Loading...
HomeMy WebLinkAboutPermit Plumbing 1994-07-12COMMERCIAL/INDUSTRIAL' - PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 SPFIINGFIELD JOB NUMBER ofCI INSPECTION LINE: 726-3769 OFFICE: 726-3759 / LOCATION OF PFIOPOSED WORK:,/fs 2r fP*,2a 4.€za a./'L 2 2422 ASSESSORS MAP:TAX LOT: PHONE: 33s o2I Ez) //rrz .4zz STATE: r 1 ZtP: OWNER: ADDRESS: CITY: DESCRIPTION OF WORKi NEW - REMODEL ADDITION DEMOLISH OTHER VALUE: NAM ADDRESS ADDRESS EXPI RES 2g PHONE MECHANICAL: ELECIRICAL: PHONECONTRAGTOR'S NAME ARCHITECT CONST. CONTRACTOR # GENERAL: PLUMBING PLUMBING NO.FEE CHARGE 3 Single Fixture !/2 l14aa Relocated Bld (new fix. addtl s ) Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backflow Device TOTAL PERMIT 3oe MECHANICAL Nr)FFF CHA RG F Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single d uct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT LAND USE: ZONING* OF UNITS: HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGEI WATER HEATER - OFFICE USL D OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/sQ. FT.VALUE TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY 32(o BUILDING PERMIT PLUMBING 3A.e-DEMOLITION 5% State Surcharoe 5% State Surcharge ?att .t4,,,/,fC z--Q z> MECHANICAL FENCE VALUE $ 5% State Su rcharoe SIDEWALK Fr. I SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL F?4Erzs d./< ,Ao-1 d'v-241Y{sr.r REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To reguest an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & , place but prlor to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these uNDERSLAB PLUMBING, inspections have been made sPEclAL INSPECTIoNS: ln accordance ELECTRICAL & and approved. section 306 0f the state specialty code MECHANICAL: To be made _ a special inspector shall be employed before any work ls covered, ATTIC DRAFT STOPS & by the Owner/ Contractor during URTAIN WALLS construction of the following work. A FOOTINGS & FOUN DATIONS: ro be made after trenches are FTREpLACE: prior to pracins 33%rij,Jl3o"rli L";i',J,?J"8lrt:iJ"" excavated and iorms are facing materials and before erected, ail steel in ptace, but framing inspection' STRUCTURAL CONCRETE: ln prior to placlng concrete. FRAMING: To be made after excess of 2500 P.S'l' (306 a'1) coNcRErE sLAB: ro be $:#:liilJ'il'Jlfl;tXi ,^ srRUcruRAL wELDS: made after all inslab building place and all pipes, chimneys Performed on the iob. (2722t) service equipment, conduit, and vents are complete and :i?[,ff""',",:;il:"; ?i]'*:'::J :1x';::[flil"i1':,X'iJ;[l:1: Blf,:,";?E]no;l"Eff"'L$t"o in place but before any tlghtenlng operations. (306 concrete is placed. TNSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON electrical, gas, sanitary sewer, barriers are In place but FIREPROOFING: U.BC. storm sewer, water and before any lath or gypsum Standards 43-8. drainage lines. To be made board interior wall covering is prior to covering or filling applied. SpEC;AL GRAD;NG,trenches. *., EXCAVATION AND FTLLING: ,NDERFL.oR: prumbing *.|{f,St"="tf;mtJfl[Hltt' Durins earthwork' (306 a'11 & electrical, mechanical. To be according to plans. Chapter 29) made prior to installation of floor insulatlon, decking or LATH AND/oR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. OARD: To be made after all Certificate by an approved lathingandgypsumboarcl,agency'furnishedtotheCity,s poST & BEAM: To be made interio] ano e-xierior, ls in Building Division before prior to installation of floor pt"Ce Out before any beams are placed' (2501 U'B."' insulation, decking or ftoor blastering is applied or before STDS"25-10J1)" sheathing.gypsumboardjointsandfasteners are tiped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'71 VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be ntade after all excavating comPlete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to Placing concrete. *ln addition to the inspec- tions specified, the Building Official may rrrake or reguire other inspections of any construction work to ensure compliance with the Bullding, Clty or Development Code. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereln is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregop pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this prolect. to ensure that all required inspections are requested at the proper time, that project address is readable from the front of the property, and the approved set of plans will remain on the site at all DateSignature times during constructl I further agree street, that the permit card is located (2.<o /s eio2a 2-AMOUNT RECEIVED: RECEIPT *:RECEIVED BY: DATE PAID: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project condltions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanlcal and Fire Department inspections are made and approved, No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Divlsion and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE 7*t: - ?r/ VALI DATION: -\ OREGON BUSINESS PROPERTIES, INC. BUSINESS . COMMERCIAL. INVESTMENT 35A BLAIR BOULEVARD EUGENE, OREGON 97402 PHONE (5o3) 342-6277 FAX (sO3) 342-6453 June 28, L994 To Whom ft May Concern: Mr. Mark Gerber As property manager for your leased space, 752 No. 28th St., Springfield, oregon, you are hereby granted permission to add plumbing fixtures (i.e. sinks, etc.), as necessary, to accom- modate your new business at that address. Best WeIIs t OCCI'PANCY INSPECTION APPLICATTON CITY OF SPRTNGFIELD BIII,DING DIIISION DATE:-1 JOB NUMBER: ADDRESS OF INSPECTTON:l5]. N ,L|te s + ,VNER. Oregon Business Properties, fnc. (Manager)pHONE NUMBER: 342-6277 OVNER,S ADDRESS: 358 Blair BIvd. , Eugene, OR 97402 fc APPLICANT:y\^"R -b<t APPLICANT'S ADDRESS: I5 L N, L 8 s+ FOR ACCESS TO PROPERTY - TELEPHONE NUMBER: -11'( - LolS gt\ be?-?Gog PROPOSED USE:U - R o,. K" l', Lr^. A $:S.OO INSPECTION FEE IS REQUIRED AT THE TIME OF APPLICATION THIS APPLICATION FORM MUST BE SIGNED BY THE OI{NER OF THE PROPERTY TO BE INSPECTED.&2) FOR OFFICE USE ONLY DATE PAID: DATE OF INSPECTION: RECEIPT NUMBER: DATE OF REPORT: DATE OF CERTIFICATE OF COMPLIANCE: COMMENTS: f a / <ts7{