HomeMy WebLinkAboutApplication APPLICANT 6/30/2022City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
SPRINGFIELD
W 0#1
Required Project Information (Applicant:
Prospective
Applicant Name: Sherry and Rob Schumacher
complete this section)
Phone: 541.579.9121
Company:
Fax:
Address: 1065 Backlund Place, Eugene, OR 97401
Prospective Carol Schirmer
Applicant's Rep.:
Phone: 541.234.5108
Company: Schirmer Consulting, LLC
Fax:
Address: PO Box 10424, Eugene, OR 97440
Property Owner: Sherry and Rob Schumacher
Phone: 541.579.9121
Company: Schumacher Living Trust
Fax:
Address: 1065 Backlund Place, Eugene, OR 97401
ASSESSOR'S MAP NO: 18020411
TAX LOT NOS
: 4600
Property Address: 725 S 57th Street, Springfield, OR 97478
Size of Property: 1.21
Acres[K] Square Feet ❑
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Not partition, 3 -lot partiiton or Subdivision
Existing Use: single unit residential
# of Lots Parcels:
Avg. Lot Parcel Size:
sf
Densit : du/acre
Prospective
Applicant:
gnat �re
C c rmer
Print
Case No.: Date:
Date: June 27, 2022
Reviewed by:
Application Fee: $
Technical Fee: 0
Posta a Fee: 0
TOTAL FEES: $ PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
Development Issues Meeting Process
The purpose of a Development Issues Meeting is to give an applicant the opportunity to discuss
his/her development proposal with the development review staff of the City. The discussion can
be general or specific, depending on the details provided with the application. A Development
Issues Meeting provides information to an applicant related to the current development
conditions and standards of the City. The Development Issues Meeting is not a land use decision
and does not confer any development rights, establish any conditions, or bind the applicant or
the City to any course of action. The meeting conveys the status of known development
opportunities and constraints. The status may change over time as development conditions or
standards change.
1. Applicant Submits a Development Issues Meeting Application
• The application must conform to the Development Issues Meeting Submittal
Requirements Checklist on page 3 of this application packet.
• Development issues meetings are conducted every Thursday.
• We strive to conduct the development issues meetings within three to four weeks of
receiving the application.
• The applicant's proposal is circulated to the relevant staff in preparation for the
meeting.
2. Applicant and the City Conduct the Development Issues Meeting
• The applicant and any design team should attend the development issues meeting.
• The meeting is scheduled for one hour.
• Staff attending the meeting will be prepared to discuss the issues raised in the
submittal by the applicant. Other issues raised during the meeting may also be
discussed.
• The meeting is informal and the City will issue no staff report.
Revised 5/21/13 KL 2 of 3
Development Issues Meeting Submittal Requirements Checklist
x❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application, technology, and postage fees are collected
at the time of complete application submittal.
x❑ Development Issues Meeting Application Form
❑x Five (5) Questions - list specific questions the applicant would like staff to answer
during the meeting. So that each question may be fully evaluated, the list is limited to five
questions.
x❑ Four (4) Copies of the Proposed Plan - suggested information valuable for staff to
review the proposal is listed below. It is not necessary to include all of these items on
the site or plot plan. However, applicants are encouraged to address as many as possible
given that the level of information that will be derived from the meeting is commensurate
with the level of detail provided in the application.
Applicants are also encouraged to include additional information on the plan as listed in
the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions &
Subdivisions - Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review
Submittal Requirements.
❑x Drawn in ink on quality paper no smaller than 11" x 17"
x❑ Scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100'
x❑ North arrow
❑x Date of preparation
x❑ Street address and assessor's map and tax lot number
x❑ Dimensions (in feet) and size (either square feet or acres) of the development area
❑x Location and size of existing and proposed utilities, including connection points
x❑ On-site drainage collection system and flow patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
N/A ❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DIMs Related to Land Divisions
❑x Approximate location, number and dimensions of proposed lots
❑x How streets in the proposal area connect with existing streets
DIMs Related to Site Plan Review
❑ Proposed and existing buildings: location, dimensions, size (gross floor area),
setbacks from property lines, distance between buildings, and height
❑ Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios and other impervious surfaces
❑ Parking and circulation plan
Revised 5/21/13 KL 3 of 3
June 29, 2022
SCHUMACHER PROPERTY
725 S 57' Street
Map: 18 02 04 11
Tax Lot: 4600
Zoning: LDR
Plan: LDR
Development Issues Meeting (DIM) —Written List of Questions
Property Description.
The subject property is approximately 1.21 acres in size and contains one house. The subject property is
zoned LDR and planned LDR. The client is considering developing the property and we wanted to explore
a couple of options. They are as follows.
• Partition the property so the single unit home remains on one lot. (2 lot partition or 3lot partition)
• Develop the remaining property with additional residential units or sell vacant lot.
PLANNING
1. Partitioning
The intention is to partition the property in such a way that the single-family home resides on one
parcel and the proposed lot(s) will be for future residential development, either by the client or some
future owner.
Q: What will be required for site improvements and/or utilities for a 3 lot partition at time of Final
Plat? Is that any different for a 2 lot partition?
Q: What will be required for site improvements and/or utilities for a Subdivision?
Q: Is there a requirement to show how the larger Id could be developed in the future? If so, is there
any commitment by a future developer to develop as initially shown?
Q: There is less than 18' between the north property line and the existing house. The panhandle
requirements are for an 18' wide driveway. Is there a mechanism to very the required driveway
width from 20'— 18'?
Q: Does the draft Site Plan also suffice fora proposed" development plan required to partition the
property?
2. Middle Housing
Minimum Lot size vs. lot dimensions. The new Middle Housing Ordinance says "Lot area and lot
dimension standards for residential uses are listed in Table 3.2.215." Table 3.2.215 in the Ordinance
does not show dimensions. The minimum lot size for residential single unit is 3000 st. The SDC Table
3.3-215 Base Zone Development Standards show a minimum street frontage of 60' (north south lots).
Q: Is the correct reading of this that the Id is required to have 60' of frontage but only 3000 sftotal
for a single unit dwelling?
Q: Can the minimum Id frontages be adjusted?
PUBLIC WORKS
3. Utilities
There is existing stormwater pipe in S 57' Street and bordering the south property line. There is an
existing 24" water main in the Bob Straub Parkway right ofway and a 2" line in S 57' Street.
Q: What level of stormwater analysis will be required for a 3 lot partition?
Schirmer Consulting, LLC • PO Box 10424, Eugene, OR 97440 • (541) 234-5109
Land.ape NMitedure ♦ Land Use Rannng
SMuma&ff Prapedy
DIM Questions
June 29 2022
Q: What level of stormwater analysis will be required for a Subdivision?
Q: Can staff see any issues with stoma water control and/or flooding in this area?
Q: Can SUB staff confirm that there is sufficient electric and water system availability and capacity
for development ofthe subject property?
Q: The Site Plan shows a shared driveway on the Subdivision. Does that work for access vs.
installing a private road?
Q: Will an additional fire hydrant be needed?
Q: Fire access and hose reach. Are they adequate considering all the 4 plexes will be sprinklered?
Q: Sewer line on south side of property available for hookup? How deep is the line? Is there an
easement?
4. Right of Way
Currently there is a sidewalk and bike path to the north and south of the property with "gap"
measuring approximately 300 ft—this distance includes approx. 50' of frontage at Lane County ROW
on north end. There is also a large exposed drainage ditch/pipe that runs in front ofthe property
parallel to 571n Street.
Q: What will be required for street frontage improvements on South 57"' Street? What will the street
section look like 9
Q: At what point would any improvements be required and who is responsible
Q: What city costs are associated with these improvements9
5. SDCs
Q: When are SDCs required to be paid in a land division process?
Q: Is there an estimated per unit SDC charge?
GENERAL
Is there anything in the material submitted with this Development Issues Meeting application that staff
finds incomplete or incorrect? Any suggestions?
Thank you in advance for your assistance with this project.
Sincerely,
Schirmer Consulting, LLC
Carol Schirmer
Schirmer Consnnlling, LLC • PO Box 10424, Eugene, OR 97440 • (541) 234-5109
Landscape Architecture t Land Use Planning