HomeMy WebLinkAboutPermit Electrical 1990-02-21i ZZs t'tov.th |th Street
i'sprLwfieLd, oregon 97477
BuiLding Diuision
7 26-37 53
b Locaticn:
tsessot,s MaP #
ubditision:
Addt ess:
ci
adl.itian
RemoCel
Date of Applicati
ntr
General
Plumbi
chanica
li ect.rj-ca
.. RESIDEI.ITIAL..SPFlINGFTEI..D
APPLICATIO*TPERMIT
26-3769 (recorder) state yout' City desigrn ted job nwnbet,
Elec tr
?o be nade after
prtor tc set up of
I d
iob aCdt'ess' tYPe
P,equesti tecei"*ed
of inspecticn
befcre 7:00 an
Su
It ie the
the
!ding
SITE INSPECTION:
e*cauarlo", A;i
forms.
ANDERSLAB,ICAL: To
PIIIAL PLUMBINO
FINAL MECHANICAL
FINAL ELECTRICAL
--Ddte: -1
to hee that aLL inepections ate nad.e at the P?ope" time' that each cddtees is reacabie
Va
fron*Bui
redponaibility of tle permtt hodet'
street, and tlwt the Penrtt eard ia
D,luiciot approt;ed pLan slnll remain
Located at the front of the property
on the BuiLding Sitc at aLL times.
PnocEDUBE FoR INSPECIION .E\-QyES?:CALL 7
"equest7-anA&en you uiLL be ready for'uiil be made the eane dag, requests made
inspection,Contnactoz's ot' Oumers ncme and plane nutnber.
aftet, 7:00 on viLL be rmde the "S"iir',* *'QDo lb()
PAOTINC & F)UNDATICN: ?o be naCe
a$ii'ffiEi' at'eircau ated and
forms are erected, but Pt'ior to
pouring ccncrete.
UND\RGROUTID PLAIBING, SEIIER, I,I.ATER'
DRAIIIAGE: To be nade PrLor to lLL-T@-iiin hes.
UTIDERFLOOR PLI]IIBING & MECHANTCAL :
of
floor ineulation or decking.
POST AND BEAM: To be nade Pt-iot' to
fritdTffii-of floor insulation ot'
deckitq,
Iour City Desigr,ated Job
DRYI.\ALL INSPECAI7N: To be made
Tftet-ilt@natTta in place,
but prior to ang taPing.
ILASONRY: Steel Location, bond
dffiijg,outing or uertieals in
accordotce t'lLth U.B.C. Section
2415,
WOODSTO'IE:
empT;tA.
After installation ts
ELECARICAL &
I N S ULAT I O II / VAPO R BA RR TE R I II SP,.E CT IO N- :
6ne maae aftet atl insulaticn and
rcquired oapor bawiera ee in p'laee
bui be|ore oty Lath, WPslttn boarC ot'
rnLL cooering is applied, cnd before
ay insulation is concealed.ana
CURB & APPRCACH A?N!'t: After forns
@,e er"c;Affinior to pouring
conerete.
SLDEWALX & DRIVEWAY: Por all con-
cr;;;nao@ilTffi street rlght-
of-tny, to be made after aLL erca-
oating canplete & form vtot'k & sub-
base naterial in Place.
irapections haue been
mad.e cnd. apptoued,.
FIRE?rttQt: FYiot' to Placir4 facing
^a;;;l;t; and before lroring inepee-
tton.
FRAL'IINC: l,tust be requested aftet'
approial of rough plwrhing, 3leetni-cal & neclwnical. ALt roofing
bracLng E chinmeys, etc. rntst be
; eottrpleted. No uonk is to be eon-
. ceCled until this inspectton las
?been nade anC app*oued.
o
?ENCE: hthen conplate -- fuouiCejffi or nooable sectione through
P, U.8,
ALL project conditions, such as the installation of st\eet trge_2,- conPletion-o! the
*"qr7r"2 Lanisccping, Lt"., i"t be satisfied befoTe the B:TLDTNG PINAL canbe requested'
FINAL B(JILDIN|: The Ei.nal Building fnspection nwet be requested aftet the Final Plwnbing
El";,;tri;;1:--ard uechani.cal rnspect-i,ono hsun been nade atd app*ooed'
?c,r tot #
Phone:
DEI,IOLITIO!] OR BUILDINCS
Sutitoty seoet capped et ptoperfil lite
Septic totk y.unped ard filled trith gta;tel
Pinal - l{lten abooe itens are canpleted
and uhen Cenolition is complete or sttac-
ture moued attd premiaes cleaneC up.
Hcnes
Blocking od. Set-uP
Plwtbittg conneetions -- scue! ord uater
Electrical Connection - Bloekittg' set-up
and plwnbing eonnections trust be apptot;ed
befoie nequeeting eleclrLeal inspecliott
Acceasori Bui.Ldirq
Ptnal - After pcrehes, skirting, decks,
etc. are cornpleted.
Page 1 of 2*AI,L IuANHCLES AND CLEANOUTS MUST BE ACCESSIBLD, ADJUSTIIENI TO BE MADE AT NO COST ?O CNY
Descrlbe l,lot'k:
].an
SOLAR ACCESS REQ.-L-co dJOB NO-
Access.P.L ae
North ilEastlSouthllWest
Iat Sq. Ftg.
I of Lot Cooetage
# of Stories
total Eeight
lropog"aphy
Bedroons:
Lot Faces -LO? ?WE
_ fntetiot'
Cormer
Panhandle
CUL-de-sac
ValueSQ. FTG xITEM
I'b.in
C@aqe
Accessory
TO?AL VALUE
S.D.C. 7.5 c
Date Pai.d:
Signed
Receipt #:
Building Volue & Permit
This penrit is granted on the erPreas eond-ition tLnt t'he said'oonatmrction
slnll, in al.- ,espects,-'i"iiri-ti- th-e ,t'dimnce adop.ted by bhe C,i'ty of
iwt"bftirta, inelluding'tirL-LL";"g Ct'dtnanc.e, regulating xhe ccnstructicn
and use of build'ings''*r,i-r\i1 a'n"eusP-ended ot'rbuokeC at cna time upon oic-
lation of any ptculsions of aaid ordinances'
Building PermLt
Total Cl,arges
State
TLL CHARGE Plumbing Perrnit
No Dereon sLaLL consttuet, instal!' altet ot clange-any ?reD.cr existing
';i,,i;u;;;"r;'Zr"a"iZ""ii;;"-i;-;il" or in patt, Lnlesb such petson is the
Legal poseessor of . rZ-tii'piiti"'i tLtn""L' &cept that a peoson nav do
plwnbing aork to p"rp")ty'"iiii-i" "*.a, LeLsed ot, ope*ated by the appli-
cant.
Fistw,ee
Resilential (1 bath)
Sani Seuer
Plwnbing Permit
State
Tctal
NO.Electricol Permit
WhereStateLanrequiresttnttheelectv'icaluorkbedoneby-anEleatrieal
Cont,actor, the electttrlcot po,L'Lo" of *'h.is -pe,mit slnll not be oaliC until
li'" tit"t'hns been aigned ty the Electtical contractot'Nan/Exterd Circuits o
Set"uice
I
lotal *
IT!M NC TLL CIIARCE Mechqnicol Permit
Eohanat HooC
Vent Fan
llcodsto,oe
Penrrtt fssuance
Meclnnicel Pet'nrit
CHMENT --
Seeurtty Deposit
Storage
Maintenance
Permit
anbcit
Sida,talk
Mobile Horne
uatePLan Erarnlnet'
I HAW CAREEULLy EXAv'|INED the completed application for permit' and- do
i";;L, ii*t;fA tlni'"1t-Lnfotmatibn heteoi is t,ue a,td.-correct, and l
ir"liL" certiiy that any ari aLL uork perforned a'@LL be done in accon-
dance r,tith th" onairai,i"es- of the City of 'spryngfield'
.attd the .Lae of the
* State of lregon p";:;;;i;;;s-'to tie w-rt< Cealcribbd het'ein, end tlnt N0 occu'
pANcy viLL be nace ;7-';;;;' ,;;";i"i iatio"t perrnission of the Buitdins DL-
uision. I furthet' certify that only contt'aitore otd.arplcyees uho ate in
Z^plri""u'rttt, oas zol.bss uiLL be- used on thie proiect
'\]TAL Al,l)UNT DUE: *tSrl
Set
Caraqe
PLan Check
Fence
Electrical la.bel
{
Permit No:
Address:
lssued Date:
STATEMENT:
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS 701.055(4), requires residential building permit applicants
who ara not regislered with the Construction Contractors Board to sign the
followingstatemeht before the building permit can be issued. Licensed Architect
and Engineer applicants, exempt from registration under ORS 701.010(7), need
not submit this statement. This statement will be filed with the permit.
i-Fill in the applicable blanks, and initial bdx 1 and either box 2A or 28:.
1 I own, reside in, or will reside in the completed structure.
2.4 My general contractor is
Contractor registration number
I will instruct my general contractor that all subcontractors who work on
the structure must be registered with the Construction Contractors Board.
OR
g.-*fl I will be my own general contractor.
lf I hire subcontractors. ! will hire only subcontractors reoistered with the
Construction Contractors Board. lf I chanoe my mind and Eo hire a qeneral
contractor. I will contract with a contrattor'who is reoistered w-ith the
Constructibn Contractors Board and I will immediately-notify the office
issuing this building permit of the name of the contradtor.
I hereby certify that the above information is correct and that I have read and understand
the lnformation Notice to Property Owners about Construction Responsibilities on the
reverse side ol this form.
Drte- I
CONSTRUCTION CDNTRACTORS BOARD
0244') 10t24tp
WHITE COPY TO ISSUING AGENCY PERMIT FILE
PINK COPY TO APPLICANT
@s
"j