Loading...
HomeMy WebLinkAboutPacket, DIM PLANNER 8/24/2022DEVELOPMENT ISSUES MEETING FORM APPLICANT: Chris Looney, Paradigm DC LLC MEETING DATE/TIME: Thursday, September 15, 20221:30 p.m. PLACE: Hybrid: DPW Conference Room 615/616 & Virtual via Zoom CONTACT PERSON: Haley Campbell 726-3647 Current Planning Staff: ❑L Miller, ❑A Limbird, ❑M Rust, ❑D Larson, ®H Campbell Jeff Paschall, City Engineer, DPW Jeff Paschall, AIC Managing Civil Engineer—DPW Ken Vogeney, Emergency Manager (DPW) Clayton McEachem, Civil Engineer, Development & Public Works Matt Stouder, Environmental Services Div. Manager/MWMC General Manager Kristi Krueger, Capital Engineering Manager, Development & Public Works Michael Liebler, Transportation Planning, Civil Engineer, Development & Public Works Gilbert Gordon, Deputy Fire Marshall 2, Fire @. Life Safety Department Ben Gibson, Maintenance Supervisor, Development & Public Works Eric Adams, Planning, Willamalane Park and Recreation District Ladd Boyce, Keoki Lapina, Springfield Utility Board (Water) Greg Miller, Springfield Utility Board (Water) Sanjeev King, Nick Amann, Springfield Utility Board (Electric) Amy Chinitz, Springfield Utility Board (DWP) Thomas Jeffreys, (EPUD) Emerald Peoples Utility District Michael Wargo, Willamalane Park and Recreation District Matt Caswell, Planning & Development Manager, ODOT, State Highway Division (odotr2planngr@odot.smte.or. us) Brad Rudler, (Electric) Eugene Water and Electric Board Wallace McCullough, (Water), Eugene Water and Electric Board Brett Yancey, Chief Operations Officer; Springfield Public Schools Chris Reiersgaard, Asst. Director of Facilities & Operations; Springfield Public Schools Safe Routes to School, Springfield Public Schools Chris Carpenter, DPW Building Official Andrew Shearer, Police Chief, Police Department Tom Schwetz, LTD, Planning and Development Director Luke Pilon, CenturyLink Jeff Paschall, AIC Community Development Manager, DPW Jeff Paschall, AIC DPW City Surveyor Sunny Washburn, Program Coordinator, Environmental Services Sasha Vartanian, Lane County Transportation (Steve Gallup, cc only) Marie Longworth, Central Lane Communications 911 Monte Brown, Northwest Natural Gas Jason McDonald, Comcast Cable Water Resource Coordinator, ESD Jamie Porter, Rainbow Water District Kristina Kraaz, City Attorney (Mary Bridget Smith upon specific request) Niel Laudati, Assistant City Manager Sarah Weaver, Administrative Specialist (DIM Annexations) Please mark who you would like to attend this meeting and return form and file to Shannon. Thanks! Revised: 06/08/2020 DEVELOPMENT INITIATION MEETING DEVELOPMENT AND PUBLIC WORKS DEPARTMENT SPRINGFIELD CITYHALL 225 FIFTH STREET DPW Conference Room 6151616 OR Zoom Meeting Date; Thursday, September 15, 2022 1:30 — 2:30 1. DEVELOPMENT INITITATION MTG #811 -22 -000198 -PRE 811-22-000199-PROJ Chris Looney Assessors Map: 17-03-2513 TL 800 Address: South of Marcola Road Existing Use: vacant Applicant has submitted proposal to construct multi -unit residential development. Planner: Haley Campbell The Development Issues Meeting informational packet for this meeting is available on-line for you to review or print out @ Laserriche website: www.sorinafeld-or.aovtweblink8tbrowse.asox VICINITY MAP 811 -22 -000198 -PRE Development Initiation Meeting 17-03-25-13 TL 800 South of Marcola Road Chris Looney SPRINGFIELD City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Development Issues Meeting (DIM) Required Project Information (Applicant: complete this section) Prospective Chris Looney541.484.7311 Applicant Name: Phone• Company: Paradigm DC, LCC Fax: Address: 1361 Pearl Street, Eugene, OR 97401 Prospective Applicant's Rep.: Carol Schirmer Phone: 541.234.5108 Com an Schirmer Consulting, LLC Fax: Address: PO Box 10424, Eugene, OR 97440 Pro a Owner: JKT Investments, LLC Phone: Com an : Fax: Address: 760 Bailey Hill Road, Eugene, OR 97402 ASSESSOR'S MAP NO: 17032513 TAX LOT NOS : 800 Pro ert Address: WA Size of Pro a 4.72 Acres x S uare Feet Description of If you arefilling In this form by hand, please attach your proposal description to this application. Pro osal: construction of mufti -family units Exlstin Use: vacant # of Lots Parcels: 1 Avg. Lot Parcel Size: 4.73 acres sf Densi : 28 du acre Prospective -� Applicant: �� �-- Date: August 12, 2022 Signature Chris Looney Print Case No.: Date: Reviewed b : Application Fee: ethnical Fee: 0 Postage Fee: 0 TOTAL FEES: $ PROJECT NUMBER: 1of3 Revised 5/21/13 KL August 23, 2022 MARCOLA APARTMENTS Marcola Road and 22"d Street Springfield, OR Map: 17 05 25 13 Tax Lot: 800 Zoning: MDR Plan: MDR Development Issues Meeting (DIM) —Written List of Questions Property Description. The subject property is approximately 4.73 acres in size and is currently vacant. The subject property is zoned MDR and planned MDR. The client plans on the developing the property with multi -family housing. Our questions are as follows: 1. Planning Density Density minimum for MDR is 14 units per acre. Density maximum for MDR is 28 units per acre. The property is 4.73 acres or 206,039 sF. There is an existing PUE on the property that totals 4,150 sF. The net acres are 4.635 acres. 28 units per acres is 129.78 units or 130 units. Q: Please confirm the density calculations are coned. Lot Coverage 3.2.225 Lot Coverage and Impervious Surface Standards, Q: Please confirm that the 45% maximum lot coverage applies only to the buildings themselves. Q: If lot coverage is calculated by totaling buildings and impervious surfaces, can pervious paving be utilized to mitigate? 2. Utilities / Public Works Q: Can SUB staff confirm that there is sufficient electric and water system availability and capacity for development of the subject property? Q: Is there sufficient water pressure for domestic and fire? Q: Can we connect to the stormwater stub to the site near R Street? Q: Does the city stormwater system have sufficient capacity so that detention will not be required? Q: Can we connect to the existing wastewater pipe that runs through the middle of the site? Q: We would like to confirm that this is a 14' sanitary sewer easement running east west through the site. Q: What can be constructed over the PUE? Q: Access location to property and relationship to R Street ok? Schirmer Consulting, LLC • PO Box 10424, Eugene, OR 97440 • (541) 234-5109 Land.ape ArMitedure ♦ Land Use Planning Marcola Apartments DIM Questions 3. Right of Way and Street Section Marcola Road primarily has a curb side sidewalk with a very small (18") setback. This plan proposes a 5' setback sidewalk and a 9' park strip (including curb). Q: What is the required street section for this side of Marcola Road? 22ntl Street has no sidewalks on the development side of the street. This plan proposes a 5' setback sidewalk and a 5' —6" park strip (including curb). This plan proposes a 5' setback sidewalk and a 9' park strip. Q: What is the required street section for this side of 22ntl Street? 4. Fire The residential buildings will be sprinklered. Q: Is the existing site plan adequate for fire access? Q: What drive aisles will be used for fire access? Q: WII additional fire hydrants be required? If so are they public or private? Q: Can you confirm that aerial access will not be required with 29 feet to roof eave? Q: WII a fire turn around be required at the north parking lot? Thank you in advance for your assistance with this project. We look forward to the conversation. Sincerely, Schirmer Consulting, LLC Carol Schirmer Schirmer Consulting, LLC • PO Box 10424, Eugene, OR 97448 • (541) 234-5109 Landscape Architedure t Land Use Planning 2