Loading...
HomeMy WebLinkAboutApplication APPLICANT 5/12/2022City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Site Plan Review Minor Modification SPRINGFIEL/D� •/1Jr Required Project Information (Applicant., Applicant Name: Adroe STIkL. complete this sec ' Phone- 'Y/•6S3•j998 Company: at iwa No RTI, qc I Fax: Address: 36579 Idr 6r.,,.A, OR 47y7& Applicant's Rep.: Phone: Company: Fax: Address: Property Owner: rbety 'f.. LV. afl. 16 Phone: Sam Company: Fax: Address: ASSESSOR'S MAP NO: 17 0 0 ®, TAX LOT NOS : 1912 Property Address: 181, H2 ha Size of Property: a ~.s Acres ® Square Feet ❑ Proposed Name of Project: Description of tf you are filling in this form by hand, please attach your proposal description to this application. Proposal: Sae ..41av6.4 Existin Use: e,ho", ypc, Si natures: Please si n and print your name and date in the appropriate Required Project Information (City Intake Staff., Associated Applications: box on the next page. complete this section) Case No.: 1I - Z2- 0001 z3 TVP I I Date: S' f742 22 Reviewed by: Application Fee: $ Technical Fee: Posta a Fee: 0 C TOTAL FEES: $ 2- ' 0 h I PROJECT NUMBER: Revised 5/21/13 KL 1 of 10 Signatures The 7777 ormation in this application is correct and accurate. Applicant: Date• sr SigffWUre 4..- 54..,kt, � Print owner Signature Print Revised 5/21/13 KL 2 of 10 Narrative for site Plan Minor Modification application of approved site plan #811-18-000120-TYP2 The items modified by this application from the original approved site plan are the relocation of the sidewalk connected to building "D" and changes to the parking layout 1. Relocation of sidewalk connected to building "D" The original application showed the sidewalk on the south side of the building. This was to accommodate the proposed man doors being located on that side. The layout of the building was changed to have the man doors on the same side as the rollup doors (north side) which meant the sidewalk needed to be relocated. Note, the sidewalk layout is now the same as the approved layout for building "A" which is directly across the parking area. Additionally, the sidewalk travels along the east side of building "D", continues between the bike rack and the two parking spots adjected to building "D" making it fully connected to the crosswalk. 2. Changes to the parking layout The original application showed 4 parking spaces in front of building "D" and 5 spaces (numbered 16- 20) along the west side of the pavement area. Due to the roll up door layout for building "D" one space was lost in front of the building (space 21) and one of the spaces to the west was lost (space 20). The submitted modification shows 2 new spaces added between building "B" and building "C. Those 2 spaces were identified as future parking for 2 cars on sheet CO.5 of original submittal.