Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Plan, Final PLANNER 10/12/2022
C P 1 1 2 CHILDREN'S CHOICE MONTESSORI 1942 5TH STREET, SPRINGFIELD, OREGON 97477 DESIGN TEAM PROPERTY OWNER AND TENANT: CHILDREN'S CHOICE MONTESSORI 1942 STH STREET SPRINGFIELD, OR 97477 541-915-0896 CONTACT: CARLA MCQUILLAN EMAIL: CARLA@MANSTREETMONTESSORLORG ARCHITECT: ROBERTSONISHERWOOD(ARCHITECTS PC 132 E. BROADWAY, SUITE 540 EUGENE, OR 97401 541-342-8077 CONTACT: JOHN WEBSTER, AIA EMAIL: AWBSTER@ROBERTSONSHERWOOD.COM CONTRACTOR: R B M CONSTRUCTION, LLC CCB#210036 1275 S 58TH STREET SPRINGFIELD, OR 97478 541-912-2137 CONTACT: ROBERT MONTGOMERY EMAIL: ROBMONTI 3@YAHOO.COM SHEET INDEX Al PROJECT INFO, EXISTING SITE PLAN A2 PROPOSED SITE PLAN A3 CODE REVIEW, EGRESS PLAN, REMODEL PLANS A4 DETAILS AND INT ELEVATIONS DEFERRED SUBMITTALS THE FOLLOWING ITEMS WILL BE SUBMITTED AS A DESIGN -BUILD DEFERRED SUBMITTALS. THESE SUBMITTALS ARE TO BE PREPARED BY THE SUBCONTRACTOR RESPONSIBLE FOR THE WORK AND SUBMITTED TO THE CITY FOR APPROVAL PRIOR TO THE START OF INSTALLATION: 1. PLUMBING DESIGN AND DRAWINGS AS REQUIRED. 2. ELECTRICAL DESIGN AND DRAWINGS AS REQUIRED. 3 LAND USE CODE ANALYSIS LEGEND LAND USE CODE ANALYSIS BASED ON CIN OF SPRINGFIELD DEVELOPMENT APPROX. LOCOATION CODE. VEHICLE PARKING REQUIRED (SDC TABLE 4A.4: SDC 4.7-125 CH ILD CARE FACILITIES: STANDARD PARKING: 1,474 SF/ 300 SF PER SPACE= 5SPACES SITE SETBACK DROP-OFF PARKING: 1,474 SF / 700 SF PER SPACE= 3 SPACES LOCATION: 19425TH STREET, TOTAL REQUIRED PARKING SPACES: 8 SPACES REQUIRED SPRNGRELD,OR97477 ET ELECTRICAL TRANSFORMER VEHICLE PARKING PROVBED: MAPRAXLOT: 17-03.2644 LOT 30DO THREE (3) 'DROP OFF"PARKINGSTALLS as (THIS INCLUDES ONE VAN -ACCESSIBLE STALL). ZONING: SIX (6) STANDARD SIZE PARKING STALLS HDR- HIGH DENSITY RESIDENTIAL (R -3) -NO CHANGE (TANDEM STALLS - n CARS DEEP). USE AS CHILD CARE CENTER APPROVED WITH TOTAL PROVIDED PARKING = 9 SPACER SITE PLAN REVIEW (TABLE 3.2.210). BICYCLE PARKING REQURED (SDC TABLE QWI: ERY. ASSISTED CARE AND DAY CARES (1 PER 5 FTAPLOYEE) MINIMUM LANDSCAPE FRONTYARD SETBACK: 10 FEET (OK) 9EMPLOYEES- 2 SPACES REQUIRED (75% LONGTERM 125% SHORT TERM) 6 FEET HIGH SIGHT -OBSCURING FENCING AROUND OUTDOOR PLAY AREAS. —m—yw—m—yw— PROPERTY LOCATED ALONG I-5 YEAR TIME OF TRAVEL ZONE FOR THE Q 4 SPACES REQUIRED MINIMUM PER SOC. STREET WELLHEAD AS DEFINED IN THE CITY OF SPRINGFIELD DRINKING Q3 WATER PROTECTION (DVVP) OVERLAY. BICYCLE PARKNG PROVIDED: a 3 LONG TERM AND 1 SHORT TERM SPACES PROVIDED. AREAS: OLU OVERALLSITE AREA: 45,745 SF (0.53 ACRES) EXISTING IMPERVIOUS AREA: 6,300 SF` f NET REDUCTION OF 545 SF TO IMPERVIOUS AREA PROPOSED. BUILDING AREA: 1,474 SF - LANDSCAPING DESCRIPTION OF WORKD (E) DRIVEWAY AND PARKING STALL REPLACED WITH NEW SOD GRASS TO MATCH EXISTING ADJACENT. NO DEDICATED LANDSCAPING IRRIGATION IS PRESENT ON SITE. EXISTING LANDSCAPING (GRASS AND TREES) MANUALLY IRRIGATED WITH HOSE BIBB. (E) 8 (E) T — _ P1.4ID86 _ - RLUMIL (E) MAPLE I co I 17-03-26-24 LOT 3000 (E) w I GATE 0 (E) -vo, I (E) 6' CHAIN LINK FENCE PARTMENT o I f ILDING Do (E)T' FRUIT BU TREE w I w I LL 0 U UNDEVELOPED SITE w z (E) 8" FRUIT EF (E) 6' WOOD FENCE I 8A APARTMENT APARTMENT PARKING LOT BUILDING EXISTING IT AND SITE DEMOLITION PLAN 1 2 PROPOSED CHANGE OF USE FROM EXISTING DAY CARE CENTER (16 STUDENT MAX) TO CHILD CARE CENTER (30 STUDENTS MAX). REMGBEL OF 61 ILBREN RESTROGM (AGE GROUPI C EE He A3 REMODEL OF EXISTING STAFF BATHROOM TO INCLUDE ADA TOILET AND LAVATORY CONFIGURATION. (E) 6' WOOD FENCE S S, P yr LEGEND SItOJy Loop Dr APPROX. LOCOATION / PROPERTY LINE 1 9 SITE SETBACK � 9 CURB I SIDEWALK m ET ELECTRICAL TRANSFORMER v f v f ELECTRICALMETER as O WATER METER � M AREA DRAIN (DR) N 8905500" E 627.00'— OVERHEAD ELECTRICAL LINE — ERY. ----— — —w —w —w —w — WATER UNE —m—yw—m—yw— a STORM WATER LINE ✓Q St m b K 051 3 a � u, WITH ATRIUM GRATE OLU ym DRIVEWAY APRON, f VICINITY MAP NTS J R St PROJECT LOCATION: 1942 5TH STREET 0 St SPRINGFIELD OREGON (E) FIRE HYDRANT ICfO A (E) SCHOOL BUILDING(E) PLUMB I� (E) (E) AMP ---- 1,474 SF LAWN PLAYGROUND 7 ( ISI N N BARK PLUMB (E) 41'-0110 ^ DECK I DEMO(E)DOOR Q ?� 1 D 9 r 1 I o 3'f- — — — — J J (E) WALL MOUNTED 1tl-d' o -- o ATE FLOOD LIGHT FRONTAGESETBACK Z (E)SI EWAL (2DDS) 4 W W A3 - - aLx_L DECK (E)RAMP (El 4"(E) 8,.IILSSS SS (E) 8SS S - E) / (E) PLUM TRETE PLAYGROUNDBARK III BARK I (E) / SW SY% � S SW J� (E)W LL MOUNTED (E)BINSSH (E)CONIC — — — (E) OUTDOOR FLOOD LIGHT (E) COVERED STEPS py REMOVE APPROX 545 SF OF FENCEDPLAY AREA PATIO F (E) ASPHALT DRIVEWAY (5,265 SF) / L--- ' --- ' --- ' --- \ AND GRAVEL PARKING (E) WALL MOUNTEDSTALL GLOBE LIGHT 0�F EI25 E FIR pR OCATE llp BAKE (E)CONCRETE z o Ox, RACK PLAY AREA w x z '" / (1.929 SF) �'� ¢;,., \I // (E)T' E) 6' a 50 EE REE „Up °3 F N E IT WOOD FENCE — — — — — N 89055'00" E 627 (E) ET ❑ TREE (E) SU (E) IP (E) I POLE 7 0� wwa y W SHARED ACCESS EASEMENT a (E) ASPHALT DRIVEWAY N a 196.00' APARTMENT /PARKING LOT (E) APARTMENT BUILDING 3 4 11 SITE LEGEND N vii N APPROX. LOCOATION / PROPERTY LINE OF 5 -YEAR TIME OF J SITE SETBACK TRAVEL BOUNDARY 4�RC&R1Sg15NFRWCOR CURB I SIDEWALK FOR THE ET ELECTRICAL TRANSFORMER Q STREET WELLHEAD / E❑ ELECTRICALMETER as O WATER METER ® AREA DRAIN (DR) N 8905500" E 627.00'— OVERHEAD ELECTRICAL LINE — ERY. ----— — (E) FIRE HYDRANT ICfO A (E) SCHOOL BUILDING(E) PLUMB I� (E) (E) AMP ---- 1,474 SF LAWN PLAYGROUND 7 ( ISI N N BARK PLUMB (E) 41'-0110 ^ DECK I DEMO(E)DOOR Q ?� 1 D 9 r 1 I o 3'f- — — — — J J (E) WALL MOUNTED 1tl-d' o -- o ATE FLOOD LIGHT FRONTAGESETBACK Z (E)SI EWAL (2DDS) 4 W W A3 - - aLx_L DECK (E)RAMP (El 4"(E) 8,.IILSSS SS (E) 8SS S - E) / (E) PLUM TRETE PLAYGROUNDBARK III BARK I (E) / SW SY% � S SW J� (E)W LL MOUNTED (E)BINSSH (E)CONIC — — — (E) OUTDOOR FLOOD LIGHT (E) COVERED STEPS py REMOVE APPROX 545 SF OF FENCEDPLAY AREA PATIO F (E) ASPHALT DRIVEWAY (5,265 SF) / L--- ' --- ' --- ' --- \ AND GRAVEL PARKING (E) WALL MOUNTEDSTALL GLOBE LIGHT 0�F EI25 E FIR pR OCATE llp BAKE (E)CONCRETE z o Ox, RACK PLAY AREA w x z '" / (1.929 SF) �'� ¢;,., \I // (E)T' E) 6' a 50 EE REE „Up °3 F N E IT WOOD FENCE — — — — — N 89055'00" E 627 (E) ET ❑ TREE (E) SU (E) IP (E) I POLE 7 0� wwa y W SHARED ACCESS EASEMENT a (E) ASPHALT DRIVEWAY N a 196.00' APARTMENT /PARKING LOT (E) APARTMENT BUILDING 3 4 11 SITE LEGEND N vii N ------- 3 N 3 N PROPERTY LINE DRAWN BY: J SITE SETBACK CRS 4�RC&R1Sg15NFRWCOR CURB I SIDEWALK m 3 N 3 N ET ELECTRICAL TRANSFORMER 0 E❑ ELECTRICALMETER 3 h O WATER METER ® AREA DRAIN (DR) vii OVERHEAD ELECTRICAL LINE —s—n—s—n— ERY. SEPTIC SEWER LINE —w —w —w —w — WATER UNE —m—yw—m—yw— a STORM WATER LINE Final Site Plan APPROVED: Ont _14-2F &I Sem or Planner October 12, 2022 3 N ai SCALE 1:10 3 N N N PAI 5 io Robe rtsonISherwoodlArchitects Pc 132 East Broadway, Suite 540 Eugene, Oregon 97401 541-342-8077 www.robertsonsherwood.com N N vii N SITE REVIEW -REMODELS 3 N 3 N 2218 DRAWN BY: J CHECKED BY: CRS 4�RC&R1Sg15NFRWCOR LU m 3 N 3 N N ai ai 0 3 h 3 N N 5TH STREET - 60 FEET - a �3 N vii LU/ ERY. M N 3 h a w SS (E)AREA DRAIN 3 3 REPLACE GRILLE u, WITH ATRIUM GRATE OLU REMOVE (E) DRIVEWAY APRON, REPLACE WITH NEW SIDEWALK AND CURB - PER SPRINGFIELD STANDARD DETAILS 3 N vii 37 AND 3-12 SW (S� 8 ~ MM W 1 LL " 3 N' � w / U U) W LU =W Ln LU � N N N LTD BUS STOP LOCATED _j W Z N 3 N ACROSS 5TH STREET, LU APPROX. 350 FEET J SOUTH) 0 o Final Site Plan APPROVED: Ont _14-2F &I Sem or Planner October 12, 2022 3 N ai SCALE 1:10 3 N N N PAI 5 io Robe rtsonISherwoodlArchitects Pc 132 East Broadway, Suite 540 Eugene, Oregon 97401 541-342-8077 www.robertsonsherwood.com 17/29/22 CITY COMMENTS 2 8/30/22 REVIEW COMMENTS 3 10/4/22 FINAL SITE PLAN ISSUE DATE: 7/28/2022 ISSUE: SITE REVIEW -REMODELS PROJECT NO: 2218 DRAWN BY: J CHECKED BY: CRS 4�RC&R1Sg15NFRWCOR LU 0 LU/ ERY. N p N ~ OLU L Z O W MM W V U LU W LU =W O LU N _j W Z N W Z LU LL J H 0 o z a FE a U N N MARK DATE DESCRIPTION 17/29/22 CITY COMMENTS 2 8/30/22 REVIEW COMMENTS 3 10/4/22 FINAL SITE PLAN ISSUE DATE: 7/28/2022 ISSUE: SITE REVIEW -REMODELS PROJECT NO: 2218 DRAWN BY: JRW CHECKED BY: CRS 4�RC&R1Sg15NFRWCOR 0ACK1FLT5PC A13 CPtlW15NFFi98Xeq PROJECTINFO EXISTING SITE PLAN Al C b 8 8 PARKING PARKNG SIGN ACCESSIBLE SIGNAGE PER ORS 447 VAN ACCESSIBLE VAN SIGN i5 5� m o z ADA PARKING SIGN A2 NTS I CC)l ml N Ld > (E) PARTMENT o BUILDING Tn I I 1 I/ BUILDING �1 SITIE PLAN R I \,A2/ 1,10 0' r4 WVJ 1401 2 (E) CON( (E) WOOD LANDING RAMP PARKIN a NEW CONC LGN, SE 6 SIDEWALK Q Q AILS d FLUSH a WITH 4 o M, ADA VAN RIS 36" �f �9-0 NO PARKIN( 8-01/0 PANT'NO PARKING" WITHIN LOADING ZONE r --(E) DRIVEWAY r31 ADA PARKING STALL A2 V4" V4"=1' -O" (E) 8" — — — — — — — (—PPL(4TQ)bBB�I,,�/�1---- _ MAPLE 17-03-26-24 0 LOT 3000 (E GATE (E) 6' CHAIN LINK FENCE ( - - - - - - '. - ELY". ELY" to -0, wIr M z W y LL O O fe w UNDEVELOPED b m 3 SITE � D Q 0 5 E)CONCRETE EM ILOYEE PARK( G (1,717 SF) 5 (6)TANDEM m (E)8" P RKING SPACE FRUIT STANDARD 6 SKEE------ — --- _L�� (E) 6' WOOD FENCE L — APARTMENT PARKING LOT C 3' 3 PER CITYOF SPRINGFIELD STANDARD DRAWING 112 c>xnau�wt, xwcs - vFwwtt\ to W1acxA wwx tet\ l5 Cm cR55Tt<:w •vex.Mt� S' 1W Smwfi>x P3,PPNs�cx� a As �'3 % zESA\cw YLax YA\CN d3NL`�i WNRS W C�9 WHEPE POSSE£ CURBSIDE SIDEWALK FGLNa E61FE 50:1 W%. SLOPE .ypiE �• I NN6 P.we MM mwM Mom MnxW R'nnW 5- ul . `�yOY' 41 y _ IR ii III µ: IV 4,0!11t Q Y,J,4R' ':cw :-t :• . LO Mot AOPF TO Vp1p�Y Qh"¢.T}yg5�+�9 LL4E ' C' 2- MINIMUM OF 3/4° MINUS IY EM Wp1Cl1D SUBGBADE COMPACTED CRUSHED ROCK CRUSHED ROCK BVWT 4° MINIMUM P.C. CONCRETE PMFW PR A TO SIKER PAMEMEM NOTES * W.IBOMMANIND MOLLIES DME NIOMNRS PIMB POLES, UM BA IG WJVEI J-FKAEI ETC) 9WL BE RPoDIFD WHIM SNE 91 NEA * NL WWCES SHML HAVE A BWM MSH. * SULWWS..WCFS5 RXMPS, NB REWEXM OMNI SILL BE ]000 N ECD SMENMH (.NSD P51 UB SIM" &0 SN:K MIX OMRETE * W EI k COMYERCYL ORMtYN'R SKILL M 3MN1 P9 REM WORM (WB M MB SIENOM) 63 SMAf MIX COIICMM �21 SIDEWALK CONSTRUCTION A2 j NTS (E) 6' WOOD FENCE (E) PLAYGROUND BARK (E) 9„ PLUMB (E) EI FRUIT PLAYGROUND 19, TREE BARK 10'POLE-MOUNTED "(E)COVERED BACK-TO-BACK LIGHT TRAVEL BOUNDARY (10OW, LEI) FIXTURE) W J PER CITY OF SPRINGFIELD CURB REPLACEMENT STANDARD DRAWING I7 WITH STANDARD CURB DMA MAY (INOM W TRAN IIDN MR) SNN1 NOT CUMPMOPFRIY IN PRO.IFLTIM _ —j4 M4%IMUM M( 1) SAWCUT K DEEP AS CLOSE RTO CURB AS PRACTICABLE SAWCUT 4' DEEP (MIN) AS COME - TO THE CURB AS PRACTICABLE '"P"w°MW I BREW 4 (3) REMOVE APPROACH X I I q 4 DRILL 3/4° x 4 1/2° HOLES INTO UISTNG 1 CUTLER BAR 24° O.C. - FILL HOLE WITH EPDXY M AND INSERT B° LONG d5 FEW INTO HOLE •� PRIOR NI PoURING NEW CURB. GU71CI BHR ° °• NOTES * DEW GNNR W6 SW1L Nm BE REMIXED MUT BEER MPMAW RE ME M 4 CURB CN MM SWll BE N ICCCR WCE MTH PERMIT 4 WE'A MLY, CUFB CNS WY BE YMf➢ UENG M PMCISM CUT MEMO Efl EpRMflR * SCUMI .MfA RWPS NO MSNMUL MRtMAK `AWL BE m P9 naL mom Go P9 MB sIIRW1N) 6A WE In MNRIE 4 CURBS 9 COMMRCVL DRM'MK SMll BE M P3 FEW OREM (1525 W UB MEI 63 WE MIX OINf.MR ') CURB/ GUTTER CONSTRUCTION A2J NTS (E) (E)OUTDO E) OUTDOOR FENCED PLAY AREA / (5,265 SF) (E) 25-- FIR 5 FIR () SHORT -TER / BIKE PARKIN — _ — — _— — — (E) ET ❑ TREE PARKNG AREA FROM VEHICULAR PARKING WITH CURB ALONG VEHICLE / PATH — — _ / APARTMENT /PARKING LOT �I � III l� .• R Ih- � II R � e ■ � ■ Dill 1 1) _111 uI / LEGEND err It APPROX. LOCOATION / PROJECT NO: 2218 OF 5 -YEAR THE OF "(E)COVERED E)TRASH TRAVEL BOUNDARY CURB / SIDEWALK W FOR THE ELECTRICAL TRANSFORMER - - 0 STREET WELLHEAD�� MOUNTED INS (3) LONG (E)CONC J/ LIGHT App INTUMESCENT PAINT Q O OR 5,8" TYPE'X' GYP BOARD 2 a� AREA DRAIN (DR) TO INTERIOR FACE OF (E) �+ < OVERHEAD ELECTRICAL LINE NORTH EXTERIOR WALL. N89°55'00"E 627.00'— b SEPTIC SEWER LINE FINISH TO MATCH EXISTING-- — WATERLINE y (E) (E)OUTDO E) OUTDOOR FENCED PLAY AREA / (5,265 SF) (E) 25-- FIR 5 FIR () SHORT -TER / BIKE PARKIN — _ — — _— — — (E) ET ❑ TREE PARKNG AREA FROM VEHICULAR PARKING WITH CURB ALONG VEHICLE / PATH — — _ / APARTMENT /PARKING LOT �I � III l� .• R Ih- � II R � e ■ � ■ Dill 1 1) _111 uI / LEGEND err It — 1 PROJECT NO: 2218 "(E)COVERED E)TRASH CHECKED BY: CRS CURB / SIDEWALK W ET ELECTRICAL TRANSFORMER - - ,q' MOUNTED INS (3) LONG (E)CONC J/ LIGHT )OD O STEPS ® AREA DRAIN (DR) —m—m—CNE— "N OVERHEAD ELECTRICAL LINE 1 TERM BIKE SEPTIC SEWER LINE —W —W —W —W — WATERLINE y —sW— • • L- 3 411 N (E) WALL MOUNTED O LU GLOBE LIGHT Z C � O W P I m w< U W LU = w O > Cl)LULU Z P (E)CONCRETE Z LU ? o VAN J A PLAY AREA 0ER w x z g (1,929 SF) �' n < - ¢ v' ® qq* U N MARK DATE DESCRIPTION NO PAR 'E SITE LEGEND II --�-�� PROPERTY LINE PROJECT NO: 2218 SITE SETBACK � CHECKED BY: CRS CURB / SIDEWALK W ET ELECTRICAL TRANSFORMER E❑ ELECTRICAL METER O WATER METER ® AREA DRAIN (DR) —m—m—CNE— OVERHEAD ELECTRICAL LINE W SEPTIC SEWER LINE —W —W —W —W — WATERLINE — III —sW—III —sW— STORM WATER LINE (E) FIRE m HYDRANTBit 3 N t3i1 II Im 3 N N II 3 N ai ) (PLUMB 3 N N (E) 5THSTREET-60FEET- LAWN ( To < ISI N 4r-0 V4" o 10-o" —(E) WALL MOUNTED FRONTAGE o FLOODLIGHT `.SETBACK z W (E) T' .. IW W W W 3 h t3i1 (E� 4. I (E) AREA GRAIN S S6 —SS --SS S SS REPLACE {E) 1E18 3 N REPLACE GRILLE (E) GRAVEL PARKING (PLUM WITH ATRIUM GRATE j SW S PACE ViRTH"NEVV SW REMOVE (E) m 3 DRIVEWAY APRON, • (224 SF) 3 rn '^ REPLACE WITH NEW SIDEWALK AND CURB SI LK . 4 W. PER SPRINGFIELD a - (: 7eSF1 I m m 3 STANDARD DETAILS e 3 m m 37 AND 3-12 n + REP .E(QASPHALT SW = SW 6 (ae l y ' DRI TH NEW " W s, w . tnr�OSc9PING Ra 240 SFW .. U)o n ~ (E) T' \ • . E) EE L(REE 6" 3 N vii = F l b LO 4G N N N 89055'00" E 627.00' (1) HC PARK( G SPACE (2) PARKIN SPACES (EJ SUOF (E) EP (E) POLE m 3 LTI) BUS STOP LOCATED TREE m TREELD m ACROSS STH STREET, APPROX. 350 FEET 94 94 9-0" 9-0"SOUTH a 1 2 3 34'-0" DRIVEWAY 21' -Br 64 3 N 3 w�a A2 yrnrc 3 N N SHARED ACCESS EASEMENT a — — (E) ASPHALT DRIVEWAY — — — ` 196.00'_ BUILDING 4 Final Site Plan APPROVED: a.I.d� .4i E cd Senior Planner October 12, 2022 3 N t3i1 SCALE 1:10 3 N N � 5 10 15 20 N aD 5 io Robe rtsonlSherwoodlArchitects Po 132 East Broadway, Suite 540 Eugene, Oregon 97401 541-342-8077 www.robertsonsherwood.com ISSUE DATE: 7/26/2022 II ISSUE: SITE REVIEW -REMODELS PROJECT NO: 2218 J � CHECKED BY: CRS W 3 II N 4 Final Site Plan APPROVED: a.I.d� .4i E cd Senior Planner October 12, 2022 3 N t3i1 SCALE 1:10 3 N N � 5 10 15 20 N aD 5 io Robe rtsonlSherwoodlArchitects Po 132 East Broadway, Suite 540 Eugene, Oregon 97401 541-342-8077 www.robertsonsherwood.com 17/29/22 CITY COMMENTS z 8/30/22 REVIEW COMMENTS 3 10/4/22 FINAL SITE PLAN ISSUE DATE: 7/26/2022 ISSUE: SITE REVIEW -REMODELS PROJECT NO: 2218 J CHECKED BY: CRS W W N p N ~ O LU Z C � O W m U W LU = w O > Cl)LULU Z N W Z LU LL - J W H 0ER LU qq* MARK DATE DESCRIPTION 17/29/22 CITY COMMENTS z 8/30/22 REVIEW COMMENTS 3 10/4/22 FINAL SITE PLAN PROPSED SITE PLAN A2 ISSUE DATE: 7/26/2022 ISSUE: SITE REVIEW -REMODELS PROJECT NO: 2218 DRAWN BY: JRW CHECKED BY: CRS �P.C&RRg1SNFRWC11p MCN1FC15PC A13 CPXIWISNFETMBXeq PROPSED SITE PLAN A2 2 CODE ANALYSIS FI /s. o.Ln01 I (E) DECK I 1 0 ADD INTUMESCENT PAINT OR 518" TYPE'X' GYP BOARD TO 14TERIOR FACE OF (E) NORTH EXTERIOR WALL. FINISH TO MATCH 3 '^ STUDENTS IN OFFICE THISAREAARE+Nh ALL 3 �p 1882150 OLD OR OLDER OFFI CE 1 481220 N ��QD'�0,(`O AREA\c�5p� CHILDREN CLASSROOM BATHROOM ) FE m m (E) * (E) 0 0OL 1`I - J r(E) 90'-47RAVEL DISTANCE KITCHEN * ° 1 I F _(E) WALL MOUNTED - - 3 8" EXIT SEPgRAT10 I FLOOD LIGHT CLASSROOM KITCHEN / CLASS R El158200 1 r - - - (E) \ Q368 20 N T ('l (E) DECK (E) RAMP 1 NOTE: MAX OF 19 `J I / (5) CHILDRENINFAN STAFF 1 21P2YEARS ROOM 3 BATHROOM L OLD OR Q 1 YOUNGER - (E) F 2' 7" TRAVEL DIS C ----171u � E 1 24 \ i (E) WALL MOUNTED \ - FLOOD LIGHT , .. (3)LONG-TERM ° .4 BICYCLE ° _a CASEMENT N GRESS IMNDOW ® Q 0 ® 0 0 L------- --- -- (E) COVERED PORCH) -- (E)WALL-MOUNTED ULIGHTrA EGRESS PLAN 1; 8"- T-0" VAN 2 A --- 1 ''�0 0 0�1 I II I �SALVAGE (E)LAV I II I II I DEMO(E)TUB I I) (E) CHILDREN BATHROOM \ -- -- DEMO (E) TOILET L \ i REMOVED FROM SCOPE (E) CHILDREN BATHROOM DEMOLITION PLAN " V2"= 1-0" a (E) CLASSROOM DEMO (E) WALL, COORDINATE WITH NEW INFANT ROOM r i CODE ANALYSIS BASED ON THE 2019 OREGON STRUCTURAL SPECIALTY CODE(O.S.S.C.) PLUMBING FIXTURE COUNT: PLLMBING FIXTURE RENOVATION SCOPE: DEMO(E)DOOR I I 11 1 1 REF PER 2D19 OREGON STRUCTURAL SPECIALTY CODE (TABLE ACTUAL APPROX.25',1 STORY MO CHANGE) DESCRIPTION: CHANGE DAY CARE CENTER (MAX 16 STUDENTS) TO CHILD S FOR EDUCATIONAL DAY W 1 1 CARECENTER (MAX 3D STUDENTS).NO (CHILD TOTAL RENOVATION RENOVATION / 111 / III I L MORE THAN(5) CHILDREN UNDER 21/2 YEARS OF AGE.CCUPANTS=iTOILETS SO OCCUPANTS=1 LAV TOTALLOCATION: Z;;M STRUCTURAL FRAME: OHOURS /4'-r H L I WATERCLOSETS 2 1 2 3 N:1 PER FLOOR =1 FOUNTAIN (W4BOTTLE FIL yI/ II 19425TH STREET, SPRNGFIELD, OR 97477 HBs 2 3 MAP/TAX LOT: 17-03-2624 LOT 3D00 REQUIRED FIXTURES FOR BUSINESS (OFFICE AREA): INTERIOR BEARING: OHOURS E() STAFF I SINKS u 3 TOILETS: 1 PER 25 OCCUPANTS =I TOILETS TOTAL PROJECT CONVERSION OF EXISTING DAY CARE CENTER LAVATORIES* 1 PER 40 OCCUPANTS =1 LAVS TOTAL SHOWEWUB 2 2 B o N TO CHILD CARE CENTER. ti FLOOR CONSTRUCTION: OHOURS W DRNKING FOLIVTAIN o 0 1 1 TOTALS: PROJECT AREA: 1,474 SF (AREA OF EXISTING BUILDING) TOILETS = 2 REQUIRED � ROOF CONSTRUCTION* OHOURS D TOTAL 8 5 7 10 RY UIRED m OCCUPANCYTYPE: \ E J Q3 DRINKIVATNG DRINKING FOUNTAIN = 1 REQUIRED CONSTRUCTION TYPE: V -B, NOWSPRINKLERED It! ILBRE IRGGM ?� (TABLE601) MINIMUM OF 25% OF PROJECT BUDGET SHALL BE ALLOCATED TO NEW FN(;WRES 61 18 BAT' TO BE SIZES Ate Q PER SEPARATION DISTANCE: > 5 FT TO < 10 FT: ACCESSIBILITY. 1 Al (TABLE602) IA, OTHERS 1HOUR ALLOWABLE BUILDING AREA: 9,500 SF PER FLOOR 4W/ (TABLE 506.2) ACTUAL- 1A743F(NO CHANGE) FI /s. o.Ln01 I (E) DECK I 1 0 ADD INTUMESCENT PAINT OR 518" TYPE'X' GYP BOARD TO 14TERIOR FACE OF (E) NORTH EXTERIOR WALL. FINISH TO MATCH 3 '^ STUDENTS IN OFFICE THISAREAARE+Nh ALL 3 �p 1882150 OLD OR OLDER OFFI CE 1 481220 N ��QD'�0,(`O AREA\c�5p� CHILDREN CLASSROOM BATHROOM ) FE m m (E) * (E) 0 0OL 1`I - J r(E) 90'-47RAVEL DISTANCE KITCHEN * ° 1 I F _(E) WALL MOUNTED - - 3 8" EXIT SEPgRAT10 I FLOOD LIGHT CLASSROOM KITCHEN / CLASS R El158200 1 r - - - (E) \ Q368 20 N T ('l (E) DECK (E) RAMP 1 NOTE: MAX OF 19 `J I / (5) CHILDRENINFAN STAFF 1 21P2YEARS ROOM 3 BATHROOM L OLD OR Q 1 YOUNGER - (E) F 2' 7" TRAVEL DIS C ----171u � E 1 24 \ i (E) WALL MOUNTED \ - FLOOD LIGHT , .. (3)LONG-TERM ° .4 BICYCLE ° _a CASEMENT N GRESS IMNDOW ® Q 0 ® 0 0 L------- --- -- (E) COVERED PORCH) -- (E)WALL-MOUNTED ULIGHTrA EGRESS PLAN 1; 8"- T-0" VAN 2 A --- 1 ''�0 0 0�1 I II I �SALVAGE (E)LAV I II I II I DEMO(E)TUB I I) (E) CHILDREN BATHROOM \ -- -- DEMO (E) TOILET L \ i REMOVED FROM SCOPE (E) CHILDREN BATHROOM DEMOLITION PLAN " V2"= 1-0" a (E) CLASSROOM DEMO (E) WALL, COORDINATE WITH NEW INFANT ROOM r i ALLOWABLE BUILDING HEIGHT: 40 FT (1 STORY) PLLMBING FIXTURE RENOVATION SCOPE: DEMO(E)DOOR I I 11 1 1 REF (TABLE 504.3,504.4) ACTUAL APPROX.25',1 STORY MO CHANGE) 1 III I I COUMBEFORE REMOVED NEW COUWAFTE If W 1 1 1 RENOVATION RENOVATION / 111 / III I L FIRE RATING REQMTS: STRUCTURAL FRAME: OHOURS /4'-r H L I WATERCLOSETS 2 1 2 3 yI/ II HBs 2 3 DEMO (E) TOILET I A V L (TABLE601) INTERIOR BEARING: OHOURS E() STAFF I SINKS u 3 BATHROOM I INTERIOR NON-BEARING: OHOURS SHOWEWUB 2 2 B o N / \ ti FLOOR CONSTRUCTION: OHOURS W DRNKING FOLIVTAIN o 0 1 1 Z � ROOF CONSTRUCTION* OHOURS TOTAL 8 5 7 10 0LU m STAIRWAY: NO STAIRS, U NO RATED ENCLOSURE ACCESSIBILITY FOR EXISTING BUILDINGS* ?� FIRE RATING OF EXT WALLS MINIMUM OF 25% OF PROJECT BUDGET SHALL BE ALLOCATED TO PER SEPARATION DISTANCE: > 5 FT TO < 10 FT: ACCESSIBILITY. (TABLE602) IA, OTHERS 1HOUR 4W/ LU PRIORITY FOR REMOVAL OF BARRIERS TO ACCESSIBILITY ARE AS FOLLOWS: (E) EXTERIOR 1" PORTLAND CENMENT PLASTER 1. ACCESSIBLE PARKING SPACE AND ACCESS TO EXISTING RAMPS. N WALL ASSEMBLY: PLASTER ON METAL LATH =3D MIN Al 2. REMODEL OF EXISTING BATHROOM TO INCLUDE ADA TOILET FIXTURE OF E. (TABLE722.2.1) GYPSUM PLASTER ON 3/8" LATH AN LDpEpL H 0 WI INTUMESCENT PAINT = 35 MIN ENERG�COUE: Lo z TOTAL WALL ASSEMBLY = 65 MIN. ALTERATIONS WILL NOT AFFECT ANY EXTERIOR ENVELOPE INSULATION. ANY NEW EXTERIOR CONSTRUCTION SHALL MEET THE FOLLOWING THERMAL WALL OPENINGS: 5 T 1OFT. UP, NS- UNPROTECTED: 10% MAX. REQUIREMENTS: � (TABLE705.8) (E) OPENINGS = 8% ON NORTH WALL (COMPLIES) MARK DATE DESCRIPTION BASED UPON THE 20190REGON ENERGY EFPICIENCYSPECIAL7YCODE (OMC) EXITS REQUIRED: 1 EXIT REQUIRED. BASED ONASHRAE N.1-219. (TABLE1006.2.1) SEXRS PROVIDED (Z ADA ERRS) Q PER TABLE B-1: CLIMATE 2ONE 4C VALUES LISTED ARE MINIMUMS PER TABLE5.54 iRAVELDISTANC E: iSD FT MAX (UNSPRINKLERED) (D ) WALLS(MOD FRAMED): R-M,R-13.3. C (TABLE 1017.2) ROOFICEIUNG: R49 FLOOR (FRAMED): R-30 EXCEPTION TO REQUIREMENT OF AUTOMATIC SPRINKLER SYSTEM: Q FENESTRATION: U-0.36 0.4 SHGC PER OSSC 9D32.6 (2): EVERY ROOM WHERE CHILD CARE IS PROVIDED HAS NOT FEWER THAN ONE EXTERIOR EXIT DOOR. FI /s. o.Ln01 I (E) DECK I 1 0 ADD INTUMESCENT PAINT OR 518" TYPE'X' GYP BOARD TO 14TERIOR FACE OF (E) NORTH EXTERIOR WALL. FINISH TO MATCH 3 '^ STUDENTS IN OFFICE THISAREAARE+Nh ALL 3 �p 1882150 OLD OR OLDER OFFI CE 1 481220 N ��QD'�0,(`O AREA\c�5p� CHILDREN CLASSROOM BATHROOM ) FE m m (E) * (E) 0 0OL 1`I - J r(E) 90'-47RAVEL DISTANCE KITCHEN * ° 1 I F _(E) WALL MOUNTED - - 3 8" EXIT SEPgRAT10 I FLOOD LIGHT CLASSROOM KITCHEN / CLASS R El158200 1 r - - - (E) \ Q368 20 N T ('l (E) DECK (E) RAMP 1 NOTE: MAX OF 19 `J I / (5) CHILDRENINFAN STAFF 1 21P2YEARS ROOM 3 BATHROOM L OLD OR Q 1 YOUNGER - (E) F 2' 7" TRAVEL DIS C ----171u � E 1 24 \ i (E) WALL MOUNTED \ - FLOOD LIGHT , .. (3)LONG-TERM ° .4 BICYCLE ° _a CASEMENT N GRESS IMNDOW ® Q 0 ® 0 0 L------- --- -- (E) COVERED PORCH) -- (E)WALL-MOUNTED ULIGHTrA EGRESS PLAN 1; 8"- T-0" VAN 2 A --- 1 ''�0 0 0�1 I II I �SALVAGE (E)LAV I II I II I DEMO(E)TUB I I) (E) CHILDREN BATHROOM \ -- -- DEMO (E) TOILET L \ i REMOVED FROM SCOPE (E) CHILDREN BATHROOM DEMOLITION PLAN " V2"= 1-0" a (E) CLASSROOM DEMO (E) WALL, COORDINATE WITH NEW INFANT ROOM r i (E) STAFF BATHROOM DEMOLITION PLAN V2"- T-0" EGRESS LEGEND OCCUPANCY STATISTICS ®- ROOM USE PER TABLE 100OR 3oD 100 OCCUPANT LOAD FACTOR OR 3 0ACTUAL#OCCUPANTS NUMBER OF OCCUPANTS AREA IN SQUARE FEET MAXIMUM OVERALL DIAGONAL DIMENSION OF SUITE - — — — — - EXIT SEPARATION DISTANCE 15-- TRAVEL DISTANCE ® EXIT LOAD ® EXIT SIGN FE TYPE 2A:1OBC FIRE EXTINGUISHER 4P EMERGENCY EXIT LIGHTING * INDICATES LOCATION OF FIXTURE USED FOR DRINKING, COOKING OR PREPERATION OF INFANT FORMULA. 3 (E) KITCHEN RELOCATE (E) REF DEMO (E) WALL, COORDINATE WITH NEW PLANS s NO (E) SHOWER SINK TO REMAIN GENERAL PLAN NOTES 1 SEE IIA4 FOR TYPICAL CHILDREN FIXTURE MOUNTING HEIGHTS TPD CHILDREN BATHROOM B .4 SD 1 7 � T-1 A A4 C A4 O o NEWADA D LAV ° ��, GANG i HANDWASH TPD PTDf� 1 -- STATION---- P I ADA DRINKING FOUNTAIN WITH BOTTLE FILLER (E) PRE L,CII�'LASS CHILDREN BATHRL PLAN " V2"= T -O" (E) CLASSROOM A SEE 41A4 FOR TYPICAL REF (E) KITCHEN ADA FIXTURE MOUNTING HEIGHTS NEW WALLS, TYP STORAGE 36" DOOR (OFCI) WITH PRIVACY LOCK ANDOCCUPANCY / ICATOR PER OSSC L \ �NEWSHEET FOOR14G� ---I� �i B II SNI L �I 2 INFANT ROOM 1 Al Aa �) m �- BI�STAFF D T-2 �--------- PTD.\ A4 o B LAJ BATHROOM11 / A4 LAV— O o i ° 01 L --------SD o 0 SINK TO REMAIN Op s O STAFF BATHROOM REMODEL PLAN D aD A3 V2". T-0.. aD 1. FIELD VERIFY ALL CONDITIONS PRIOR TO BEGINNING WORK. IMMEDIATELY NOTIFY ARCHITECT UPON DISCOVERY OF ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS. 2. DIMENSIONS ARE TO FACE OF FINISH, U.O.N. 3. DEMOLITION PLAN DESCRIBES IN GENERAL REQUIRED DEMOLITION WORK. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO COMPLETE NEW WORK AS SHOWN ON DRAWINGS OR AS SPECIFIED. 4. SPECIFIC AREASOF DEMOLITION WILL REQUIRE REFERENCE TO OTHER SHEETS OR DETAILS TO DETERMINE DIMENSIONAL EXTENT OF WORK. 5. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS(DEFERRED SUBMITTAL) FOR ADDITIONAL DEMOLITION AND NEW WORK INFORMATION. 6. PROTECTALL EXISTING FINISHES, CASEWORK, AND EQUIPMENTTO REMAIN. 7. PATCH EXISTING SURFACES AFFECTED BY DEMOLITION WORK TO MATCH ADJACENT, INSTALL ROOM FINISHES PER ROOM FINISHES. 8. PROVIDE BLOCKING FOR ALL WALL MOUNTED FIXTURES AND GRAB BARS. SEE DETAIL YA4. 4 ROOM FINISHES REMODELED RESTROOMS TO HAVE THE FOLLOWING FINISHES: FLOOR: NEW SHEET VINYL WITH INTEGRAL 4" COVE (COLOR/PATTERN TO BE SELECTED BY OWNER). BASE: AT LOCATIONS OUTSIDE OF BATHROOMS, MATCH EXISTING ADJACENT BASE. WALLS: GYPSUM BOARD - TEXTURE TO MATCH EXISTING ADJACENT AND PAINT (COLOR SELECTED BY OWNER). PLUMBING WALLS: AT LOCATIONES WHERE PLUMBING PENETRATIONS OCCUR, INSTALL WATER RESISTANT"GREEN BOARD"- TEXTURE AND PAINT (COLOR SELECTED BY OWNER). CEILINGS: GYPSUM BOARD TEXTURE AND PAINT (COLOR SELECTED BY OWNER). Final Site Plan APPROVED: Senior Planner October 12, 2022 3 io Robe rtsonISherwoodlArchitects 132 East Broadway, Suite 540 Eugene, Oregon 97401 541-342-8077 www.robertsonsherwood.com r=====I L DEMO(E)DOOR I I 11 1 1 REF 1 1 J 1 III I I If W 1 1 1 0 / 111 / III I L J 0 /4'-r H L I yI/ II DEMO (E) TOILET I A V L LW I.L E() STAFF I BATHROOM I 5� 0 N / \ ti 0 W Z � MI5 IyL �------- - DEMO (E) LAV 0-3.. (E) STAFF BATHROOM DEMOLITION PLAN V2"- T-0" EGRESS LEGEND OCCUPANCY STATISTICS ®- ROOM USE PER TABLE 100OR 3oD 100 OCCUPANT LOAD FACTOR OR 3 0ACTUAL#OCCUPANTS NUMBER OF OCCUPANTS AREA IN SQUARE FEET MAXIMUM OVERALL DIAGONAL DIMENSION OF SUITE - — — — — - EXIT SEPARATION DISTANCE 15-- TRAVEL DISTANCE ® EXIT LOAD ® EXIT SIGN FE TYPE 2A:1OBC FIRE EXTINGUISHER 4P EMERGENCY EXIT LIGHTING * INDICATES LOCATION OF FIXTURE USED FOR DRINKING, COOKING OR PREPERATION OF INFANT FORMULA. 3 (E) KITCHEN RELOCATE (E) REF DEMO (E) WALL, COORDINATE WITH NEW PLANS s NO (E) SHOWER SINK TO REMAIN GENERAL PLAN NOTES 1 SEE IIA4 FOR TYPICAL CHILDREN FIXTURE MOUNTING HEIGHTS TPD CHILDREN BATHROOM B .4 SD 1 7 � T-1 A A4 C A4 O o NEWADA D LAV ° ��, GANG i HANDWASH TPD PTDf� 1 -- STATION---- P I ADA DRINKING FOUNTAIN WITH BOTTLE FILLER (E) PRE L,CII�'LASS CHILDREN BATHRL PLAN " V2"= T -O" (E) CLASSROOM A SEE 41A4 FOR TYPICAL REF (E) KITCHEN ADA FIXTURE MOUNTING HEIGHTS NEW WALLS, TYP STORAGE 36" DOOR (OFCI) WITH PRIVACY LOCK ANDOCCUPANCY / ICATOR PER OSSC L \ �NEWSHEET FOOR14G� ---I� �i B II SNI L �I 2 INFANT ROOM 1 Al Aa �) m �- BI�STAFF D T-2 �--------- PTD.\ A4 o B LAJ BATHROOM11 / A4 LAV— O o i ° 01 L --------SD o 0 SINK TO REMAIN Op s O STAFF BATHROOM REMODEL PLAN D aD A3 V2". T-0.. aD 1. FIELD VERIFY ALL CONDITIONS PRIOR TO BEGINNING WORK. IMMEDIATELY NOTIFY ARCHITECT UPON DISCOVERY OF ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS. 2. DIMENSIONS ARE TO FACE OF FINISH, U.O.N. 3. DEMOLITION PLAN DESCRIBES IN GENERAL REQUIRED DEMOLITION WORK. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION REQUIRED TO COMPLETE NEW WORK AS SHOWN ON DRAWINGS OR AS SPECIFIED. 4. SPECIFIC AREASOF DEMOLITION WILL REQUIRE REFERENCE TO OTHER SHEETS OR DETAILS TO DETERMINE DIMENSIONAL EXTENT OF WORK. 5. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS(DEFERRED SUBMITTAL) FOR ADDITIONAL DEMOLITION AND NEW WORK INFORMATION. 6. PROTECTALL EXISTING FINISHES, CASEWORK, AND EQUIPMENTTO REMAIN. 7. PATCH EXISTING SURFACES AFFECTED BY DEMOLITION WORK TO MATCH ADJACENT, INSTALL ROOM FINISHES PER ROOM FINISHES. 8. PROVIDE BLOCKING FOR ALL WALL MOUNTED FIXTURES AND GRAB BARS. SEE DETAIL YA4. 4 ROOM FINISHES REMODELED RESTROOMS TO HAVE THE FOLLOWING FINISHES: FLOOR: NEW SHEET VINYL WITH INTEGRAL 4" COVE (COLOR/PATTERN TO BE SELECTED BY OWNER). BASE: AT LOCATIONS OUTSIDE OF BATHROOMS, MATCH EXISTING ADJACENT BASE. WALLS: GYPSUM BOARD - TEXTURE TO MATCH EXISTING ADJACENT AND PAINT (COLOR SELECTED BY OWNER). PLUMBING WALLS: AT LOCATIONES WHERE PLUMBING PENETRATIONS OCCUR, INSTALL WATER RESISTANT"GREEN BOARD"- TEXTURE AND PAINT (COLOR SELECTED BY OWNER). CEILINGS: GYPSUM BOARD TEXTURE AND PAINT (COLOR SELECTED BY OWNER). Final Site Plan APPROVED: Senior Planner October 12, 2022 3 io Robe rtsonISherwoodlArchitects 132 East Broadway, Suite 540 Eugene, Oregon 97401 541-342-8077 www.robertsonsherwood.com 1 7/29/22 CITY COMMENTS 2 8/30/22 REVIEW COMMENTS 3 10/4/22 FINAL SITE PLAN ISSUE DATE: 7/28/2022 ISSUE: SITE REVIEW -REMODELS PROJECT NO: 2218 DRAWN BY: JRW CHECKEDBY: CRS pBoeEBrsox IsHEB•noe IexcBrecnx ma oenxusHEerslrFuaa CODE REVIEW EGRESS PLAN REMODEL PLANS A3 J W 0 0 LW I.L C0 0 N ti 0 W Z � 0LU m U WLU ?� x 0 j 4W/ LU 0 Z N W Z LU LL_ J W H 0 o Lo z a U � fn fA MARK DATE DESCRIPTION 1 7/29/22 CITY COMMENTS 2 8/30/22 REVIEW COMMENTS 3 10/4/22 FINAL SITE PLAN ISSUE DATE: 7/28/2022 ISSUE: SITE REVIEW -REMODELS PROJECT NO: 2218 DRAWN BY: JRW CHECKEDBY: CRS pBoeEBrsox IsHEB•noe IexcBrecnx ma oenxusHEerslrFuaa CODE REVIEW EGRESS PLAN REMODEL PLANS A3 C n e 0\ 3 3 1 1 2 � CHILDREN BATHROOM INTERIOR ELEVATIONS A4 I _„�„ REMOVED FROM SCOPE STUD FRAMING °I 1Z'X12GAMETALPLATEV 7/28/2022 MIRROR MOUNTED MIRROR Cl) PROJECT NO: 38"MAX DRAWN BY: SOAPDISPENSER EAT PAPER TOWEL CRS (SO) rOVERDISPENSER�DISPENSOR (PTD) SECURE BACKING TO(3) 0 TOILET PAPER LENGTH OF WALL AT WATWOODORmErALSTUDWAEM SO PAPER CABNETS OR SHELVNG - DISPENSER (TPD) pISP PD)) W _ E WITH HANDRAILS, CABINET z a q -- TED z WORK, DOOR HARDWARE, T-1 T-1 UNDER SI (E) ROOF FRAMING O AND INSULATION PIPE + M WALL ASSEMBLY PER GA (E)CEILING z i 12" SUPPORTING GREATER TO ACHIEVE STC 40-44 SIDE WALL BACK WALL x STUD WALL AT CHILDREN (AGE 384) CHILDREN (AGE 384) CHILDREN AG 2x4 STUDS AT 24" OC SECURE BLOCKING TO (2) TOILET MOUNTING SINK MOUNT14G ACCESSORIES TYPICAL CHILDREN BATHROOM MOUNTING HEIGHTS s COVE SHEET VINYL i OBJECT -BOTH SIDES BASE TO MATCH 4" UP WALL, TYP. 2X STUD BLOCKING AT (E) BRACE LOCATIONS (E) PPIJb Ott Cl) (E) FLOOR STUD FRAMING °I 1Z'X12GAMETALPLATEV 1 2 A ET SEAT, COVER ASPENSER DISPOSAL BACK WALL LIGHT FIXTURE MIRROR 3 T SWITCH SEE 4/A4 FOR MOUNT14G GRAB PTO 0 m I i COVED COVED %STORAGE BASE BASE (OFCD z� BASE A -WEST WALL B - NORTH WALL C - EAST WALL STAFF BATHROOM INTERIOR ELEVATIONS V4"= T -D" 54"MIN. INSULATED %i ;�1 UNDER SND LTOILET PAPER 1'-4" SIDE WALL DISPENSER (TPD) MIN. MIRROR MIRROR MOUNTED SOAP DISPENSERf; n ADA MIRROR MOUNTED PAPER TOWEL LAVATORY SOAP DISPENSER DISPENSER lj)jl SEE 81A4 SINKMOUNTNG ACCESSORIES STAFF BATHROOM MOUNTING HEIGHTS 1; 4'= T-0" GRAB 2 REMOVED FROM SCOPE ADA LAVATORY A4 T, T_0.. 4 BASE D- SOUTH WALL TURF 11 Final Site Plan APPROVED: �+�- Senior Planner October 12, 2022 3 io Robe rtsonISherwoodlArchitects 132 East Broadway, Suite 540 Eugene, Oregon 97401 541-342-8077 www.robertsonsherwood.com 7/28/2022 (4)#IOSCREWSAT3"OC Cl) PROJECT NO: VERTICALLY AT EACH STUI DRAWN BY: J CHECKEDBY: CRS W SECURE BACKING TO(3) 0 STUDS MIN - EXTEND FULL O LENGTH OF WALL AT WATWOODORmErALSTUDWAEM CABNETS OR SHELVNG - COORDINATE LOCATIONS W _ E WITH HANDRAILS, CABINET WORK, DOOR HARDWARE, WALL MOUNTED EOUIPMEE (E) ROOF FRAMING O AND INSULATION WALL ASSEMBLY PER GA (E)CEILING A FOR USE LOCATIONS O LOADS THAN ASSEMBLY TYPE WP -3W8. SUPPORTING GREATER TO ACHIEVE STC 40-44 � x STUD WALL AT RESTROOM BRACE LOCATIONS ACOUSTIC 2x4 STUDS AT 24" OC SECURE BLOCKING TO (2) INSULATION STUDS MN -EXTEND MN 6" 518" TYPE'X' GYP BOAR[ BEYOND END OF ATTACHED POWDER DRIVEN LU PS AT 24"OC COVE SHEET VINYL i OBJECT -BOTH SIDES BASE TO MATCH 4" UP WALL, TYP. 2X STUD BLOCKING AT (E) BRACE LOCATIONS (E) PPIJb Ott Cl) (E) FLOOR Z 12GAPA.F.F.SHEATHING AT WOOD STUD WALLS TYPICAL PARTITION© FOR USE AT LOCATIONS LL J SUPPORTING LOADS 50 LBS OR LESS INT. WALL ASSEMBLY BLOCKING AT WALL MOUNTS 5 s A4 1112°=1._0-., A4 NTS 1 2 A ET SEAT, COVER ASPENSER DISPOSAL BACK WALL LIGHT FIXTURE MIRROR 3 T SWITCH SEE 4/A4 FOR MOUNT14G GRAB PTO 0 m I i COVED COVED %STORAGE BASE BASE (OFCD z� BASE A -WEST WALL B - NORTH WALL C - EAST WALL STAFF BATHROOM INTERIOR ELEVATIONS V4"= T -D" 54"MIN. INSULATED %i ;�1 UNDER SND LTOILET PAPER 1'-4" SIDE WALL DISPENSER (TPD) MIN. MIRROR MIRROR MOUNTED SOAP DISPENSERf; n ADA MIRROR MOUNTED PAPER TOWEL LAVATORY SOAP DISPENSER DISPENSER lj)jl SEE 81A4 SINKMOUNTNG ACCESSORIES STAFF BATHROOM MOUNTING HEIGHTS 1; 4'= T-0" GRAB 2 REMOVED FROM SCOPE ADA LAVATORY A4 T, T_0.. 4 BASE D- SOUTH WALL TURF 11 Final Site Plan APPROVED: �+�- Senior Planner October 12, 2022 3 io Robe rtsonISherwoodlArchitects 132 East Broadway, Suite 540 Eugene, Oregon 97401 541-342-8077 www.robertsonsherwood.com 7/29/22 CITY COMMENTS z 8/30/22 REVIEW COMMENTS 3 10/4/22 FINAL SITE PLAN ISSUE DATE: 7/28/2022 ISSUE: Cl) PROJECT NO: 2218 DRAWN BY: J CHECKEDBY: CRS W 0 O m W _ E O O N ~ O W ~ 0 z � x m p m LU O U W LU W W = O Cl) Z Cl) W Z LU LL J H 0 FE a U Cl) N MARK DATE DESCRIPTION 7/29/22 CITY COMMENTS z 8/30/22 REVIEW COMMENTS 3 10/4/22 FINAL SITE PLAN ISSUE DATE: 7/28/2022 ISSUE: SITE REVIEW -REMODELS PROJECT NO: 2218 DRAWN BY: JRW CHECKEDBY: CRS DETAILS AND INT ELEVATIONS