Prosper Park, LLC
Attn: Mr. Leonard Tarantola
34801 Matthews Road
Eugene, Oregon 974O5
Re: Prosper Park Phase I & ll Occupancy
Dear Mr. Tarantola,
The purpose of this letter is to follow up on occupancy issues with your Prosper Park development,
Phase I & ll, located at 945 28th Street, being tax parcels L7O231OOO-1101, 1000 and 1702312202300,
which were identified in the July 1, 2014 letter, a copy of which is attached. At this point only shell
approval has been granted for the buildings. As stated in the July t,2Ot4letter no Certificate of
Occupancy has been issued for any of the shell structures and no permits/occupancy has been issued for
individual units/tenants, therefore the units should not be occupied. In the interest of not displacing the
existing tenants the City at that time had not required the immediate closure of these units in order to
give you a reasonable amount of time to have the appropriate applications submitted to the city.
However given the amount of time that has elapsed, almost one year, the City of Springfield is asserting
its authority to require at a minimum the submittal of the required information for each of the units
prior to May 26, 2015.
Any units failing to comply within this submittal deadline will be posted "DO NOT OCCUPY". Once
posted the units can no longer be occupied or used in any way until such time as the appropriate
permits are obtained, issued and approved for occupancy. ln order to avoid this disruption to your
tenants' use of the property please comply with the following requirements.
ln order for these units to be occupied, each individual unit/lessee is to make application to the city for
an individual tenant infill permit (structural to start), identifying the type of occupancy and compliance
with current building and zoning codes, as they relate to proposed improvements and uses.
Accompanying this infill permit should be a completed Drinl<ing Water Protection Overlay District (DWP)
form along with a site and/or unit layout diagram, reflecting the proposed or current improvements that
were constructed since the completion of Phase I of the project in 201,4. This site/unit diagram should
show any and all improvements, including but not limited to changes to the mechanical, structural,
electrical or plumbing systems. This information will be utilized along with site inspections to determine
all the required permits that need to be applied for and ii the uses are permitted for the zone. For your
convenience I have attached with this letter the structural permit form along with the DWP form.
225 FIFTH STREET
SPRINGFIELD, OR 97477
PHONE: 541.726.3753
FAX: 541.736.1021
wvtrw. s p i n gf i e I d- o r. g ov
Page I of2
The purpose of these requirements is to ensure the appropriate codes have been met, allowing for the
safe use of the units within the specified Building, Zoning and Fire, Life, and Safety Codes. During this
compliance process no units are permitted to be occupied in any form unless they have submitted the
requested information by the May 26, 2015 deadline or are performing work [n connection with an
issued permit.
lf you should have any questions or need additional information, please do not hesitate to contact the
Planning Supervisor Mr. Jim Donovan or me at (5411726-3753.
Respectfu lly,
Matthew A. Ruettgers
Building and Land Development Manager
ATT:July 1, 201-4 Letter
Structural Permit
DWP form
CC:Christina Tarantola
578 Washington BLVD #8L4