HomeMy WebLinkAboutPermit Plumbing 1993-05-23SPRINGFIELE,
RESIDENTIAL
PERMIT APPLICATION
lnspections T26-3769
Otlice: 726-i\759
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:
LOT:
h,4
JOB NUMBER 7
225 Fifth Street
Springfield, Aregon 97 477
TAX LOT:
SUBDIVISIONBLOCK:
PHONE
ZIP:STATE:
226 72
CITY
--
ADDRESS:
OWNER: -
NEW _-, - REMODEL ADDITION DEMOLISH OTHER
DESCRIBE WORK:
PHONEEXPIRESADDRESSCONTRACTOR'S NAME
GEN I.-RAL:
CONST.
CONTRACTOR ''
RANGE:
I OF BDRMS:
_ OFFICE USE _
ZONING CODE:
FLOOD PLAIN
WATER HEATER
SECONDARY HEAT:
SOUARE FOOTAGE:
QUAD AREA:
# OF BLDGS
CONSTR. TYPE:
HEAT SOURCE:
OCCY GROUP:
-=-, OF STORIES: =.._=-.=--_-
# OF UNITSI ,
To reques t irn ins pection, you must call 726-3769. This is a 24 hour recording. All inspections requested before 7:00 a'm' will be
madr: the s.rme working cjay, inspections requested after 7:00 a.m. will be made the following work day'
REQUIRED INSPECTIONS
Temporary Electric Rough Mechanical - Prior to
cover.
Final Plumbing - When all
plumbing worl( is comPlete.
E Site lnspection - To be made
af ler excavation, but Prior to
setting forms.
Rough Eleclrical - Prior to Final Electrical - When all
electrical work is comPlete.cover
Underslab Plumbing/ Electrical/
Mechanical - Prior to cover.
Eleclrical Service - Must be
approved to obtain Permanent
electrical power.
Final Mechanical - When all
mechanical work is comPlete.
Footing - After trenches are
excavated.Fireplace - Prior to facing
materials and framing lnsP.
Final Building - When all
required inspections have been
approved and building is
completed.Masonry - Steel location, bond
bcams, grouting.Framing - Prior to cover,
Other
Foundalion - After forms are
erect,:d but Prior to concrete
placement.
Wall/Ceiling lnsulation - Prior to
cover,
Underground Plumbing - Prior
to fillrng trench.[--l Drywall - Prior to taping.
MOBILE HOME INSPECTIONS
Underlloor Plumbing/ Mechanical
- Pr'or to insulation or clecking.Wood Stove - After installation
Post and Beam - Prior to floor
insul.rtion or decking.lnsert - After f irePlace aPProval
and installation of unit.
Blocking and Set'UP - When all
blocking is comPlete.
Floor lnsulalion - Prior to
decki ng.Curbcut & APProach - After
forms are erected but Prior to
placement of concrete.
Plumbing Conneclions - When
home has been connected to
water and sewer.
f-iZ Sanilarv Sewer - Prior to f illing
La__J trencn.'Electrical Connection - When
blocking, set-up, and Plumbing
inspections have been aPProved
and the home is connected to
the service panel.
Stornr Sewer - Prior to filling
Sidewalk & DrivewaY - After
excavation is comPlete, forms
and sub-base materiai in Place.trencn
Water Line - Prior 1o filling
trenc n Final - After all required
inspections are aPProved and
porches, skirting, decks, and
venting have been installed.Rough Plumbing - Prior to Streel Trees - When all required
trees are Planted.cover
-o
?7/>
LAND USE:
E
tl
E
r
E
E
E
[-l Fence - When cornPleteC.
tl flE
E
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total height
Lot Type
-
lnterior
-
Corner
-
Panhandle
-
Cul-de-sac
P.L.HSE GAR ACC
N
S
E
IS THE PROPOSED WORK IN THE
HISTORICAL DISTRICT, OR ON
THE HISTORICAL REGISTEFI? _--
lf yes, this application must bc signed
and approved by the Historical
Coordinator prior to permit rssuance.
APPROVED:
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express conditron that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any t me
upon violation of any provisions of said ordinarrces.
Receipt Number:--
Plans Reviewed By
Plan Check Fee: --
Date Paid
Received By
VALUE
(A)
X $/SO. FT.
Total Value
Building Permit Fee
State Surcharge
Total Fee
BUILDING PERMIT
ITEM SQ. FT.
Main
Garage
Carport
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
Systems Development Charge is due on all undeveloped
properties within the City limits which are being improved.
ADDITIONAL COMMENTS
ITEM
Fixtures
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home
FEE
(c)
N0
FT.
FT.
FT.
,te I </ez
/2-*
PLUMBING PERMIT
/2*
-i-F.Z-
Plumbing Permit
State Surcharge
Total Charge
Wood Stove/ lnsert/ Fi replace Unit
Dryer Vent
(D)
N0Vent Fan
Mechanical Permit
lssuance
State Surcharge
Total Permit
M ECHAN ICAL. PERMIT
Fu rnace
Exhaust Hood By signature, I state and agree, that I have caref ully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I f urther certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springf ield, and the Laws
of the State of Oregon pertaining to the vrork dcscribed
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employer-'s who
are in compliance with ORS 70'1.055 v,rill be used on this
proiect.
I f urther agree to ensure that all required inspection;; are
requested at the proper time, that each address is readable
from the street, that the permit card is located at the f ront
of the property, and the approved set of plans rvill remain
Signature
Date
on the site at all t during construction
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk
-
ft
Curbcut
--
ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)
AMOUNT RECETVED - --e:
*=/
a>,>77DATE PAID
VALIDATION:
RECEIPT NUMBER
-
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, D, and E Combined)
42--
Date
RECETvEDav---fu
Permit No:%d7%
Address:
lssued by
y'/{y' n^ -|= -
e
R OFFICE USE ONLY
STATEMENT:
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITIES
Note: Oregon Law, ORS 701.055(4) , requires residential construction permit
applicants who are not registered with the Construction Contractors Board to
sign the following statement before the building permit can be issued. This state-
ment is required for residential building, electrical, mechanical, and plumbing
permits. Licensed Architect and Engineer applicants, exempt from registration
underORS 701.010(7), need not submit this statement. This statement will be
filed with the permit.
Fill in the applicable blanks, and initial boxes 1 and 2, and either box 3A or 38:
I own, reside in, or will reside in the completed structure.
I understand that I must register as a construction contractor if the structure is sold
or offered for sale before or upon completion.
A
1
2
3 My general contractor is ,
Contractor registration numbe
I will instruct my general contractor that all subcontractors who work on the struc-
ture must be registered with the Construction Contractors Board.
OR
3,8 I will be my own general contractor.
lf I hire subcontractors, I will hire only subcontractors registered with the Construc-
tion Contractors Board. lf I change my mind and do hire a general contractor, I will
contract with a contractor who is registered with the Construction Contractors Board
and I will immediately notify the office issuing this building permit of the name of
the contractor.
! hereby certify that the above inlormation is correct and that I have read and understand
the lnformation Notice to Property Owners about Construction Responsibilities on the
reverse side of s form.
*Gzz-*
Si of Permit lica Date
CONSTRUCTION CONTRACTORS BOARD
0244J 8t91
WHITE COPY TO ISSUING AGENCY PERMIT FILE
PINK COPY TO APPLICANT
INFORMATION NOTICE TO PROPERTY OWNERS
ABOUT CONSTRUCTION RESPONSIBILITTES
NOTE: T.frip ld0rmgtion Notice to Property Owners
was developed by the Construction Contractors Board
About Construction Responsibilities
in accordance with ORS 7fi:055(5),
':.. ' ' : --bv t he re.Oregon1989passed Legislatu
If you are acting as your.'owri contractor to construct a hew home or make a substantial improvement to an
existing structure, you can prevent many problems by being aware of the following responsibilities and areas
of concern
EMPLOYER RESPONSIBILITIE$::' ' -i! : . ?t, ';,
lf you hire persons not registered with the Construction Contractors Board to do labor in constructing or assisting
in the construction or improvement of alres!.d,ehfial gtructure, you.wit!;_in most'instances, b6-.ruled to be an
"employer" and the people you hire will be, "6dtrployees". As the employe( you must comply vtith the following:
Oregon's Wilhhglding Tax Lawj As an emptoyer, you musi withhold incorne taxes.frorn'emplayee wages at
the time employees are paid. -You will he,liabte for the tax-paym.eqlg 9vp1r_if y6gdon'faatuqtly withhold the
tax from your employees. For more information, call the Oregon Department oI ffevenUe at 378-3390.
Unemployment lnsurance Tax
'' ', ..., ;.'' ,'.' -'As an employer, you are required to pay-a tax for unemployment insurance
purposes on the wages of all employee$ - Fo1 molB,intorfration, call the Qlegon Em$oymenf Division DHR
at 378-3224.
Wqf[qq] Compensation lnsurance: As arneolployer, yorr are subiact to the Oregon \A/orkers' Compensation
Law, and must obtain workers' compensation insurance for your employees. lf you fail to obtain workers'
compensation insurance, you may be subject to penalties and will be liable for atl claim costs if one of your
employees is injured on the job. For more information, call the Workers' Compensation Division DIF at gf374g.
U.S. lnterr"l3l Revenue.9eryice: ,fu.qf ."fnployer, y-ou must withhold federal income tax.from employees' wages.
y,e,'i.iirveniryol['gion,t".i,"ttyili11ir'ogtne.taiF6rmoreinfc,imation,call
the lnternal Revenue Service at 221-3960.
OTHER RESPONSIBILITIES AND AREAS OF CONCERN:
Code Complianee: As the permit,holder for this project, ygu are responsible for resolving any failure to meet
code ?equirements that may b* brought to your attention through:inspections.
.-; ,.. ,r.,.: .. ., ,: ,:.
Liability and Property Damage lnsurance: Contact your insurance agent to see if ydu have adequate insurance
coverage for accidents and omissions such as falling tools, paint oversprai; wdf6r fainage from pipe punc-
tures, fire, or work that must be re-done.
'..-!i;:' ': , ,-. ;,'-":'i:-. . " ' ;' : ., . ,''s .: ':'. : '. -;t"i: t"' t' ii
Time.S, Supezuise Employees:,i-fi/lffke sure you,have strfficient tirne tO,siupervise yourtemployeesr
' *'i'-- 'r' 3i' :;1 S'a: tr '''9':
Expertise: Make sure you have the expertise to act as.your,own general contractor, to coordinate the work
of rough-in and finish trades,'and to notify building offid'ials at the.appropriate times so they can perform
lf you have additional questions, write to:Construction Contractors Board
700 Summer St. NE, Suite 300
Salem, OR 97310-0151
Phone 503-3784621
OT YqOC XHIqo24N 10124t89