Required Project Information (Applicant: complete this section)
Applicant Name: Joe Sturtevant Phone: 360-713-7464
Company: Hayden Homes Fax:
Address: 2464 SW Glacier PI, Ste 110, Redmond OR 97756
Prospective
Applicant's Rep.: Renee Clough, PLS, PE, AICP
phone: 541-746-0637
Company: Branch Engineering, Inc
Fax:
Address: 310 5th St, Springfield OR 97477
Property Owner: Joe Sturtevant
Phone: 360-713-7464
Company: Hayden Homes
Fax:
Address: 2464 SW Glacier PI, STE 110, Redmond OR 97756
ASSESSOR'S MAP NO: 17-02-32-00
TAX LOT NOS : 2202
Property Address: none
Size of Property: 4.8 Acres X Square Feet ❑
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Subdivision
Existing Use: Vacant
# of Lots/Parcels: 36
Av . Lot/Parcel Size: 2300 sf I
Densit : 7.5 du/acre
Prospective
Applicant: ✓t.�� Date: 4-25-22
Signature Date Received
Joe Sturtevant
Print APR 2 0 2021
Required Project Information (City Intake Staff., complete this section)
�Orgi al Submittal
No.: Z7'ro01p4-��-E Date: ZReviewedby: 1'��
Application Fee: uCi6.013
Technical Fee: $0
Posta a Fee: $0
TOTAL FEES: b46 '90
PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
Development Issues Meeting Process
The purpose of a Development Issues Meeting is to give an applicant the opportunity to discuss
his/her development proposal with the development review staff of the City. The discussion can
be general or specific, depending on the details provided with the application. A Development
Issues Meeting provides information to an applicant related to the current development
conditions and standards of the City. The Development Issues Meeting is not a land use decision
and does not confer any development rights, establish any conditions, or bind the applicant or
the City to any course of action. The meeting conveys the status of known development
opportunities and constraints. The status may change over time as development conditions or
standards change.
1. Applicant Submits a Development Issues Meeting Application
• The application must conform to the Development Issues Meeting Submittal
Requirements Checklist on page 3 of this application packet.
• Development issues meetings are conducted every Thursday.
• We strive to conduct the development issues meetings within three to four weeks of
receiving the application.
• The applicant's proposal is circulated to the relevant staff in preparation for the
meeting.
2. Applicant and the City Conduct the Development Issues Meeting
• The applicant and any design team should attend the development issues meeting.
• The meeting is scheduled for one hour.
• Staff attending the meeting will be prepared to discuss the issues raised in the
submittal by the applicant. Other issues raised during the meeting may also be
discussed.
• The meeting is informal and the City will issue no staff report.
Revised 5/21/13 KL 2 of 3
Development Issues Meeting Submittal Requirements Checklist
91 Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application, technology, and postage fees are collected
at the time of complete application submittal.
❑x Development Issues Meeting Application Form
® Five (5) Questions - list specific questions the applicant would like staff to answer
during the meeting. So that each question may be fully evaluated, the list is limited to five
questions.
® Four (4) Copies of the Proposed Plan - suggested information valuable for staff to
review the proposal is listed below. It is not necessary to include all of these items on
the site or plot plan. However, applicants are encouraged to address as many as possible
given that the level of information that will be derived from the meeting is commensurate
with the level of detail provided in the application.
Applicants are also encouraged to include additional information on the plan as listed in
the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions &
Subdivisions - Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review
Submittal Requirements.
x❑ Drawn in ink on quality paper no smaller than 11" x 17"
❑x Scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100'
® North arrow
x❑ Date of preparation
❑x Street address and assessor's map and tax lot number
❑x Dimensions (in feet) and size (either square feet or acres) of the development area
❑ Location and size of existing and proposed utilities, including connection points
❑ On-site drainage collection system and flow patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
❑x Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DIMS Related to Land Divisions
x❑ Approximate location, number and dimensions of proposed lots
x❑ How streets in the proposal area connect with existing streets
DIMS Related to Site Plan Review
❑ Proposed and existing buildings: location, dimensions, size (gross floor area),
setbacks from property lines, distance between buildings, and height
❑ Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios and other impervious surfaces
❑ Parking and circulation plan
Revised 5/21/13 KL 3 of 3
(Branch
ENIGINEERIN&
sine ,l
April 19, 2022
DIM QUESTIONS
WESTWIND ESTATES, 1'T ADDITION
Branch Engineering Inc. Project No. 22-198
The site lies at the northwest corner of the Daisy Street/Weyerhaeuser Haul Road
intersection. It previously received tentative subdivision approval for a 24 lot
subdivision in 2017 (Case Number TYP217-00012) and underwent a small lot concept
DIM in May 2018. This DIM is requested to discuss a revised small lot concept. This
concept has two main aims: increase affordable housing options in Springfield and
minimize wetland impacts. To do this the concept utilizes small homes on small lots.
1. The city previously expressed interest in partnering with development on this site to
construct S 481" St.
a. Is the city still agreeable to transferring some property to private ownership?
b. What amount of contribution will Hayden need to make towards the S 481" St
improvements?
c. Please confirm existing haul road pavement can be used for emergency vehicle
egress if platted and built out before S 48th St is constructed.
d. Is the city still considering a roundabout at S 48th and Daisy Streets?
2. A number of the lots are accessed by private accessways rather than a street.
a. Can the accessways be privately owned by an HOA?
b. Do they need designated pedestrian routes or can vehicles and pedestrians be
mingled?
c. Is 24' width of pavement acceptable for the accessways?
3. To maximize the number of lots possible (thereby increasing affordability by
reducing the project's per lot cost), the public street has been minimized.
a. Are curbside sidewalks acceptable for the public streets?
b. Are the public street centerline radii acceptable?
c. Considering the reduced lot dimensions and setbacks, along with curbside
sidewalks, is the city willing to waive street tree requirements?
d. Will PUEs be required along the public streets?
4. The number of lots is also maximized by reducing the lot sizes and setbacks.
a. Are the reduced building setbacks (building to property line and building to
building) acceptable?
b. Can the two Acadia lots have only one off-street parking stall?
EUGENE -SPRINGFIELD PHILOMATH
310 511, Street, Springfield, OR 97477 1 P. 541.746.0637 1 a amv.brancheng inee ri ng.com
Date Received
APR 2 0 ZU[l
Original Submittal (CV`s
Westwind DIM Questions
April 19, 2022
c. Lot dimensions and sizes are below current code minimum. Can this be
addressed by a cluster subdivision and/or standards in the code to be adopted
soon?
S. Additional questions as time allows:
a. Does staff see anything in new code standards which would be helpful to this
project?
b. At one time SUB Water was contemplating a new main in S 48- St. Is this still
under consideration?
c. Are any other utility upgrades under consideration?
Branch Engineering, Inc. page 2 of 2
fn l
�I
CI
1 I I
J smar rvow�LWls
.HM smLA CYwNVEL F Sr
atom �'. \� ...
a./ewr:cw. cTrnrtom Pu �•
MCL. sL�ratW IA� ,or
R9•[T—
W
�I I R LOrN R I W �EK LOI JP n I .9 Lm J/ W)JO n
.� a 61XIC �pr/YHC �,
[�.I �{'smvuirn� A w zJ 9I q Lm z+ bru � I ;� Lar n Lora � W Lmv
. fnl IIII �I of Lm z➢ 'q
R brit I LOI ZI LmA '.i I R LOr 1D
Lor 1e y I Lar n Lm re §
S4TTH PL
rew .o aD .o' w w w ao 0
'-^ Lml IMz ort Ipr. LOrS 10)e Ip!) Lpl9 ny Lm9 LO/10 bf 11
IOI )i LOI IJ Lm I. 1Or
z'rlavWxArfx
<M<M �Atitf MW
N GTAYC
+am STREU CMNNEL
i8'-4pMu'rta'.
APR19, 1111
Z
EP
O
0.0
bIA
33-198
. . m-xW sWxs � Mnuro wrmrron.
C�
Date Received
APR 2 6 1022
Original SubMtlal�Nnj
•�soevir�rvc
"I
APR19, 1111
Z
EP
O
0.0
L
L
r
33-198
0
LQ
r
N
LLI
2
1^Q
A
yF•
W
N
W
Wz
®
4 O
W
Z
d'
> �
J
qYA
F LL
L
V
W
vl ?
3
Qz
o�
"I
APR19, 1111
e.awe.
EP
a oev
0.0
ren•••=
33-198
DIVISION
CONCEPT
ranch
INEERING-
�I
o.e,ettl,l..
r I ,
-J — _roazarswxev um
I sr
� Q
Fi i cm sir i I .
W
1Iyy�LC<¢C`s`i]]l�'YR7 u]' �I 5.
10 I p
W Q C)
tn
mx mxe i mww wrrnlwx q Z > �
of J
LL
� E �� � E LA
W
o�
a
F
APR 19, 2022
FR
RIC
22-1988
ea^°BUILDOUT
CONCEPT
��2 OF 2