HomeMy WebLinkAboutPermit Building 1987-12-17 (2)NE
COHBI I
74_
Legal Descr.iption -o?*o<a
Ra
Hea
EI,IERGY SOURCES:
I'later Heater
0wner Value of l/ork:
6a
. 0ther
I'la n
Sq. Ftg
Sq. Ftg
Access.
Add
ence
Address a
:€., Btt Sing e
Construction Lender
Addres s
Phone
\
\$
N
Prima
Structura I
E I ectri ca I
Hechanical
PLUI{B I NG ELECTRI CAL MECHAN ICAL
Each single fixture Res idence of
sQ. rr
--.
BTLI' s
furnace/burner to
Relocated buildino
(new fix. additional)New circuits altsor extensions
FIoor furnace
and vent
S. F. Residence(l bath)SERV I CES Recessed wal I
Space heater and vent
Duplex (1 bath) each
Additional bath Temporary Constructi on Apol iance vent
seDarate
[,later servi ce Change in existing
res i dence
Stati onar.v evap
cool er
Sewer muitifamily, comm 0r
I ndu stri a I
Vent fan with
sinole duct
Storm Sewer 0f s.Vent system apart from
heatinq or A.C.
c0r,il'r./IND. FEEDERS Mechan ical exhaust
hood and duct
I n sta I I /a l terl rel ocatedistrib. feeders ['lood stove/heater
ampt0f
ISSUANCE OF PFRIlIT
TOTAL CHARGES TOTAL CHARGES TOTAL CHARGES
I',HERE STATE LAN REQUIRES that the Electrical work be done by an Electrical Contractor, the electrical portion of this permitshall not be valid until the label has been signed by an Electrical Supervisor and returned to the Building Division
I HAVE CAREFULLY EXAMINED the completed apnlication for oermit, and do hereb.y certify that all information hereon is true
and correct, and I further certify that any and all work performed shall be done in accordance with the 0rdinances of the Cityof Springfield and the Laws of the State of Oreoon pertaining to the work described herein, and that N0 OCCUPAI,ICY will be madeof any structure without the permission of the Building Div'ision. I further certify that my registration vrith the Builder's
Board is in full force and effect as reguired by ORS 701.055, that if exempt the basis for exemption is noted hereon, and that
only subcontractors and employees who are in comcliance with 0l?S 701.055 l.ri'll be used on this Droject.
t'lAt'lE ( pl ease pri nt )S IGiIATURE DA.TE
FOI'I OFFICE USE ONLY
d _ Sq. Ftg. Access x Value
"r q.Ft;.nn""Wu;u"-767
TOTAL VALUATION
steris
7y
Deve
1.5%
I
-0cc.y GroFlood Plain Stori es
Loa
an
an
its
Ne-fe-a-
TYPelConst
opment
al ue
Fire Zo
Zone
Bedrooms
BUILDING PERI'IIT
Charges and
Surcha rges Res
Per Fee
Fto. l,lain x
FencePLUI4EING PERMIT
Charges and
Surcha rges Demo
Sidewalk
Tota l Cornb. I'ermi t
ELECTRICAL PERI1IT
Charges and
Surcha rges A/C Paving
Curb CutI,IECHANICAL PERMIT
Charges and
Surc harges
1/ 77loTALfrq/E<r tu
Job Address
PERMIT VALIDATION
Permit Clerk
COMBINATION APPLICATION/PERMIT (CAP)
I. APPIicant to furnish
A. Job Address
B. Legal DescriPtion
Il'-e*arpte- iax Lot 100' Lane county Map Reference
T7-0T-43?. example- Lot 1' Block 3' 2nd Addition to
SFifigTieta Estates
C. llame,'etc] of owner and construction lender
D. EnergY Sources iti or forced air qas
rr Sol are
E aluation, e sq. footq.foot house, 500 I
i
arage
proj ect, check new -if add ti on,
F. Building permit information:- -1. example -'iontt"'Ct single family house with an
;TtaaIed qaraqe
2. eiampte -'ie'6oef existing- garage into family room
3: ffiFT" - tonv""t single iamity residence into
restaurant (change of use)
G. Value of *o.f-ui-J.tined in Section 303 (a) of the
Structural SPecialtY Code
H. DESIGN TEAM AND CONTRACTORS
To avoid oesign oi construction delays' Building.
Division Stafi must be able to contact appropriate
persons t"gutdi;g-dtiign information or iob site
corrections, etc'
II. RUUreviatea plumUing, Mechanical, & Electrical Schedules
n.- Except wnere blink spaces occur-'in the description
poiiion of the Mechanical and-Electrical Schedules'
lne appticant-need fill-in only the No' Boxes adiacent
to thb appropriate item(s) to be-installed
B. Frff pfuirbini, Mechanicil, and Electrical Schedules
are availabli at the Building Division
1. To conserve space on the-permit form the schedu'les
have been abbreviated
2. If the item(s) to be installed are not covered on
the abbreviited schedules you should consult the
full schedules
C. BUILDING DIVISION STAFF WILL FILL OUT ALL FEES AND
CHARGES ON THE SCHEDULES
D. As noted on the CAP, the label must be delivered to the
electrical contractor for signature by his eiectrical
supervisor, The general contractor is not authorized
to sign the electrical iabel.
III. App'licant to sign and date
I'lhenever possibie, the initial application will be used as
a worksheet only. Where possible, Building Division Staff
will prepare a type written copy and return it to the
applicant at the time the actual permit is issued for his
s i gnature.
IV. Fees and Charges
Plan check fees are due and payable at the time of the
application, and no plans will be processed until these
fees are paid. All other fees and charges are due and
payable when the permit is issued.
V. FOR OFFICE USE ONLY
PROJECT CONDITIONS TO BE SATISFIED BEFORE OCCUPAI{CY:
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Information
PLANS REVIEWED BY:
name ate -/2'ig nature a7