HomeMy WebLinkAboutApplication APPLICANT 5/26/2022City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
ISPRINQFIEID
Required Project information (Applicant:
Prospective
Applicant Name: Matt McLaughlin
complete this section)
Phone: 541-484-2046
Company: NW Dental Partners
Fax:
Address:
Prospective
Applicant's Rep.: Anthony J. Favreau Phone:
541-683-7648
Company: The Favreau Group, LLC Fax:
Address: 3750 Norwich Ave., Eugene, OR 97408
Property Owner: Same as applicant Phone:
Company: Fax:
Address:
ASSESSOR'S MAP NO: 17-03-36-21
TAX LOT NOS :8800
Property Address: 1645 H St.
Size of Property: 0.2 Acres 0 Square Feet
Description of if you are oiling In this form by hand, please attach your proposal description to this application.
Proposal- PArkinq lot for adjacent dental building
Existing Use: Single Family Residence
# of Lots Parcels: 1
Av . Lot Parcel Size: 8,586 sf
Densi : du/acre
Prospective I/ ,
Applicant: (L� Date:
Signature
Print
Required Project Information (City Zntake Staff. complete this section)
Case No.: `6ll -2-2- 0D0136-'pft.E Date: 5 7.6 7-z� Reviewed b
Application Fee: l0'+6 'r'
Technical Fee: 0
Posta a Fee: 0
TOTAL FEES: $
PROJECT NUMBER:
Revised 5/21/13 KL I of 3
May 25, 2022
Assessor's Map: 17-03-36-21 Tax Lots 8800
DIM Questions
Applicant: Matt McLaughlin
Applicant's
Representative: The Favreau Group
3750 Norwich Ave.
Eugene, OR 97408
541-683-7048
Attn: Anthony Favreau
1. This is an employee parking lot. Do we need to provide an ADA space?
2. The stormwater facility has been sized for flow control. Is this correct?
3. Are there any other issues from the City's perspective?
Stormwater Surface FiltrationAnfiltration Facility Sizing Spreadsheet
24 Hour Storm, NRCS Type 1 A Rainfall Distribution
City of Eugene
Name:
Oakmont Dental
Date:
5/25/2022
Address:
NHSt.
Permit Number:
Permit
Total Square Footage of Drainage Area=
Sorinafield. OR Rio Cutlet
Catchment ID:
Parkina Lot
rr:
Anthony J. Favreau
TY:
The Favreau Group
Complete this form for each drainage catchment in the project site that is to be sized per the Presumptive Approach.
Provide a distinctive Catchment ID for each facility coordinated with the site basin map to correlate the appmpdate
calculations with the facility.
The maximum drainage catchment to be modeled per the Presumptive Approach is 1 acre (43,560 SF)
=or infiltration facilities in Class A or B soils where no infiltration testing has been per romed use an infiltration rate of 0.5 in/hr.
For all facilities use a maximum soil infiltration rate of 2.5 in/hr for lommi/growing medium.
rome'Ym' from the dmpdown loxes below next to the design standards requirements for this facility.
Pollution Reduction (PR)Yes
Flow Control (FC)j Yes
Destination(DT) No 'Anim'iivationkciiiry rnM1xrhgeenae rxmr1l1Vh,,m meetdvsmoton rsqui2meme
Total Square Footage Impervious Area=
6670
sgfl
Total Square Footage Pervious Area= 2020 sqN
Impervious Area CN=l
98
Flow Control
Pervious Area CN=l 135
Total Square Footage of Drainage Area=
8690
511
Time of Concentration Post Development=min
Weighted Average CN=l
95
Pre�Development CN= 85 Time of Concentration Pre�Development= min
Tested Soil Infiltration Rate= Iirtlhr(Soo role 4) Destination Design=®iNhr
Design Soil Infiltration Ratej Whr Soil Infiltration Rate
R uirement
Rainfall De h
Desi nStorm
Stoma
P011otlonlVuIlon
1.4inches
Water
Flow Control
3.6 inches
Flood Control
Destination
I 3.6 inches
Flood Control
Facility
Facility Side Slop(
Max. Ponding Depth
in Stormwater Facility=
Depth of Growing Medium (So
5/25/2022-5:06 PM
Facility Surface
Facility Surface Pern
Facility Bottom
Facility Bottom Pern
Ratio of Facility Area to
Basin Vc
Pollution Reduction-Calculation Results
Peak Flow Rate to Stormwater Facility = 0.051 cfs
Pik Facility Overflow Rate= 0.000 cfs
Total Runoff Volume to Stormwater
Facility 884 cf
Total Overflow Volume= 0 cf
Max. Depth of Stormwater in Facility= 5.4 in
Drawdown Time= 3S hours
Yes Facility Sizing Meets Pollution Reduction Standards?
VES Meets Requirementoi No Facility Flooding?
VES Meets Requirement for Maximum of 18 Hour Drawdown Time?
Flow Control-Calculation Results
Peak Flow Rate to Stormwater Facility = 0.174 cfs
Peak Facility Overflow Rate= 0.110 cfs
Total Runoff Volume to Stormwater
Facility= 2193 cf
Total Overflow Volume= 1022 cf
Peak Off -Site Flow Rate
Max. Depth of Stormwater in Facility= 18.0 in
Filtration Facility Underdrain= 0.008 cfs
Drawdown Time= 18.5 hours
Pr vekmment Runoff Data
Peak Flow Rate = 0.113 cfs
Total Runoff Volume =1 1523 cf
=Facility Sizing Meets Flow Control Standards?
VES Meets Requirement for Post Development offsite flow less or equal to Pre-Development Flow?
El
VES Meets Requirement for Maximum of 18 Hour Drawdown Time?
Destination-Calculation Results
Peak Flow Rate to Stormwater Facility = N/A cfs
Peak Facility Overflow Rate= N/A cfs
Total Runoff Volume to Stormwater
Facility= N/A cf
Total Overflow Volume= N/A cf
Max. Depth of Stormwater in Facility- N/A in
Drawdown Time= N/A lours
N/A Facility Sizing Meets Destination Standards?
N/A Meets Requirement of No Facility Flooding?
L.2LAJMftts Requirement for Maximum of 30 hour Drawdown Time?