HomeMy WebLinkAboutPermit Building 1991-05-13RESIDENTIAL
PERMIT APPLICATION
lnspections: 726-3769
Office: 726-3759
LOCATION OF PROPOSED WORK:jo+ LIa orrJ 7S rt*
h,
JOB NUMBER
225 Fifth Street
Springf ield, Oregon 97 477
ASSESSORS MAP t-? 03 3b 14 TAX LOT:t5660
LOT:BLOCK SUBDIVISION
zlPSTATE:
PHONE:1Lc..1L 1L-T>u-rc Src-r<-r-,t s+.)OWNER
ADDRESS:
CITY:
NEW .- REMODEL ADDITION DEMOLISH OTHER i
DESCRIBE WORK:
ADDRESS EXPIR PHONE
\taort *CONTRACTOR'S NAME
MECHANICAL:
ELECTRICAL:
PLUMBING:
GENERAL:
CONST.
CONTRACTOR #
RANGE:
g OF BDRMS:
_ OFFICE USE _
LAND USE:
ZONING CODE:
FLOOD PLAIN
WATER HEATER:
I OF UNITS:
SECONDARY HEAT:
SQUARE FOOTAGE:
QUAD AREA:
# OF BLDGS
OCCY GROUP:
S OF STORIES:
CONSTR. TYPE:
HEAT SOURCE:
To request an inspection, you must call 726-3769. This is a24hour recording. AII inspections requested before 7:00 a.m. will be
made the same working day, inspections requested after 7:OO a.m. will be made the following work day.
REOUIRED INSPECTIONS
Temporary Eleclric Rough Mechanical - Prior to
cover.
Final Plumhing - When all
plumElog work is complete.
Site lnspection - To be made
after excavation, but prior to
setting forms.
Rough Electrical - Prior to Final Electrical - When all
electrical work is complete.cover
Underslab Plumbing / Electrical /
Mechanical - Prior to cover.
Electrical Service - Must be
approved to obtain permanent
electrical power.
Final Mechanical - When all
mechanical work is complete.
Footing - After trenches are
excavated.Fireplace - Prior to facing
materials and framing lnsp.
K Final Building - When all
required inspections have been
approved and building is
completed.Masonry - Steel location, bond
beams, grouting.Kl Framing - Prior to cover,
Other
Foundation - After forms are
erected but prior to concrete
placement.Wall/Ceiling lnsulation - Prior to
cover.
MOBILE HOME INSPECTIONS
Underlloor Plumbing/ Mechanical
- Prior to insulation or decking.Wood Stove - After installation.
Post and Beam - Prior to floor
insulation or decking.lnsert - After fireplace approval
and installation of unit.
Blocking and Set-Up - When all
blocking is complete.
Floor lnsulation - Prior to
decki ng.Curbcut &Approach - After
forms are erected but prior to
placement of concrete.
Plumbing Connections - When
home has been connected to
water and sewer.
Sanitary Sewer - Prior to filling
trench.Electrical Connection - When
blocking, set-up, and plumbing
inspections have been approved
and the home is connected to
the service panel.
Storm Sewer - Prior to filling
trench.
Sidewalk & Driveway - After
excavation is complete, forms
and sub-base material in place.
Water Line - Prior to filling
trench.
Fence - When completed
Slreet Trees - When all required
trees are planted.
Final - After all required
inspections are approved and
porches, skirting, decks, and
venting have been installed.
tr
Rough Plumbing - Prior to
cover.
o(L
r
E
E i;ffin!"i,llin'.'-oins - Prior ffi Drvwatr - prior to tapins.
E
E
fl r
Lot faces
Lot sq. ftg.
Lot coverage
Topography
Total height
Lot Type
-
lnterior
-
Corner
-
Panhandle
-
Cul-de-sac
Setbacks
P.L.HSE GAR ACC
N
S
E
rS THE PROPOSED WORK IN THE
HISTORICAL DISTRICT, OR ON
THE HISTORICAL REGISTER? NO
lf yes, this application must be signed
and approved by the Historical
Coordinator prior to permit issuance.
APPROVED:
BU!LDING PERMIT
ITEM SO. FT. X $/SO. FT.VALUE
LL,5b
A,L),1 J
b5-@(A)
D,Total Value
Building Permit Fee
State Surcharge
Total Fee
Main
Garage
Carport
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the construction and use of
buildings, and may be suspended or revoked at any time
upon violation of any provisions of said ordinances.
Plans Reviewed By Date
Recei pt Numbe
Plan Check Fee:
Date Paid
Received By:
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
Systems Development Charge is due on all undeveloped
properties within the City limits which are being improved.
ITEM
Fixt u res
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Mobile Home
PLUMBING PERMIT
FEE
20,oo
,o, dl)
N
FT.
FT.
FT.5C
(c)
l, 6u
et,6)
Plumbing Permit
State Surcharge
Total Charge
ADDITIONAL COMMENTS
Wood Stove/lnserti Fireplace Unit
Dryer Vent
MECHANICAL PERM!T
(D)
N0
Mechanical Permit
lssuance
State Surcharge
Total Permit
Fu rnace
Exhaust Hood
Vent Fan
By signature, I state and agree, that I have caref ully examined
the completed application and do hereby certify that all
information hereon is true and correct, and I f urther certify
that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any
structure without permission of the Building Safety Division.
I further certify that only contractors and employees who
are in compliance with ORS 701.055 will be used on this
proiect.
I f urther agree to ensure that all required inspections are
requested at the proper time, that each address is readable
from the street, that the permit card is located at the front
of the property, and the approved set of plans will remain
*
3
on the site all times during
Signatu
Date
struction
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State Surcharge
Sidewalk
-
ft
Curbcut
-
ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)
TOTAL AMOUNT DUE (excluding electrical)
(A, B, C, D, and E Combined)
8G,v3
7oo f3
RECEIVED BY a=/'.2
AMOUNT RECEIVED
DATE PAID
VALIDATION:
RECEIPT NUMBER