HomeMy WebLinkAboutPermit Building 1994-07-18COMMERCIALIINDUSTRIAL -
PERMIT APPLICATION
225 Ffiln Street, Springfield, Oregon 97477
LOCATION OF PROPOSED WORK:I
ASSESSORS MAP:
SPFIINGFIELE,
d
JOB NUMBER
INSPECTION LIN E: 726-3769
OFFICE: 726-3759
TAX LOT:
PHONE:1(
ZIP:STATE:aR.
a9aq6- //
CITY:
ADDRESS
OWNER:
DESCRIPTIOl-r.2/r*1N6/V '
t
VALUE:
N F WOR
REMODEL EMOLISH OTHERADDITION
NAME ADDRESS PHONE
ADDRESS EXPI RES PHONECONTRACTOR'S NAME
ARCHITECT
MECHANICAL:
ELECTRICAL:
CONST.
CONTRACTOR #
GENERAL:
PLUMBING
PLU MBING
NO.FEE CHARGE
Single Fixture
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
MECHANICA L
NO trtrtr CHARGF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f Ioor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
from
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
F HANDICAP ACCESS
LIGHTING POWER BUDGET:
WATER HEATER:
FLOOD PLAIN
ZONING* OF UNITS:
LAND USE
OCCY GROUP:
* OF STORIES:
QUAD AREA:
r OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
SQ. FT,$/SQ. FT.VALUE
TOTAL VALUE OF P
RCPT#PLAN CHECK FEE DATE BY
X
x
X
SQ. FTG MAIN
SO. FTG ACCESS
SO. FTG OTHEB
f,s
BUILDING PERMIT 6o,€1 PLUMBI NG DEMOLITION
5% State
Surcharoe zcL /)lt tzzJ ,
2.,r 5-/ g9 5% State
Su rcharoe
MECHANICAL'-FENCE
VALUE $
5% State
Surcharqe
SIDEWALK
FT.
SUBTOTAL
PERM ITS
PAVING CURBCUT
FT,
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
(
Ecr 452Ary-
gt,sQ-.,
UL.K3
I
REOUIRED INSPECTIONS
It is the responsibility of the permit holderto see that all inspections are made at the proper time. To request an insp#16n, call
726-3769 (recorder), :;tate your City designated job number, job address, type of inspection requested and when you wfbe ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work (lay.
SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in
made aftel excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSL,\B PLUMBING' inspections have been made SPECIAL INSPECTIoNS: ln accordance
ELECTRIC,qL & and approved. Section 306 0f the state Specialty code
MECHANITIAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor during
CURTAIN WALLS construction of the following work. A
FooTlNGs; & FoUNDATIoNS: E,6Eh, A^E. r copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division.
excavated and forms are facing materials and before
;',r,'::l*::";il":,E:l:' "' -L ::::::,::::"'"" srRUcruRAL ..NCRETE: rn
^
FRAMING: To be made after excess of 2500 P's l' (306 a'1)
coNcRErE sLAB: ro be l1:J...............-::l:|jJ'efi[lflbtIi ," srRUcruRAL wELDS:
made after all inslab building place and all pipes, chimneys Performed on the iob. (2722t\
service eqr.ripment, conduit, and vents are complete and
:#,i,?;"":,T;?{:? ?,f-:'::J n'.',i'":[.",]igl:,X, j,j;[?:X: Bl?Xf],?E]noT,l"*?,o,.THt"oin place bttt before any tightening operations. (306
concrete i:; placed. INSULATION & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON
electrical, 3as, sanitary sewer, barriers are in place but FIREPROOFING: U.BC.
storm sew,lr, water and before any lath or gypsum Standards 43-8.
drainage lines. To be made board interior wall covering is
prior to cor'ering or filling applied. S'ECIAL GRAD'NG,trenches' \ -/ ExcAVATIoN AND FlLLrNc:
'NDERFL..R:
prumbins , A- I:::,It:tfm'l3}"Hit* Durins earthwork. (306 a'11 &
electrical, rrechanical. To be according to plans. chapter 29)
made prior to installation of
f loor insulittion, decking or
floor sheathing.
POST & BEAM: To be made
prior to ins,tallation of floor
insulation, decking or floor
sheathing.
FLOOR IN:}ULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond bearrs grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: [)rior to installing
any roof cc,vering.
>< LATH AND/OR GYPSUM--- BoARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10J1).
STRUCTU RAL MASONRY: (306
a.7)
*ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in complianr)e with ORS 701.055 will be used on this project.
I further agree to ens Jre that all required inspections are requested at the proper time, that project address is readable f rom the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
Date
times duri
;)K.
no construction."4a
VALI DATION:rrAMOUNT RECEIVED:
RECEIPT *:RECEIVED BY:
DATE PAID:
FINAL PLUMBlNG
FINAL ELECTRICAL
FINAL MEcHANICAL
FINAL FIRI: DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this inspection.
*FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE