Loading...
HomeMy WebLinkAboutApplication APPLICANT 5/10/2022City of Springfield SPRINGFIELD Development. & Public Works 225 Fifth Street Springfield, OR 97477 (,% Accessory Dwelling Unit (ADU) — Type I FOREGO Project Information (Applicant., complete this section) Applicant Name: Phone: S41 - Sos - -q-2-3L Company if applicable): Pz�t ��z Wit, NG Email:: ,se 0 ,e,6,:1{-.� Mailing Address: 3gao KAT N tcvE, ,4t Si-rIQ6e 02 -7 Applicant's Rep.: 5�„�n� A-5 ? plc Phone: Company: Ir -mail: Mailing Address: Pro ert Owner: — nn�- Phone: 541 -2Zi- kka+ Company:Email:,„Lc1��^e'e�k.1 rw Address: I oI MP IG Si. sP�ycYk'Z�C� o aT -'I"1 ASSESSOR'S MAP NO: IZ o•'6Z5" TAX LOT NOS : Property Address: 14 4 Seet .r7XtlA x ,-Z Size of Property: 0- 14 Acres kJ Square Feet ❑ Type of ADU: _Conversion of part of house (describe existing use) (check one) _Conversion of accessory structure (describe existing use) _Addition to house V"New detached dwelling Zoning of Property: /LOW Density Medium Density _High Density Residential Si natures: Please si n and riot our name and date in thea ro riate box on the next a e. -. -. ..- Associated Cases: Case No.: -.aa- - Date:5IIDI- Reviewed by: OL, n Application Fee: $ W Technical Postage Fee: $0 ' TOTAL FEES: $ y' PRO]ECT NUMBOAte Received 2—ii AAn.it'l M I R R.Mw RA.— MAY 10 2U22 Original Submitral �W— nano 1 nfA Signatures The undersigned acknowledges that the information in this application is correct and accurate. Prin St �ASE-/ c k Nxmz a`l"), Date: 3 Si ature zoQIA . McCIQVk Pri?ft Revised April 3, 2018 Sandy Belson page 2 of Accessory Dwelling Unit Submittal Requirements Checklist NOTE: If you feel an item does not apply, please state the reason why and attach the explanation to this form. ❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee calculation formula. A copy of the fee schedule is available at the Development & Public Works Department. The applicable application, technology, and postage fees are collected at the time of complete application submittal. Mr Accessory Dwelling Unit Application Form Irl Narrative explaining the proposal and any additional information that may have a bearing in determining the action to be taken, including findings demonstrating compliance with the Accessory Dwelling Unit Development and Design Standards described in SDC 5.5-125 and 5.5-130. ❑ Thr (3) Copies of a Plot Plan Including the Following: 7The scale appropriate to the area involved and sufficient to show detail of the plan and related data, such as 1" = 30', 1" = 50' or 1" = 100', north arrow, and date of preparation 5 -property lines including dimensions and size of the property ,--[r-� LName and location of abutting street(s) and alley(s) Lyrroposed accessory dwelling unit and its relation to the primary dwelling, showing ,,��location, dimensions, height, setbacks from property lines, and entrance locations U Existing and proposed structures, fences, walls, including required outdoor storage and parbage areas; showing location, dimensions, and setbacks from property lines ercentage of the lot covered by existing and proposed structures �y Location of utilities and meters Mlocation of existing driveways, curb -cuts and required off-street parking areas Location of existing sidewalks and walkways and required pedestrian walkway [5'Existing and proposed trees and landscaping Three (3) Copies of a Detailed Floor Plan of the ADU, drawn to scale with labels on rooms indicating proposed uses Thr e (3) Copies of an Elevation Drawing of the ADU Including the Following: —7—/xteriorfinish materials I_y'Roof pitch V,�W/A indow placement and sizes L! indow and door trim Q lmensions of eaves Height of accessory dwelling Revised April 3, 2018 Sandy Belson page 4 of Accessory Dwelling Unit Application Process 1. Applicant Submits an Accessory Dwelling Unit Application to the Development Services Department The application must conform to the Accessory Dwelling Unit Submittal Requirements Checklist on page 4 of this application packet. Planning Division staff screen the submittal at the front counter to determine whether all required items listed in the Accessory Dwelling Unit Submittal Requirements Checklist have been submitted. Applications missing required items will not be accepted for submittal 2. City Staff Conduct Detailed Completeness Check Planning Division staff conducts a detailed completeness check within 30 days of submittal. The assigned Planner notifies the applicant in writing regarding the completeness of the application. An application is not be deemed technically complete until all information necessary to evaluate the proposed development, its impacts, and its compliance with the provisions of the Springfield Development Code and other applicable codes and statutes have been provided. Incomplete applications, as well as insufficient or unclear data, will delay the application review process and may result in denial. 3. City Staff Review the Application and Issue a Decision • This is a Type I decision and thus is made without public notice and without a public hearing since there are clear and objective approval criteria and/or development standards that do not require the use of discretion. • Decisions address all the applicable approval criteria and/or development standards. • Applications may be approved, approved with conditions, or denied. • The City mails the applicant and property owner the decision, which is effective on the day it is mailed. • The decision issued is the final decision of the City and may not be appealed. Revised April 3, 2018 Sandy Belson page of PROPER BUILT INC. MCCLURE ADU NARRATIVE Tuesday, May 10th, 2022 City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 dpw(a springfield-or.aov Subjed:MCCLURE ADU NARRATIVE To Whom it may Concern, PROPER BUILT DESIGN + BUILD The owner, Joel McClure, of the subject property, 1404 Olympic Street, is proposing to build a detached 440 square feet accessory dwelling unit on the north side of the property. The owner's sonwill be the occupant of the premises. The proposed ADU will comply wilhSection 5.5-130 Design Standard 'B. Meet Clear and Objective standards' as described in Section 5.5-100 Accessory Dwelling Units in the Springfield Development Code. Stormwater for the proposed ADU will be treated through a rain garden. Stormwater facility design is currently under design and will be submitted with the building permit for final approval. Access to the ADU is a paved alleyway, accessible only through walking. Parking for the ADU will be paved on -street parking directly abutting the property. The abutting street includes parking on both sides of the street, and there are no adopted plans to remove the on -street parking. Sincerely, Proper Built, Inc. Casey Koontz Owner / Designer casev orooerbuilinet (541) 505-9236 Date Received MAY 10 2022 Ofiginal Submittal ((\L 3990 Kathryn Ave, Unit B - Springfield OR 97478 j CCB 237697