HomeMy WebLinkAboutPacket, DIM PLANNER 12/5/2022DEVELOPMENT ISSUES MEETING FORM
APPLICANT: Ramona Mitchell
MEETING DATE/TIME: Tuesday, January 3,2023
PLACE: Virtual via Zoom
CONTACT PERSON: Andy Limbird 726-3784
Current Planning Staff: ❑L Miller, ❑A Limbird, ❑M Rust, ❑J Shull, ❑T Sievers
Jeff Paschall, City Engineer, DPW
Jeff Paschall, AIC Managing Civil Engineer—DPW
Ken Vogeney, Emergency Manager (DPW)
Clayton McEachem, Civil Engineer, Development & Public Works
Matt Stouder, Environmental Services Div. Manager/MWMC General Manager
Kristi Krueger, Capital Engineering Manager, Development & Public Works
Michael Liebler, Transportation Planning, Civil Engineer, Development & Public Works
Gilbert Gordon, Deputy Fire Marshall 2, Fire @. Life Safety Department
Ben Gibson, Maintenance Supervisor, Development & Public Works
Eric Adams, Planning, Willamalane Park and Recreation District
Ladd Boyce, Keoki Lapina, Springfield Utility Board (Water)
Greg Miller, Springfield Utility Board (Water)
Sanjeev King, Nick Amann, Springfield Utility Board (Electric)
Amy Chinitz, Springfield Utility Board (DWP)
Thomas Jeffreys, (EPUD) Emerald Peoples Utility District
Michael Wargo, Willamalane Park and Recreation District
Matt Caswell, Planning & Development Manager, ODOT, State Highway Division
(odotr2planngr@odot.smte.or. us)
Brad Rudler, (Electric) Eugene Water and Electric Board
Wallace McCullough, (Water), Eugene Water and Electric Board
Brett Yancey, Chief Operations Officer; Springfield Public Schools
Chris Reiersgaard, Asst. Director of Facilities &Operations; Springfield Public Schools
Safe Routes to School, Springfield Public Schools
Chris Carpenter, DPW Building Official
Andrew Shearer, Police Chief, Police Department
Tom Schwetz, LTD, Planning and Development Director
Luke Pilon, CenturyLink
Jeff Paschall, AIC Community Development Manager, DPW
Jeff Paschall, AIC DPW City Surveyor
Sunny Washburn, Program Coordinator, Environmental Services
Sasha Vartanian, Lane County Transportation (Steve Gallup, cc only)
Marie Longworth, Central Lane Communications 911
Monte Brown, Northwest Natural Gas
Jason McDonald, Comcast Cable
Water Resource Coordinator, ESD
Jamie Porter, Rainbow Water District
Kristina Kraaz, City Attorney (Mary Bridget Smith upon specific request)
Allie Camp, Economic Development
Sarah Weaver, Administrative Specialist (DIM Annexations)
Please mark who you would like to attend this meeting and return form and
file to Shannon. Thanks!
Revised: 06/08/2020
DEVELOPMENT
INITIATION MEETING
DEVELOPMENT AND PUBLIC WORKS DEPARTMENT
SPRINGFIELD CITYHALL
225 FIFTH STREET
DPW Conference Room 6151616 OR Zoon
Meeting Date; Tuesday, January 3, 2023 11.00-12.00
1. DEVELOPMENT INITITATION MTG #811 -22 -000256 -PRE 811-22-000263-PROJ Ramona
Mitchell
Assessor's Map: 18-03-02-24 TL 1500
Address: 1354 S. 2n1 Street
Existing Use: residential
Applicant has submitted proposal for residential redevelopment with home and shop and
possible future ADU.
Planner: Andy Limbird
The Development Issues Meeting informational packet for this meeting is available on-line for
you to review or print out @ Laserfiche website: www.si)ringfield-or.gov/weblink8/browse.asl)x
VICINITY MAP
811 -22 -000256 -PRE Development Initiation Meeting
18-03-02-24 TL 1500
1354 S. 2nd Street
Ramona Mitchell
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
ISPRIN6F1�
r ..
11111111111 r
Required Project Information (Applicant: complete this section)
r.wpauvu
A licant Name:
I Y t I
Phone:�-S^"SLa `l-i—�7-0
Company:
E-mail: -.ears
Address: 1356 S-
s�, S ✓I �e.0
j C04-/17
Prospective
Applicant's Rep.: Se F
Phone:
Com p an :
E-mail:
Address:
nn
Proe Owner:
Phone:
Company:
E-mail:
Address:
ASSESSOR'S MAP NO:
TAX LOT NOS :
Property Address: j354
Size of Pro ert: 4,
-eAcres
Square Feet ❑
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: fish hate v NrJ�(i +!d 4/dsh 4i
Existing Use: V7s6ic"
9 of Lots/Parcels: %
Av . Lot/Parcel Size: sf
Densit : du/acre
Prospecti�i Annir (
�a
j<0tA01bzq la7�w
Signature 9
•�Q_V'1'tOY1CZ %lir-�C�21�f
Print
rr�� Bit.]
�� c. y
ase No.:' 3 1-)-2--,,VI,V"'SiP - 7 Date: � (
DDlication Fee: S WI0 -t /0 Technical Fee:
FEES:
Revised 07/20/22 sml of 4
K01
Date: ff° o/'
Fee:
1354S 2nd (map and tax lot number 18-03-02-24-01500) Mitchell, Ramona DIM
Questions
Development Narrative
1354/1356 S 2nd St is a 4.11 acre lot located on the West side of S 2nd St, just North of Dorris
Ranch, map and tax lot number 18-03-02-24-01500. 1 inherited the property from my father in
2010. With recent changes in our lives we are now living on the property and ready to make
this our final home, as we have hoped for many years.
We will replace the existing house with a new house in the same location and construct a shop
to the South of the house, create an additional access to the property on the Southeast side
from S 2nd St, and construct an ADU in the future.
Currently, we are simultaneously obtaining bids for construction of a 1,500 sf shop and 2,800-
3,200 sf home. We plan to demolish the current home in the spring of 2023, unless
construction of a home requires earlier demolition.
Questions
1—Additional Access off 5 2nd: The current northern access, used primarily, to the property is
too narrow for a pick-up truck pulling a trailer or RV to pull into the driveway safely. It is
currently 13'8" long in the flat area and 24'6" including the wings, at the street curb. There are
two existing driveways to the property (one each for 1354 and 1356). Neither driveway can be
widened in such a way to accommodate larger vehicles, as each access is either restricted by
the water main or the utility pole. We would like to add a 3'd access on the South side of the
property to accommodate longer vehicle configurations and movement on the property.
Traffic has increased in numbers and speed of vehicles and it is becoming unsafe to backout of
the driveway or back vehicles in. Vehicles will speed by and cross lanes to pass unsafely.
a. What is the process required for an additional access?
b. What fees are required?
c. What is the maximum width allowed?
d. Can the Owner perform the work?
2—Demolition of existing house: The existing house was built in the early 1900's, is on pier
blocks, and has not been maintained for decades. Rather than remodel the existing house we
will demolish and build a new home in the same location. I am aware an asbestos report needs
to be performed and issued with a licensed asbestos abatement company contracted for
removal of asbestos materials.
a. What additional testing and reporting is required (e.g. lead based paint, etc.)?
b. Can the owner perform the demolition work, excluding the asbestos abatement?
Mitchell 1354 S 2nd St
c. Is there an application and permitting process for demolition?
d. Whatarethefees?
e. What records need to be kept, if any?
3—Construction of new house: At this time, I am searching for a builder to construct a new
home of approximately 2,8003,200 sf, 3-4 bedrooms, 2.5-3.5 baths. The house will be
constructed in the location of the existing house after demolition. The house will be a
minimum 10' from the northern property line and more than 50' from the eastern property line
fronting S 2ntl St.
a. Are any soils tests or engineering reports required? The property is all clay soil.
b. What is the process to tie into the current septic system?
c. What are the septic configuration requirements, including set -backs for both the tank
and drainfield?
d. Can we run conduit down the existing utility pole, located at the southern edge of the
2nd driveway, for underground service to the structures?
e. What is the process for temporary power/utilities?
f. What is the process for utility placement (application, permit, etc.), including any
requirement for upgraded equipment if needed (e.g. transformer)?
g. We are considering a builder that provides a completed shell with the owner performing
the site preparation and completing the home finishes (floors, cabinetry, fixtures, etc.).
Are they any special requirements to build a home in this manner?
4—Construction of a shoo: We are currently obtaining bids for either a pole building or metal
shop with a 34'x44' enclosed floor area with a 12' open extension (RV covered storage) for an
overall width of 46' and a potential 16' lean-to off the back of the structure (cover for farm
equipment). The shop will have 16' eaves, two roll -up doors, and one man door. The electrical
will need to accommodate 100 amps to run a welder and compressor. The shop would have a
full bath, either initially if constructed by the Owner or at a later time if the building is
contracted out.
a. Are there any additional requirements/upgrades needed to accommodate the required
amperage to run the welder and compressor (upgraded transformer)? If yes, what are
the costs and procedures?
b. What would the requirements be for a septic system to tie into the existing septic for a
future bathroom?
5—Timing of development: The overall plan is to construct both a home and a shop.
Unfortunately, finding, hiring, and scheduling construction is a challenge in the current market
and material supply chain, which makes timing an issue for construction of the two structures
while meeting our needs in a reasonable period of time. We need a shop as soon as possible
for our business operations and temporary storage while constructing a home. We will be
demolishing the house in preparation for a builder, which will likely come prior to completion of
Mitchell 1354 S 2n^ St
the shop due to weather, availability of contractors, and material supply chain issues. It is
unreasonable to push demolition and construction of a home out an additional year.
Additionally, the shop is needed for our business operations and is more financially reasonable
than renting off site storage.
a. What is the process to obtain a code waiver, if needed, to build a shop while
demolishing the existing house in preparation for the new house construction?
6—Future ADU: A future ADU build is planned for an 800 sf building.
a. What should be considered for septic tie-in?
b. What is the set -back requirement from the S 2nd street frontage?
Mitchell 1354 S 2nd St
N Mitchell, Ramona
494'-3.96" 1354/1356 S 2nd St
Springfield
60'-0.00" 63'-0.00" map/taxlot # 13-03-02-24-01500
prepared 11/25/22
\777\r
rb the existing first drivewa
CD ?ld begin at 22'; the second [
0 10'-0.00" f\
O
O O replacement Ohouse2,8003,200 oGravel driveway,10'-0.00" / NOTE: Approx. 54'from house
available for drainfield. estim M �=
ated size for the septic tanks
�n 17-0.00"
vl 34'"
Shop 1,5000
'poY f. 34x44
e
Note: rear lean-to 34
long
12' RV extension 44 ,.
long
46-0.00"
0
v
0
N
Scale 1:500
L_ 100'-0.00'