HomeMy WebLinkAboutApplication APPLICANT 10/13/2022City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Initiation Meeting (DIM)
Name: Finlev Heiahts. LLC
1 SPRINGFlE�
(541)521-1276
Com an
IE -mail. royalm@plirisplans.com
Address: 869 NW Wall Street, Suite 204, Bend, OR 97703
Prospective
Applicant's Rep.: Scott Morris PE
Phone: (541) 302-9790
Com an : A & O Engineering LLC
E-mail:scottmorris@ao-engr.mm
Address: 380 Q Street Ste 200 S fid OR 97477
Property Owner: Finley Heights,
Phone: (541)521-1276
Company:
E-mail: royalm@plirisplans.com
Address: 869 NW Wall Street, Suite 204, Bend, OR 97703
ASSESSOR'S MAP NO:18-02-02-00118-02-02-24
TAX LOT NOS
: 500 6001 1600 1700 1800
Property Address: Vacant near S. 71st Street
Size of Proe : 25.12 +/-
Acres ® Square Feet
Description of If you are filling In this form by hand, please attach your proposal description to this application.
Proposal: Phases 1 & 2 of 52-1 at subdivision in Hillside Deveinpment overlay District/ PassibleAnnexation Phnnp 9
Existing Use: vacant
# of Lots/Parcels: 52
Av . Lot/Parcel Size: 21,000
sf Densi : 2 du/acre
Prospective
Applicant: Scott Morris,
Scott Morris
Case No.: l) i
.c 0
Revised 07/20/22 sml o1`4
Fee:
NUMBER:
10/7/2022
L11111 111`/�
Development Initiation Meeting Process
The purpose of a Development Initiation Meeting is to give an applicant the opportunity to
discuss a development proposal with the development review staff of the City. The discussion
can be general or specific, depending on the details provided with the application. A
Development Initiation Meeting provides information to an applicant related to the current
development conditions and standards of the City. The Development Initiation Meeting is not a
land use decision and does not confer any development rights, establish any conditions, or bind
the applicant or the City to any course of action. The meeting conveys the status of known
development opportunities and constraints. The status may change over time as development
conditions or standards change.
1. Applicant Submits a Development Initiation Meeting Application
• The application must conform to the Development Initiation Meeting Submittal
Requirements Checklist on page 3 of this application packet.
• Development Initiation Meetings are typically scheduled on Tuesdays and Thursdays.
The Tuesday time slot is 11:00 am and the Thursday time slot is 1:30 pm.
• We strive to conduct the Development Initiation Meetings between three to four weeks
of receiving the application.
• The applicant's proposal is circulated to the relevant staff and referral agencies in
preparation for the meeting.
2. Applicant and the City Conduct the Development Initiation Meeting
• The applicant and any design team should attend the Development Initiation Meeting.
• The meeting is scheduled for one hour.
• Staff attending the meeting will be prepared to discuss the issues raised in the
submittal by the applicant. Other issues raised during the meeting may also be
discussed.
• The meeting is informal and the City will issue no staff report.
Revised 07/20/22 sm2 of 4
Development Initiation Meeting Submittal Requirements Checklist
Q Application Fee - Refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application fees are collected at the time of complete
application submittal.
2 Development Initiation Meeting Application Form
® Five (5) Questions - List specific questions the applicant would like staff to answer
during the meeting. So that each question may be fully evaluated, the list is limited to five
questions. If more than five questions are asked or multiple part questions are presented
staff may not be able to address all relevant concerns. Prioritizing the five questions is
recommended.
❑
One (1) Copy and one (1) digital copy of the Proposed Plan -
Suggested information valuable for staff to review the proposal is listed below. review the
proposal is listed below. It is not necessary to include all these items on the site or plot
plan. However, applicants are encouraged to address as many as possible given that the
level of information that will be derived from the meeting is commensurate with the level of
detail provided in the application.
Applicants are also encouraged to include additional information on the plan as listed in the
Springfield Development Code (SDC) 5.12.120, Land Divisions - Partitions & Subdivisions -
Tentative Plan Submittal Requirements or 5.17.120, Site Plan Review Submittal
Requirements.
❑ Drawn in ink on quality paper no smaller than 11" x 17"
® Scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100'
North arrow
® Date of preparation
Street address and assessor's map and tax lot number
Fv1 Dimensions (in feet) and size (either square feet or acres) of the development area
❑ Location and size of existing and proposed utilities, including connection points
❑ On-site drainage collection system and flow patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DIMS Related to Land Divisions
Approximate location, number, and dimensions of proposed lots
How streets in the proposal area connect with existing streets
DIMS Related to Site Plan Review
❑ Proposed and existing buildings: location, dimensions, size (gross floor area),
setbacks from property lines, distance between buildings, and height
Revised 07/20/22 sm3 of 4
❑ Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios, and other impervious surfaces
❑ Parking and circulation plan
Revised 8/4/22 MEM
Finley Estates—City of Springfield Development Initiation Meeting (DIM)
i. Are there any constraints on annexing the balance of the property into the city?
z. South 71" Street is sub -standard width and has steep slopes on both sides. What is the minimum cross section for
a roadway/sidewalk that can be constructed here?
3. Regarding Middle Housing —please explain how properties in the HD Oveday District are exempt from HBzooi?
The proposed layout includes townhouse lots; is there away to incorporate these into this subdivision process?
y. Are there any capacity issues with the existing wastewater lines adjacent to the property? And/or will any offsite
wastewater improvements be required?
S. Are there any features on this property that we should be aware of that will be required and/or need to be
incorporated into the design?