HomeMy WebLinkAboutApplication APPLICANT 8/22/2022SPRINGFIELD
• ' ' • ' •
225 FIFTH STREET
DEVELOPMENT AND PUBLIC WORKS SPRINGFIELD
GON SPRINGFIELD, OR 97477
PHONE, 541.726.3753
FAX, 541.736.1027
www.spnngfield-orgov
NOTICE OF INCOMPLETE APPLICATION
Date of Letter: Planning Applicafion:
Much 10, 2022, Accessory Dwelling Unit Type
8 1 1-22-000037-TYP2
639 19" Street, Springfield OR 97477
Applicant:/Property Owner:
David Cole
P.O.Box 70142
Springfield, OR 97475
Request: An application for Accessory Dwelling Unit approval was submitted to the Springfield Planning Division on
February 8, 2022 for the construction of an Accessory Dwelling Unit. The site is at 639 190 Street, Springfield Oregon
(Map and Tax Lot 17-03-36-12-12600).
Status of the Application: The application is incomplete and requires additional information for review. The Springfield
Development Code requires that submittal requirements of SDC 5.4-105 be fully met prior to application acceptance for
review.
The items listed below are needed to make the application complete for review:
1. All utility lines must be shown must be shown on the plan including distances from existing and proposed
structures.
Alt easements associated with these lines must be shown on the plan.
The apphcanf is showing anew lateral to connect to the 6" sewer line to the east of the proposed ADD
location. This is a lateral connection to provide service to existing homes to the north of 639 191 Street
and cannot be used for connection. The applicant shall show the ADU being connected to one ofthe
existing laterals to the 15" hunk line running east to west.
The applicant shall provide a stormwater plan to accommodate runoff on the site. There is no existing
piped public system with direct connection to this property. The public system consists ofweepholes to
the street and the nearest inlet to the underground storm system is approximately 130' and this gutter
capacity is shared with all other existing homes in the neighborhood. The gutter has limited capacity and
any additional runoff from this lot is required to be mitigated on site as much as possible for all new
impervious area on site.
The applicant must provide a small site study drainage report that includes onsite mitigation measures,
usually done through infiltration. The type of onsite stormwater management system will need to meet
the requirements of that type of facility for size, construction and vegetation per the City of Eugene
Stormwater Management Manual. If infiltration is not possible on this lot due to soil conditions this will
need to be verified by an onsite infiltration test as defined in the Eugene Stormwater Management
Manual. For questions on stormwater requirements please contact Clayton McEachem at 541-736-1036
or CmceachemOsorinefield-or.eov.
the following items are not required for review of the Accessory Dwelling Unit application for planning but were of note
from the Building Division for the upcoming building permit. Preparing these may save time during the building permit
review:
• The soils on this site are Hydric and will require a Geotechnical report prior to fust inspections.
• Energy measures identified on Page 3 of the plans are out-of-date and reference the 2017 ORSC. A current
version of the energy measures for 2021 ORSC needs to be submitted with plans. NI 101.1.2
• Whole-hguse ventilation system needs to be reflected on the plans. R3034, M1505.4
If you have any questions, please contact me at 726-2301 or (miller@springfreld-or.gov.
S' aerely, `
,
Liz Miller
Planner,
19th 5T.
19
N CiR y W
21
�
qg
Q)
—4
NORTH
DAVID COLE
°`°w
L
STORM WATER FLAN
1,12I122
BUILDING OE81CsN
SPRINGFIELD, OR
—WO151—
1 1
SIM FORM:. 2014 (Simplified Approach for Stormwater Management)
Application David Cole Building Permit If
Address 639 14th St
Springfield, OR Residential/Commercial
Tax Lot tt 17-03-36-12-12600 IOme Gael
NRCS Soil Type or
Measured Inflltraiton Rate Type 32 -Coburg -urban land complex
Facility Sizing far Water Quality Flow Control and Flood Control """ Only for use in TvDe A & B Soils
Surface. Facilities
Impervious Area Managed
Facility Sizing
Faclity Surface Area
Total Proposed New or Replaced Impervious Surface Area
884 Box
ImperviousArea Reduction
-
StormwaterPlanter
sf x
Permeable Pavements
sf
Sand Filter
sf x
Eca-Raaf
sf
Sum of Total
Contained Planter
sf
Impervious Area Managed
684 Box
Tree Credit
sf
(Box 4 must be equ al or
greater than Box 3)
Total Impervious Area Reduction
Overflow tog utter lw lel
>0 Box 2
Total Impervious Area Requiring Stormwater Managemment
884 Box
)11.1-Boi 2)
Facility Sizing for Water Quality
OnN
Subsurface Infiltration
Surface Facilities
Impervious Area Managed
Sizing Factor
Faclity Surface Area
Rain Garden
sf
x 0.05 =.
Stormwater Planter
sf
x 0.03 =
Swale
884 sf
x 0.06 =
53.04
Vegetated Filter Strip
sf
x 0.2 =
Sand Filter
sf
x 0.03 =
Facility Sizing for Water Quality
and Flow Control
Surface Facilities
Impervious Area Managed
Sizing Factor
Faclity Surface Area
Rain Garden
sf
x 0.11 =
Stormwater Planter
sf
x 0.07 =
'
Sand Filter
sf
x 0.07 =
Facility Sizing far Water Quality Flow Control and Flood Control """ Only for use in TvDe A & B Soils
Surface. Facilities
Impervious Area Managed
Sizing Factor
Faclity Surface Area
Rain Garden
at x
013
-
StormwaterPlanter
sf x
0.11
=
Sand Filter
sf x
0.11
=
Sum of Total
Impervious Area Managed
684 Box
Point of Discharge lcheck ane)
(Box 4 must be equ al or
greater than Box 3)
Overflow tog utter lw lel
Overflow to public storm drain pip.
rain
Overflow to Open Drainage
Subsurface Infiltration
1703 3612 12,600
63g I% Stream '77177
� SYZn
T
N
5 EWE[
LATERAL
Qa✓J Cole
Ro. Boy ��'yz
Sp;n�f.e/d,OR TN75
5 6"
R:apos�d ',
AUXIu,}=y OWeLL:,y
y uN►7 LEXi`s'{in�
r'iou$e
Sepa"�{c I SBwE�
Ww'ier ,
MK%ehS
w�
lol
F ElecYpSp Malo
r �
J^,
LINE T�Ve�L✓cEL > y � Q.> � �, �r� y' j � z � ` � Wr��L
6l'J�- Pawe,-4�1e OVerhea Paver
foie
7Lf F'We�7 sfr
iZOct
17ff+