Loading...
HomeMy WebLinkAboutApplication APPLICANT 11/10/2022October 20, 2022 City Administrator City of Springfield 225 Fifth Street Springfield OR 97477 Y SSW ENGINEERS. CML 5111110AL HILAIX616111 ams LN96a PLIMI 16 2350 Oakmont Way, Suite 105 Eugene, OR 97401 Subject: ADU Narrative at 1021 71M1 Steet, Springfield OR 97477 (541),185-8383 Fax (541) 485-8384 wnwemengineem.wm The following narrative is for the above property and will show compliance with the Springfield Development Code (SDC) section 3.2.275 for Accessory Dwelling Units (ADU). The proposed ADU will provide flexibility to accommodate changes in the current household sin and/or composition over the course of time, allowing for intergenerational living. Construction of the ADU will be detached from the primary single unit dwelling on the lot. The lot is zoned R, which allows the ADU. Per SDC 3.2.275(F) the ADU meets the following criteria: (1) The ADU is setback from the property line a minimum of 5 feet. ADU height is less than 14 foot in height and lot coverage is approximately 39% with the addition of the ADU. The ADU is built to current codes. (2) Per submitted plans ADU will contain a kitchen, bathroom and sleeping area that are completely independent of the primary dwelling. (3) ADU is 392 square feet which is less than permitted 800 square feet. (4) Per submitted plans ADU has an entrance that is separate from the entrance of the primary dwelling. (5) A 3 foot hard surface walk way to 71 Street shall be provided. (6) A new address will be given from the city at time of permit approval. (7) Outdoor storage and garbage areas are screened from view from adjacent properties and those across the street by the existing fence in the sides and back of the property and by the primary dwelling in the front. The fence is approximately 6 foot tall. (8) Structure is not a manufactured home or towable. Per SDC 3.2.275(G) the ADU meets the following criteria for Match the Primary Dwelling Standards: (1)(a) Exterior finish materials visually match those of the primary dwelling, consisting of horizontal wood siding. (1)(b) The ADU roof pitch matches the predominate roof pitch of the primary dwelling and the other structures on site (see attached photos) (1)(c) Trim around doors and windows match those of the primary dwelling. (1)(d) Windows match those of the primary dwelling in proportion and orientation. (the) Eaves project from the ADU the same distance as the eaves on the primary dwelling. The ADU meets the criteria set forth in SDC 3.2.275(F) & (G). Please let us know if you have any questions. Sincerely, Michael A Cox, P.E. SSW Engineers Inc. A -- Primary Dwelling Ai Total Predominant Roof 60% of Are. Minor Roof 40% of Are 0 N (T 4- t5 t i ' :SA yr 1 �1 .1 1 301X5 � i CnJ`aFr, k�LcS�uny DELKZ7 '. 3 t H: R RT S trO AFI EWnc4'cb ov S' 0'N KN rc R i �ftvnir f=�^.:fl At ror:r 9' ,Ec -pc a 60' y I I Vi us a ' 1L � J ul ;� I I Vi us a Ty P R SSm�D ��1$ d l�°n1 l� W J ���d —__.r_______ — � _ _ �_ — _ __� - - ��J.-� - -' � _ _9 __ _ �. ::. ::9 i - _ �_ P � __ _ __ _— y p`'� _____ __ �F SJ; E°�� ��w6� eaW�,a s$ wQ$ ��YWu s�QT� Z y >({�W �--- - - - � � � � o I I._ � � v `Y _ _ I e � �� y 3 \ `� 3�— � N i' _ �\ �� O / _ B\_ �# l F� I �" 9 � , l � i � --� �9r q] x -� � � � �_ r 4P _ n"4� ._ _ n_ �� �'d �'x .� c 4A<U- °J ¢ n h _ - f } r, m� 1 q:ham I e4 5l: y fT 1- t' n j u3� q:ham I e4 5l: y fT 1- I I I I I n j u3� w �U IVY$I S. y r ^14m� I q"da jry I I I I I .09 q 09 I I 'k I IZ aw .09 q \ ! � ! { \` | -�! Z� Vii§! li 4 §a R � ! \ ! { ` | -�! | � ! ! � : ) g !/ ! , : � ! S1M fORM: 20,14 (SiiTplif eO Approach }or Stnrrrfwater Management] Application Sp,,.,-���t� Building Permit#\\-h-Ooc1'kL�'YPI Address a4E. P,v..\ G2 9�4Z-1 Residential/Commercial Tax Lot # Icrcle onel NRCS Soil Type or Measured Infiltraiton Rate Facility Sizing for Water Quality Flow Control and Flood Control*** Only for use in Tvoe A& B Soils Surface Facilities Farility5izing Sizing Factor Total Proposed New or Replaced Impervious Surface Area �Bex 1 Impervious Area Reduction 0.13 = Permeable Pavements sf sf x 0.11 E. -Root sf Sand Filter sf x Contained Planter sf = Sum of Total Tree Credit sf Impervious Area Managed sT� Total Impervious Area ReductionRO Roz 2 Total Impervious Area Requiring Stormwater Managemment -- � 8-0-X3 pci- MX z) Facility Sizing for Water Quality Only Overflow tog utter (weephole)� Surface Facilities Impervious Area Managed Sizing Factor Faclity Surface Area Rain Garden sf z 0.05 = Stormwater Planter sf x 0.03 = Swale sf x 0.06 = Vegetated Filter Strip sf x 0.2 = Sand Filter sf x 0.03 = Facility Sizing for Water Quality and Flow Control Surface Facilities Impervious Area Managed Sizing Factor Faclity Surface Area Rain Garden sf x 0.11 = Stormwater Planter 50-> sf x 0.07 •PCOJ14�'.4.r� Sand Filter sf x 0.07 = Facility Sizing for Water Quality Flow Control and Flood Control*** Only for use in Tvoe A& B Soils Surface Facilities Impervious Area Managed Sizing Factor Faclity Surface Area Rain Garden sf x 0.13 = Stormwater Planter sf x 0.11 = Sand Filter sf x 0.11 = Sum of Total Impervious Area Managed sT� Box4 Paint of Discharge (check ane( (Box 4 must be equal or greaterthan Sox 3) Overflow tog utter (weephole)� Overflow to Publicstorm drain pipe Overflow to Open Drainage Subsurface Infiltration D 30 �,s T�mT€e Rall Stora water Subsurface Filtrationllnfiltretion Facility Sizing Spreadsheet 24 Hour Storm, NRCS Type IA Rainfall Distribution City of Eugene 1021 7th Street Parma Number: 811-224OD182WP1 Springfield. OR 97477 Catchment to: [Catchment to] Michael A Cox, P.E. SSW analnoers Inc. Complete this form for each drainage catchment in the project site that is to be sized per the Presumptive Approach. Provide a distinctive Catchment ID for each facility coordinated with the site basin map to correlate the appropriate calculations with the facility. The maximum drainage catchment to be modeled per the Presumptive Approach is 1 acm (43,560 SF) :or infiltration facilities in Class A or B soils whem no infiltration testing has been perfromed use an infiltration rate of 05 imhr. rorman design "Yes" from the dropdown boxes below next to the design standards requirements forthis facility. Pollution Reduction(PR) Na 'sealage mmnrhes dreinng mmmenral Mn,hg la. regmm pre-mamemm man PMIMn mda on maulremems Flow Control (FC)J Yes Destination(DT) Yes •nn lml0anm muay mmm ce aw..n a. uwfoolrobpe W mea aesmnamnn regmremems Total Square Footage Impervious Area= 503 sgft Total Square Footage Pervious Area= 050 q Impervious Area CN= p 98 Flow Control Pervious Area CN= 85 Total Square Footage of Drainage Area= 503 all Time of Concentration Post Developnvmt Omin Weighted Average CN= 98 Site Data -Pre Development (Data In this section's only used if Flow Control Is required) Pre -Development CN= 85 Time of Concentration Pre-Dewlopmanr mmn Soil Data Tested SoilingNraeon Ra[a+ iNhr ts.e ll.. 4) Destination Design- r/hr Design Sotl Infiltration Fete= imhr Soil Infiltration Rate Re uirement Rainfall Depth cesiumStorm Pollution Reduction t,41 c9_ s Water Oualtt Flow Control 3.6 inches Flood Contrd Destination 3.6 inches Flootl Control Surface Facility Surf. Facility Surface P Basin Effective Facility Percent Storage Depth Material DepN lin) Votes lint Drains a Rock, Layer 1 12.0 35% 6.2 Drainage Rock, Lae;2 0.0 0.0 rotate= 120 in 4.2 Pollution eduction- alcu aflon Results Peak Flow Rate to Stormwater Facility= 0.004 ds Peak Facility Overflow Rate- 0.000 ds Total Runoff Volume h Storacal;=� Faclliry= 98 cf Total Overflow Volume= 0 of Max. Eff. Depth of Stormwater in FacIIItY 0.1 in Drewdown Time= D.2 hours r—N\7,7lFacility Sizing Meets Pollution Reduction Standards? MA Jkleets Requirementof NO Facility Flooding? NVQ MeetsRequirementfor Maximum of 18 Hour Drawdown Time? Flow Control-Calculation Results Peak Flow Rate to Stormwater Facility = 0.011 cis Peak Facility Overflow Rate=ds loate Total Runoff Volume h Smmv Facility= 141 & Total Cver low Volume= d Peak Off3ile Flow Rate Max. Eff. Depth of Stornnvater in Facility= 1.3 in Filtration Facility Underdraim;PIds Drewdown Time= 0.2 hours P .. vetoomen l Runion a Peak Flow Rate = 0 con &s Total Runoff Volume = 88 d F-771Facility Sizing Meets Flow Control Standards? YES Meeh Requirement for Post Development offsite flow leas or equal to Pre�Developmem Flow? VES Meeh Requirement for Maximum of la Hour Drawdown Time? Destinatlon-Calculatlon Rescue, Peak Flow Rate to Stormwster Facility 0.011 ds Peak Facility Overflow Rate-0.000 ds Total Runoff Volume to Stormwate Faclliry= 141 Lf Total Overflow Volume= 0 of Max. Eff. Depth of Stormwater in Facilay= 3.6 in Drewdown Time= 0.2 hours =Facility Sizing Meets Destination Standards? VES Meets Requirement of No FacilityFlooding? VES Meets Requirement for Maximum of 30 hour Drewdown Time? 11MQ022-11:21 AM