\J
* OF UNITS:
FLOOD PLAIN:
MB
REOUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work daY.
SITE INSPECTION: To be
made after excavation, but
prior to setuP of forms.
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to Placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framlng, fire
blocking and braclng are in
place and all pipes, chimneYs
and vents are complete and
the rough electrical, Plumblng
and mechanical are apProved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vaPor
barriers are in place but
before any lath or gYPSum
board lnterlor wall covering is
applied.
FIRE & SEPARAT]ON WALL:
Located and constructed
according to Plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering ls applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
waY, to be made after all
excavating comPlete and form
work and sub-base material in
vertlcals ln accordance with place.
uBc 2415.
CURB AND APPROACH
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work ls covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in Place, but
prior to Placing concrete.
CONCRETE SLAB: To be
made af ter all lnslab building
service equiPment, conduit,
piping, accessories and other
ancillary equipment items are
ln place but before anY
concrete ls Placed.
UN DERGROUND: Plumbing,
electrical, gas, sanitarY sewer,
storm sewer, water and
dralnage lines. To be made
prior to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
e'lectrical, mechanical. To be
made Prlor to installation of
floor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installatlon of floor
lnsulation, decking or floor
sheathing.
FLOOR INSULAT]ON &
VAPOR BARRIERS: To be
made prior to installation of
decklng or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
ICAL: No work is to
APRONS: After forms are
erected but prior to Placing
concrete.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: IN
excess of 2500 P.S.l. (306 a.1)
STRUCTURAL WELDSI
Performed on the iob. (2722 l')
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
Durlng earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10J1).
STRUCTURAL MASONRY: (306
a.7)
-ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
ROOF SHEATHING AND
NAILING: Prior to installing
anY roof covering.
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
nerein is true and correctfand I further certify that any and all work performed shall be done in accordance with the ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any struciure wlthout permission of the Buildlng Salety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project'
ure that all required inspections are requested at the proper time, that project address is readable from the
it card ls located at the front of the property, and the approved set of plans will remain on the site at all
DateSignature ,
I further agree to ens
street, that t
tiontimes durl
/
zo
AMOUNT RECEIVED
RECEIPT C:RECEIVED BY:
DATE PAID:
E F.NAL PLUMBING
-F FTNAL ELEcTRtcAL
SITE PLAN BEVIEW BOARD: Must be requested 2 days in advance
of the date you wish lnspection. All proiect conditions such as
landscaping, parking lot striping, etc' must be completed before
requesting thls insPection.
FINAL MECHANICAL
FTNAL FIRE DEPARTMENT
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certlflcate of Occupancy has been issued by the Building Division
and posted on the Premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
VALIDATION:
SF<INGFIELO
BI.,ECTRTCAL PBRHIT APPLICATION225 FIFTE STREET
SPRINGFIELD, OREGON
INSPECTION REQTIEST:
0FPICE: 726-3759
The.lollowing proiec? fli r(rhn
1on,ng, end cjoes not rc*iu;i.iapproval.
97 47
726
qTobqf
1. LOCATION OFlloll,, 4olt\
ON
DESCRIPTION
DESCRIPTION
Permits are non-transferable and expire
if vork is not started vithin 180 days
of issuance or if vork is suspended for
180 days.
2. CONTRACTOR INSTALI..ATTON ONLY
Electrical Contract
Address
Ci ty Job Nurnber
COHPLETE FEE SCEEDTII,E BELOV
New Residential-Single or
MuIti-Family per dvelling unit.
Service Included:Items Cost
L000 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each Manuf'd Home. or
Modular Dvelling
Sertice or Feeder
s 8s.00
$ 1s.00
s 40.00
Services or Feeders
InstalIation, Alterations
or Relocation:
3
A
Sum
B
Ci ty
Supe
Expiration Date \tJ.\qR
Constr Contr. Number
Expiration Date
of Su ing Electrician
ers Name
Phone
rv I sor cense Number
200 amps or less
20L amps to 400 amps
-401 amps to 600 amps _
601 amps to 1000 amps_
0ver 1.000 amps/volts
Reconnect Only
s s0.00
s 60.00
s100.00
s130.00
$300.00
$ 40.00
$ 40.00
$ ss.oo
$ 80.00
\
c Temporary Services or Feeders
Installation, Alteration or Relocation
s see nBr a
c$200 amps''or less
201 amps to 4OO amps
-0ver 40L to 600 amps
Over 600 amps or 1000 vofT
D. Branch Circuits
Nev, Alteration or Extension Per Panel
one circuit -y_ $ :s. oo 35-
Each Addi tional
Circuit or vith Service-
or Feeder Permi t --L $ 2.oo q
E. Miscellaneous (Service/feeder not included)
-Each ins tal-lation
Pump or irrigation
sign/ou tline Lighting-
Limi ted Energy/Res
Limited Energy/Comm
SUBTOTAL OF ABOVE
52 State Surcharge
3Z Administrative Fee
TOTAL
60ve
Address *h
Ph"".aL/)-5960
,f
Ci ty
OVNER
The installation is being made on
property I ovn vhich is not intended
for sale, lease or rent.
Ovners Signature:
l,l
$
s
$
$
40.00
40.00
20.00
36. O0
q
5
DATE:
RBCEIVED
ffi
,"r,,r,r.*I--*