HomeMy WebLinkAboutApplication APPLICANT 7/8/2022City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
srwrwans 0
Required Project Information (Applicant., complete this section)
Prospective Dan Weber
Applicant Name: Phone: 541.302.9076
Company: Fax:
Address: P.O. Box23408 Eugene, OR 97401 dweber@webertawbells.mm
Prospective
Applicant's Rep.; David Schmitz
Phone: 541.868.4535
Company: engage:ARCHITECTURE
Fax'
Address: 132 E. Broadway, Suite 415 Eugene, OR 97401 dm@engagearchitecture.com
Property Owner: Dan WeberPh
One: 541.302.9076
Company:
Fax:
Address: P.O. Box 23408 Eugene, OR 97401 dweber@webertacobells.mm
ASSESSOR'S MAP NO: 17-03-27-12
TAX LOT 11,10(s): 03000
Property Address: 2448 Clear Vue Lane, Springfield, OR 97477
Size of Propert : 1.76 Acres X square Feet ❑
Description of if you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Looking for infonnation regarding right-of-way, home addition, new accessory structure, new ADU
and possible future subdivision.
Existing Use: Single Family Dwellin
# of Lots/Parcels: 1
Av . Lot/Parcel Size: 1.76 sf
Densi :.57 du/acre
Prospective
Applicant:
Jfi Date: Lot
S'rtature
i�&o,A R_" -o , rT -e-
Print
Required Project Information (City Xntake Staff., complete this section)
Case No.://o����P Date: 2'L Reviewed by: W
Application Fee: W1 0
Technical Fee: 0
Posta a Fee: 0
TOTAL FEES: $ 7U PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
engage:ARCXITECTURE
132 E. BROADWAY, SUITE 415
E u g e n e, 0 R 9 7 4 0 1
5 4 1. 3 7 5. 0 3 4 3
drsQengagearchitecture.com
development issues meeting: QUESTIONS
July 6, 2022
2448 Clear Vue Lane, Springfield, OR
- Any development of this property will trigger a 'Development Issues Meeting' with the city of Springfield to
determine Right -of -Way access to the property.
-Accessory Dwelling Units = 800 s.f. maximum
-Accessory Structures cannot be larger than the primary dwelling in s.f. or height. Multiple Accessory
structures allowed.
PROPOSED SCOPE OF WORK:
- Addition to and renovation of the existing 1,308 s.f. home to become a 3,200 s.f. home
- Add (1) 3,000 s.f. Accessory Structures (group A)
- Add 800 s.f. Accessory Dwelling Unit
QUESTIONS
1. If the existing septic system and well are evaluated and found adequate, would an addition to the existing
house require us to connect to the city water system or the city sanitary sewer? Same questions in regards
to adding an ADU.
2. What would trigger the client to be required to allocate 30' of right-of-way to the City of Springfield? What
process does this entail?
3. If the client makes these additions to the property now, does this still leave the opportunity to subdivide
the property into multiple individual lots in the future?
4. Considering that Clear Vue Ln. Is not a paved street with curbs, are we allowed to provide a new gravel
driveway access to a new ADU and/or new accessory structure?
S. The intent for the new accessory structure is to house (2) horses, with the rest of the property serving as
a pasture, does this use of the land pose any specific restrictions?
Thank yo
David R. SCR
engage:ARCNITECTURE Pagel of