HomeMy WebLinkAboutApplication APPLICANT 8/18/2022City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
Final Site Plan Review
SPRINGFIELD
I& f
Application Type .. -
Site Plan: Minor Site Plan Modification: ❑
Ma'or Site Plan Modification: ❑
Required Project Information (Applicant: complete this section)
Applicant Name: David Loveall Phone: 541.345.9900
Company: Masaka Properties Fax:
Address: 1657 Delrose Ave, Springfield, OR 97477
Applicant's Re .: Jenna Fribley Qenna@campfirelab.com)
Phone; 541 914.0334
Company: Campfire Collaborative: Architecture & Design, PC
Fax:
Address: 341 Main Street, Springfield, OR 97477
Property Owner: David Loveall
Phone: 541.345.9900
Company: Masaka Properties
Fax:
Address: 1657 Delrose Ave, Springfield, OR 97477
ASSESSOR'S MAP NO: 17-03-35-31
ITAX LOT NO S.: 08000
Property Address: 448 Main St. (also 120 & 122 5th St.)
Size of Property: 4800 s.f. (40'x 120') Acres ❑ Square Feet ❑
Proposed Name of Project: Rivett Building @ 448 Main
Description of if you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Remodel ground Floor; construct 2 new stories (12 apartments) on top of existin buildin
Existing Use: Commercial/mercantile/office - 3 tenant spaces
Tentative Case #:
Signatures: Please si n and Drint our name and date in the a ro riate box of the next a e.
Required Project Information (City Intake Staff., complete this section)
Associated Applications:
1�
Case No.: I I
Date:
Reviewed by:
i
Application Fee: $ a.
Technical
Postage Fee: 0
TOTAL FEES: $22 .9 JECT NUMBER:
Revised 1/1/08 Molly Markarian 1 of 4
Signature
I represent this application to be complete for submittal to the City. I affirm that the information identified by the
City as necessary for processing the application is provided herein or the information will not be provided if not
otherwise contained within the submittal, and the City may begin processing the application with the information as
submitted. This statement serves as written notice pursuant to the requirements of ORS 227.178 pertaining to a
complete application.
Date:
Signature-
Revised
ignature
Revised 1/1/08 Molly Markarian 2 of 4
Final Site Plan Review Application Process
1. Applicant Submits a Final Site Plan Review Application to the Development Services
Department
The application must conform to the Final Site Plan Review Submittal Requirements
Checklist on page 4 of this application packet.
Planning Division staff screen the submittal at the front counter to determine
whether all required items listed in the Final Site Plan Review Submittal
Requirements Checklist have been submitted.
Applications missing required items will not be accepted for submittal
2. City Staff Conduct Detailed Completeness Check
• Planning Division staff conducts a detailed completeness check within 30 days of
submittal.
• The assigned Planner notifies the applicant in writing regarding the completeness of
the application.
• An application is not be deemed technically complete until all information necessary
to evaluate the proposed development, its impacts, and its compliance with the
provisions of the Springfield Development Code and other applicable codes and
statutes have been provided.
• Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
3. City Staff Review the Application & Issues Final Approval
This is a Type I decision and thus is made without public notice and without a public
hearing since there are clear and objective approval criteria and/or development
standards that do not require the use of discretion.
• Decisions address all the applicable approval criteria and/or development standards.
• Applications may be approved, approved with conditions, or denied.
The City mails the applicant and any party of standing a copy of the decision, which
is effective on the day it is mailed.
• The decision issued is the final decision of the City and may not be appealed.
4. City Drafts a Development Agreement
Applicant and City sign Development Agreement
Final Site Plan and Development Agreement become null and void if construction
has not begun within two years of signing the Development Agreement.
S. City Conducts Final Site Inspection
City authorizes provision of public facilities and services and issues Certificate of
Occupancy
Revised 1/1/08 Molly Markarian 3 of 4
Final Site Plan Review Submittal Requirements Checklist
NOTE: If you feel an item does not apply, please state the reason why and attach the
explanation to this form.
V3 Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development Services
Department. The applicable application, technology, and postage fees are collected at the
time of complete application submittal.
Final Site Plan Review Application Form
X Letter Addressing Conditions of Approval - lists and addresses each condition of
approval, detailing the actions taken and current status of each item.
Five (5) Copies of the Final Site Plan Sets incorporating all required modifications and
applicable conditions
�( Additional Documents requested as Conditions of Approval as part of the Site Plan
Review decision.
Revised 1/1/08 Molly Markanan 4 of 4
CAMPFIRE COLLABORATIVE
ARCHITECTURE & OESIGN
X www.campfirelo L.eom pcpmpf helvU
August 15, 2022
Andrew Larson
City of Springfield
Development & Public Works
Springfield, OR 97477
Reference: Rivett Building @ 448 Main Street
(MAP/TL #17-03-35-31-08000)
Response to Site Plan Review Report & Decision dated July 1, 2022:
The staff report outlined one condition of approval:
1. Prior to Final Site Plan approval, the applicant must show a sanitary drain for the trash alcove
area located at the northwest comer of the first floor.
b A sanitary drain was already previously shown on the enlarged floor plan sheets, however a
specific annotation was added to the site plan sheet to more clearly illustrate/emphasize that
a sanitary drain is intended in the trash alcove.
Thank you for your review and comments of this project. Please call/email with any questions or need
for additional information/clarification.
Sincerely,
Jenna L. Fribley, AIA, LEED AP, Architect / Co -Founder
Campfire Collaborative: Architecture & Design, PC
ienn@gcampfirelab.com 541.914.0334
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE 1
go_
ARCHITECTURE & DESIGN
7� .w.,.mPhWah.cam YCPmprirelah
December -17,2021 UPDATED APRIL 5, 2022
Andrew Larson
City of Springfield
Development & Public Works
Springfield, OR 97477
SITE PLAN REVIEW APPLICATION: Rivett Building @ 448 Main St. (Map)rTL: #17-03-35-31-08000)
CONTENTS:
A. NARRATIVE
• Projectsummary
• Plan set review items summary
• Specific code section summaries
B. ATTACHMENTS
ATT -1: Copy of the Site Plan Reduced to 8.5" x 11" size, separate from large format drawing set
ATT -2: Copy of Deed
ATT -3: Preliminary Title Report
ATT -4: Trip generation calculation from Access Engineering
ATT -5: Excerpt from ODOT Signal Design manual, and correspondence with Kathy Tourtillott
and Scott Cramer from ODOT clarifying clearance requirements for the traffic signal
ATT -6: Letter from Springfield Utility Board stating that the site will be adequately served for
electrical service, along with Tentative Step Plan and supporting illustrations
ATT -7: Signed construction agreement between the property owner and Springfield Utility
Board for installation of increased electrical service
ATT -8: Letter from Springfield Utility Board stating thatthe site will be adequately served for
water service, along with email and utilities plan showing water service available
ATT -9: N Report for Waste Water Lateral - letter from Harvey & Price summarizing video
review comments and recommendations for waste Imes
ATT -10: Lighting Cut Sheets- See attached lighting cut -sheet for more information about Type of
illumination, wattage, shielding, etc. for the proposed gooseneck wall -mounted fixtures
proposed for building exterior.
ATT -11: Recorded utility easement documentation
C. DRAWING SET (4) Copies of the drawing plan sets required, large format sheets; also see outline
within narrative for specific review items and where they are addressed in the plan set
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
ACAMPFIRE COLLABORATIVE -2-
ARCHITECTURE & DESIGN
.P.4www, ca mph beta b.ca m %camplirelob
NARRATIVE:
Summary: Adaptive reuse of existing single -story building, including remodel of ground floor
commercial spaces and addition of 2 new stories of apartments above
Existing building data:
• Constructed in 1909 by Charles Rivett
• Historic uses include general store, grocery store, appliance store; most recently The
Sewing Room
• Reinforced concrete exterior walls, 12"thick
• Wood -framed floorand ceiling/roof, wood support columns/beam at mid -span
• Large mezzanine in north portion of building built in 1917 to provide first ladies' public
restroom in Springfield
• Existing heating system: large RTU serving main commercial space; supplemental wall
heaters in smaller spaces
• Existing plumbing fixtures: 3 kitchenette sinks, 2 lavatory sinks, 2 toilets, 4 washer/dryer
hookups, one tank -style water heater
• No existing sprinklersystem
Project scope:
• Demo:
o Demo of all existing interior elements, including walls, fixtures, mezzanine,
dropped ceilings
o Demo of existing wood framed Floor assembly and interior wood columns
• Concrete:
o New footings as required for new structural support
o New concrete slabs on grade on ground floor in apartment entry lobby, stairwells,
and live/work unit; slabs in 2 commercial tenant spaces to be poured as part of
separate/future T.I. permits
• Glazing:
o Historic window/door openings, previously infilled, to be reopened and new
glazing to be installed
o Reconstruction of existing storefront glazing in a manner that is more compatible
with the historic character of building
• Framing:
o New steel moment frames and framed shear walls and associated footings to be
erected to support existing roof/ceiling structure and construction of 2 new
stories above
o Exterior walls- new b" steel stud walls for apartments on levels 2 & 3
o Floors - new open web joists for level 2 floor; new TJI's for level 3 floor, with steel
framing at balconies; new TJEs for new roof structure; new car -decking assembly
for live/work unit mezzanine
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE 3
ARCHITECTURE &DESIGN
7.-C wwwcapnrelab.cam pcampfirelab
o Interior bearing walls -staggered steel stud bearing walls between apartment
units; bearing shear walls at ground floor
o Interior non-bearing walls- new interior walls throughout apartment units,
enclosing stairs, W.C., utility room, storage closets, etc.
o New beams/columns as indicated on structural drawings
o New stair systems throughout, including (2) egress stairs, (12) typical apartment
interior stairs, and (1) mezzanine stair for live/work unit
• Fire/life safety:
o Fire rated assemblies -1 hour separation between ground floor and apartments
on second floor, 1 hour between apartments; 1 hour stair enclosures
o New NPFA-13 sprinkler system to be installed throughout building, in all enclosed
spaces on all floors, and under stairwells
• Exterior improvements:
o New paint on exterior concrete fapade; new upper level walls to be clad in brick -
look fiber -cement panels
o New awnings/canopies over entrances along Main Street and 5'^ Street
o New planter boxes and outdoor seating elements
o New gooseneck wall -mounted light fixtures around building
o New bike parking stalls
• Proposed uses:
o Ground floor residential - 1 accessible live/work unit at NE corner of building with
independent entrance on 5"' St.
o Ground floor commercial- 1 large tenant space along Main St„ 1 smaller tenant
space along 5`b St.; to be built as shell spaces for this permit; tenants not yet
identified; future buildouts to be submitted as separate T.I. permits
• Systems:
o Electrical -service to be upgraded, including new meters and panels, per SUB
and code requirements; new wiring, lighting, and receptacles throughout;
coordination with other trades for power requirements for equipment
o HVAC -new mini -splits to independently serve each apartment and each
commercial space; new exhaust ducting for residential kitchens and baths in (13)
apartments as well as (2) public W.C. on ground floor; exhaust ducting for laundry
in 2nd floor hallway and ground floor live/work unit; mechanical chase provided
for potential future commercial kitchen in main commercial space, though
equipment not part of this permit
o Plumbing- new meter and upsized line from meter into building; tie into existing
sanitary connection; new fixtures throughout and supply/waste piping; floor
drains in ground floor W.C.'s, utility room, and trash alcove; new underfloor 75 -
gallon grease trap in utility room; 2 new gas water heaters in utility room
o Fire suppression- new sprinkler system throughout; hot tap into main fire supply
line along Main St., backflow device in SW corner of building; standpipe and fire
alarm panel to be in utility room; fire department connection to be at SE corner of
building along 5'd St.
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE -
4-ARCHITECTURE &DESIGN
X www.eomplieloh com Xcumpl Velob
PLAN SET REVIEW ITEMS
a. Site Assessment of Existing Conditions- see Existing Site Plan on sheet A0.02
• Prepared by an Oregon licensed Architect
• Vicinity Map shown on sheet A0.01
• Refer to the existing site plan on sheet A0.02 for all relevant existing site features and their
names, uses, locations and dimensions, as well as what is to be removed. Existing building
perimeter is at extent of property lines. Building shares a party wall with one building on
the south-west side.
• The site is not located along a water course as indicated by the Water Quality Limited
Watercourse Map on file in the Development& Public Works department.
• The site is not located in the 100 -year flood plain or have flood boundaries on the site as
specified in the latest adopted FEMA Flood Insurance Rate Maps.
• The site is not located in any of the Time of Travel Zones, as specified in SDC 3.3-200 and
delineated on the Wellhead Protection Areas Map on file in the Development and Public
Works Department
• For physical features such as tree diameters, refer to the existing site plan on sheet A0.02.
There are no riparian areas, wetlands and rock outcroppings on or adjacent to site.
b. Site Plan -see Proposed Site Plan on sheet A0.02
• Prepared by an Oregon licensed Architect
• The location, dimensions, size, building adjacencies, and property lines are shown on the
Proposed Site Plan on sheet A0.02. As this is an existing building with extents to the
property line, there are no setbacks, so no surveyor was required. The Downtown
Springfield parking exemption applies to this site.
For the locations and heights of walls, trash, and exterior features see sheet A2.01 No
fences, or external site storage are proposed. New trash alcove shown the Proposed Site
Plan on sheet A0.02, with more detail shown on the Level 1 -Dimensioned Plan on sheet
A1.02.
• Underthe Downtown Springfield parking exemption no site-specific ADA parking spaces
are proposed. The site is relatively flat for ADA use, and all entries are at grade. Please
see plan 3/A0.02.
• Dimensions of development are 40'x 120' as indicated on the Vicinity Plan on sheet
A0.01. 100 percent of the property is building structure. There is no change in the
footprint area of 4800 s.f., from existing to new proposal. All else is existing and is not
proposed for change, such as sidewalks and other impervious surfaces.
• As specified in 3.2-225 Base Solar Development Standards, the zoning of this site is MUC
and does not need to observe solar access requirements.
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
ACAMPFIRE COLLABORATIVE -5-
ARCHITECTURE & DESIGN
X ...,c mpfl,flWb.cum Ncnmpli,d.b
• See site plans on sheet A0.02 for on-site loading areas, and vehicular and pedestrian
circulation.
• See site plans on sheet A0.02 for access to streets, alleys, and properties to be served,
including the location and dimensions of existing curb cuts
• Bicycle parking
o See 2/A0.02 for proposed location of bicycle parking spaces
o Shortterm stalls required:
• Residential:1/unit, 75% long term, 25% short term
• 13 units => 9.75 long term, 2.25 short term
Commercial/restaurant(TBD): 1/600 s.f., 25% long term, 75% short
term
• 2962 s.f. / 600 = 5 spaces; 1.25 long term, 3.75 short term
c TOTAL REQUIRED:
11 long term (9.75 + 1.25)
6 shortterm (2.25 + 3.75)
• 1 long term oversized
o TOTAL PROVIDED/PROPOSED:
• 11 long term vertical stalls+ 1 oversized stall, located in residential
lobby through access -controlled exterior door
• 8 short term spaces provided by 4 new hoops; 2 hoops located near
Main St. entrance, and 2 hoops located near lobby entry along 5^ St.
• Additional long-term storage if required for commercial tenant spaces
to be provided within tenant spaces as part of future interior buildout
(to be submitted in separate T.I. permit)
• Lane Transit District Springfield Bus Station is located .1 miles south west of the site.
• 100 percent of the property is building structure. No proposal to remove existing
structure to dedicate or reserve for public and semi-public uses.
• No proposed phasing development plan for this project.
c. Existing Improvement and Public Utilities Plan -see Existing Site Plan on sheet A0.02
• Prepared by an Oregon licensed architect
• There are no applicable easements to the existing footprint. All overhangs over sidewalk
are proposed at 5 ft depth, within the allowable half -depth of sidewalks (typical depth of
east side walk is 10 ft; depth of south sidewalk is 16'-8 ".)
• See 3/A.01 and 1/A0.02 for location, widths, names of right-of-ways within or adjacentto
the site and downspouts for roof drainage connections. The only other jurisdiction is
ODOT located within the boundaries of Main Street.
See 1/A0.02 for existing street lighting locations.
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE -
6-ARCHITECTURE & DESIGN
7r www.,n.pflrplpb. cpm #..pfiW.b
• See 2/A0.02 for existing traffic control devices. See 2/A0.02 for proposed Fire department
connection and backflow preventers. No existing power poles or transformers. Closest
public (neighborhood?) mailbox is 0.1 miles north-east from site under City Hall.
• See 1/A0.02 for existing sidewalks. No new paths of any kind are proposed.
• See 1/A0.02 and 2/A0.02 for location and size of existing utilities on and adjacent to site,
plus connection points.
• See 1/A0.02 for existing spot elevation indicated by "+" symbol. North-east corner of
site/building is at elevation of 459 ft above sea level. Site is relatively flat with gentle,
declining slope from north to south, less than 5 percent slope. Adjacent existing paved
surfaces are sloped towards storm drains.
d. Proposed Grading, Paving and Utilities -see Proposed Site Plan on sheet A0.02
• Not proposing new onsite stormwater. Existing building covers entire property, no new
impervious area proposed. Site has existing downspouts piped under sidewalk to
weepholes at the curbs along Main St. and 5tb St., and piped into storm sewer along alley.
Drainage from new roof and canopies will tie into existing downspouts.
• Not proposing new streets, alleys, or other rights -of -ways
• There are no proposed easements.
• Existing City -owned street lightto remain. New wall -mounted gooseneck light fixtures
proposed around building fa4ade, see Exterior Elevations on sheet A2.01 for locations.
• Slopes are not greater than 5 percent.
e. Landscape Plan- see Existing & Proposed Site Plans on sheet A0.02
• Landscape plan not required; site plan prepared by an Oregon licensed architect.
• See 1/A0.02 for existing trees. No new proposed landscaping or street trees.
f. Archrteetural Plans
• See attached drawing set for architectural plans.
• The site does not abut residentially zoned properties, however exterior elevations are
provided on sheet A2.01.
g. On-site Lighting Plan
• Existing City -owned standard decorative LED street lights to remain; see locations on
1 /A0.02.
• New wall -mounted gooseneck down light fixtures proposed around building fagade, see
Exterior Elevations on sheet A2.01 and plan 2/A0.02 for locations.
• See attached lighting cut -sheets for more information about type of illumination, wattage,
shielding, etc.
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE
ARCHITECTURE &DESIGN
�� www.c•mplielod.com #complirelod
Additional Materials That May Be Deferred
• New landscape materials are not proposed.
• No new stormwater management system is proposed.
• No irrigation plan is proposed.
• Photometric test report for light source(s) to be provided as a deferred submittal if
required.
Additional Materials That May Be Required by the Director
• A copy of a Preliminary Title Report -attached
• No Traffic Impact' Study is required -the trip generation from the 12 additional dwelling
units will be well below the thresholds outlined in SDC 4.2-10S. Per staff request, we have
included a memo from Access Engineering that provides a trip generation estimate. See
attachment ATT -4
• Multi -family development - Per clarification with Planning staff, this section (SDC 3.2-240)
does not apply to this project. The building is located in the Downtown Mixed Use area.
The ground floor's greatest floor area is commercial; therefore, the commercial mixed use
standards apply — not the multi -unit standards.
• Site is not in riparian area / or near a watercourse, so no Riparian Area Protection Report is
required.
• Site is not in an area of unstable soils or high water table, geotech report not required.
• See below for code analysis pertaining to Mixed Use Overlay District (SDC 32-625)
• No physical aspects of the proposed development include scale, odor noise, glare or
vibrations that could impact the surrounding uses.
• No trees are proposed to be removed, no tree felling permit necessary.
• No wetlands are present on the property, to wetland delineation necessary.
• No additional federal/state permits are required.
• No grading, filling, or excavating is proposed that would affect drainage of site or
surrounding area.
• No Discretionary Uses or Variances are proposed.
• No Annexation is proposed.
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE $
ARCHITECTURE & DESIGN
� C www.compli relo L.cam Ncompflrelob
5.77-725 SITE PLAN REVIEW CRITERIA
A. No change in zoning is proposed; the existing zoning is consistent with the Metro Plan diagram,
and/or the applicable Refinement Plan diagram, Plan District map, and Conceptual Development
Plan.
B. Capacity requirements for utilities will be met:
• Electricity & water: see letters from SUB stating adequate capacity for utility service to the
site
• Sanitary sewer and stormwater management facilities: see report from Harvey&Price
• Streets and traffic safety controls shall not be exceeded
• Public improvements shall be available to serve the site at the time of development
C. The proposed development shall comply with all applicable public and private design and
construction standards contained in this Code and other applicable regulations. See code analysis
below for sections:
• 3.2-625 Mixed -Use District Development Standards—General
• 3.2-630 Mixed -Use Development Standards -Specific
• 3.3-1000 Nodal Development Overlay District
• 3.2-240 Multi -unit Design Standards
D. No new parking areas or ingress -egress points are proposed
E. The site has no significant physical features requiring protection or special attention. There are no
steep slopes, unstable soils, or considerable geologic conditions to address on site. The site is not
located in the 100 -year flood plain or have flood boundaries on the site as specified in the latest
adopted FEMA Flood Insurance Rate Maps. The site is not located along a watercourse as
indicated bythe Water Quality Limited Watercourse Map on file in the Development & Public
Works department. The site is not located in any of the Time of Travel Zones, as specified in SDC
3.3-200 and delineated on the Wellhead Protection Areas Map on file in the Development and
Public Works Department. The site does not contain significant clusters of trees and shrubs, nor is
it part of any riparian areas or wetlands. There are no rock outcroppings, natural open spaces, or
areas of historic and or archeological significance on site.
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRECOLLABORATIVE -
9-ARCHITECTURE &DESIGN
�jr www.ca mpllrelpb.c om Acompf ❑elob
3.2-625 MIXED-USE DISTRICT DEVELOPMENT STANDARDS-GENERAL
A. Building Design Standards
1. On corner lots/parcels this provision applies to both elevations requirement: 50 percent of
length of elevation must linearly be window at ground floor
East wall = 120 ft length
East wall windows length = 62 ft
62/120=.52 Requirement met
South wall = 40.42 ft length
South wall window length = 34.75 ft
34.75/40A2 =.86 Requirement met
Requirement: at least 25 percent of the ground floor wall area as windows and/or doors that
allow views into lobbies, merchandise displays, or working areas.
East wall = 120 ft length
East wall views -in window length = 43.1 ft
43.1/120 =.36 Requirement met
South wall = 40.42 ft length
South wall views -in window length = 32.92 ft
32.92/40.42 =.81 Requirement met
Exceptions: north wall adjacent to alley, east wall is parry wall
2. N/A
3. Requirement met -along the vertical face of the building, offsets occur ata minimum of
every 50 feet by providing: recessed balconies with a depth of 4'- 2" and balcony overhangs
with a depth of no more than 5 ft
4. Requirement met- building design breaks up vast expanses by a combination of
architectural elements and features, including, but not limited to: offsets, windows, entry
treatments, balconies, overhangs and faux brick
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE
ARCHITECTURE & DESIGN
7t www.camnn tela h.c pm Mcompfire loh
10-
S. Requirement met- design provides differentiation between the ground floor and upper
stories, through balconies for upper levels, and awnings, canopies, or other similar
treatments for lower levels. variation in building. materials, paint, ornamentation, and
windows.
6. N/A
B. Building Orientation/Setbacks: N/A- existing building
C. Weather Protection
1. Requirement met- proposed awnings and canopies are at least 6 feet wide (but not greater
than 5' depth), and shall follow building offsets to eliminate long expanses of awnings.
2. Requirement met- awnings and canopies do not obscure architectural features (e.g.,
transom area) and do not extend into the second story of the building.
3. Requirement met- awnings and canopies are in proportion to the overall building and
correspond to the width and locations of the storefront openings.
4. Requirement met- no backlit awnings or canopies are proposed.
S. Requirement met - awnings and canopies are suspended from the building and not
supported by posts.
D. Landscaping & Screening
1. N/A- existing building/site
2. N/A- not adjacent to residential, no ground mounted equip., existing street trees
3. N/A- no new landscape areas
4. Requirement met - existing trash receptacles shared with neighbor and hosted on
neighboring site behind buildings, does not abut residential districts; all utilities are wall -
mounted on the rear/alley elevation facade; (e) street trees are fully grown
E. Street Connectivity/Circulation: N/A - existing site/development
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE 11 -
ARCHITECTURE & DESIGN
X www. ¢o mplirelvb.c om Mcv mpfirelvb
F. Neighborhood Compatibility: WA- not adjacent to LDR zone
G. Pedestrian Amenities
1. Approximately 13,470 S.F. requires 3 pedestrian amenities
2. Requirement met- proposal includes new outdoor seating, existing and new
container planters, new canopies over sidewalk, existing street trees, existing sidewalk
lights, and view of mural across street
3. Requirement met -
a. Amenities are available along both 5th and main streets
b. Amenities are sized appropriately for available space
c. Amenities are consistent with those throughout downtown, and suitable for
outdoor use
d. N/A- no bus stops adjacent to site
3.2-630 MIXED USE DEVELOPMENT STANDARDS - SPECIFIC
a. MUC development standard
1. Requirement met - 86 percent of ground floor area within building is dedicated to
commercial use; commercial use is proposed with residential uses concurrently
2. Requirement met- maximum square footage of a single tenant space is 2200 S.F..
3. Requirement met - 100 percent of lot7parcel is building floor area
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE COLLABORATIVE -12-
ARCHITECTURE & DESIGN
.J.e wwwcomptirelob. com Xcumpnrelob
3.3-1000 NODAL DEVELOPMENT OVERLAY DISTRICT
3.3.1005 Purpose, Applicability and Review
1. Design standard met - See Project Scope Exterior Improvements above
2. Design standard met- Lane Transit District Springfield Station busses located .1 miles
or 3 minute walk from site
3. Design standard met - Grocery, cafes, restaurants, banks, post office, art gallery,
museum, and library located within walking distance of site.
4. Design standard met - Library plaza, Millrace park, Island park, Booth Kelley Path
Trailhead withing walking distance of site.
S. Design standard met- Site is near residential area. Site will add 13 new residential
units on 4720 S.F. footprint.
3.3-1005 (Bx3) Applicability: An expansion of 50 percent or more of the total existing building
square footage on the development site.
Existing:
LEVEL 1 - 4720 S.F
Expansion:
LEVEL 2-4362 S.F.
LEVEL 3 - 4326 S.F.
TOTAL:
3 STORIES - 13,408 S.F
Expansion is
over 50 percent of total existing building square footage.
3.3-1010 (A): Mixed commercial and residential uses permitted within base Mixed -Use Commercial
MUC District in Section 3.2-610; none ofthe prohibited uses listed in section 3.3-1010(B) are proposed
3.3-1020 Minimum Density and General Development Standards
Floor Area Ratio or FAR
Gross floor area/total lot parcel area.
13,408/4720= 2.8
A. Minimum Density and Floor Area Ratio
1. Requirement mart- Site will add 13 new residential units in 4720 S.F. footprint
2. Requirement met- MUC minimum floor area is.4, actual is 2.8
3. N/A- Base zone is not LMI, CI, or MUE
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
CAMPFIRE
ARCHITECTURE &DESIGN 13 -
ARCHITECTURE & DESIGN
X www.compl help E.cam pco mpf lrelc5
B. Building Setbacks
1. Requirement met -Commercial building is existing, with no setbacks from the street
2. Requirement met- Proposed residential uses will have zero setback from the street
3. Requirement met- Proposed building is existing and will have zero setback from the
street
C. Parking Between Building and the Street
1. NA- No new parking is proposed. Building is existing and falls under the Downtown
Springfield parking exemption
2. NA -No new parking is proposed. Building is existing and falls under the Downtown
Springfield parking exemption
3.3-1025 Specific Design Standards: Multi -unit residential dwellings shall comply with the design
standards specified in Section 3.2-240 (see below) and Section 3.2-625C (see above).
• 3.2-240 Multi -Unit Des gn Standards. Per clarification with Planning staff, this section does
not apply to this project. The building is located in the Downtown Mixed Use area. The
ground floor's greatest floor area is commercial; therefore, the commercial mixed use
standards apply— not the multi -unit standards.
• Section 3.2-625C Weather Protectom Awnings and canopies are intended to protect
pedestrians from the weather and add to the architectural interest of buildings. New
commercial or mixed-use residential development shall provide a weather -protected area
adjacent to sidewalks and plazas. The proposal achieves all requirements of this section; see
details in code summary of section 3.2-625 above.
Campfire Collaborative: Architecture & Design, PC 341 Main Street, Springfield, OR 97477 541.914.0334
A STREET
— _ — — — — — — _I
a a
ADJACENT PROPERTY + + -
NOT IN SCOPE
ILI
W
[C
y
PROPERTY LINE S
(AREA OF WORK) —
y ALLEY
j --33'-e" 33'-d'
a
M (E) FIRE HYDRANT
MAIN STREET
448 MAIN STREET - RIVETT BUILDING
SITE PLAN 1" = 50"
Project number 21006
Date 2021.12.17 �p°FpF COLIFe�pA�\
Access Engineering LLC
wry•
b4 E.17 A—Suite 1
V.,e 3-, 91,01
. 5,1-0853215
.' Tiaespollntion Fngineeting
- reart,=nes�e�
Tdp Gene�atlon
i�c ea Management
T.. i..0
-Strwt CI9Wy
Low -Rise Apartment Trip Generation
6130122
Twelve low-rise apartment are planned for as an addition to a commercial building on
Main Street in Springfield Oregon. The City has asked the developer to include a trip
generation estimate relating to the increase in trips documenting compliance with SDC
42-105.
The Springfield Development Code 4,2-105 states:
B. An applicant may be required to prepare a Traffic Impact Study (7 IS) to identi�
potential traffic impacts from proposed development and needed mitigation
measures. I TIS is required iii ny of the frallawing criteria are met.
1. Peak Hour Threshold. If a change in land use or intensification of an existing
use generates 100 or more trips during any peak hour as determined by
procedures contained in the most recent edition of the Institute of
Tramportation Engineers Trip Generation Manual, a ZZS shall be performed
by a registered professional engineer.
2. Average Daily Traffic Threshold. If a change in land use or intensification of
an existing use generates 1,000 or more trips per day as determined by
procedures contained in the most recent edition of the Institute of
Transportation Engineers Trip Generation Manual, a TIS shall be performed
by a registered professional engineer.
The trip generation for the 12 apartment addition on Main Street in downtown
Springfield, Oregon is found using the 110 Edition of the ITE Trip Generation Manual
using the ITE Code 220 - Multifamily Housing (Low -Rise) with the Dense Multi -Use
Urban setting. The AM peak hour trips generated are 12 and the PM peak hour trips
generated are 6. There is no daily trip data for the dense multi -use urban category.
However, daily trips for the General Urban/Suburban setting are 192 trips per day. As
one can see, the 12 apartment unit addition will not generate enough daily or peak hour
trips to warrant a Traffic Impact Analysis.
From: TOURTILLOTT Katherine Katherine.TOURTILLOTT@oestsYate.or.us
Subject: PW: 448 Main Street, Springfield
Data: November 29, W21 at 12:16 PM
To: Jenna@campfiolob.cnm
Cc: POWELL Wade Wade.POWELL@odOLslate.ocus, LIEBLER Micheal mliebler@spdngfiekior.gov, PARKS Brien N
Brim.N.PARKS@adot.oregon.gov
Hi Jenna,
Had to get a few people involved but it looks like you need to leave 5' between the awning and the signal pole.
Please see email, below.
Thank you.
Kathy Tourtillott
Area/District 5 Permits
P: 541-735-4724 F: 541-7262509
2080 Laura Street Springfield OR 97477
Katherine.tourtillott@odot.state.or.us
From: CRAMER Scott B<Scott.B.CRAMER@odot.state.or.us>
Sant: Monday, November 29, 2021 11:47 AM
To: LAFLEUR Christina L<Christina.L.LAFLEUR@odot.oregon.gov>
Cc: PARKS Brian N <Bdan.N.PARKS@odoLoregon.gov>; TOURTILLOTI- Katherine
<Katherine.TOURTILLOTT@odat.state.or.us>; POWELL Wade <Wade.POWELL@odot.state.or.us>; SCHMIDT
Jamie M<Jamie.M.SCHMIDT@odot.oregon.gov>
Subject: RE: 448 Main Street, Springfield
Goad question! Section 5.5.4 of the Signal Design Manual should apply. While this isn't a low voltage utility
conflict, working clearances still apply. So we are looking for 5'.
https://www.oregon.00v/adot/En igneering/Documents Traff'c$tandards/S'gnal-Design-2022-05 odf
Scott B Cramer, P.R.
State TrafOc Signal Engineer I Y 503/476-7849
Oregon Department of Transportation 1 4040 Fairview Industrial or SE
smttb cremsn3odot state onus I Salem, Oregon 97302-1142
From: LAFLEUR Christina L<Christina.L.LAFLEUR@odot.oreaon gov>
Sent: Monday, November 29, 2021 11:30 AM
To: CRAMER Scott B <ScotLB.CRAMER@odoLstate.ocus>
Cc: PARKS Brian N <Bdan.N.PARKS@odot.oreaonoov>; TOURTILLOTT Katherine
<Kathedne.TOURTILLOTT@odot state or us>; POWELL Wade <Wade.POWELL@odot.state.or.us>; SCHMIDT
Jamie M <Jamie.M.SCHMIDT@odot.oreaan.aov>
Subject: RE: 448 Main Street, Springfield
Hi Scott,
Do we have a requirement for how much clearance we would want a building canopy to keep from a signal
pole? The building at the address in the subject line is remodeling and warded to take that in consideration. I
am not aware of a standard for this, and would like your input.
Thanks,
Christy LaFleur, P.E.
Region 2 Traffic Design Engineer
Oregon Department of Transportation
Region 2 Tech Center
455 Airport Rd SE, Bldg A
Salem, OR 97301
Phone: 1-503-988-2714
Traffic -Roadway Section
Traffic Signal Design Manual - Signal Plan
5.5.4 Utility Conflicts
Always check to see if there is the possibility of overhead and underground utility conflicts
when locating poles. Conflicts with overhead and underground utilities will need to be
addressed during the design of the signal. A minimum of 10 feet from overhead high voltage
lines is required as per OAR 437-002-0047. For low voltage utilities (e.g. communication, fiber
optic, cable, etc.), the following minimum clearances should be provided (See Figure 5-90):
• A minimum of 5 feet from access points (e.g. removable pole caps, handholes, and
terminal cabinets) and illumination fixtures
• A minimum of 1 foot from above the mast arm and backplates
If there are any known conflicts with utilities, contact the Region Utility Specialist for help. See
chapter B for more detailed information about identifying conflicts and working with the
Region Utility Specialist. There are three possible solutions depending on the situation; 1.) the
signal pole location may need to be adjusted (which may require other auxiliary signal
equipment such as pedestrian pedestals), 2.) the utility may need to be relocated, or 3.) a
combination of number one and two. Utility conflicts shall be addressed and resolved before the
design is complete.
January 2022 Page 5-99
Traffic -Roadway Section
Traffic Signal Design Manual - Signal Plan
Figure 5-90 1 Low Voltage Utility Clearances
/'A,
ati r'ae°p�geal�.. xw Cxi a<p°l<Pci<: N
came PoleO ONE
ass Po/ n
F /nMnNe
Q;'�� (Acte slant/
�44��cc—nnrrtrlwe
eim/wl Cabne
a Polnrl
£ r
cwE mob 4ow varmAG[Irt rm a[nxn
LECIe eW�[ urh as,em°wbe P°He a{v,
na�en'oi°., �r'eerz ae.P,,;Pm<
mamtwaaceaR �� � ��n
43— � maWne aria aurins
ea0ev<egnalbarkpAresGall ne as sh°mm
/° a.°,Ma°�'a�mrer"erameail,Ne/mk,.me<
:yam
i3 /ea�n <trYPs° Der kaa ac IheuM;rvtw�+eaa
'Igrca nrha ,M1es<
II<. gmawo./m»n aPP nNm o�.w,¢ye.ummes. r°
i nmon"a eima<, %vown< gw,e,eeeo,er
adz-aca
January 2022 Page 5-100
Am
SPRINGFIELD UTILITY BOARD
FLT( TRIC SERV ICE( 66' T ER 1001 Mein Street Springfield, OR 97477-4819 Tel 541.726.2395 Fe 541.726.2399 www—buti Lcam
March 25, 2022
Jenna Fribley
Campfire Collaborative Architecture & Design
341 Main Street
Springfield, OR 97477
RE: Capacity requirements to adequately serve the project at 448 Main Street.
Dear Jenna:
The requested electrical service has the following characteristics:
Panel Size: 1,000 Amp
Voltage: 120/208 Volt, Three Phase
Given these criteria, SUB has the following capacity requirements to serve the project
for which the cost will be the responsibility of the developer:
1. Utility Transformer capacity. SUB will install an upgraded vault and transformer
to provide sufficient capacity for the development.
2. Utility Secondary capacity. SUB will install additional conduit and conductor to
connect the new/upgraded transformer to the existing secondary
conduit/conductor system.
3. Utility Infrastructure design. Utility infrastructure design will be completed by
SUB and the utility will coordinate the adjustment and/or installation of electric
facilities with the developer.
4. Utility Infrastructure Installation. Infrastructure will be installed in accordance
to the terms of a construction agreement between SUB and the developer.
The electric distribution system shall be designed and installed to adequately serve the
development in accordance with the Springfield Utility Board's Development and
Reeddevelopm�enn�tt �Policy.
Sincerely,
!V
Dan Norland
Electric Engineering Technician
541-744-3784
Enclosure:
Electric Utility Work
Temporary Pole Location
TENTATIVE STEP PLAN FOR TEMP OVERHEAD POWER SOURCE
WEDNESDAY INSTALL POLE AND CONDUIT TO VAULT 75G009
THURSDAY INSTALL OVERHEAD TRANSFORMER BANK AND CONDUCTOR
FRIDAY EARLYSTART SAM-9AM TRANSFER SERVICES TO OVERHEAD TRANSFORMER BANK
REMOVE PADMOUNT TRANSFORMERS AND PRIMARY/SECONDARY IN VAULT 99A017/99A018
WEEKEND -
MONDAY
CONTRACTOR TO REMOVE EXISTING VAULTS 99A017/99A018
TUESDAY
CONTRACTOR TO TRENCH ALLEY AND INTERCEPT EXISTING S' CONDUIT
WEDNESDAY
CONTRACTOR TO TRENCH ALLEY AND INTERCEPT EXISTING S" CONDUIT
THURSDAY
CONTRACTOR TO INSTALL NEW S'X 7'VAULT 220005
FRIDAY
CONTRACTOR CLEANUP AND TEMPORARY ALLEY RESTORATION
- WEEKEND -
MONDAY PULL PRIMARY BACK TO NEW VAULT 200005
TUESDAY SECONDARY TO SOO MAIN VAULT AND SET TRANSFORMER ON VAULT 200005
WEDNESDAY NIGHTWORK 7PM— 12AM CONVERT 500 MAIN STREET TO 120/208V, 3 PHASE
THURSDAY NO WORK. CREW ON REST.
FRIDAY EARLYSTART 4AM-9AM CONVERT 141/149 5TH STREET TO 120/208V, 3 PHASE.
CONVERT 538 MAIN STREET TO 120/208V, 3 PHASE. SECONDARY TO VAULT 75GO09
- WEEKEND -
MONDAY OVERTIME 7AM— 7PM SECONDARY FROM VAULT 75G009 T0448 MAIN. CONVERT 440,
444,448 MAIN STREET.
TUESDAY REMOVE OVERHEAD TEMP TRANSFORMER BANK AND CONDUCTOR
WEDNESDAY REMOVE POLE AND CONDUIT.
THURSDAY CONTRACTOR CONCRETE REPAIR FOR SIDEWALK AND 2 PANELS IN ALLEY,
FRIDAY CLEANUP/FINISH
Note: Dates/Times are subject to change.
ASI
W
i
=i
URN
`,1,Li/AMa ..
� N
T
r
1
S ,Ah St 5th St
kcal:
0
CONSTRUCTION AGREEMENT
THIS AGREEMENTmadeand ¢opened into this day✓ A AAA -19-2@2, by and between Me CITY
OF SPRINGFIELD, OREGON, a municipal corporation, artia, by and through the SPRINGF160 UTILITY BOARD,
hereinafter refernedto as Me first party, and Masala PropeNes, LLC, hereinafter referred to as the second party.
WITNESSETH
WHEREAS, Me first party owm and operates municipal electric and water systems serving within and
adjacetAMthe corporation limits of said city, and
WHEREAS. Me second parry Is planning the development and construction of A Commercial Buddha,
heated ai dIR Main Street in lane County, Oregon, said developed for COMMERCIAL amounts, described
partimlarityas falloers:
T" MAP, 17-[B- 1, TAR LOT: Wall
WHEREAS, the second party has applied to Me first parry for electrical services for said development; rmw,
therefor,
IT IS AGREED by and between the first party and the second party and each in consideration of promises and
agreements ofthe others do hereby promise and agree as follows:
1. The Springfield utility Board does hereby agree m install an electric distribution system for Me service of A
Commercial Building in accordance with plain for electric developments shown an bb Number 121011.
2. The second party agees to pay the first partythe sum of$d9,B99.Q payable before Me start of construction,
in accordance with Me Springfield Utility Board's Development and Redevelopment Oiarge Policy.
3. The first party's plans, specifications and developmem charges are based on Me aaumptiom thMMe complete
distribution system shall he installed. Nthe second parry changes Me plain and constructs the development
other than orionally stated, Me second party shall pay for any additional cost incurred by Me first party. Said
payment to be made MicrM the first party energizing Me system electrical.
a. The second party a pees to comply with all Mops specified in the current Electric Development and
Redevelopment Charge Policy in effect atthe timethis agreement is entered into.
5. The second party requests peculation of distribution facilities M commence within 30 days of the payment
dare.
fi. The first party agees to make a concerted effort W commence installation of distribution facilities wnhln 30
days of the second party's requested installation date provided the second party does not obstruct or denies
Mefimtpary's... Within 180 daysofthedateofM6 ageement,ifthesecond parrydoesnotperfornih
resporrsihili hes under theaWeement, pufust party has no furtheroblivoon under this agreement.
T. This ageement shall be bindhrg upon heirs, eaecutors, administrators, successors and assignees of the
nupeetive partes.
S. Nothingherein containedshall beconstrued as limdingthefirst party ortheserund party in any manner except
as herein set forth human as services, meters and Me reading thereof and Me billing for camumption, and
associated smite charges are concerned.
9. "R sort or legal action inatiated by either party for the purpose of enforcing the terns of this ageemeM,the
prevailing party shall be entitled M dud ment apimt the other party for the prevailing parties reasonable
attorney fees and court costs as date unined by Me Court atrial or any appeal therefrom."
Deed this 309 day,o,11hi;g42Up
^
/ ! /
Santa, Rin, Director Dartd u.11 a@n inner
Dectrk: Engineering&Operations Mas prop C
SPRINGFIELD UTILITY BOARD
WATER SERVICE CENTER 202 South 18th Street, Springfield, OR 97477-5240 Tel 541-726-2396 Fax 541-747-7348 www.subutil.com
TO: Drew Larson
City of Springfield
225 N. 5th Street
Springfield, OR 97477
DATE: October 11, 2021
SUBJECT: SUB Water comments for DIM 811 -21 -000257 -PRE, David LoveaA
Listed below are our comments for the above referenced development proposal:
1. The proposed development is within the Springfield city limits and currently receives water service
from the Springfield Utility Board (SUB).
2. Please ask the developer to contact SUB Water Division for detailed information regarding any
proposed modification of the existing water service(s) or any additional water services to the
proposed development.
3. SUB and the City of Springfield are separate entities. Any water related items affecting your
development will need to be coordinated through SUB Water Division independently from any items
or submittals that may be required by the City. Please contact the SUB Water Divisfan for detailed
information regarding any water servfcefs) to the proposed development.
4. Non-residential backflow prevention assemblies are required to be installed downstream, above ground and
adjacent to the water/fire/irrigation service. New non-residential water services (domestic and irrigation)
require the installation of a Reduced Pressure Backflow Assembly (RPBA).
5. New residential water services with lawn sprinkler systems or other cross -connection hazards will require a
Reduced Pressure Backfiow Assembly (RPBA) installed above ground and at a location between a tap on the
domestic service line and the irrigation system. Residential fire systems containing anti -freeze compounds or
any other chemicals shall be isolated using a RPBA. If no chemicals are used in the fire system, then a Double
Check Valve Assembly (DCVA) is required. These assemblies are required to be installed above ground and at
a location between a tap on the domestic service line and the fire system.
6. All non-residential domestic water, fire, and/or irrigation service(s) will require the installation of a backflow
prevention assembly(ies).
7. All backflow prevention assembly design plans must be submitted to SUB Water Division for approval. For
more detailed information about SUB's Cross Connection Control Program Standards contact the Water
Division at 541-726-2396 or refer to SUB's website at: http://www.subutil.com/water/cross<onnection-
control-and-backflow-protection/.
S. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from
wells. In every instance, care shall be taken to prevent groundwater contamination.
Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals,
petroleum products, fertilizers, and the prevention of groundwater and storm water runoff contamination.
Special requirements maybe necessary for groundwater protection at this development. Formoredetailed
information, Contact the SUB Water Division Drinking Water Source Protection Coordinator at 541-726-2396.
PLEASE NOTE: SUB development charges are paid directly to SUB Water Division and SUB Electric Division.
Sincerely,
Spring(leld Utility Board— Water Division
From: HIGLEY Scott scotth@subutil.com ef
Subject: FW:44e MAIN ST
Date: December 16, 2021 M 7:40 AM
To: Drew Larson almson@springlield-or.gov
Cc: Water Ergineering Waterengineering®subutil.com, Jenna campfirelab.cnm jenna@campfirelab.cum
Hi Andrew,
Attached is what I have sent to the architect and the owner has filled out our meter sizing
form. The owner is also working with our Water Quality manager on the placement of the
backflow assemblies for the fire and domestic service. I am working with the owner on
sizing the domestic water service. The 12" PVC water main that is under the sidewalk will
supply any amount of water that this site will need. The static water pressure at the water
main is 50 psi. Please let me know if you need anything else.
Thanks,
Scott Higley
Engineering Technician
Springfield Utility Board
Water Service Center
202 South 18th Street
Springfield, OR. 97477
e-mail scotth@submil.com
www.subutil.com
general (541)-726-2396
direct (541)-736-3295
cell (541)-501-1750
fax (541)-747-7348
From: HIGLEY Scott <scotth@subutil.com>
Sent: Wednesday, December 08, 2021 2:47 PM
To: 'Jenna Fribley' <jenna@campfirelab.00m>
Cc: Water Engineering <Waterengineering@subutil.com>; RebeccaW
<RebeccaW @ subutil.com>
Subject: RE: 448 MAIN ST
Hi Jenna,
Attached is a pdf of the water map and the letter that went to the city. Please let me know
if you need anything else. I have sent the meter sizing for to Harvey and Price this
morning and need to see any plans that you have for this development.
Thanks,
Scott Higley
Engineering Technician
Springfield Utility Board
Water Service Center
202 South 18th Street
i
V— 3 Fo N
1-1,0 ASST a ;n 8V-95 2V-32
M M M
5
I�
�
� F
167-1
8M
GE
/
/1
V �
138
75 �j
M
r,
134
1 51
_N
`r
N
N
d
d
�� 140 130
.a\-� ..C1 —n A1C._
PN
GP
�
� F
PN
g\.•
GE
/1
V �
M
1 22
M
O O
Iu i
N
Lr LOR
LO
ePN�
cJ (p
d
a°
C' F
N t
of
0F d
It
It
44
4
vRRpp�
M
6V-166
H— 9 41
121
H 909
6V-167
MAIN Sl 4V-148 2V-147
4" PVC,'86902 FIRE SERMC /60642
/1
V �
M
M
O O
Iu i
N
Lr LOR
LO
ePN�
a°
S
116" DI,'07957
�v-172 S A ST
10"
HARVEY
PRICE
$.
Project: 448 Main.
Site Address 448 Main St. Springfield, Or. 97477
Regarding: Building Sewer Video.
Author of document: Ben Ellis, Harvey & Price.
Date:1/22/22
Upon reviewing the building drain videos offered on this project, here's our thoughts.
The existing drain line makes multiple offsets that could and should be alleviated. The portion nearest
the building has roots inside of the pipe. The roots appear to enter through inconsistent and poorly
made pipe joints.
The last few feet before the connection with the 10" sewer lateral appear to be sloped at roughly 45'
upward off the 10". This same sloped run appears to be in good shape and is root free.
Our recommendation is to replace the building sewer from the upstream end of the first piece off of the
10" main. This allows the existing 10"x4" building sewer connection to remain in use while replacing
the inferior section of existing 4" pipe.
Regards,
Ben Ellis.
LIGHTING
MILLENNIUM
Millennium Lighting
www.miltenniumlighting,com
LEDRS10 -LED R SERIES OUTDOOR 10"ANGLE SHADE
This item can be converted to a pendant or wall sconce with
purchase of separate compatible clownrod or goose neck.
Please see compatible downrods and arms below:
Compatible downrods RSI, RS2, and R53
Compatible with arms: RGN10, RGN12, RGN13, RGN15, RGN22, RGN23,
RGN24, RGN30, and RGN41
Compatible with wire guard: RWG10
LEDRAS10-SB
Nmxallfiniand a outdoor fin.ngmust asprosnin
wmah aainctl and treeled. Therebre,pra suggest cleaning
p.da . auni application r finisM1 preserving 8 renewing
pmducts SUCM1 as PejwenaR.
R SERIES
R ONRI■S
Dimensions
Width
10"
Height
11"
Wire Length
100"
Weight
2.51 lbs.
Finish & Material
Finishes Sa-satin Black
Material Metal
LED Light Engine
11W LED
90 CRI
800 Lumens
3000k
50,000 Hour Lifespan
Constructed in Aluminum
5 Year Warranty
Replaceable LED Module
Certification
UL Listed Wet Location
Item Number
SKU'S LEDRASIO-SB
'V&king the L�esird & o%vddV
R SERIES OPTIONS
GOOSE NECKS - (WALL MOUNT)
RGNIO RGNI2 RGNI3 RGN15
T m_TI I
W
g- � 3
S f 14Y 3
RGN22 RGN23 111311124
II \\ tT iy 5- uI�»-
\�V 15' �k
�� �I �
E °d 31
RGN30 RGN41
T TO
y IE 3g 3 �.E er 3 E 4y. 3
WdPWe
In[IutlM
ID:3/4"
FINISHES
ABR -Architectural Bronze
AL -Aluminum
ASB -Aluminum Painted Satin Black
GA - Galvanized
GY - Gray
NB - Navy Blue
NC - Natural Copper
SB - Satin Black
SG -Satin Green
SR - Satin Red
WH -White
STEMS AND CANOPY
KITS - (CEILING MOUNT)
STEM CONNECTORS
Rwcn
RSCK(25'"Ie)
4X'
1T
RC
Accep9ts3/4" stem
• v.0
M14
ID:3/4"
..AFF
3X11
`'F FF
RSCM
O
FINISHES
FINISHES
13"
°
ABR -Arch itectural BronzeIL
ABR- Architectural Bronze
RSI
sx"
GP-Gopper
GA - Galvanizetl
P' �
�k J
AL -Aluminum
CR - Gopper
] id
GV -Gray
144
GA - Galvanized
NB - Navy Blue
GY - Gray
_
N
RSCKSS Hilo Angle)
SB - Satin Black
NB - Navy Blue
.8.
SG - Satin Green
Satin Red
SB - Satin Black
SG - Satin Green
RS2
WH -White
-Satin Red
9fi
WH -White WH -White
R53
WALL MOUNT SWIVELS
WIRE GUARDS
NSH FINISHES
Rwcn
ABR -Architectural Bronze
CP - Copper
Jh' GA - Galvanized
4X'
1T
SB -Satin Black
3
SG - Satin Green
M14
SR - Satin Red
f T 3 WH -White
..AFF
3X11
`'F FF
RM2
JT
13
E jl
RAie
°
R S®RIBR
FINISHES
ABPArchitecturalBronze
GA - Galvanized
GY-Gray
NB - Navy Blue
SB -Satin Black
SG - Satin Green
SR - Satin Red
WH -White
R SERIES OPTIONS
1 LIGHT POST ADAPTERS
Will work with any RLM shade
Designed to fit standard 3" posts and pier mount bases
Uniquestem hung design does not require pipe sealant
compound on fittings.
3/4" inner diameter rigid conduit or water pipe may be
substituted for stems or goose necks.
RPAS
26"
18_ 3
2 LIGHT POST ADAPTERS
Will work with any RLM shade
Designed to fit standard 3" posts and pier mount bases
Unique stem hung design does not require pipe sealant
compound on fittings.
3/4" inner diameter rigid conduit or water pipe may be
substituted for stems or goose necks.
RPAD
R 6Is1411 s
16�
��
33"
W: 33' x H: 26'
Finish & Material
Finishes
ABR -Architectural Bronze
AL -Aluminum
CP - Copper
GA - Galvanized
CV - Gray
NB - Navy Blue
SB -Satin Black
SG - Satin Green
SR - Satin Red
WH - White
Material
Cold Rolled Steel,
Die Cast Zinc
Certification
UL Listed
Wet Location
Item Number
SKU
RPAS
Finish & Material
Finishes ABR -Architectural Bronze
AL -Aluminum
CP - Copper
GA - Galvanized
GV - Gray
NB - Navy Blue
SB -Satin Black
SG - Satin Green
SR - Satin Red
WH -White
Material Cold Rolled Steel,
Die Cast Zinc
Certification
UL Listed Wet Location
Item Number
SKU RPAD
)
§
/
!§
(
}
t
§
Pic
_
)
Q
\
;
[ ,b
.
)j
r))./�/.
)�\\�
T!4
)
§
/
!§
(
}
t
§
\\
r))./�/.
)�\\�
T!4
p
)
SO* Map IT 03 35 2 4
SEE SUPPLEMENT MAP
.a• � n
S 1000 YI • 1 W 90D a90D 9DD�2 B�. 18� f BBf♦•
W • ..q
floo 21
• 1200
e
{
2800 2900 ;(1pp � s 3300 .
350f
I- f •
M
sDo I 1 SooD 13 3I 4501 1 450,
Y
p /+ 80W !{{ 9100 94Di 8500 9700
• � LfLf Il ` '
1 1
1 I
3� w
!pI
STREET . te4r4r
fll�41 N
4200
l L
M
J
N
ua Q
C N m m m O
O—w 0 d 0 C 0 mL3c w c
0
M—
C-
- a�Oc0 UN v'�om p.MOZ mE II "D 00
U~ m O s Alu-o) - m om
a� m m .o :fifl c S.
IJrfOvQM-7 °d1im''L tNc cTaisw':"m 0 a)mT.mc
0c•',iIaWcm.Y.000 m maQ�l O tP aupiEcNaa Slno
m m poOw0+
0 00o"`crmO c Ow`N0 0 0E o (D L O o
_U
Tm NL - WN00--- O p 0 aO797
m�O=„d c i5 'SM mm m w o c E3 °momcZ ;r c ca Sc
co
rnoE19 me OO119O Jeo -5.F
CO w
3+0Eoc m m.oomw QooL0 O
om� r.
o 0cc ID 8mm c0 0 ocm moo W v W pa. 1a
O V U C > e�j m m C Tc p•. = T E `” W 7e paoaaa ao) panraaaa sem IuawMsut m^
J .— L m XC
O- m m � m J 4 v^ N e4 ) 9 4 °P ' J
. � rp .`. Q' "O m T' T y- i W 7. a) 7 1 fi plaa fi aaa filun0 w
v o a w o `� O •8 r c c 3 L m m ics a ao ue cn • as un a m
c y W c m m .p Ix v m .� c m �,� m m P. yl ) P >I I� ti aJ rP'1 m vi 8
m m- O m E r E o c o w o ,c •ss - aue•„o 6}uno0 O. m
c y y 0 0 a o 0i 0$ y t- E O ZO w uosaJO;o a;e;s m r
3 D.' C N 'c N O .L..
X00 ccrn�c aami° rt'co� m�>.E�>. a; c mmo
F- C co m 't6 p Ui � w U� z � d c O 0 O) m e C = O m c
Z o M E W t a b o E w �..� Q o o 'o U If o E w 0 a) v a E
g Tm� ca mmw 't-0 o.> a.c cz m TW v m �-'v m
y vOF (9c0o�E vrnn aNi.d00 c-9•0-4) y m EV E0
Q Jr'� t y CD 'C L O CL 'c N rm-• L C L J c E
W 3n nm«tO°c 3 >�m Ep cwE m°o20 E m t�i orcin
oW v�_o.mo co 2:a lu ='EoO ) chip� .pm o E O a9E
m E: c 3 0 m O m m O U N U mm L V m 0 0
c z d W 3 �. V 2 1 Y >.r � O m y c w'� m m W a C X
_ O J Z L L p -d c m w 0.2 T.d? t0 ( m 0f 0 E >
O �6Cv m rp O 00 O m. o 0 m $ m y C
aCCO i1OJc3Coo p'i0 �mawiLLd _o4)0e(a to m $ omp
mmz -C�ELa 9E o: �d�SroT mm acm0 > E o pmc0
. 'm$.p' o -M E.2 o$E -Pppwmm Oc0'namip�` .$ 2 Amo.
3 C m •c L _w 0 a'0+ U m 0 W m - A C m i� E V
C Vc C w . t.. '0G O�W mc.o. oOrN�cZO m mpj U a$v
m- WV Gawio+ c�i`m a)vc�m o0. m$aTiU CC
ct 00cc
W a C mU` .. ..l �. C 0vM m W 2 ._� m d --c[ m m= m O r1 ` fnj Viv w
m 0 m�•-3 aTc i�o�o .mui�W00 J O .4
Q0- CQ N O m -0p -_ cm C.._,c r. LN0 C'mV m 0 W En
c4O O C G O ro =LMO.5 (V Y T L C 2 O Zw 0-0
�mwai c>y0ot �40 X c aE�E X .0
m°�oorom O = ,y �Z vtE
-c m pL�z.. LnrX to �wT ca pcccc. F' m� W5 c.o0
F -❑mc 2— i5c cm's'' io 16Lzc .�� me me ec. O- 2i OU 0.co
-z -id 3aE W �moic0 mv� <Q m=0 Yl m £y m`m m.� Z co N 0L- 1 mm4)
W -m0 0. c-pV Evo NV NL R•pcEmEy ¢ M 'i LL f Eva
0� fa E 4) -G C m O 0 V W C O T T� T) W ZW gg 0
ZZ ccs W �wo
E�oE ami `bac E- c`Z mz E 'c$mmomo ¢ I_ o W
tq�O.m �mwoc ocmm carcc m t' _ n Q� OmcY
IL ym wcpm— J .ON •• N 61 •pLC c >—
'F=-cot0 2ioNC8Q�-a F(n0 w ro.20Em w mOZpZpnza O� ? a' ti() 0ocnca
IM MM owl NM9HG 01 Nam
__ .
1-
li8
0 ^
N
0
LL
g L
3 O
d w
N
a
O
zW.
c
0
y
E
E
U
2 LL
CORK
W
F
N
LL
LL
U-
04 N
CL
W
0