Pre -submittal (Site Plan Review) #811 -22 -000115 -PRE 811-22-000046-PROJ LDS Church
Assessor's Map: 17-03-15-40 TL: 3200-3500
Address: International Way and Corporate Way
Existing Use: Vacant
Applicant has submitted plans to develop a new Temple for the LDS Church
Planner: Andy Limbird
Meeting: Friday, May 13, 202211:00 — 12:00 via Zoom
VICINITY MAP
811 -22 -000115 -PRE Pre -submittal Meeting
17-03-15-40 TL 3200, 3300, 3400, 3500
International Way at Corporate Way
Church of Jesus Christ of Latter-day Saints
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Site Plan Review
SPRINGFIll
WA*
Application Type (Applicant: check one)
Site Plan Review Pre -Submittal: Major Site Plan Modification Pre -Submittal:
❑
Site Plan Review Submittal: ❑ Ma'or Site Plan Modification Submittal.
Required Project Information (Applicant: complete this section)
Applicant Name: The Church of Jesus Christ of Latter-day Saints phone:
❑
Company: The Church of Jesus Christ of Latter-day Saints
Email:
Address: 50 East North Temple Street, 10th Floor, Salt Lake City, UT 84150
Applicant's Rep... Rick Satre
Phone: (541) 686-4540
Company: The Satre Group
Email:
Address: 375 W. 4th Avenue Suite 201, Eugene, OR 97401
Property Owner: The Church of Jesus Christ of Latter-day Saints
phone:
company: The Church of Jesus Christ of Latter-day Saints
Email:
Address: 50 East North Temple Street, 10th Floor, Salt Lake City, UT 84150
ITAX
ASSESSOR'S MAP NO: 17-03-15-40
LOT NO 5 :3200, 3300, 3400, and 3500
Property Address: Not addressed; See Map and Tax Lot Above
.1 29
Size of Property Acres Square Feet ❑
Proposed No. of
Proposed Name of Project: Willamette Valley Oregon Temple
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Pro osal: Develop a new Temple for the Church of Jesus Christ of Latter-day Saints
Existing Use: Vacant Land
New Impervious Surface Coverage (Including Bldg. Gross Floor Area :139,024
sf
Si natures: Please si n and Lrint your name and date in the anDroLmate
Required Project Information (City Intake Staff.,
Associated Applications:
box on the next
complete this section)
Si ns:
a e.
Pre -Sub Case No.: 7,Z-Oao .
Reviewed b
Case No.:
Date:
Reviewed by:
Application Fee: $ L{'LJ .Oil
Technical Fee:
Posta a Fee: $
TOTAL FEES: $ �'�7i p
PROJECT NUMBER:
Mill
Revised 1/7/14 KL 1 of 11
April 29, 2022
THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
WILLAMETTE VALLEY OREGON TEMPLE
Site Plan Review
Map 17-03-15-40, Lots 3200, 3300, 3400, and 3500
WRITTEN STATEMENT
In accordance with Site Plan Review submittal requirements, this written statement describes the
proposed development and demonstrates that the proposal complies with the criteria contained in SDC
5.17-125.
LAND USE REQUEST
A. Development Objective
Having announced plans in April
2021, The Church of Jesus Christ of
Latter-day Saints is moving forward
with its plans to construct a new
temple to be known as the
Willamette Valley Oregon Temple on
a 10.29 -acre site in the Gateway
neighborhood of Springfield. Plans
call for an approximately 30,000
square feet building serving some
30,000 Latter-day Saints. This will be
the third temple in Oregon, the other
two being located in Lake Oswego
(the Portland Oregon Temple) and in
Central Point (the Medford Oregon
Temple). Oregon is home to more
than 150,000 Latter-day Saints, who
worship in more than 300
congregations. Land use approvals
include Site Plan Review, Tree
Felling, Floodplain Development and
Drinking Water Protection.
B. Project Directory
OwnerlDeveloper
The Church of Jesus Christ of Latter-day Saints
50 East North Temple Street, 10th Floor
Salt Lake City, UT 84150
Planner
Rick Satre, AICP, ASIA, CSI
The Satre Group
375 West 4^ Avenue, Suite 201
Eugene, OR 97401
Phone: (541)686-4540
Email: rick(EDsatrearouo.com
+ urrmuroerzm +
PLANNERS tARRSCAPEARCNITECTS - ENVIRONMENTALSPECIALISTS
375 West 4th, Suite 201, Eugene, OR 97401I 1
Phare: 541.686.4540
www.satregroup com 1I r
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Site Plan Review
Map 17-03-15-40, Lots 3200, 3300, 3400, and 3500
Landscape Architect
John Anderson, ASLA
The Satre Group
375 West 411h Avenue, Suite 201
Eugene, OR 97401
Phone: (541) 686-4540
Email: iohna0satiegrouo.com
Surveyor
Mike Dahrens, PLS
SSW Engineers Inc
2350 Oakmont Way, Suite 105
Eugene, OR 97401
Phone: (541)485-8383
Email: miked(ftswenoineers.com
Civil Engineer
Matt Keenan, PE
KPFF Consulting Engineers
800 Willamette St, Ste 400
Eugene, OR 97401
Phone: (541) 684-4902
Email: matt.keenan(oftff.com
Architect
David Henderson, AIA
HKS Architects
90 South 400 West, #110
Salt Lake City, UT 84101
Phone: (801) 384-7604
Email: dhenderson(cahksinc.com
Page 2 of 21
I. THE SITE AND EXISTING CONDITIONS
A. Development Site
The site is located north of International Way in the Gateway area of Springfield. It is comprised
of four tax lots and is approximately 10.29 acres in size'. The site abuts offices to the west and
east and farmland to the north. To the south is property owned by PeaceHealth.
B. Planning Context
1. Planning and Zoning
a.
Jurisdiction:
b.
Metro Plan:
c.
Refinement Plan:
d.
Base Zoning:
e.
Overlay Zoning:
f.
Acreage:
g.
Map:
h.
Tax Lots:
City of Springfield
Campus Industrial
Campus Industrial
Campus Industrial
Drinking Water Protection
and Floodplain Development
10.29 acres
17-03-1540
3200, 3300, 3400 and 3500'
004-04
The subject property is currently comprised of four tax lots. Aland use application currently in process, a Major Rapist, if
approved would consolidate those four lots into one (Case No. 811-22-000044).
The Satre Group • 375 West 4s' Avenue, Suite 201, Eugene, OR 97401 • (541) 686-0540 • viva,satrenrouo.man
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Site Plan Review
Map 17-03-1540, Lots 3200, 3300, 3400, and 3500
Page 3 of 21
2. Transportation
a. Metro Area Transportation Plan (Translelan).
The metro area's adopted transportation plan, The Eugene -Springfield Transportation
System Plan (TransPlan), does not include projects in the vicinity of the subject property.
b. City of Springfield 2035 Transportation System Plan.
The City of Springfield's transportation plan does not include any projects abutting the
subject property.
c. Street Classification.
Springfield's Street Classification Map identifies International Way as a collector street
and Corporate Way as a local street. The street classification cavies with it a standard
right-of-way (ROW). The standards for International Way and Corporate Way are as
follows:
Street
" Glassifcation
.. Existing ROW
Minimum ROW
Existing
Min. Cl
Curb-to-
Curb
Curb
International
',, Major Collector
72 feet
56 feet
',, 48 feet
36 feet
wall
Corporate
',, Local Street
50 feel
',, 41 fee[
",, 24 feet
20 fee[
Wa
d. Public Transit.
The metro area's public transit system, Lane
Transit District (LTD), provides service in
front of the adjacent property east of the
subject property via the EMX International
Center Station. No other bus route intersects
the area.
e. Bicycle and Pedestrian Facilities.
There are sidewalks on both International
Way and Corporate Way abutting the subject
property. There are no bike lanes in either
street.
Utilities
a. Stormwater and Wastewater.
The subject site is located in the North
Gateway Stormwater Drainage Basin. The
Springfield Stormwater Facilities Master Plan
identifies one capital improvement project,
"Low Priority CIP 43," to address current
issues around water quality in the campus
industrial area.
Capital Improvement Map Excerpt (Fig. 5-1)
Stormwater Facilities Master Plan
City of Springfield 2008
The Satre Group • 375 West 4t Avenue, Suite 201. Eugene. OR 97401 - (541) 6864540 • wmvsae'earouo.com
The Church of Jesus Christ of Laner-Day Saints
W famette Valley Oregon Temple
Site Plan Review
Map 17-03-15-40, Lots 3200, 3300, 3400, and 3500
Stormwater service exists
with an 18 -inch line in
International Way and a
72 -inch line along the
western boundary of the
site. Wastewater service
is also available to the site
via International Way by a
12 -inch line.
Existing Sanitary and
Star FacilHies
City of Springfield 2022
Page 4 of 21
b. Water and Electric Service.
The site receives water service
via with a 12 -inch line in
International Way which has an 8 -
inch stub to the subject property.
There is sufficient capacity within
the electric system to support the
proposal.
c. Wellhead Protection.
The Springfield Wellhead
Protection Areas Map shows the
subject site as within the 1 -year
Time of Travel Zone and within the
2 -year Time of Travel Zone along
the eastern boundary.
Development of the property is
therefore subject to the Drinking
Water Protection Overlay District
and certain land use criteria will
apply.
I SPORTS
Existing Water and Electric Infrastructure
Springfield Utility Board 2017
a
Wellhead Protection Areas Map E dcrdt
City of Springfield 2019
The Satre Group • 375 West 4'" Avenue, Suite 201, Eugene, OR 97401 • (541) 6863540 • %wnv satregrouo.com
The Church of Jesus Christ of Latter -Day Saints Page 5 of 21
Wll.rm tts valley Oregon Temple
Site Plan Review
Map 17-03-15-40, Lots 3200, 3300, 3400, and 3500
Apr129.2022
4. Natural Resources.
a. The Springfield Water Quality
Limited Watercourses Study does
not identify a wetland or Water
Quality Limited Watercourse on the
property.
b. The tax lot is shown as being in the
Special Flood Hazard Area —
Floodplain Zone A. Development of
the property is therefore subject to
the Floodplain Overlay District and
a Floodplain Permit is required.
Floodplain Roodway Map Excerpt
Olty, of Springfield 2022
III. SITE PLAN REVIEW– APPROVAL CRITERIA AND FINDINGS
This section is presented in the same order of applicable requirements found in Section 5.17-125,
Site Plan Review Criteria of the Springfield Development Code. Applicable sections of the Code are
in bald italics, followed by proposed findings in normal text.
A. The zoning is consistent with the Metro Plan diagram, and/or the applicable Refinement
Plan diagram, Plan District Map, and Conceptual Development Plan.
Response: The subject property is within the
boundaries of the Gateway Refinement Plan. The
Gateway Refinement Plan designates the subject
property as Campus Industrial. The Metro Plan
Designation and Zoning Map are also Campus
Industrial. The zoning is therefore consistent with
the Metro Plan and the Refinement Plan. Given
this, this criterion (SDC 5.17-125.A) is met.
Gateway Refinement Plan
November 1992
i VU
SubjtttPmpeM1y Excerpt
Springfield Zoning Map
January 2020
Metro Plan Diagram
2010
The Safre Group • 375 West 4'^ Avenue, Suite 201, Eugene, OR 97401 • (541) 686-0540 • vmwsatraamuo.com
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Site Plan Revlew
Map 17-03-15-40, Lots 3200, 3300, 3400, and 3500
Page 6 of 21
B. Capacity requirements of public and private facilities, including, but not limited to, water
and electricity; sanitary sewer and stormwater management facilities; and streets and
traffic safety controls shall not be exceeded and the public improvements shall be
available to serve the site at the time of development, unless otherwise provided for by
this Code and other applicable regulations. The Public Works Director ora atflityprovider
shall determine capacity issues.
Response: Public and private facilities are provided as follows:
Storm: There are two public storm mains adjacent to the property, one in Corporate Way and
the other in an easement on the east side of the site. This easement will be maintained
with the development. There is also no over -land flow from adjacent properties that
would be cut off by this development.
Sanitary: Wastewater service is available to the site via International Way by a 12 -inch pipe.
Water: The site receives water service via a 12 -inch line in International Way with an 8 -inch
stub to the property.
Electric: Electric infrastructure is adjacent to the site along International Way.
Streets: International Way is a major collector; it has an existing right-of-way width of 72 feet
and a curb -to -curb width of 48 feet. Corporate Way is a local street; it has an existing
right-of-way of 50 feet and a curb -to -curb width of 24 feet.
Fire: There are several existing Fre hydrants in the vicinity —two on the south side of
International Way and one on the east side of Corporate Way, directly abutting the
subject property. This nearest hydrant, on Corporate Way, is within the 600 -foot
distance limit. Knox boxes will be installed at perimeter gates for emergency fire
access.
Given this, this criterion (SDC 5.17-125.B) is met.
C. The proposed development shall comply with all applicable public and private design and
construction standards contained in this Code and other applicable regulations.
Response: Applicable public and private design and construction standards can be found in SDC
Chapter 3 -Land Use Districts and in SDC Chapter 4 -Development Standards. The components
of these two chapters which are applicable to the proposed development, and proposed
compliance with said components, is as follows.
SDC Chapter 3 -Land Use Districts
SDC Chapter 3 -Land Use Districts includes all Base Zone Districts, Overlay Zone Districts and
Plan Districts. Within those, the chapter identifies the land uses that are permitted within each
district, basic development standards, and use -specific design standards applicable to certain
zones.
Within Chapter 3, Section 3.2-400 Industrial Zoning Districts, 3.3.200 Drinking Water
Protection Overlay District, and 3.3.400 Floodplain Overlay District apply.
3.2-400 Industrial Zoning Districts
With the property's Campus Industrial zoning, section 3.2-400 applies. Applicable components of
SDC 3.4-400 can be found in the specific sections 3.2-415 Schedule of Use Categories 3_2 -
The Satre Group • 375 West 0 Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w.wi.satnnrouo.com
The Church of Jesus Christ of Latter -Day Saints Page 7 of 21
W Ilamette Valley Oregon Temple
Site Plan Revlew
Map 17-03-15-00, Lots 3200, 3300, 3400, and 3500
Apri129 2022
420 Base Zone Development Standards, and 3.2-445 Campus Industrial Design Standards.
Responses in compliance with those sections are as follows.
3.2-415 Schedule of Use Categories
The Church of Jesus Christ of Latter-day Saints submitted a Formal Interpretation (Case No. 811-
21-000308-TYP2) to determine if a religious temple is an allowed use in the Campus Industrial
district. A temple is a principal center for religious education and instruction, special activities and
ceremonies, and regional administrative offices of the church. The temple does not cater to walk-
in customers and the site is proposed to have secured, gated access. The temple does not
operate as a church or house of worship in that weekly sermons and large congregational
gatherings are not held at the site.
The city determined that "educational facilities in business parks" and "corporate headquarters,
regional headquarters and administrative offices" are listed uses in the Campus Industrial District.
Administrative offices are allowed when they are part of a business park in accordance with SDC
3.2-415, Footnote 4. See table below.
Use Categoryluses CI District
Pri Uses 3)
Corporate headquarters regional headquarters, and administrative offices 4
Permitted
Educational facilities in business parks, including, but not limited to, professional,
vocational and business schools; and job training and vocational rehabilitation
services
Permitted
(4) Corporate headquarters, regional headquarters, and administrative offices may be permitted as
part of a large-scale light -manufacturing use or located wfthin a business park. Corporate and
regional headquarters may also stand alone. The acreage comprising stand alone corporate or
regional headquarters site shall be applied to the 40 percent gross acre standard for business
parks specified in Note (2), above. Corporate and regional headquarters shall have at least 20 or
more employees at the time of occupancy.
Response: Per the Staff Decision from the formal interpretation, staff found that the temple met
the schedule of use categories:
Regional Headquarters and Administrative Offices:
• The subject site is four vacant lots of the Liberty Professional Center subdivision. The
subdivision was platted and recorded in 2007 as a planned business park development. A
MasterPlan for the business park was approved in 2007 and expired in 2014 (Case
LRP2007-00020). Therefore, the site qualifies for the listed uses of administrative offices and
educational facilities in business parks in accordance with SDC 3.2-415, Footnote 4.
• In accordance with SDC 3.2-415, "regional headquarters" and "administrative offices" are
listed as Permitted uses in the CI district. These facilities have characteristics that are similar
to a religious temple in that they. are designed and intended to accommodate a core group of
employees engaged in specific administrative, management or operational activities, serve as
the principal facility within a sizable geographic area, have operational hours that largely
coincide with the "business day, do not typically serve walk-in customers, may have secure
access exclusively for members of employees, and often provide rooms for offices, meetings,
training, and specialized activities.
Educational Facilities in Business Parks:
• In accordance with SDC -415, "educational facilities in business parks" are listed as a
Permitted Use in the Cl district. These facilities have characteristics that are similar to a
religious temple in that they. operate primarily during daytimelweekday business hours which
may extend into the evening, provide a specialized curriculum and training for students or
enrollees; do not typically serve walk-in customers, may have secure access exclusively for
The Satre Group - 375 West 4° Avenue, Suite 201, Eugene, OR 97401 - (541) 686-0540 - w satraarouaddm
The Church of Jesus Christ of LattenDay Saints
Willamette Valley Oregon Temple
Lots 3200, 3300, 3400, and 3500
Page 8 of 21
employees or studentsrenrollees, and often provide rooms for offices, meetings, training,
study, and specialized activities.
3.2-420 Public and Private Development Standards
Campus Industrial Base Zone Development Standards are as follows
Minimum Lotilaarcel Size:
10,000 square feet
Minimum Frontage:
75 feet
Front Yard, Street Side Yard Setback:
20/30 feet building setback, and 5 feet parking,
driveway, and outdoor storage.
Interior Yard, Rear Yard Setback:
20 feet building separation from other buildings within
the Cl District, and 5 feet parking, driveway, and
outdoor storage.
Maximum Height (6):
45 feet
(6) Height Exceptions. Incidental equipment may exceed the height standards.
Response: The Willamette Valley Oregon Temple plans show the top of the parapet of the main
body of the temple at 29'-2", with the top of the mechanical parapet at 37'-3". The top of the finial
of the steel spire is 125'. The spire is an ornamental element. At the Development Issues Meeting
(Case 611 -21 -000267 -PRE), staff found that the building height is considered "incidental
equipment" in compliance with SDC 3.2-420(6) which allows height exceptions to the 45'
maximum in Campus Industrial. Therefore, all the base zone development standards are met.
See the Site Plan.
3.2-425 Cl District -Operational Performance Standards
The operational performance standards listed below apply to all uses permitted within the
Cl District. For permitted light industrial manufacturing uses, compliance with these
operational performance standards shall be the determining factor. In all other cases, the
use lists in Section 3.2-415 are the determining factor.
A. All manufacturing operations shall be entirely enclosed within a building;
Response: No manufacturing operations will occur at the Willamette Valley Oregon Temple.
B. All applicable onsite design standards specified in Section 3.2-445 shall be met;
Response: See response to the design standards in Section 3.2-445.
C. The storage of raw materials and/or finished products shall occur entirely within
enclosed buildings. The parking of trucks necessary for the operation of the facility
shall occur within enclosed buildings, unless permitted as specified in Section 4.6.125
and 3.2-445C.;
Response: No storage of raw materials and/or finished products will occur at the Willamette
Valley Oregon Temple.
D. Office and commercial uses shall not primarily serve the public;
Response: The administrative office portion of the temple does not serve the public.
E. The movement of heavy equipment on or off the site shall not be permitted.
EXCEPTION: Truck deliveries and shipments are permitted;
The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 6864540 - wwwsatreorouo.com
The Church of Jesus Christ of Latter -Day Saints Page 9 of 21
Willamette Valley Oregon Temple
Site Plan Review
Map 17-03-1540, Lots 3200, 3300, 3400, and 3500
April 29. 2022
Response: No heavy equipment will occur at the Willamette Valley Oregon Temple.
F. Proposed uses on the prohibited use list specified in Section 3.2-415 shall not be
permitted; and
Response: Acknowledged and agreed.
G. Proposed uses shall also comply with the additional operational performance
standards listed below, The intent is not to specifically deny a use, but ensure
compliance with applicable local, State, and Federal regulations. Compliance with
these operational performance standards are the continuing obligation of the property
owner. Failure to comply with these operational performance standards shall be a
violation of this Code and/or Chapter 5 of the Springfield Municipal Code, 1997,
1. Air pollution. Air pollution includes, but is not limited to, emission of smoke, dust,
fumes, vapors, odors and gases. Air pollution shall not be discernable at the
property line by a human observer relying on a person's senses without the aid of
a device. The applicant shall obtain and maintain all applicable licenses and
permits from the appropriate local, State, and Federal agencies.
EXCEPTION: Water vapor or other benign plumes from processes orpollution
control equipment shall not be considered air pollution.
2. Fire and explosive hazards. All activities involving the use, storage and/or disposal
of flammable or explosive materials shall comply with the Uniform Fire Code as
most recently adopted by the City.
3. Glare.
a. Glare resulting from exterior lighting, excluding low -intensity pedestrian -level
lighting, shall be controlled by deflecting light away from abutting uses and
from public rights-of-way as specified in Section 4.5-100.
b. Glare resulting from an industrial operation including welding or laser cutting
shall not be visible from the outside of the building.
4. Groundwater Protection. Proposed development utilizing hazardous materials that
may impact groundwater quality shall be as specified in Section 3.3-200.
5. Hazardous Waste. Proposed development shall not utilize or produce hazardous
waste unless permitted as specified in Oregon Administrative Rule (OAR) 340-102-
0010 through 340-102.0065 or any applicable Federal regulation.
6. Noise. These standards apply to noise generated by any machinery or equipment
on the development site. The maximum permitted noise levels in decibels across
IoUparcel lines and district boundaries shall be as specified in OAR 340-035-0035,
Noise Control Standards for Industry and Commerce.
EXCEPTION: Excluded from these noise standards are background traffic on State
highways and public streets and occasional sounds generated by temporary
construction activities, truck deliveries, warning devices, or other similar
temporary situations.
7. Radiation. There are various sources of radiation, including, but not limited to
ionizing radiation, electromagnetic radiation, and radiation from sonic, ultrasonic,
or infrasonic waves. Uses that involve radiation shall comply with the regulations
in OAR 333-100-0001 through 333-100.0080 and any applicable Federal regulation.
B. Vibration. No use, other than a temporary construction operation, shall be
operated in a manner that causes ground vibration that can be measured at the
property line. Ground -transmitted vibration shall be measured with a seismograph
or a complement of instruments capable of recording vibration displacement
particle velocity, or acceleration and frequency simultaneously in 3 mutually
perpendicular directions.
The Satre Group -375 West 4° Avenue, Suite 201, Eugene, OR 97401 -(541) 6064540- www.satreorouocom
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Site Plan Review
Map 11-03-1540, Lots 3200, 3300, 3400, and 3500
Page 10 of 21
Response: The Willamette Valley Oregon Temple (a regional headquarter, administrative
office, and educational facility) will not cause air pollution, create fire/explosive hazards,
glare, groundwater protection concerns, hazardous waste concerns, noise issues,
radiation, or vibration. The temple is in compliance with these cited operational
performance standards.
3.2445 Campus Industrial Design Standards
In the Cl District, new buildings; expansions of, or additions to existing buildings; or
improvements to existing fagades that require a building permit shall provide architectural
designs that encourage flexibility and innovation in site planning by complying with the
following on-site design standards:
A. Building Exteriors. In order to break up vast expansions of single element building
elevations applicable to both length and height, building design shall include a
combination of architectural elements and features, including, but not limited to:
offsets, windows, entrances, and roof treatments.
1. Offsets. Offsets shall occur at a minimum of every 100 feet of lineal building wall
by providing recesses or extensions with a minimum depth of 4 feet.
EXCEPTION: Variations in building wall materials, including, but not limited to:
wood siding, brick, stucco, textured concrete block, tile, glass, stone, or other
suitable materials may be used instead of offsets.
The Director, in consultation with the Building Official, may approve othersuitable
materials without the need for a Variance. Smooth -faced concrete panels or
prefabricated steel panels may also be used as accents, but shall not dominate the
building exterior. Exterior colors for buildings and fences shall be subdued or
earth tones.
Response: The building exteriors incorporate offsets, windows, entrances, and various
changes in height and massing. Where offsets are not provided, the stonework on the
building provides sufficient variation. See architectural plans.
Windows. Ground floor windows are required for all office and commercial uses,
including those office and commercial uses that are contained within light
industrial manufacturing uses. Ground floor windows for the remainder of a light
industrial building are optional. All elevations of office and commercial buildings
abutting any street shall provide at least 50 percent of their length (e.g., a 100 -foot -
wide building fagade shall have a total of at least 50 linear feet of windows) and at
least 25 percent of the ground floor wall area as windows and/or doors that allow
views into lobbies, merchandise displays, or work areas. On comer lots/parcels
this provision applies to both elevations. Where upper story windows are
proposed, either awning, canopies, or other similar treatments shall be required for
ground floor windows or variations in window materials, trim, paint or
ornamentation may be used.
EXCEPTIONS:
a. A mural, that does not include any advertising, maybe used to meet 50 percent
of the ground floor window standard specified in Subsection 2., above. Murals
are regulated under Chapter 8.234 of the Springfield Municipal Code, 1997.
b. Building elevations adjacent to alleys or vehicle accessways used primarily for
servicing and deliveries are exempt from this standard.
The Satre Group • 375 West 0 Avenue, Suite 201, Eugene, OR 97401 • (541) 6864540 • www satagnoup.wm
The Church of Jesus Christ of Latter-0ay Saints Page 11 of 21
Willamefte Valley Oregon Temple
Site Plan Review
Map 17-0315-40, Lots 3200, 3300, 3400, and! 3500
April 29 2022
Response: This project is assembly occupancy. This standard is not applicable.
Windows are provided to allow natural light to enter, however, views into the interior are
not provided.
3. Entrances. To the greatest extent practicable, all new buildings in the Cl District
shall be oriented toward both exterior and internal streets.
a. The primary entrance to all buildings in the CI District shall be visible from the
street; and
b. A weather -protected area, including, but not limited to: awnings or canopies, at
least 6 feet wide, shall be provided at all public entrances.
Response: The primary entry is visible from International Way and protected from
weather by a portico. There are two additional entries, one facing Corporate Way and the
other facing an internal parking area; the additional entrances are also protected by a
portico.
4. Roof Treatments. The following roof treatments are required.
a. Sloped roofs and multiple roof elements shall be the primary methods for roof
treatment Variations within one architectural style; visible roof lines and roofs
that project over the exterior wall of a building enough to cast a shadow on the
ground and architectural methods used to conceal flat roof tops may also be
used.... If building wall offsets are used, offsets or breaks in roof elevation with
a minimum of 3 feet or more in height may be used for every 100 feet of lineal
building wall.
It. The architectural design of the building roof shall also incorporate features
which screen all heating, ventilation and air conditioning units from adjacent
LDR and MDR properties and the street. Mechanical equipment shall also be
buffered so that noise emissions do not exceed the standards specified in
Section 3.2-425G.6. The City may require a noise study certified by a licensed
acoustical engineer for compliance verification.
Response: Architectural parapets are provided to conceal flat roofs and offsets and
changes in massing are provided where building wall offsets are used. All mechanical
equipment is located remotely from the building and is concealed via a screen wall.
Mechanical equipment is designed to be compliant with the noise standards referenced.
B. Landscaping. The following landscaping standards are in addition to standards specified
in Section 4.4-105:
1. A minimum of 35 percent of each development area shall be landscaped open space.
2. Plants shall be sized to attain 90 percent coverage of required landscape areas
(excluding tree canopies), within 3 years of installation. Plantings of native species
and plant communities shall achieve 90 percent coverage within 5 years of
installation.
3. At least 10 percent of the interior of a parking lot having 20 or more parking spaces
shall be landscaped. This standard is in addition to any landscaping setbacks
required in Section 3.2-020.
4. Natural assets identified in the Gateway Refinement Plan, any other applicable
refinement plan or elsewhere in this Code shall be included in the site design and
protected. Where protection of these natural assets prevents the development of the
site consistent with this Code, the functional equivalent of the natural assets may be
substituted as may be allowed by the City.
Response: The development site is 10.29 acres (448,232 square feet); 35 percent of the
development site for open space is 156,881 sf. The proposed open space constitutes 44 percent
The Satre Group • 375 West 41h Avenue, Suite 201, Eugene, OR 97401 • (541) 6864540 - www.aatretroua.com.
The Church of Jesus Christ of Latter-0ay Saints Page 12 of 21
Willamette valley Oregon Temple
Site Plan Review
Map 17-03-15-40, Lots 3200, 3300, 3400, and 3500
Adult 29 2022
of the development site or 195,577 sf. As for parking, the paved areas constitute 49,307 sf;
21,406 sf will be landscaped or 43 percent of the paved parking area, exceeding the minimum
10 percent coverage requirement. Planting in the landscaped areas will achieve 90% coverage
within 3-5 years of installation.
C. Screening. Screening shall be as specified in Section 4.4-110. In addition, truck parking for
vehicles necessary for the operation of the facility shall be screened by a masonry or
concrete wall that is an extension of the building and complements the fayade of the
building. The wall shall have a minimum height of 8 feet. The wall shall totally conceal
trucks from public view and shall meet the setback requirement specified in Section 3.2-
420.
EXCEPTION: The Director may consider proposed truck parking that is enclosed by
buildings and complies with Section 4.6-125.
Response: There is an enclosed garage at the northwest corner of the site for maintenance
vehicles. The site does not abut residential districts, is not a multifamily development, automobile
wrecking/salvage yard, and no outdoor mechanical devices will be visible from the street.
Therefore, the screening criteria in Section 4.4-110 is not applicable to the subject site.
D. Pedestrian Walkways and River Access
1. Walkways from a sidewalk to building entrances. A continuous pedestrian walkway
shall be provided from the primary frontage sidewalk for pedestrians to access
building entrances.
2. Walkways from parking lots to building entrances. Internal pedestrian walkways shall
be developed forpersons who need access to the buildings from the parking lots. The
walkways shall be located within the parking lots and designed to provide access from
the parking lots to the entrances of the buildings. The walkways shall be distinguished
from the parking and driving areas by use of any of the following material., special
pavers, brick, raised elevation, scored concrete or other materials as approved by the
Director.
3. In the Gateway Cl District, access to the McKenzie River, both forpedestrians and
bicycles, shall be addressed in the site design, where specified in the applicable
refinement plan or TransPlan.
Response: The Willamette Valley Oregon Temple will have a continuous walkway from the
public sidewalk to the building entrances. The parking lot areas will also have internal
pedestrian walkways distinguished by scored concrete and raised elevation.
E. Transit Stations and Stops. When required, transit stations and stops shall conform to the
standards of the Lane Transit District.
Response: There is an existing EMX transit stop in front of the Willamette Valley Oregon Temple.
No new stations or stops are proposed for the area.
3.3-200 Drinking Water Protection Overlay District
Response: A Drinking Water Protection Overlay District Development application is submitted
concurrent with this Site Plan Review application. Please refer to that application for information
pertaining to how the project satisfies the Drinking Water standards.
The Satre Group •375 West 4" Avenue , Suite 201, Eugene, OR 97401•(541) 6864540-xv aatrearoun.com
The Church of Jesus Christ of Latter -Day Saints Page 13 of 21
Willamette Valley Oregon Temple
Site Plan Review
Map 17-03-1540, Lots 3200, 3300, 3400, and 3500
3.3.400 Floodplain Overlay District
Response: A Floodplain Overlay District application is submitted concurrent with this Site Plan
Review application. Please refer to that application for information pertaining to how the project
satisfies Floodplain Overlay standards.
SDC Chapter 4 -Development Standards
SDC Chapter 4 -Development Standards address general development standards that are
applicable to all development as well as special standards for certain uses. Here, the following
specific sections were cited and thus apply to the project. Responses in compliance with those
standards, are as follows.
SDC 4.2-105 Public Streets
Response: No new public streets are required or proposed.
SDC 4.2-110 Private Streets
Response: No new private streets are required or proposed.
SDC 4.2-120.A Site Access and Driveways - General
Response: Proposed improvements associated with this project include two new driveways
abutting Corporate Way (a local street) and one new driveway abutting International Way (a
collector street).
SDC 4.2-120.8 Driveways must take access from lower classification streets when
development sites abut more than one street and streets are of differing classification as
identified in the Springfield Transportation System Plan.
EXCEPTION. Driveway access to or from a higher classification street may be permitted if
no reasonable alternative street access
1. Where a proposed development abuts an existing or proposed arterial or collector
street, the development design and off-street improvements shall minimize the traffic
conflicts.
2. Additional improvements or design modifications necessary to solve identified
transportation conflicts may be required on a case-by-case basis.
Response: One driveway is proposed on International Way, a collector street. At the
Development Issues Meeting (Case 811 -21 -000267 -PRE), Staff found that the proposed
driveway on International Way is acceptable; It is further away from the Lane Transit District stop
on International Way than the existing driveway on the neighboring Giustina property. Therefore,
the driveway alignment minimizes traffic conflicts on International Way.
SDC 4.2-120. C Driveways shall be designed to allow safe and efficient vehicular ingress
and egress as specified in Tables 4.2-2 through 4.2-5 and the City's Engineering Design
Standards and Procedures Manual and the Public Works Standard Construction
Specifications.
The Satre Group • 375 West 0 Avenue, Suite 201, Eugene, OR 97401 • (W) 6864540 •yBNV.aatrearouo.00m
The Church of Jesus Christ of Latter -Day Saints
Willamette Vallev Oregon Temple
Site Plan Review
Map 17 03-1 540, Lots 3200, 3300, 3400, and 3500
SDC Table 4.2-2 Driveway Design Specifications
Page 14 of 21
Drive
Design Specifications
Radius of Cum 2.
Driveway
Throat Depth
1 -Way
Driveway
Width
2 -Way
Driveway
Width
Transition
Width
Driveway Throat
Depth
Land Use
MhulMax.
M1nJMax.
MinAMax.
Industrial
24735'(1)
8'7N A.
18'(2)
Response: The project includes the construction of three two-way driveways. The driveway
aprons have a width of 26' with an 8 -foot transition width and throat depths exceeding 18 feet.
The streets do not contain any curbside parking and vision clearance areas will be established.
SDC Table 4.2-3 Curb Return Driveway Design Specifications
Cum Return Driveway Desi Specifications
rivewa Width 1
Driveway
Radius of Cum 2.
Driveway
Throat Depth
Land Use IMin. Max.
Min. I Max.
Minimum (3)
Industrial 1 24 feet 1 35 feet
1 15 feet J 35 fee[
1 60 feet
Response: The driveways are curb returns. They have a driveway width of 26', a radius of 20
feet, and a throat depth exceeding 60 feet.
SDC Table 4.24 Minimum Separations Between a Driveway and the Nearest Intersection
Cum Return on the Same Side of the Street (1)
(1) Each category ofstreet is considered separately. Distances maybe reduced in the following
circumstances:
(a) Access is from a one-way street
(b) The driveway is marked for "right -in -right -out only."
(c) The driveway is marked "exit only" and is designed to prevent left turns.
(d) In cases where an existing lotiparcel andlor use make compliance with these specifications
unreasonable, a new driveway or an existing driveway required to be relocated by this Code
shall be placed at the furthest point from the intersection curb return, considering both
safety and internal circulation requirements of the development
Response: International Way is a collector street. Corporate Way is a local street. The nearest
intersection is at the southwest corner of the subject site, at International Way and Corporate
Way. The single new driveway associated with this project on International Way is over 200 feet
from the International Way and Corporate Way intersection. There are two driveways on
Corporate Way for the project. The southern -most driveway on Corporate Way, at the southwest
comer of the site, is less than 150 feet from the intersection of International Way and Corporate
Way. This driveway is placed at the furthest point possible given the site plan from the
intersection curb return. As Corporate Way is a low volume dead-end street, the location of this
driveway will not impact safety and circulation needs.
The Satre Group - 375 West 0 Avenue, Suite 201, Eugene, OR 97401 • (541) 666-4540 - wwwsatrearouo.com
The Church of Jesus Christ of Latter -Day Saints
Wllamette Valley Oregon Temple
Site Plan Review
Map 17-03-1&40, Lots 3200, 3300, 3400, and 3500
Page 15 of 21
SDC 4.2-130 Vision Clearance.
Response: A 10 -foot by 10 -foot minimum vision clearance triangle is proposed for the driveways.
No vegetation, screen or other physical obstruction will occur between 2-1l2 and 8 feet above the
established height of the curb in the triangular area.
SDC 4.2.135 Sidewalks
A. Sidewalks and planter strips abutting public streets shall be located wholly within the
public street right-of-way, unless otherwise approved by the Director.
Response: The applicant is proposing relocating the existing setback sidewalk on
International Way to move the walk further back from the street, adding a slight curve to the
walkway (this will require a public sidewalk easement to accommodate the new sidewalk
location). The existing sidewalk on Corporate Way adjacent to the development site will
remain and be repaired, as necessary.
D. Planter strips are required as part of sidewalk construction. Planterstrips must be at
least 4.5 feet wide and long enough to allow the street tree to survive. Planter strips
must have approved landscaping consisting of street trees and ground cover allowed
per the City's Engineering Design Standards and Procedures Manual.
Response: There is an existing 4.5' wide planter strip with street trees on Corporate Way that
will remain. As mentioned above, the setback sidewalk on International Way will be relocated;
the existing sidewalk is quite close to the curb and the street trees, as they mature, are being
squeezed. The new planter strip will be at least 4.5' wide and contain approved landscaping.
SOC 4.2-140 Street Trees
A. New Street Trees. New street trees shall be at least 2 inches in caliper. New street
trees shall be selected from the City Street Tree List and installed as specified in the
City's Engineering Design Standards and Procedures Manual. The Director shall
determine which species are permitted or prohibited street trees.
Response: Five street trees are proposed where existing street trees will be removed to
make way for the development. The new street trees will be at least 2 inches in caliper and
be selected from the City Street Tree List.
B. Existing Street Trees.
2. Street Tree Removal Standards.
b. Existing street trees on private property cannot be removed without prior
authorization by the Director. Removal of 5 or more street trees on private
property is subject to the tree felling standards specified in Section 5.19-100.
c. Existing street trees on private property must not be removed to accommodate
additional or expanded driveways.
3. Street Tree Replacement Standards. Where possible, any street tree proposed to
be removed shall be replaced with a tree at least 2 inches in caliper.
Resoonse: There are existing street trees on International Way and Corporate Way. Two
street trees will be removed on International Way to install the proposed setback sidewalk
and three street trees will be removed on Corporate Way to install the proposed driveways.
The site plan was reviewed by City Staff during the Development Issues Meeting on
November 9, 2021 (Case 811 -21 -000267 -PRE). The replacement street trees will be at least
2 inches in caliper.
The Satre Group • 375 West Or Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 -w satrearouo.com
The Church of Jesus Christ of Latter -Day Saints Page 16 of 21
Wllamefle Valley Oregon Temple
Site Plan Review
Map 17-03-15 40, Lots 3200. 3300, 3400, and 3500
April 29 2022
A Tree Felling permit application is submitted concurrent with this Site Plan Review
application. Please refer to that application for information pertaining to how the project
satisfies Tree Felling standards.
SDC 4.2-145 Street Lighting
Response: Street lighting exists along the property frontage. No new street lighting is required or
proposed.
SDC 4.2-150 Multi -Use Paths
Response: No new multi -use paths are required or proposed.
SDC 4.2-160 Accessways
Response: The development site does not abut any adjacent streets, residential areas,
neighborhood activity centers, industrial or commercial centers, transit facilities, parks, schools,
open space, or trails and paths where no public street access exists. No new accessways are
required or proposed.
SDC 4.3-105 Sanitary Sewers
Response: There are three existing sanitary sewer stubs to the subject property on International
Way. Proposed sanitary for the temple will come from International Way.
SDC 4.3-110 Stormwater Management
B. The Approval Authority shall grant development approval only where adequate public
and/or private stormwater management systems provisions have been made as
determined by the Public Works Director, consistent with the policies set forth in the
Stormwater Management Plan and the Engineering Design Standards and Procedures
Manual....
Response: Adequate public stormwater management systems exist adjacent to the subject
site. There are piped facilities in both International Way and Corporate Way. Additionally,
there is a public stormwater detention facility immediately north of the site.
D. Run-off from a development shall be directed to an approved stormwater management
system with sufficient capacity to accept the discharge. Where the Public Works
Director determines that the additional run-off resulting from the development will
overload an existing stormwater management system, the Approval Authority shall
withhold Development Approval until provisions, consistent with the Engineering
Design Standards and Procedures Manual, have been made to correct or mitigate this
condition.
Response: Stormwater from the west portion of the site will be discharged into an existing
public stormwater facility in Corporate Way. Stormwater from the south area of the site will
be discharged into existing public stormwater facilities in International Way. Stormwater from
the east and northeast portions of the site will be discharged into an on-site private vegetated
stormwater treatment facility, which will have an overflow connection to an existing piped
stormwater facility along the east property line. These stormwater collection points all Flow
north and discharge into the existing public stormwater detention swale north of the property.
The Satre Group • 375 West 4a Avenue, Suite 201, Eugene, OR 97401 - (541) 6864640 • wwweatrecrouo.com
The Church of Jesus Christ of Latter -Day Saints Page 17 of 21
Willamette Valley Oregon Temple
Site Plan Review
Map 17-03-1540, Lots 3200, 3300, 3400, anal 3500
SDC 4,3420 Utility Provider Coordination
Response: As described elsewhere herein, utility infrastructure exists to serve the site.
coordination is underway with the City of Springfield, Springfield Utility Board and Northwest
Natural.
SDC 4.3-125 Underground Placement of Utilities
Response: Existing utilities are all located underground. New utility infrastructure will also be
placed underground.
SDC 4.3430 Water Service and Fire Protection
Response: There are several fire hydrants in the vicinity —two on the south side of International
Way and one on the east side of Corporate Way, directly abutting the development site. This
nearest hydrant, on Corporate Way, is within the 600 -foot distance limit. Knox boxes will be
installed for fire access at perimeter gates.
SDC 4.3-135 Major Electrical Power Transmission Lines
Response: No new electrical power transmission lines are required or proposed.
SDC 4.3-140 Public Easements
Response: No new public utility easements are required or proposed.
SDC 4.3.145 Wireless Telecommunications System (WTS) Facilities
Response: No new Wireless Telecommunication System is required or proposed.
SDC 4.4-105 Landscaping
E. At least 65 percent of each required planting area shall be covered with living plant
materials within 5 years of the date of installation. The living plant materials shall be
distributed throughout the required planting area. The planting acceptable per 1,000
square feet of required planting area is as follows:
1. As a minimum, 2 trees not less than 6 feet in height that are at least 2 inches in
caliper,' and
2. Ten shrubs, 5 gallons or larger.
3. Lawn and/orgroundcover may be substituted for trees or shrubbery unless
required for screening when there are adequate provisions for ongoing
maintenance.
Response: Required setbacks shall be landscaped. Planting quantities per 1,000 square feet
shall be as follows: A minimum of two trees not less than 2 inches caliper and 6 feet in height,
ten 5 -gallon shrubs and lawn, ground cover or organic mulch as appropriate. A minimum of 65%
of required planting areas shall be covered with living plant material within 5 years of installation.
F. Parking lot planting areas shall include 1 canopy tree at least 2 inches in caliper that
meets City street tree standards as may be permitted by the City's Engineering Design
Standards and Procedures Manual and at least 4 shrubs, 5 gallon or larger, for each
100 square feet of planting area. Shrubbery that abuts public right-of-way or that is
placed in the interior of any parking lot shall generally not exceed 2.112 feet in height at
maturity. Parking lot planting areas shall include:
1. Parking and driveway setback areas specified in the applicable zoning district,, and
The Satre Group -375 West 4'Avenue, Suite 201, Eugene, OR 97401-(541)68&4540-v veatreamuv.mm
The church of Jesus Ohnst of Latter Day Saints Page 18 of 21
Willamette Valley Oregon Temple
Site Plan Review
Map 17-03-15-40, Lots 3200, 3300, 3400, and 3500
A n129 2022
2. 5 percent of the interior of a parking lot, exclusive of any required parking
setbacks, if 24 or more parking spaces are located between the street side of a
building and an arterial or collector street, and are visible from any street.
3. See also Section 3.2-240D.B.c. for multifamily design standards.
Response: Parking lots will be landscaped with 1 canopy tree not less than 2 inches in caliper
and 4 shrubs for each 100 square feet of planting area. As the site is in the Campus Industrial
zone, 10% of the interior parking lot and all setbacks will be landscaped. Planting adjacent to
driveways shall respect vision clearance limitations. See plan set.
SOC 4.4-110 Screening
Response: The site does not abut residential districts, is not a multifamily development,
automobile wrecking/salvage yard, and no outdoor mechanical devices will be visible from the
street. Therefore, the screening criteria in Section 4.4-110 is not applicable to the subject site.
See plan set.
SDC 4.4-115 Fences
Fences shall not exceed the height standards in Table 4.4-1 and shall be located as
follows:
Table 4.4-1
(3) In the Campus Industrial District the base height standard is 6. In all other industrial districts,
the base height standard is 8'.
(6) Special standards in the Campus Industrial District:
(a) No fencing shall be permitted within 35' of a Cl District perimeter or 20 feet of any
development area perimeter or within interior lots/parcels of development areas.
EXCEPTION: 3' maximum height decorative fencing or masonry walls may be permitted as
screening devices around parking lots.
(b) Chain link fences shall be permitted only when combined with plantings of evergreen
Shrubs or climbing vines that will completely cover the fence(s) within 5 years of installation
(as certified by a landscape architect or licensed nursery operator).
(c) Painted fences shall match the building color scheme of the development area.
Response: A 6' tall ornamental perimeter fence surrounds the temple site. See plan set.
SDC 4.5-110 Illumination and Height
A. On-site lighting shall be the minimum illumination necessary for a given application
including parking areas and vehicle sales areas. All exterior light fixtures shall be
shielded or recessed so that direct glare and reflection are contained within the
boundaries of the property, and directed downward and away from abutting
properties; public rights-of-way; and riparian, wetlands and other protected areas
identified in this Code on the same property.
The Satre Group • 375 West an Avenue, Suite 201, Eugene, OR 97401 • (541) 688A540 • amweaheoreup.com
Base Hei ht b Zonrrt
District
Yard Type
Residential
Commercial
Industrial
PLO
MS
Front Yard(l)
6'2
6'
6'/8'3
6'
6'
Street Side Yard(4)
6'
6'
67 8'(3)
6'
6'
Rear Yard
6'
6'
678'(3)
6'
6'
Height Exceptions
8'/ 10'(5)
8'
8'
N/A
Vision Clearance
Area(7)
2 %'
2 W
-8'(6)
2 W
2 "G'
2'A'
Barbed/Razor
Wre/Electric
Y(8)
Y(8)
Y(8)
Y/N(8)
N
(3) In the Campus Industrial District the base height standard is 6. In all other industrial districts,
the base height standard is 8'.
(6) Special standards in the Campus Industrial District:
(a) No fencing shall be permitted within 35' of a Cl District perimeter or 20 feet of any
development area perimeter or within interior lots/parcels of development areas.
EXCEPTION: 3' maximum height decorative fencing or masonry walls may be permitted as
screening devices around parking lots.
(b) Chain link fences shall be permitted only when combined with plantings of evergreen
Shrubs or climbing vines that will completely cover the fence(s) within 5 years of installation
(as certified by a landscape architect or licensed nursery operator).
(c) Painted fences shall match the building color scheme of the development area.
Response: A 6' tall ornamental perimeter fence surrounds the temple site. See plan set.
SDC 4.5-110 Illumination and Height
A. On-site lighting shall be the minimum illumination necessary for a given application
including parking areas and vehicle sales areas. All exterior light fixtures shall be
shielded or recessed so that direct glare and reflection are contained within the
boundaries of the property, and directed downward and away from abutting
properties; public rights-of-way; and riparian, wetlands and other protected areas
identified in this Code on the same property.
The Satre Group • 375 West an Avenue, Suite 201, Eugene, OR 97401 • (541) 688A540 • amweaheoreup.com
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Site Plan Review
Map 17-03-15-00, Lots 3200, 3300, 3400, and 3500
Page 19 of 21
Response: Temple facades and spires are typically lit at night for religious significance. The
Postures will be shielded and recessed so glare and reflection are contained to the property and
away from abutting properties.
SDC 4.6-120 Vehicle Parking— Parking Lot Improvements.
Response: The proposal will comply with the parking lot improvement standards found in SDC
4.6-120. See enclosed plans for specifics.
SDC 4.6-125 Vehicle Parking — Parking Space Requirements
The following parking standards have been established according to use and apply to that
use in any zoning district.
Use Minimum Parking Requirements
Recreational facilities, and religious, social and 1 space for each 100 square feet of floor area in
public institutions the primary assembly area and 1 for each 200
square feet of gross floor area for the remainder of
the building.
Special provisions:
D. cl District
1. To the greatest degree practical, parking shall be located behind buildings internal to
development or to the side of a building.
2. An additional 5 percent of impermeable surface may be allowed in cases where all parking
on a lot7parcel Is screened by earthen berms with an average height of 3 feet, sunken below
grade an average depth of 3 feet, or both.
3. Truck parking for vehicles necessary for the operation of the facility may be located either.
a. Within an enclosed building; or
b. Outside ofa building if the following standards are met.
L Be prohibited from all front and street -side yards;
ii. Meet bre building setback standards specMed in Section 3.2-420; and
ill. ee semened as speciOed in Section 3.2-415.
Response: Padang is provided as follows:
Use
Area s.(.
Parking Standard
Parking Require
Parkin Provided
TempleAssembly
3,374 sf
1 space / 100 sf
34
34
Temple Remainder
27,284 sf
1 space 1200 at
137
137
Distribution Bldg
1 300 at
1 space 1300 sf
5
5
Grounds Bldg
1 875 sf
1 space / 1,000 sf
2
2
Total: 1
178
178
As for accessible parking spaces, within the above total, the following is provided:
Parking Sages
I Parkin .Standard
Parkin Re uired
Parkin Provided
Accessible
1 2space minimum
6
6
Wheelchair
1 1 space
1
1
Van
1 0
1 0
1 0
Total:
1
1 7
1 7
Regarding 4.6-125.13, vehicle parking is located to the side of the building. Maintenance vehicles
(sometimes including trucks) will either be in or adjacent to the grounds building. The grounds
building is located to the rear of the site. It is not in the front or street side yard, it meets building
setbacks and is screened.
The Satre Group • 375 West 4' Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w,w.satrearou odurn
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Site Plan Revlew
Mao 17-02L1540, Lots 3200, 3300, 3400, and 3500
Page 20 of 21
SDC 4.6-135 Loading Areas —Facility Design and Improvements
A. All necessary loading areas for commercial and industrial development shall be
located off-street and provided in addition to the required parking spaces.
B. Vehicles in the loading area shall not protrude into a public right-of-way or sidewalk.
C. The minimum sizes required for commercial and industrial loading areas are as
follows:
3. Seven hundred fifty square feet for buildings in excess of 50,000 square feet of
gross floor area.
D. The required loading area shall not be less than 10 feet wide by 25 feet long and have
an unobstructed height of 14 feet.
Response: There is an enclosed garage at the northwest corner of the site for maintenance
vehicles. The loading area does not intrude into the public right-of-way or sidewalk. The proposed
truck loading area is over 750 square feet and at least 10 feet wide by 25 feet long with an
unobstructed height of 14 feet. Therefore, these standards are met.
SDC 4.6-145 Bicycle Parking — Facility Design
Response: Each bicycle parking space will be at least 2 by 6 feet with an overhead clearance of 7
feet and have a 5 -foot access aisle between each row of bicycle parking. All spaces will be
designed as long-term spaces —covered and lighted.
SDC 4.6-155 Bicvcle Parkina— Number of Spaces Reou/red
Table 4.6-3
Land Use
Minimum Parking Requirements (Minimum 3
Type and % of Bike
Bicycle Space
Provided
spaces required)
Parkin
Office
0.75 per 5,000 square feet of floor area
75%long term
School (Instruction)
1,928 at
25% short term
Schools
1 per 10 students based on planned capacity
25% long term
1,970 at
0.75 space 15,000 sf
75% shortterm
Religious institutions and
1 per 20 seats or 40 feet of bench length (fixed
100% short term
places of worship
seating) or 1 per 500 square feet of floor area (no
16
fixed seating)
Response: As outlined below, a minimum of 16 bicycle parking spaces are required and 16 will
be provided. Although some could be short term, all 16 parking spaces will be located in two
covered bike shelters.
Use
Area (suf.)
Bicycle Space Standard
Bicycle Space
Required
Bicycle Space
Provided
Office I Admin
1,239 sf
0.75 space 15,000 sf
0.75
1
School (Instruction)
1,928 at
1 space I10 students
131 students total
14
14
Other Assembly
'Similar to Office
1,970 at
0.75 space 15,000 sf
1
1
Total.
16
16
D. Parking areas and ingress -egress points have been designed to: facilitate vehicular traffic,
bicycle and pedestrian safety to avoid congestion; provide connectivity within the
development area and to adjacent residential areas, transit stops, neighborhood activity
centers, and commercial, industrial and public areas; minimize driveways on arterial and
collector streets as specified in this Code or other applicable regulations and comply with
the ODOT access management standards for State highways.
The Satre Group • 375 West 0 Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • ywev.satrooroup.com
The Church of Jesus Christ of Latter -Day Saints
W Ilamef[e Valley Oregon Temple
site Plan Review
Map 170115-40, Lots 3200, 3300, 3400, and 3500
Page 21 of 21
Response: Parking areas and ingress -egress points have been located and designed to promote
vehicular, bicycle and pedestrian safety. The facility takes access from International Way, a
collector street and Corporate Way, a local street. As noted above in response to SDC 4.2-120, at
the Development Issues Meeting (Case 811 -21 -000287 -PRE), staff found that the proposed
driveway on International Way is acceptable; It is further away from the Lane Transit District stop
on International Way than the existing driveway on the neighboring Giustina property. Therefore,
the driveway alignment minimizes traffic conflicts on International Way. The driveways on
Corporate Way provide vehicular access to the parking lots and loading area at the northwest
corner of the site and the secondary access from International Way provides access to a parking
area.
Pedestrian safety is ensured with sidewalks from the right-of-way and driveways to the entrances
of the proposed building, to the bicycle parking locations and parking areas. Connections to transit
stops are provided with the existing street -side sidewalk along International Way.
E. Physical features, including, but not limited to: steep slopes with unstable soil or geologic
conditions; areas with susceptibility of flooding; significant clusters of trees and shrubs;
watercourses shown on the WQLW Map and their associated riparian areas; other riparian
areas and wetlands specked in Section 4.3-117; rock outcroppings; open spaces; and
areas of historic and/or archaeological significance, as may be speciffed in Section 3.3-900
or ORS 97.740-760, 358.905-955 and 390.235-240, shall be protected as specified in this
Code or in State or Federal law.
Response: There are no physical features on the subject property meeting this definition. Thus,
this standard does not apply.
IV. CONCLUSION
The above information represents known applicable planning, zoning and site development
requirements for the contemplated project. It presents known physical conditions and contexts. It
captures the project's primary development objective. Based on the information and findings
contained in this written statement, associated exhibits and plan set the proposed Willamette Valley
Oregon Temple project meets the Site Plan Review criteria of approval contained in the Springfield
Development Code. Therefore, the applicant requests that the City of Springfield approve the
proposal. Both the applicant and the applicant's representative are available for questions.
If you have any questions about the above application, please do not hesitate to contact Rick Satre,
AICP, ASLA, CSI, at The Satre Group, 541-686-4540, or rickCa).satrearoup.com.
The Satre Group -375 West 4s Avenue, Suile 201, Eugene, OR 97401 • (541) 686-0540- wwwsatrearoup.com