HomeMy WebLinkAboutApplication APPLICANT 7/11/2022City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
1 SPpINOFI�
Project Information (Applicant:
Prospective
Applicant Name: Terry Rutledge
completeRequired
Phone; (541) 913-2592
Company: Springfield Public Schools
Fax:
Address: 640 A Street, Springfield, OR 97477
Prospective Eric Favmau
Applicant's Re .:
(541) 556-4425
Phone:
Company: Favreau Engineering
Fax:
Address: 2206 Country Haven Dr, Eugene, OR 97408
Property Owner: Springfield Public Schools
Phone; (541)913-2592
Company:
Fax:
Address: 640 A Street, Springfield, OR 97477
ASSESSOR'S MAP NO: 17-03-35-11
TAX LOT NOS : 03400
Property Address: 1084 G St, Springfield, OR 97477
Size of Property: 20.04 Acres ❑x Square Feet ❑
Description of If you are filling in this form by hand, please attach your proposal description to this application.
proposal: Hitting facility for softball field just north of Two Rivers Elementary. Facility to be used by high school team.
Existing Use: Softball field
# of Lots/Parcels: 1Av
. Lot/Parcel Size: sf
Densit : du/acre
Prospective
Applicant: ,.!J�7
Date: -7 y
Signature
rM 714 d(cp 1
Print
Required Project Information (City Intake Staff., complete this section)
Case No.: Date: Reviewed by:
Application Fee: $
Technical Fee: $0
Posta a Fee: $0
TOTAL FEES: $
1 PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
Development Issues Meeting Process
The purpose of a Development Issues Meeting is to give an applicant the opportunity to discuss
his/her development proposal with the development review staff of the City. The discussion can
be general or specific, depending on the details provided with the application. A Development
Issues Meeting provides information to an applicant related to the current development
conditions and standards of the City. The Development Issues Meeting is not a land use decision
and does not confer any development rights, establish any conditions, or bind the applicant or
the City to any course of action. The meeting conveys the status of known development
opportunities and constraints. The status may change over time as development conditions or
standards change.
1. Applicant Submits a Development Issues Meeting Application
• The application must conform to the Development Issues Meeting Submittal
Requirements Checklist on page 3 of this application packet.
• Development issues meetings are conducted every Thursday.
• We strive to conduct the development issues meetings within three to four weeks of
receiving the application.
• The applicant's proposal is circulated to the relevant staff in preparation for the
meeting.
2. Applicant and the City Conduct the Development Issues Meeting
• The applicant and any design team should attend the development issues meeting.
• The meeting is scheduled for one hour.
• Staff attending the meeting will be prepared to discuss the issues raised in the
submittal by the applicant. Other issues raised during the meeting may also be
discussed.
• The meeting is informal and the City will issue no staff report.
Revised 5/21/13 KL 2 of 3
Development Issues Meeting Submittal Requirements Checklist
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application, technology, and postage fees are collected
at the time of complete application submittal.
❑ Development Issues Meeting Application Form
❑ Five (5) Questions - list specific questions the applicant would like staff to answer
during the meeting. So that each question may be fully evaluated, the list is limited to five
questions.
❑ Four (4) Copies of the Proposed Plan - suggested information valuable for staff to
review the proposal is listed below. It is not necessary to include all of these items on
the site or plot plan. However, applicants are encouraged to address as many as possible
given that the level of information that will be derived from the meeting is commensurate
with the level of detail provided in the application.
Applicants are also encouraged to include additional information on the plan as listed in
the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions &
Subdivisions - Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review
Submittal Requirements.
❑ Drawn in ink on quality paper no smaller than 11" x 17"
❑ Scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100'
❑ North arrow
❑ Date of preparation
❑ Street address and assessor's map and tax lot number
❑ Dimensions (in feet) and size (either square feet or acres) of the development area
❑ Location and size of existing and proposed utilities, including connection points
❑ On-site drainage collection system and flow patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DIMs Related to Land Divisions
❑ Approximate location, number and dimensions of proposed lots
❑ How streets in the proposal area connect with existing streets
DIMs Related to Site Plan Review
❑ Proposed and existing buildings: location, dimensions, size (gross floor area),
setbacks from property lines, distance between buildings, and height
❑ Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios and other impervious surfaces
❑ Parking and circulation plan
Revised 5/21/13 KL 3 of 3
Famau Engineering
FUR E U 2206 Eugene, R 97408
(541) 556-4425
Springfield HS Softball Facility DIM Questions
1. Specifically, what fire/life safety considerations must be adhered to and considered?
2. Are there any ADA concerns with the location of the proposed site?
3. Is the proposed sewer connection acceptable? Are any additional improvements required?
4. We are planning to direct stormwater roof runoff to the existing vegetation that surrounds the
site where it will be treated and infiltration. Downspouts will be directed to splash blocks. Is this
acceptable?
5. Does the City have any other concerns or comments about the proposal?
Page 1 of 1