HomeMy WebLinkAboutPermit Building 1996-01-23COMM ERCIAL/IN DUSTRIAL .-
PERMIT APPLICATION
225 Fifth Street, Springfietd, Oregon g7477
LOCATION OF PROPOSED WORK =az 52.
JoB NUMBE* ?4ee-
INSPECTION LINE: 726.3769
OFFICE: 726.3759
rAX Lor A<e /
SPRINOFlELO
;
ASSESSORS MAP /B e/ao
,,r,3f{7 7
PHONE
STATE;
LC,7 Yo ,7OWNER
ADDRESS:
CITY:
ol'r rE n VALUE
t
ADDrroN DEM.LT'H X
DESCRIPTION OF WORK
NEW- REMODEL
ELECTRICAL:
NAME ADDRESS PHONE
ADO RESS
tI
5Le S
do5".581/
CONTRACTOR'S NAME
ARCHITECT:
P::]|r]f
-791-/9t /
CONST.
CONTFACTOR '
GENERAL:
PLUM B I NG
,
NO FEE CHAFG E
Single Fixture
Relocated Bldg
(new f lx. addtl)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
Backf low Devlce
TOTAL PERMIT
NN
< 100 000 BTUs
Furnace/ burner & vent
Furnace/burner & vent
> 100 Us
-Su s pcrrded wat l-oilt,cor
Floor furnace and vent
mounted unit heater
Appliance Vent
separat e
Stationary evap.
coo I er
an ng
IS erI rtpa
hIo t s.
duct
r't t
Ven t
f rorn
Mecnanicaf exhaust
hood and duct
TOTAL PERMIT
Permit lsSUanCe s 1 0.00
--l---
I
L-
E-l- csn
ZONING:
LIGHTING POWER BUDGET:
WATER HEATER:
- OFFICE USE _
LAND USE:
C OF UNITS:
HANDICAP ACCESS:,__
FLOOD PLAIN:
OCCY GROUP:
I OF STORIES:
OUAD AREA:
a OF BLDGST
CONSTR. TYPE
HEAT SOUBCE:
SQ. FT.$/sQ. FT,VALUE
TOTAL VALUE OF PROJECT-
x
X
SQ. FTG MAIN
SQ. FTG ACCESS
SO. FTG OTHER
RCPT'PLAN CHECK FE^E BYOATE
BUILDING PERMIT PLUM BI NG D EMOLITION
S
% State
;urchaioe 5% State
Surcharoe F;MECHANICAL FENCE
VALUE $
-
5% State
Surcharoe
SIDEWALK
FT.
SU BTOTA L
PERM ITS
PAVI NG CURBCUT
FT.
TOTAL PERMIT FEES
EXCLUDING ELECTFICAL
SYSTEMS
DEVELO PM ENT
/8"*
/2 //l
MECHANICAL:
-
PI
REOUIRED INSPECTIONS
It is the responsibitity of the permit holder to see that all inspecilons are made at the proper time, To request an inspection, call
726.9769 (recorder), state your city designatecl job number, iob address, type of lnspection requested and when you will be ready
for lnspcction. Requests ieceived before 7:OO :.r m. will be made the same worklng day, requests made after 7:00 a m' will be made
the (ollowing work daY.
SITE INSPECTION: To be
made after excavation, but
prior to setuP of forms.
UNDEBSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
irefore any work is covered.
FOOTINGS & FOUNDATIONS:'fo be rnade alter trenches are
cxcavated and forms are
ereclecl, al I steel in Place, but
prior to placing concrete.
CONCRETE SLAB: TO bE.
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDEBGROUND: Plumbing,
electrical, gas, sanitarY sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to lnstallation of
floor insulatlon, decking or
floor sheathlng.
POST & BEAM: TO bE MAdE
prior to lnstallation of floor
insulation, decklng or floor
sheathing,
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415,
-
ATTIC DRAFT STOPS &
CURTAIN WALLS
ROUQH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
FIREPLACE: Prior to Placlng
facing materlals and bofore
framing lnspection.
FRAMING: To be made after
the roof, all f ramlng, fire
blocking and bracing are ln
place and all PlPes, chlmneYs
and vents are comPlete and
the rough electrlcal, Plumbing
and mechanlcal are aPProved.
INSULATION & VAPOR
BARRIEB: To be made after all
insulatlon and requlred vaPor
barriers are ln place but
before any lath or gypsum
board lnterlor wall covering ls
applled.
FIRE & SEPARATION WALL:
Located and constructed
according to Plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathlng and gypsum board,
interlor and exterlor, ls ln
place but before any
plasterlng ls applled or before
gypsum board Joints and
fasteners are taped and
fi nl shed.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving withln street right of
way, to be made after all
excavating complete and form
worl< and sub-base mate[ial in
pl ac e.
CURB AND APPROACH
APRONS: After forms are
erected but prlor to placlng
concrete,
PAVING: Atter gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTUBAL CONCRETE: IN
excess of 2500 P.S.l. (306 a.l)
STRUCTURAL WELDS:
Performed on the iob, (2722 t)
HIGH STRENGTH BOLTING:
During all bolt lnstallation and
tightening operations, (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8,
SPECIAL GRADING,
EXCAVATION AN D FI LLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU-LAM BEAMS: lnspection
Certificate by an approved
agency, furnisned to the CitY's
Bulldlng Divlsion before
beams are placed. (2501 U.B.C.
srDS. 25-10,11).
STRUCTU RAL MASONBY: (306
a.7)
'ln addition to the inspec-
tions speclfled, the Building
Officlal may makd or require
other lnspections of any I
constructlon work to ensure
compllance wlth the Bullding,
Clty or Development Code.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
By signature, I stlte and agree, that I have caref ully examined the completed appllcation and do hereby certify that all information
herejrr ls true and correct, and I {urther certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described hereln, and that NO OCCUPANCY
will be rnade of any structure without permission of the Buildlng Safety Divlslon, I lurther certify that only contractors and employees
who are in compliance with OBS 701.055 will be used on this proJect.
1 further agree to ensure that all required inspections are requested at the proper time, that project address ls readable from the
street, that the permlt card ls located at thc front of the property, and the approved set of plans wlll remain on the site at all
DateSignatLrre
times 11 uri ng constructlon
n//VALIDAT ION /-2V ?<
RECEIVED BY:
DATE PAID:AMOUNT RECEIVED
RECEIPT *:
FINAL PLUMBING
FINAL ELECTRICAL
- FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be reques.ted 2 days in advance
of the date you wish lnspectlon. All prolect conditlons such as
Iandscaping, parklng lot stpl plng, etc. must be completed before
requestlng thls lnspection.
FINAL BUILDING: Requested af ter the final plumbing, electrical,
mechanlcal and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certiflcate of Occupancy has been issued by the Building Dlvision
and posted on the premises.
ADDITIONAL COMMENTS;
PLANS REVIEWED BY DATE
,w