Loading...
HomeMy WebLinkAboutPlan, Tentative APPLICANT 4/27/2022UTIL POLE (APPROX) _ N89, ALLEY FUTURE DEVELOPMENT ON FUTURE PARTITIONED LOT II______________I I I I I I I I I � I I `l DEMO GARAGE I I w I I cl I I ml I I 1 CONC 36" WIDE 1 TIRE STRIPS 1 1 ELEC METERS & I- UNDERGROUND LINE I I I �--SETBACKS I CONC DRIVEWAY STORMWATER TREATMENT, L FILTER STRIP EXIST &NEW 11 WATER LINES - EXIST SIDEWALK N LIGHT POL (APPROX) UTIL POLE (APPROX)-T; BASIS OF DESIGN ____ _______ --� PROJECT DESCRIPTION: CONSTRUCT A REMODEL AND ADDITION THAT _ i- 4 INCLUDES AN ACCESSORY DWELLING UNIT(ADU) _ ON RELEFLAT LOT AND LOW DENSITY I o I j RESIDENTIAL AL (LD (LDR) PROPERTY. THE ADU WILL I0 1 INCLUDE AN ENTRY AND LAUNDRY ROOM ON THE FIRST FLOOR AND 2 BEDROOM AND 1.5 BATHROOM ON THE SECOND FLOOR. I ADDITION I 42" HEIGHT RELATED LAND -USE: ACCESSORY DWELLING UNIT &ADU I i GARBAGE _ SCREEN MAP & TAX LOT: 17-0335-14, LOT 11700 1 FENCE 1 I I I CODES: 2021 OREGON RESIDENTIAL SPECIALITY CODE ID X36" CONC WALK SPRINGFIELD DEVELOPMENT CODE SITE & BUILDING AREA: EXIST SAN °• TOTAL SITE AREA: 10,800 SF SEWER m BUILDING: _ (MEASURED OUTSIDE OF EXTERIOR WALL) - 749 SF EXIST 1ST FLOOR (W/O GARAGE) I3 EXIST HOUSE - 356 SF DEMO EXIST GARAGE/LAUNDRY u o Ip - 376SF EXIST 2ND FLOOR z - 1,266 SF 1ST FLOOR (EXIST + ADDITION + ADU; W/O GARAGE) TA." - 259 SF GARAGE x7w. ° (718')- 1,525 SF TOTAL I ST FLOOR(EXIST+ ADDITION+ADU+GARAGE) - 1,327 SF TOTAL 2ND FLOOR(EXIST+ADDITION+ADU) STORM- 2,593 SF TOTAL BUILDING (EXIST+ ADDITION +ADU; W/0 GARAGE) TREATM ATERTREATMENT, - 772 SF ACCESSORY DWELLING UNIT (120 SF IST+6525F TND) �I SOAKAGE TRENCH NOTE: THE EXISTING HOUSE HAS BEEN LOCATED FROM THE EAST PROPERTY LINE PER A'PROPERTY STUDY' DATED 10.08.2019 BY POAGE ENGINEERING & SURVEYING, INC. THE REMAINING SITE PLAN IS APPROXIMATE WITH LOCATIONS BASED UPON FIELD VERIFICATION OF _ EXISTING CONDITIONS. WATER -66 TREES (APPROX) M=S.��_ STORMWATER TREATMENT: EXIST CURB CUT `' ALL DOWNSPOUTS (SHOWN AS'DS' ON SITE PLAN) AND AREA DRAINS (APPROX) C STREET (SHOWN AS'DRN' ON SITE PLAN) TO BE PIPED TO SOAKAGE TRENCH IN SITE PLAN 19 IF Al 1"=20' _1-- Zo C):D^Z V ZLL <Z� 'J J Z ®W~ �C)a W CLO Y r r ZOWz 0U)of -UU 'o W LU O - W OV~oz Naz 5� N G 69dX�I�I DRAWN MPM CHECKED DATE 04.22.2022 SHEET Al REMOVED ITEMS SHOWN DASHED, TYP w 0 3 EXIST GARAGE ELEC i.'.' 1 �.-j IIJOI EXIST -- -EXIST I% _ BATH i w 1 � I •, I/ KITCHEN I I I _ I I C II `SII EXIST BEDROOM ___ EXIST BEDROOM EXIST DINING EXIST LIVING I I REMOVECMU ;- CHIMNEYAND BRICK SURROUND j� DEMO FIRST FLOOR " D1 1/8"=1'-0"14 1p %N 2 DEMO SECOND FLOOR D1 1/8" = 11-0" D Q � a '^J D V 7 J j �W�- of 2C)a 'LLJ O 1..� ZoW Z 0 (09 U) U o 1 H ci W O 0' W co J 0 z N d r DEMO FLOOR PLANS DRAWN MPM CHECKED DATE 04.22.2022 SHEET Dl r EXIST DINING j� FIRST FLOOR PLAN e'�EDROOM no LL Qaz ROOM 0JH r --- OWw M 3 BEDROOM KITCHEN I� % a WIBEDROOMaBEDROOM ---z O W z Ou°jU) EXIST 1.� O BEDROOM . 3o z W Z W cizz fw3 �� �U0�w DUB'' �til jE 0- _______ < G W FLOOR PLAN EXISTATTIC DRAWN MPM CHECKED DATE 04.22.2022 j�2 SECOND FLOOR PLAN SHEET A2 / , A2 ,/8" = V-0.1 12 Z o a ® Z)7- NON-REFLECTIVE D ROOFING Z (D LL NEW BATHROOM Z DORMER zm'r;�aercxman _j � L� - WINDOW 1..1..1 ENTRY O Z, L L SIDING 50 W 0- SOUTH ELEVATION p®'�y' 0 7 ZOW Z 0�� UU ILX 72 NON-REFLECTIVEI— F O ROOFING LU Z W p _ 0 of W NEWBAT (NOann ._ ..,� _ _ _ _. ... _.. -. _. _:� - OOM LL HR r 1'-0" 4- ® ® - — - DORMER CC GMS SIDING - _ _ ELEVATIONS WINDOW I -- - El 6H DRAWN MPM ADDITION EXISTING ELEC METERS CHECKED DATE 04.22.2022 �WEST ELEVATION SHEET /� ^ A3 1/8"= 1'-0" A % r,LRTH ELEVATION A4 1!8" = P-0" NEW BATHROOM DORMER , 12 2 ai�avfa� 18 — �8 aa„ - - WINDOW SIDING ADU ENTRY COVER EXISTING ADDITION i 2 EAST ELEVATION A4 118"= ,'-0" zo o�Z) Z LL Q z }- -� J Z W LL ® LL O r r zOW Z 0 W UU o W WzW� pWFL W U ~_'� J U Z" a - ELEVATIONS DRAWN MPM CHECKED DATE 04.22.2022 SHEET A4 r�mm ADU ENTRY s ® NON -REFLECTIVE ROOFING _ COVER WINDOW SIDING � III i SECTIONAL DOOR iaffM"*cxo-isp F I � r,LRTH ELEVATION A4 1!8" = P-0" NEW BATHROOM DORMER , 12 2 ai�avfa� 18 — �8 aa„ - - WINDOW SIDING ADU ENTRY COVER EXISTING ADDITION i 2 EAST ELEVATION A4 118"= ,'-0" zo o�Z) Z LL Q z }- -� J Z W LL ® LL O r r zOW Z 0 W UU o W WzW� pWFL W U ~_'� J U Z" a - ELEVATIONS DRAWN MPM CHECKED DATE 04.22.2022 SHEET A4