HomeMy WebLinkAboutApplication APPLICANT 5/19/2022bill = Lvl'ono-k
Ch�tiSOuAo rsc ' (20 ,--%
jCity of Springfield1 I ilL
^oFIc
Development& Public Works225 Fifth Street -.4e bC�`�m
Springfield, OR 97477
Development Issues Meeting (DIM)
Required Project Information (Applicant.,
complete this section)
Prospective
Applicant Name:
Phone:.54l- D-5 O75
Company:
Fax:,541-
to aS4
Address: tt s4
Prospective
Applicant's Rep.:
Phone:
Company:
Fax:
Address:
F22'i1L CMIi s
5H I-Sao-5ao3
Property Owner: T „
Phone:
C1�.(.d5 FLu} a (ie{ad,r
Company: 2m a
Fax:Z'Ai,-
t� a�a-r,
Address:
Io$3182.
Ot3oD
ASSESSOR'S MAP NO: �-qo
TAX LOT NOS : p
toeq
Pro ert Address:
Size of Property: la Acres 15k Square Feet ❑
Description of If you are filling in this form by hand, pease attach your proposal description to this application.
Proposal:
Existing Use::.
# of Lots/Parcels: Av . Lot/Parcel Size: y,W s Densi : 3. du/acre
Prospective L%�i�(�
Applicant:
Date: - -
Signature
e)".\.\
Print
pp
Case No.: `LZ-pf;U\Z�(-'1'(LC- Date: VV\o., (%Zdz-Z Reviewed b :
I
Application Fee: LLAG,W
Technical Fee: $0
Postage Fee: $0
TOTAL FEES: $ Li I 'OL) PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
Development Issues Meeting Process
The purpose of a Development Issues Meeting is to give an applicant the opportunity to discuss
his/her development proposal with the development review staff of the City. The discussion can
be general or specific, depending on the details provided with the application. A Development
Issues Meeting provides information to an applicant related to the current development
conditions and standards of the City. The Development Issues Meeting is not a land use decision
and does not confer any development rights, establish any conditions, or bind the applicant or
the City to any course of action. The meeting conveys the status of known development
opportunities and constraints. The status may change over time as development conditions or
standards change.
1. Applicant Submits a Development Issues Meeting Application
• The application must conform to the Development Issues Meeting Submittal
Requirements Checklist on page 3 of this application packet.
• Development issues meetings are conducted every Thursday.
• We strive to conduct the development issues meetings within three to four weeks of
receiving the application.
• The applicant's proposal is circulated to the relevant staff in preparation for the
meeting.
2. Applicant and the City Conduct the Development Issues Meeting
• The applicant and any design team should attend the development issues meeting.
• The meeting is scheduled for one hour.
• Staff attending the meeting will be prepared to discuss the issues raised in the
submittal by the applicant. Other issues raised during the meeting may also be
discussed.
• The meeting is informal and the City will issue no staff report.
Revmed 5/21/13 KL 2 of 3
Development Issues Meeting Submittal Requirements Checklist
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application, technology, and postage fees are collected
at the time of complete application submittal.
❑ Development Issues Meeting Application Form
❑ Five (5) Questions - list specific questions the applicant would like staff to answer
during the meeting. So that each question may be fully evaluated, the list is limited to five
questions.
❑ Four (4) Copies of the Proposed Plan - suggested information valuable for staff to
review the proposal is listed below. It is not necessary to include all of these items on
the site or plot plan. However, applicants are encouraged to address as many as possible
given that the level of information that will be derived from the meeting is commensurate
with the level of detail provided in the application.
Applicants are also encouraged to include additional information on the plan as listed in
the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions &
Subdivisions - Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review
Submittal Requirements.
❑,/ Drawn in inkon quality paper no smaller than 11" x 17"
ltd Scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100'
❑ North arrow
Date of preparation
Street address and assessor's map and tax lot number
❑ Dimensions (in feet) and size (either square feet or acres) of the development area
[I Location and size of existing and proposed utilities,. including connection points
❑ On-site drainage collection system and flow patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DJ.k1s Related to Land Divisions
Approximate location, number and di
mgnsions of proposed lots
How streets in the proposal area connect with existing streets
DIMS Related to Site Plan Review
Proposed and existing buildings: location, dimensions, size (gross floor area),
-_{{,, setbacks from property lines, distance between buildings, and height
Ev Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios and other impervious surfaces
Parking and circulation plan
Revised 5/21/13 KL 3 of
Proposal
When we initially made contact with the City of Springfield in 2011, telling them
that we were opening a business, the liaison didn't say a thing about Land Use
Permits and things of that nature. We thought we were good to go because that
was the first place we went. So we were misdirected by whoever we talked to 12
years ago. Naturally at this point in the game it's no longer a surprise. It certainly
was a surprise in 2019 . Now the proposal is we want to stay in business because I
don't want to have to shut this down and go to work for someone else. And that's
all of it in a nutshell.
Bill Childs
1.) There is a house up at the front of the property who have put in a cargo/railroad type structure
that the landlord of said residence had done. We believe that this structure is being kept on the
easement therefore, everyone assumes that where the structure ends is actually where the
easement begins. Which is causing a bit of confusion. Now do we go about having that either
checked out or remedied?
2.) During the first meeting I attended, I misspoke and said that the length along the building at
114528" St. was not paved when it actually is. What restrictions apply to parking vehicles on said
concrete? (I think it's concrete, it's got kind of little bits of gravel mixed in with it).
3.) Can parking area be fenced off from surrounding area? Restrict access basicallyto customers only
for the main driveway into 1145 28t" St. There is another driveway for the other buildings right
next to it about 50 ft or so.
4.) What kind of a timeline will there be on getting all this done? I work alone and so there is not
another person to help get this completed other than administration type things.(i.e., meetings,
writings, messages, paperwork.etc... ) and financial stresses sometimes are an issue.
5.) What is the nature of the fines being assessed/leveled at the Boone estate? And why?