Loading...
HomeMy WebLinkAboutApplication APPLICANT 5/19/2022City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 Tree Felling Permit 6 mo VAV ,Required Project Information (Applicant: Applicant Name: Keoki Lapina, Water Engineering Supervisor complete phone: this section) (541) 726-2396 Company: Springfield Utility Board Fax: Address: 202 South 18th Street, Springfield, OR 97477 Applicant's Rep.: Richard M. Satre, AICP, ASLA, CSI Phone: (541) 686-4540 Com an : The Satre Group Fax: Address: 375 W 4th Avenue, Suite 201, Eugene, OR 97401 Property Owner: Springfield Utility Board Phone: (541) 726-2396 Company: Springfield Utility Board Fax: Address: 202 South 18th Street, Springfield, OR 97477 ASSESSOR'S MAP NO: 18-02-03-00 TAX LOT NO(S): 302 Property Address: No site address for the tax lot Size of Property: 1.77 Acres ✓ Square Feet Description of If you are filing in this form by hand, please attach your proposal description to Proposal: Construct improvements to the SUB 3rd Level Reservoir this application. Si natures: Please si n and rint our name and date in the appropriate Associated Cases: box on the next page. Si ns• No.bI-22-0133- Z Date: 5/2Z Reviewed b : Ll kl tf1 t('— ('ACase lication Fee.. Application I V VTechnical Fee: qss -)c ] Postage Fee, TOTAL FEES: .$_ I -19S. q PROJECT_ NUMBER: Vl - Revised 1/1/08 Molly Markarian Date Received MAY 19 2022 OrinEn, alSubr,ittal_ 1 of Signatures The undersigned acknowledges that the information in this application is correct and accurate. f�� Y Date: 511-712 02 Signature K.eoK�i La {� ivy Print If the applicant is not the owner, the owner hereby grants permission for the applicant to act in his/her behalf. Owner: Date: ,s % Sig-nnatu`re ,4ee 1&11e/' Print ' Revised 1/1/08 Molly Markarian 2 of 5 May 19, 2022 SPRINGFIELD UTILITY BOARD SOUTH HILLS 3RD LEVEL RESERVOIR REPLACEMENT Tree Felling Permit Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 WRITTEN STATEMENT In accordance with Tree Felling Permit submittal requirements, this written statement describes the proposed development and demonstrates that the proposal complies with the standards and criteria contained in SDC 5.19-105 through SDC 5.19-125. The proposal is submitted concurrently with a Site Plan Review application and a Hillside Development Overlay District application. We request that these applications be processed concurrently. LAND USE REQUEST A. Development Objective The development objective for the existing reservoir site is threefold. One, to continue serving as a water storage reservoir site; two, the construction of a new, second water storage reservoir, and three the demolition and replacement of the existing water storage reservoir. Subject Property RLID Maps 2022 B. Land Use Request 1. Tree Felling Regarding tree felling, there are trees on all tax lots which are included in the Tree Felling Permit. There are a few scattered trees on Tax Lots 302 and 6000 through 6500, the site of the proposed To level reservoir. Impacts per tax lot are as follows: On the d. level reservoir site, ill r acres (approximately 68% f of the site) will not be disturbed. Trees in that area will remain. As noted above, of the 46 trees on the entire 3rd level reservoir site, 28 will be removed (60%) and 18 will remain (40%). Date Received 9J PLANNERS + LANDSCAPE ARCHITECTS ENVIRONMENTAL SPECIALISTS MAY 19 2022 375 West 4th, Suite 201, Eugene, OR 97401 r Phone: 641.686.4690 www.satregroup.com r I 1 Original Submitlai Project Area Total Number Number of Number of Trees NumberofTrees of Trees Surve d Trees to be Removed to Remain 3' Level Reservoir Site Tax Lots: 46 trees 46 trees 28 trees 18 trees 6000-6200,6400- 6500 and 302 ProJect Area Total Number Number of Acres Impacted Numberof Acres of Acres not Im acted 3K Level Reservoir Site Tax Lots 6000- 3.58 acres 1.13 acres (including the proposed 2.45 acres 6200,6400-6500 reservoir and improvements to and 302 existing ddvewa On the d. level reservoir site, ill r acres (approximately 68% f of the site) will not be disturbed. Trees in that area will remain. As noted above, of the 46 trees on the entire 3rd level reservoir site, 28 will be removed (60%) and 18 will remain (40%). Date Received 9J PLANNERS + LANDSCAPE ARCHITECTS ENVIRONMENTAL SPECIALISTS MAY 19 2022 375 West 4th, Suite 201, Eugene, OR 97401 r Phone: 641.686.4690 www.satregroup.com r I 1 Original Submitlai Project Area Total Number Number of Number of Trees NumberofTrees of Trees Surve d Trees to be Removed to Remain 3' Level Reservoir Site Tax Lots: 46 trees 46 trees 28 trees 18 trees 6000-6200,6400- 6500 and 302 ProJect Area Total Number Number of Acres Impacted Numberof Acres of Acres not Im acted 3K Level Reservoir Site Tax Lots 6000- 3.58 acres 1.13 acres (including the proposed 2.45 acres 6200,6400-6500 reservoir and improvements to and 302 existing Springfield Utility Board —South Hills 3rd Level Reservoir Page 2 of 8 Tree Felling Permit Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 C. Project Directory Owner/Applicant Keoki Lapina Springfield Utility Board 202 South 18th Street Springfield, OR 97477 Phone: (541)726-2396 Email: keokil(dsubutil.com PlannerlLandscape Architect (and Applicants Representative) Rick Satre, AICP, ASLA, CSI The Satre Group 375 West 4d' Avenue, Suite 201 Eugene, OR 97401 Phone: (541)686-4540 Email: rick(d),satregroup.com Surveyor Dan Nelson, PLS Branch Engineering, Inc 310 51h Street Springfield, OR 97477 Phone: (541)746-0637 Email: dann(albranchengineerino.com Civil Engineer Tom Boland, P.E. Murraysmith, Inc. 888 SW bt^ Avenue, Suite 1170 Portland, OR 97204 Phone: (503) 225-9010 Email: Tom.Bolandnomurraysmith.us II. THE SITE AND EXISTING CONDITIONS A. Development Site The 3'd Level Reservoir site is located at South 661h Place and Jessica Drive in the Thurston Hills of Springfield. The reservoir site is partially forested and is approximately 3.58 acres in size. Access is by way of a graveled drive (part of an existing variable width access and utility easement) extending from South 661h Place. Abutting the site to the north, south and east is unimproved land which is planned and zoned for low density residential development. The 3'd Level Reservoir is inside Springfield city limits. B. Planning Context 1. Planning and Zoning. The Satre Group • 375 West 4'" Avenue, Suite 201, Eugene, OR 97401 • (541) 6864540 • w sstremmuo.com Springfield Utility Board — South Hills 3rd Level Reservoir Tree Felling Permit Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 Local long-range land use is governed by the Eugene -Springfield Metropolitan Area General Plan (Metro Plan), often supplemented with a more specific refinement plan and/or neighborhood plan, followed by site-specific zoning. Further, zoning can sometimes be comprised of base and overlay zoning. For the reservoir site, the Metro Plan designation is Low Density Residential, there is no applicable neighborhood plan, and the base zoning is Low Density Residential. Page 3 of 8 Zoning Map ember 2018 2. Transportation. a. TransPlan. The metro area adopted transportation plan, The Eugene -Springfield Transportation System Plan (TransPlan) includes one project in the vicinity of the subject property — Project 36, a future collector connecting Straub Parkway to the west to the general vicinity of the south side of MountainGate Master Plan area. b. Springfield 2035 Transportation System Plan. The City of Springfield's Local Street Network fC... . diagram shows proposed future streets within Springfield's jurisdiction. The plan is illustrative only /) and is not parcel specific. Future local streets, their locations and connection points can be adjusted at time of specific development proposals. r j 4 Local Street Network Map Excerpt City of Springfield August 2018 c. Public Transit. There is no public transit service in the vicinity of the reservoir site. 3. Utilities. a. Storrnwater and Wastewater. The Springfield Stormwater Facilities Master Plan shows the property as being within the Weyerhaeuser Basin. The Master Plan identifies no capital improvement projects in the vicinity of the project. The site has both stormwater and sanitary infrastructure adjacent to the property in both South 661 Place and Jessica Drive. The Save Group • 375 West 4° Avenue, Suite 201, Eugene, OR 97401 • (541) 61 • www.satremmuo.com Springfield Utility Board — South Hills 3rd Level Reservoir Page 4 of 8 Tree Felling Permit Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 Storinni Facilities Master Plan City of Springfield, October 2008 b. Wellhead Protection. The subject property is not within a wellhead protection area, nor are there any protection areas near the subject property. Wellhead Protection Areas Map Excerpt City of Springfield and Springfield Utility Board January 2013 c. Water&Electric. The site has both water and electric infrastructure adjacent to the subject property. Existing Water Infrastructure Springfield Utility Board, 2021 d. Utility Easements. 7 i t it Existing Electricli-i runtil Springfield Utility Board, 2021 The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-0540 • www satreoroun win Springfield Utility Board — South Hills 3rd Level Reservoir Page 5 of 8 Tree Felling Permit Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 A variable width private access and utility easement exists on the SUB reservoir site. The easement (Lane County Deeds and Records 2007-020544) is for a water line and private access and private utilities. There is also a 10 -foot -wide public utility easement along the east side of South 66th Place and the north side of Jessica Drive abutting the reservoir site. 4. Natural Resources. a. Springfield Natural Resources Study. The Springfield Natural Resource Study Report does not identify any resources on or near the site that would be impacted by the proposed development. b. Springfield Wetland Inventory / Water Quality Limited Watercourses (WQLW). Neither the National Wetlands Inventory nor the Local Wetlands Inventory document the presence of jurisdictional wetlands on or adjacent to the subject property. Springfield's Water Quality Limited Watercourses inventory also documents that there are no WQLW features on or adjacent to the subject property. c. Geotechnical Stability. A geotechnical evaluation has been performed for the 41h Level Reservoir site. The report lists construction, site preparation, and foundation design recommendations. 5. Parks and Open Space. a. Willamalane Park and Recreation Comprehensive Plan. The Willamalane Comprehensive Plan includes three projects within the vicinity of the reservoir project. Project 3.8. Pursue acquisition and development of natural area parks and trail systems along the Thurston Hills ridgeline south of Potato Hill and towards the Jasper-Natron area. (Completed. See Project 4.10.) Project 3.10. Identified in the MountainGate Master Plan, develop a 90 -acre natural area park and trail system on top of Potato Hill. Project 4.10. Acquisition and development of a ridgeline trail in the south Thurston Hills area. (Property has since been acquired. The portion immediately southeast of the reservoir site has been identified by Willamalane as a Community Forest. Development of a trail system is underway.) Park and Recreation Projects Map Excerpt Wllamalane Park and Recreation District October 2012 The Satre Gmup• 375 West 4th Avenue, Suite 201, Eugene, OR 97401•(541) 888-4540• w aatrearoua.com Springfield Utility Board - South Hills 3rd Level Reservoir Page 6 of 8 Tree Felling Permit Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 III. TREE FELLING -STANDARDS, CRITERIA AND FINDINGS This section is presented in the same order of applicable requirements found in Section 5.19-125, Tree Felling Permit Criteria of the Springfield Development Code. Applicable sections of the code are in bold italics, followed by proposed findings in normal text. The location, species, and size of the trees proposed for removal are shown on the enclosed Tree Felling Plan. The removal will be completed by a contractor licensed to do the work using accepted site clearing and tree felling techniques and procedures. On-site supervision will be present at the time of removal to ensure that no damage to surrounding properties occurs. 5.19-125 Criteria The director, in consultation with the Public Works Director and the Fire Chief shall approve, approve with conditions or deny the request based on the following criteria: A. Whether the conditions of the trees with respect to disease, hazardous or unsafe conditions, danger of falling, proximity to existing structures or proposed construction, or interference with utility services or pedestrian or vehicular traffic safety warrants the proposed felling. Response: The requested tree felling is necessary as the form and function of the 3rd Level Reservoir cannot co -exist with trees when the trees would be within the footprint of the reservoir. Trees will be removed to facilitate installation and operation of the reservoir. Trees will be left intact surrounding the reservoir site corridor and in the vicinity of the reservoir site because they are not within the identified construction footprint, and do not pose an obstruction or potential threat to ongoing operation of the facility. B. Whether the proposed felling is consistent with State standards, Metro Plan policies and City Ordinances and provisions affecting the environmental quality of the area, including but not limited to, the protection of nearby trees and windbreaks; wildlife; erosion, soil retention and stability, volume of surface runoff and water quality of streams; scenic quality, and geological sites. Response: The proposed felling is consistent with State standards, Metro Plan policies, and City ordinances. Removal of the trees from the subject property should not have a long-term adverse effect on the surrounding physical and visual environment because: a) The proposed tree felling will retain intact stands of trees. Stands of trees minimize windthrow as well as provide a visual buffer between the reservoir site and adjacent residential property. b) The area subject to tree removal will be revegetated, thereby providing for soil absorption of rainfall and runoff. c) The applicant is proposing to only remove trees that are within the reservoir improvements area and where they would interfere with the long-term operation, maintenance and safety of the facility. Thus, the removal of trees will have minimal effect on erosion, soil retention, and stability. As noted above, some 68% of the entire site will remain as is. C. Whether it is necessary to remove trees in order to construct proposed improvements as specified in an approved development plan, grading permits and construction drawings. The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 6884540 • w satrearouo.com Springfield Utility Board - South Hills 3rd Level Reservoir Page 7 of 8 Tree Felling Permit Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 Response: It is necessary to remove trees to construct the proposed development. An accompanying Site Plan Review application and plan set document tree removal as well as areas of trees to remain. D. In the event that no Development Plan has been approved by the City, felling of trees will be permitted on a limited basis consistent with the preservation of the site's future development potential as prescribed in the Metro Plan and City development regulations, and consistent with the following criteria. Response: The proposed tree felling area is not located in an area with natural drainageways and no large-scale clear -cuts will occur on the site. The project site is within a future residential neighborhood, so trees will be retained in areas where they will provide buffering and screening for future residents. E. Whether the applicant's proposed replanting of new trees or vegetation is an adequate substitute for the trees to be felled. Response: The proposed development setback areas should not be disturbed so setback landscaping is satisfied with the existing vegetation. Interior to the reservoir site, there will be some disturbed areas as the reservoir and associated improvements are constructed. These areas will be planted with approved vegetation with grasses that are drought resistant and don't need irrigation. The non -irrigated grasses and forbs will help to stabilize the hillside and prevent erosion and sedimentation issues. F. Whether slash left on the property poses significant fire hazard or liability to the City. Response: All trees and slash will be removed from the site within 72 hours. Removal of the cut trees, woody material and debris from the project area will reduce the fire hazard liability an the site. No burning of the slash piles will occur; debris will instead be recycled at nearby wood processing facilities. G. Whether the felling is consistent with the guidelines specified in the Field Guide to Oregon Forestry Practices Rules published by the State of Oregon, Department of Forestry, as they apply to the northwest Oregon region. Response: The proposed tree felling is consistent with the specified guidelines. The Oregon Department of Forestry, through its Community and Urban Forestry program, advocates for selecting appropriate tree species based on site conditions, avoiding invading exotic species, and reforesting the urban environment. The project is designed and intended to accommodate major public utility infrastructure by removing trees from the subject area. The affected properties are zoned and designated for residential use and not for public open space or preservation. (The site is included in the Public Facilities and Services Plan, so a discretionary use permit is not required, and development is allowed.) For these reasons, the proposed tree removal does not rise to the level of a regulated timber harvest or commercial logging operation and the activity is governed by the applicable provisions of the Springfield Development Code. Therefore, the Oregon Department of Forestry objectives have been met by this tree felling proposal. H. Whether transportation of equipment to and equipment and trees from the site can be accomplished without a major disturbance to nearby residents. Response: Construction access to the site will be from South 66'^ Place and will pass through a residential neighborhood. Public access is close to the local transportation network via Main Street. The existing access driveway will also be used to access the project area. Tree felling activities will take place between the hours of 8:00 AM and 5:00 PM, Monday through Friday, and The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w, w+.satreanouo.com Springfield Utility Board — South Hills 3rd Level Reservoir Page 8 of 8 Tree Felling Permit Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 will be of limited duration. Therefore, transportation of equipment and trees from the site will be accomplished without major disturbances to nearby property in compliance with this criterion. IV. CONCLUSION The above information represents known applicable planning, zoning and site development requirements for the contemplated project. It presents known physical conditions and contexts. It captures the project's primary development objective. Based on the information and findings contained in this written statement, associated attachments and plan set, the proposed SUB Souht Hills 31d Level Reservoir project meets the Tree Felling criteria of approval contained in the Springfield Development Code. Therefore, the applicant requests that the City of Springfield approve the proposal. Both the applicant and applicant's representative are available for questions. We look forward to working with staff to ensure this project meets the goals and objectives of the applicant and the city. If you have any questions about this written statement, please do not hesitate to contact Rick Satre at (541) 686-4540 or email rickesatregroup.com. Sincerely, RLc ,Satre Rick Satre, AICP, ASLA, CSI, Principal / Partner The Satre Group The Satre Group • 375 West 0 Avenue, Suite 201, Eugene, OR 97401 • (541) 6864540 • w .satregmuo.cam May 19, 2022 SPRINGFIELD UTILITY BOARD SOUTH HILLS 3RD LEVEL RESERVOIR Map 18-02-03-00, Lot 302 and Map 18-02-03-10, Lots 6000, 6100, 6200, 6400 and 6500 Vegetation and Re -Vegetation Report This report is presented as a supplement to a Tree Felling Permit application and Hillside Overlay District Development application. Those two applications, along with a Site Plan Review application, are being submitted for concurrent review and processing in support of the proposed reservoir pump station project. Please refer to those applications, along with their written statements, attachments and plan sets to gather a complete understanding of the proposal. Vegetation The overall reservoir site occupies six tax parcels. The proposed reservoir site is located on tax lots 302 and 6500. The site development touches all six tax lots. In terms of existing vegetation, the site is inconsistently covered in a mixture of deciduous and evergreen (primarily Douglas Fir) trees. A limited number of trees will be removed in order to construct the reservoir and associated site improvements. Subject Properly RLID Maps 2022 Re -Vegetation A tree survey for the parcels has been conducted. This inventory can be found in the Tree Felling Plan. Only those trees necessary to construct the reservoir improvements as well as several trees deemed as a potential future hazard will be removed. As noted in the Tree Felling Permit Written Statement, there are 18 existing trees on the subject tax lots that will not be disturbed. Within the 1.06 acres of the site which will be disturbed, 28 trees will be removed. Therefore, 40% of the entire site with remain as is. Any areas of disturbance will be seeded with a mix of relatively low growing, drought tolerant grasses and forbs — to minimize erosion, minimize stormwater runoff, provide an environment to foster restoration of the forest floor and improve the appearance and natural function of the site. See Landscape Plan. Date Received MAY 19 2022 Original Subtnittal------ PLANNERS LANDSCRPEARCNITECTS ENVIRONMENTAL SPECIALISTS 375 West 4th, Suite 201, Eugene, OR 97401 Phan e: a41.888A800 www.satregroup.com N E � p� b�e `e3@4g�§sd ° P e a4® •,�5' � e � 5g%� jxas°� a,a. _ z e i e °.�Sy7v Easy I"ss4 z MH HI 1 A: z�� HN aseI $ m - 1 a5 $ £ @ � §%�� :: g: 9 e e• 3 i e a e i $_ 4 Ee`3 de e a e �.,o9a&�54`Ez F§R nil I F % x e si I �. I p vs i ,1 4 lilt y OCR £ \ tt J �1i � 0�011 a3.� A Fs�fl all,A r f vI 11 c THE SATRE GROUP Land Use Planners, Landscape Architects, Environmental Specialists 375 West 4'^ Avenue, Suite 201, Eugene, Oregon 97401 (541)686-4540 • www.satregroup.com TO: City of Springfield 225 5� Street Springfield OR 97477 TRANSMITTAL DATE: May 19, 2022 PROJECT: SUB 3rd Level Reservoir Tree Felling Permit CLIENT PROJ #: ATTN: SG PROJ #: 2140 TRANSMITTED: Herewith X DISPOSITION: For Your Approval Separate Cover For Your Information/Use Other For Reply TRANSMITTED: # Copies Item Dated No. Pages Tree Felling Permit Application Packet Varies Several REMARKS: This Tree Felling Permit application packet is hereby submitted for processing. The application packet includes: 1. This Transmittal 2. Application Fee 3. Application Form 4. Written Statement 5. Deed 6. Title Report 7. Vegetation & Re -Vegetation Report 8. Tree Felling Plan 9. Reduced Tree Felling Plan We look forward to your assistance with the project. Don't hesitate to contact us should you have any questions or need any additional information. Thank you. �y J COPIES TO: Agency BY: x File X Consultant Team X Owner X Other