HomeMy WebLinkAboutApplication APPLICANT 5/10/2022City of Springfield SPRINGFIELD
Development. & Public Works
225 Fifth Street
Springfield, OR 97477 (,%
Accessory Dwelling Unit (ADU) — Type I FOREGO
Project Information (Applicant., complete this section)
Applicant Name: Phone: S41 - Sos - -q-2-3L
Company if applicable): Pz�t ��z Wit, NG Email:: ,se 0 ,e,6,:1{-.�
Mailing Address: 3gao KAT N tcvE, ,4t Si-rIQ6e 02 -7
Applicant's Rep.: 5�„�n� A-5 ? plc
Phone:
Company:
Ir -mail:
Mailing Address:
Pro ert Owner: — nn�-
Phone: 541 -2Zi- kka+
Company:Email:,„Lc1��^e'e�k.1
rw
Address: I oI MP IG Si. sP�ycYk'Z�C� o aT -'I"1
ASSESSOR'S MAP NO: IZ o•'6Z5"
TAX LOT NOS :
Property Address: 14 4 Seet .r7XtlA x ,-Z
Size of Property: 0- 14 Acres kJ Square Feet ❑
Type of ADU: _Conversion of part of house (describe existing use)
(check one) _Conversion of accessory structure (describe existing use)
_Addition to house V"New detached dwelling
Zoning of Property: /LOW Density Medium Density _High Density Residential
Si natures: Please si n and riot our name and date in thea ro riate box on the next a e.
-. -. ..-
Associated Cases:
Case No.: -.aa- -
Date:5IIDI-
Reviewed by: OL,
n
Application Fee: $
W
Technical
Postage Fee: $0 '
TOTAL FEES: $ y' PRO]ECT NUMBOAte Received
2—ii AAn.it'l M I R R.Mw RA.—
MAY 10 2U22
Original Submitral �W—
nano 1 nfA
Signatures
The undersigned acknowledges that the information in this application is correct and accurate.
Prin
St �ASE-/ c k Nxmz
a`l"), Date: 3
Si ature
zoQIA . McCIQVk
Pri?ft
Revised April 3, 2018 Sandy Belson page 2 of
Accessory Dwelling Unit Submittal Requirements Checklist
NOTE: If you feel an item does not apply, please state the reason why and attach the
explanation to this form.
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate
fee calculation formula. A copy of the fee schedule is available at the Development
& Public Works Department. The applicable application, technology, and postage
fees are collected at the time of complete application submittal.
Mr Accessory Dwelling Unit Application Form
Irl Narrative explaining the proposal and any additional information that may have a bearing
in determining the action to be taken, including findings demonstrating compliance with
the Accessory Dwelling Unit Development and Design Standards described in SDC 5.5-125
and 5.5-130.
❑ Thr (3) Copies of a Plot Plan Including the Following:
7The scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100', north arrow, and date of
preparation
5 -property lines including dimensions and size of the property
,--[r-� LName and location of abutting street(s) and alley(s)
Lyrroposed accessory dwelling unit and its relation to the primary dwelling, showing
,,��location, dimensions, height, setbacks from property lines, and entrance locations
U Existing and proposed structures, fences, walls, including required outdoor storage and
parbage areas; showing location, dimensions, and setbacks from property lines
ercentage of the lot covered by existing and proposed structures
�y Location of utilities and meters
Mlocation of existing driveways, curb -cuts and required off-street parking areas
Location of existing sidewalks and walkways and required pedestrian walkway
[5'Existing and proposed trees and landscaping
Three (3) Copies of a Detailed Floor Plan of the ADU, drawn to scale with labels on
rooms indicating proposed uses
Thr e (3) Copies of an Elevation Drawing of the ADU Including the Following:
—7—/xteriorfinish materials
I_y'Roof pitch
V,�W/A indow placement and sizes
L! indow and door trim
Q lmensions of eaves
Height of accessory dwelling
Revised April 3, 2018 Sandy Belson page 4 of
Accessory Dwelling Unit Application Process
1. Applicant Submits an Accessory Dwelling Unit Application to the Development
Services Department
The application must conform to the Accessory Dwelling Unit Submittal
Requirements Checklist on page 4 of this application packet.
Planning Division staff screen the submittal at the front counter to determine
whether all required items listed in the Accessory Dwelling Unit Submittal
Requirements Checklist have been submitted.
Applications missing required items will not be accepted for submittal
2. City Staff Conduct Detailed Completeness Check
Planning Division staff conducts a detailed completeness check within 30 days of
submittal.
The assigned Planner notifies the applicant in writing regarding the completeness of
the application.
An application is not be deemed technically complete until all information necessary
to evaluate the proposed development, its impacts, and its compliance with the
provisions of the Springfield Development Code and other applicable codes and
statutes have been provided.
Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
3. City Staff Review the Application and Issue a Decision
• This is a Type I decision and thus is made without public notice and without a public
hearing since there are clear and objective approval criteria and/or development
standards that do not require the use of discretion.
• Decisions address all the applicable approval criteria and/or development standards.
• Applications may be approved, approved with conditions, or denied.
• The City mails the applicant and property owner the decision, which is effective on
the day it is mailed.
• The decision issued is the final decision of the City and may not be appealed.
Revised April 3, 2018 Sandy Belson page of
PROPER BUILT INC.
MCCLURE ADU NARRATIVE
Tuesday, May 10th, 2022
City of Springfield Development & Public Works
225 Fifth Street
Springfield, OR 97477
dpw(a springfield-or.aov
Subjed:MCCLURE ADU NARRATIVE
To Whom it may Concern,
PROPER BUILT
DESIGN + BUILD
The owner, Joel McClure, of the subject property, 1404 Olympic Street, is proposing to build a detached 440 square feet accessory
dwelling unit on the north side of the property. The owner's sonwill be the occupant of the premises.
The proposed ADU will comply wilhSection 5.5-130 Design Standard 'B. Meet Clear and Objective standards' as described in Section
5.5-100 Accessory Dwelling Units in the Springfield Development Code.
Stormwater for the proposed ADU will be treated through a rain garden. Stormwater facility design is currently under design and will
be submitted with the building permit for final approval.
Access to the ADU is a paved alleyway, accessible only through walking. Parking for the ADU will be paved on -street parking directly
abutting the property. The abutting street includes parking on both sides of the street, and there are no adopted plans to remove the
on -street parking.
Sincerely,
Proper Built, Inc.
Casey Koontz
Owner / Designer
casev orooerbuilinet
(541) 505-9236
Date Received
MAY 10 2022
Ofiginal Submittal ((\L
3990 Kathryn Ave, Unit B - Springfield OR 97478 j CCB 237697