HomeMy WebLinkAboutMWMC Agenda Packet
b.
______________________________________________________________________________
Memo: Property Insurance Renewal
June 2, 2022
Page 2 of 3
DISCUSSION
Property Asset Values – The total insured value of the MWMC’s assets was $337.55 million in FY 2021-22,
representing a net increase of $1.65 million in property and mobile equipment when compared to the
prior year. The total insured value of the MWMC’s assets is now $349.56 million in FY 2022-23,
representing a net increase of $14.86 million in inflationary adjustments on property asset values. The
increase in total asset value takes into consideration increasing inflationary adjustments,
added/upgraded and/or removed systems, equipment, infrastructure, and mobile equipment.
The current MWMC statement of values includes close to final costs for the Renewable Natural Gas
project at $8.65 million with insurance coverage pending final completion.
Property Insurance – Due to the $349.56 million in assets and coverage levels for flood and earthquake,
many insurance providers do not have the capacity to provide insurance coverage to meet the standard
MWMC coverage levels for flood, earthquake, and underground pipes. At this time last year, the
Commission approved property insurance renewal with Starr Technical Risks Agency effective July 1,
2021 through June 30, 2022 on a one-year renewal, with a total of $50M in earthquake coverage.
It is important to note that Starr Technical Risks Agency property coverage includes earthquake at $50
million. Additional Difference in Conditions (DIC) earthquake coverage is available and can be provided
by separate insurance providers to add to the current $50 million in earthquake coverage, if desired.
Please note DIC earthquake coverage does not include: (1) underground pipes, (2) extra expense, and (3)
course of construction projects -- as they are excluded from the DIC policies.
The table below provides the property insurance pricing from Starr Tech with property insurance
including a policy limit of $100 million, a flood sublimit of $100 million, an earthquake sublimit of $50
million, and sewer pipes sublimit of $10 million.
Property Coverage
thru June 30, 2021 July 1, 2022
Expiring Recommended
Program Pricing $50M Earthquake $50M Earthquake
Starr Tech / ACE America All Risk
Property Insurance includes $50M EQ $342,964 $353,640
TOTAL Premium $342,964 $353,640
Cost difference compared to Expiring $15,361
% of cost difference to Expiring 4.5%
Property Insurable Values $337,550,791 $349,561,091
The property insurance pricing above does not include agent commissions, as the MWMC agent of
record services are based on an annual fee paid directly by the MWMC.
______________________________________________________________________________
•
•
•
•
•
Digital Signature:
Digital Signature:
Digital Signature:
______________________________________________________________________________
•
•
•
•
Digital Signature:
Digital Signature:
Digital Signature:
______________________________________________________________________________
•
•
➢
______________________________________________________________________________
ATTACHMENT 1
ATTACHMENT 1
➢
ar
ATTACHMENT 1
1 2 43 5 6 7
A
B
C
D
E
29'-0"15'-2 1/2"6'-7"15'-2 1/2"34'-0"37'-0"
137'-0"67'-0"39'-0"18'-0"40'-3 1/2"164'-3 1/2"Break Room, Pantry, Jan Storage
Meeting / Hoteling
Storage
Laundry
Mud Room
Open OPS Crew Area / Open Office
Office
Administrative Front / Open Office
Lobby + Vestibule
N
MWMC ADOPS Building
Renovate, Option 4A
19,775 SF
Conference / Training / Meeting Room
Mechanical Room
OPS Lab
Console Room
Restrooms, Shower Locker Rooms,
Unisex ADA Restrooms
DCS Room, Server Room,
Electrical Room + IT Desk Room
Primary
Effluent
Office Office Office Mechanical
Room Office Office Office
Office
Office
Office
Office
Flex-Use
Training /
Meeting Room
JAN
Office
ADA
Restroom
ADA
Restroom Storage
W
Restroom
M
Restroom
Administrative
Front Office, Flex
Space + Copy/Print
Area
Lobby +
Vestibule
IT Desk
Room
DCS
Server
Electrical
Room Storage
Flex-Use /
Meeting Room
Break Room,
Pantry
OPS Lead
Console
Room
Meeting Room
/ Emergency
ADA
Restroom
Shower
ADA
Restroom
Shower
Mud
Room
Laundry
M OPS
Locker
W OPS
Locker
Storage
Open OPS
Crew Area
OPS
Supervisor
OPS
Lab
OPEN
MEETING /
FUTURE
EXPANSION
Training /
Meeting Room
Electric
Feed
Hot
Water
Water
Supply
Chilled
Water
Water
Supply
Water
Supply
60
Break Room, Pantry, Jan Storage
Meeting / Hoteling
Storage
Laundry
Mud Room
Open OPS Crew Area / Open Office
Office
Administrative Front / Open Office
Lobby + Vestibule
N
MWMC ADOPS Building
Rebuild, Option 3,
19,783 SF
Conference / Training / Meeting Room
Mechanical Room
OPS Lab
Console Room
Restrooms, Shower Locker Rooms,
Unisex ADA Restrooms
DCS Room, Server Room,
Electrical Room + IT Desk Room
Primary
Effluent
Office Office Office Mechanical
Room Office Office Office
Office
Office
Office
Office
Storage
W
Restroom
M
Restroom
Office
ADA
Restroom
JANTraining /
Meeting Room
Storage
Flex-Use /
Meeting Room
Lobby +
Vestibule
Storage
Meeting Room
/ Emergency
Laundry
W OPS
Locker
M OPS
Locker
Open OPS
Crew Area
OPS
Lab
IT Desk
Room
Electrical
DCS
Server
OPS Lead
Console
Room
ADA
Restroom
Shower
Mud Room
Electric
Feed
Hot
Water
Water
Supply
Chilled
Water
Water
Supply
70
Water
Supply
MWMC Ops Building Development Alternatives Matrix
Both:Risk Cat IV w/ IV+ Core
Description
Qualities/Features Weight Raw Score Wtd Score Raw Score Wtd Score
Location
1.5 4 6 5 7.5
Seismic Retrofit & Project Complexity
1.5 3 4.5 5 7.5
Fiber system renovation and
SCADA/Network operations 1.4 3 4.2 3.5 4.9
Space Programming and Design Flexibility
1.3 3 3.9 5 6.5
Exterior Design Options
1.1 2 2.2 5 5.5
Temporary Facilities during construction
0.7 4 2.8 4 2.8
Building Sustainability
1.2 4 4.8 3.5 4.2
Long Term vs Short Term
1.3 3 3.9 4 5.2
HVAC Upgrade
1.2 3.5 4.2 4 4.8
TOTAL SCORE RENOVATE TO RC IV/IV+36.5 REBUILD TO RC IV/IV+48.9
MID-RANGE ROM CONSTR
COST
ROM TOTAL PROJECT COST
RANGE (-30% : MID : +50%)
ALTERNATIVE 1 RENOVATE ALTERNATIVE 2 REBUILD
$11.5 : $16.4M : $24.7 $12.3M : $17.6M : $26.3M
$10.9M $11.7M
Total SF = 19,760
(~15,230 SF existing, ~3,600 SF RC IV+ Core)
-Core consists of console room, SCADA/Network room, multi-
purpose meeting room with kitchen area, restroom/shower,
electrical room.
Total SF = 19,770
(16,670 SF RC IV and ~3,100 SF Risk Cat IV+ Core)
-Core consists of console room, SCADA/Network room, multi-
purpose meeting room with kitchen area, restroom/shower,
electrical room.