HomeMy WebLinkAboutApplication APPLICANT 11/29/2022City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
1 SPNINDFIELD
Required Project Information ..
Prospective Joe Karcher: joe@teamjck.com
Applicant Name: Roch Belisle: rockconstruction mail.com
Phone: 503-568-4043
Company; JCK Birdz LLC
Fax:
Address: 875 Country Club Road, Eugene, OR 97401
Prospective Cam Fultz, cam@cba-arch.com
A .:
Applicant's Re
Office: 206-782-2911
Phone: Cam: 509-312-0134
Company: CB Anderson Architect
Fax: 206-782-5624
Address: 7209 Greenwood Ave N, Seattle WA 98103
Property Owner: Joe Karcher: joe@teamjck.com
Phone: 541-342-6557
Company: JCK Enterprises LLC
Fax:
Address: 875 Country Club Road, Eugene, OR
ASSESSOR'S MAP NO: 17032531 Springfield
TAX LOT NOS
: 17032531-02700.-02800,-03100
Property Address: 1570 Mohawk Blvd, 97477
Size of Property: 0.74 acres Acres x❑ Square Feet ❑
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Re -develop site into food establishment with a drive-through
Existing Use: Retail, office building with a drive-through (bank)
# of Lots Parcels: -
Av . Lot/Parcel Size: -
sr
Densit : - du/acre
Prospective
Applicant:
Signatu e //
Print
Required Project Information (City Intake
Case No.: Date:
Date:
Staff., complete this section)
Reviewed by:
Application Fee: $
Technical Fee: 0
Posta a Fee: $0
TOTAL FEES: $ PROJECT NUMBER:
Revised 5/21/13 KL 10 1
Development Issues Meeting Process
The purpose of a Development Issues Meeting is to give an applicant the opportunity to discuss
his/her development proposal with the development review staff of the City. The discussion can
be general or specific, depending on the details provided with the application. A Development
Issues Meeting provides information to an applicant related to the current development
conditions and standards of the City. The Development Issues Meeting is not a land use decision
and does not confer any development rights, establish any conditions, or bind the applicant or
the City to any course of action. The meeting conveys the status of known development
opportunities and constraints. The status may charge over time as development conditions or
standards change.
1. Applicant submits a Development Issues Meeting Application
• The application must conform to the Development Issues Meeting submittal
Requirements Checklist on page 3 of this application packet.
• Development issues meetings are conducted every Thursday.
• We strive to conduct the development issues meetings within three to four weeks of
receiving the application.
• The applicant's proposal is circulated to the relevant staff in preparation for the
meeting.
2. Applicant and the City Conduct the Development Issues Meeting
• The applicant and any design team should attend the development issues meeting.
• The meeting is scheduled for one hour.
Staff attending the meeting will be prepared to discuss the issues raised in the
submittal by the applicant. Other issues raised during the meeting may also be
discussed.
• The meeting is informal and the City will issue no staff report.
Revised 5/21/13 KL 2 of 3
Development Issues Meeting Submittal Requirements Checklist
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application, technology, and postage fees are collected
at the time of complete application submittal.
❑ Development Issues Meeting Application Form
❑ Five (5) Questions - list specific questions the applicant would like staff to answer
during the meeting. So that each question may be fully evaluated, the list is limited to five
questions.
❑ Four (4) Copies of the Proposed Plan - suggested information valuable for staff to
review the proposal is listed below. It is not necessary to include all of these items on
the site or plot plan. However, applicants are encouraged to address as many as possible
given that the level of information that will be derived from the meeting is commensurate
with the level of detail provided in the application.
Applicants are also encouraged to include additional information on the plan as listed in
the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions &
Subdivisions - Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review
Submittal Requirements.
❑ Drawn in ink on quality paper no smaller than 11" x 17"
❑ Scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100'
❑ North arrow
❑ Date of preparation
❑ Street address and assessor's map and tax lot number
❑ Dimensions (in feet) and size (either square feet or acres) of the development area
❑ Location and size of existing and proposed utilities, including connection points
❑ On-site drainage collection system and flow patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DIMS Related to Land Divisions
❑ Approximate location, number and dimensions of proposed lots
❑ How streets in the proposal area connect with existing streets
DIMS Related to Site Plan Review
❑ Proposed and existing buildings: location, dimensions, size (gross floor area),
setbacks from property lines, distance between buildings, and height
❑ Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios and other impervious surfaces
❑ Parking and circulation plan
Revised 5/21/13 KL 3 of 3
CB ANDERSON
ARCHITECT
Date: Nov 22, 2022
To: Shannon Morris
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
smorris®springfield-or.gov
541744.3 387
Re: DIM QUESTIONS:
Site Address:
1570 Mohawk Blvd, 97477 - TENANT IMPROVMENT
A BRIEF NARRATIVE OF THE PROJECT
A tenant improvement of an existing structure used as a bank and other commercial offices with a
drive-through. The tenant improvement would change to a restaurant use. The square footage
would be reduced to comply with existing parking quantity. The reduction is easily achieved by
removing mezzanine use. The current bank teller window use would be pick up only for people who
have already ordered ahead on-line. No exterior work is planned.
BACKGROUND
We have a final site plan approval for a redevelopment. However, a drive-through is not the primary
building type that Dave's Hot Chicken (DHC) does. With the recent opening of the Eugene location
and additional input from corporate regarding this growing brand. It is likely not feasible to pursue a
redevelopment.
5 QUESTIONS
1. For this tenant improvement, can the existing driveway out on Mohawk at the south end
remain since no changes are occurring? Are there code triggers that can cause sitework to
happen even when no site work is proposed?
2. For this tenant improvement, do we have to provide vegetative stormwater treatment even
if we are not changing the parking lot? If no, can we update any landscaping? Alternatively,
can we voluntarily provide areas vegetative storm water treatment without triggering any
other site requirements? In other words, what can we volunteer to do with the current
layout (not changing non-compliant setbacks) to help the city with their critical few items
without triggering a landslide of other things?
3. For this tenant improvement, do we still need to replace the existing fire hydrant at the
northeast corner that is on an undersized main?
4. For this tenant improvement, do we still need to add street trees or do the public art?
208782-2911 7209 Greenwood Ave N
F: 208.782-%24 8eanle WA 98103
Development Issues Meeting
1570 Mohawk Blvd
Date: Nov 22 2022
5. We want to reuse this building as -is without major modifications, structural upgrades,
sprinkler adds, or building envelope upgrades. Our goal is to limit development to within the
space's existing envelope. 7o what extent can we relocate existing windows and doors
before they need to be preplaced with new meeting current energy standards? Are there
any problems with adding windows the fa4ade facing Center Street? (We know that city
design standards prefer this, and it doesn't hurt to have more visibility into the dining room,
but it is not necessary.) Similarly, there used to be a garage door at the north east corner of
the building. Is there a code problem if this were to become a sectional, glazed storefront
open to dining?
Page 2 of 2