HomeMy WebLinkAboutPlan, Tentative APPLICANT 4/27/2022UTIL POLE
(APPROX)
_ N89,
ALLEY
FUTURE DEVELOPMENT
ON FUTURE
PARTITIONED LOT
II______________I
I I
I
I I I
I I
� I I
`l DEMO GARAGE
I I
w I I
cl I I
ml I I
1 CONC 36" WIDE
1 TIRE STRIPS
1 1 ELEC METERS &
I- UNDERGROUND LINE I
I I
�--SETBACKS
I
CONC DRIVEWAY
STORMWATER
TREATMENT,
L FILTER STRIP
EXIST &NEW
11 WATER LINES
-
EXIST SIDEWALK N
LIGHT POL
(APPROX)
UTIL POLE
(APPROX)-T;
BASIS OF DESIGN
____ _______
--� PROJECT DESCRIPTION: CONSTRUCT A REMODEL AND ADDITION THAT
_ i- 4 INCLUDES AN ACCESSORY DWELLING UNIT(ADU)
_
ON RELEFLAT LOT AND LOW DENSITY
I o I j RESIDENTIAL AL (LD
(LDR) PROPERTY. THE ADU WILL
I0 1 INCLUDE AN ENTRY AND LAUNDRY ROOM ON THE
FIRST FLOOR AND 2 BEDROOM AND 1.5 BATHROOM
ON THE SECOND FLOOR.
I
ADDITION I 42" HEIGHT RELATED LAND -USE: ACCESSORY DWELLING UNIT
&ADU I i GARBAGE
_ SCREEN MAP & TAX LOT: 17-0335-14, LOT 11700
1 FENCE
1 I I I CODES: 2021 OREGON RESIDENTIAL SPECIALITY CODE
ID X36" CONC WALK SPRINGFIELD DEVELOPMENT CODE
SITE & BUILDING AREA:
EXIST SAN
°• TOTAL SITE AREA: 10,800 SF
SEWER
m BUILDING:
_ (MEASURED OUTSIDE OF EXTERIOR WALL)
- 749 SF EXIST 1ST FLOOR (W/O GARAGE)
I3 EXIST HOUSE - 356 SF DEMO EXIST GARAGE/LAUNDRY
u o
Ip - 376SF EXIST 2ND FLOOR
z - 1,266 SF 1ST FLOOR (EXIST + ADDITION + ADU; W/O GARAGE)
TA." - 259 SF GARAGE
x7w.
° (718')- 1,525 SF TOTAL I ST FLOOR(EXIST+ ADDITION+ADU+GARAGE)
- 1,327 SF TOTAL 2ND FLOOR(EXIST+ADDITION+ADU)
STORM- 2,593 SF TOTAL BUILDING (EXIST+ ADDITION +ADU; W/0 GARAGE)
TREATM ATERTREATMENT, - 772 SF ACCESSORY DWELLING UNIT (120 SF IST+6525F TND)
�I SOAKAGE
TRENCH NOTE: THE EXISTING HOUSE HAS BEEN LOCATED FROM THE EAST
PROPERTY LINE PER A'PROPERTY STUDY' DATED 10.08.2019 BY POAGE
ENGINEERING & SURVEYING, INC. THE REMAINING SITE PLAN IS
APPROXIMATE WITH LOCATIONS BASED UPON FIELD VERIFICATION OF
_ EXISTING CONDITIONS.
WATER -66 TREES (APPROX)
M=S.��_ STORMWATER TREATMENT:
EXIST CURB CUT `' ALL DOWNSPOUTS (SHOWN AS'DS' ON SITE PLAN) AND AREA DRAINS
(APPROX) C STREET (SHOWN AS'DRN' ON SITE PLAN) TO BE PIPED TO SOAKAGE TRENCH
IN
SITE PLAN
19 IF Al 1"=20'
_1--
Zo
C):D^Z
V
ZLL
<Z�
'J J Z
®W~
�C)a
W CLO
Y
r
r
ZOWz
0U)of
-UU
'o
W
LU
O - W
OV~oz
Naz
5� N
G
69dX�I�I
DRAWN MPM
CHECKED
DATE 04.22.2022
SHEET Al
REMOVED ITEMS
SHOWN DASHED,
TYP
w
0 3
EXIST
GARAGE
ELEC i.'.'
1
�.-j
IIJOI
EXIST
--
-EXIST I%
_ BATH i w
1 � I •, I/
KITCHEN I
I
I
_
I
I
C II
`SII
EXIST
BEDROOM
___
EXIST
BEDROOM
EXIST DINING
EXIST LIVING
I I
REMOVECMU
;-
CHIMNEYAND
BRICK SURROUND
j� DEMO FIRST FLOOR
" D1 1/8"=1'-0"14 1p
%N 2 DEMO SECOND FLOOR
D1 1/8" = 11-0"
D
Q � a
'^J D
V
7
J j
�W�-
of
2C)a
'LLJ O
1..�
ZoW Z
0 (09
U) U o
1 H ci
W
O 0' W
co
J 0 z
N
d r
DEMO FLOOR
PLANS
DRAWN MPM
CHECKED
DATE 04.22.2022
SHEET Dl
r
EXIST DINING
j� FIRST FLOOR PLAN
e'�EDROOM no LL
Qaz
ROOM 0JH
r
--- OWw
M 3 BEDROOM KITCHEN I� % a
WIBEDROOMaBEDROOM
---z O W z
Ou°jU)
EXIST 1.� O
BEDROOM . 3o z W Z W cizz fw3 �� �U0�w
DUB'' �til jE
0-
_______ < G W
FLOOR PLAN
EXISTATTIC
DRAWN MPM
CHECKED
DATE 04.22.2022
j�2 SECOND FLOOR PLAN SHEET A2
/ , A2 ,/8" = V-0.1
12 Z o
a
® Z)7-
NON-REFLECTIVE D
ROOFING Z (D LL
NEW BATHROOM Z
DORMER
zm'r;�aercxman _j � L�
- WINDOW 1..1..1
ENTRY
O Z, L L
SIDING
50
W 0-
SOUTH ELEVATION p®'�y' 0
7
ZOW Z
0��
UU ILX
72 NON-REFLECTIVEI— F O
ROOFING LU Z W p
_ 0 of W
NEWBAT
(NOann ._ ..,� _ _ _ _. ... _.. -. _. _:� - OOM LL
HR
r 1'-0" 4- ® ® - — - DORMER CC
GMS
SIDING - _ _ ELEVATIONS
WINDOW I
-- - El
6H
DRAWN MPM
ADDITION EXISTING ELEC METERS CHECKED
DATE 04.22.2022
�WEST ELEVATION SHEET /� ^
A3 1/8"= 1'-0" A %
r,LRTH ELEVATION
A4 1!8" = P-0"
NEW BATHROOM
DORMER
,
12 2
ai�avfa� 18 — �8
aa„ -
- WINDOW
SIDING
ADU ENTRY
COVER
EXISTING ADDITION
i
2 EAST ELEVATION
A4 118"= ,'-0"
zo
o�Z)
Z LL
Q z }-
-� J Z
W
LL
® LL
O
r
r
zOW Z
0 W
UU o
W
WzW�
pWFL
W
U ~_'�
J U Z"
a -
ELEVATIONS
DRAWN MPM
CHECKED
DATE 04.22.2022
SHEET A4
r�mm
ADU ENTRY s
®
NON -REFLECTIVE
ROOFING
_
COVER
WINDOW
SIDING
�
III
i
SECTIONAL DOOR
iaffM"*cxo-isp F
I �
r,LRTH ELEVATION
A4 1!8" = P-0"
NEW BATHROOM
DORMER
,
12 2
ai�avfa� 18 — �8
aa„ -
- WINDOW
SIDING
ADU ENTRY
COVER
EXISTING ADDITION
i
2 EAST ELEVATION
A4 118"= ,'-0"
zo
o�Z)
Z LL
Q z }-
-� J Z
W
LL
® LL
O
r
r
zOW Z
0 W
UU o
W
WzW�
pWFL
W
U ~_'�
J U Z"
a -
ELEVATIONS
DRAWN MPM
CHECKED
DATE 04.22.2022
SHEET A4