HomeMy WebLinkAboutApplication APPLICANT 4/8/2022THE SATRE GROUP
Land Use Planners, Landscape Architects, Environmental Specialists
375 West 41h Avenue, Suite 201, Eugene, Oregon 97401
(541)686-4540 • www.satreoroup.com
TRANSMITTAL
TO: City of Springfield DATE: April 6 2022
225 51h Street PROJECT: Willamette Valley Oregon Temple
Springfield OR 97477 No -Rise Floodplain Overlay
District Development
CLIENT PROJ #:
ATTN: SSG PROJ #: 2125
TRANSMITTED: Herewith X�DISPOSITION: For Your Approval
Separate Cover For Your Information/Use X
Other For Reply
TRANSMITTED:
# Copies Item Dated No. Pages
(In addition to this cover page)
3 paper copies of a:
No -Rise Floodplain Overlay District Development application packet Varies Several
REMARKS: This No -Rise Floodplain Overlay District Development packet is hereby submitted for
processing. The submittal packet includes:
1. This Transmittal
2. Application Fee
3. Application Form
4. Written Statement
5. Deed
6. Title Report
7. Plot Plan
We look forward to your assistance with the project. Don't hesitate to contact us should you have any
questions or need any additional information. Thank you. _
COPIES TO:Agency BY:
File e X Consultant Team X
Owner X Other B
'pity of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
Floodplain Overlay District Development
BPii1NaF1
Required Project Information (Applicant: complete this section)
Applicant Name: The Church of Jesus Christ of Latter-day Saints phone:
Com an : The Church of Jesus Christ of Latter-day Saints Fax:
Address: 50 East North Temple Street, 10th Floor, Salt Lake City, UT 84150
Applicant's Re .: Rick Satre
Phone: (541) 686-4540
Company: The Satre Group
Fax:
Address: 375 W 4th Avenue, Suite 201, Eugene, OR 97401
1
Property Owner: The Church of Jesus Christ of Latter-day Saints
Phone:
Company: The Church of Jesus Christ of Latter-day Saints
Fax:
Address: 50 East North Temple Street, 10th Floor, Salt Lake City, UT 84150
ASSESSOR'S MAP NO: 17-03-15-40
TAX LOT NOS :3200, 3300, 3400, and 3500
Property Address: Not addressed; See Map and Tax Lots Above
Size of Ill 10.29 Acres N Square Feet Fj
Zoning: Campus Industrial with Drinking Water Protection and Floodplain Overlays
Existing Use: Vacant
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Develop a new Temple for the Church of Jesus Christ of Latter-day Saints
Si natures: Please si nand rint our name and date in the a ro riate box on the next pace.
Associated Cases:
Case No.: -22- O t I
Date: r-{' 21 2-2
Reviewed by:
Application Fee: /3
Technical Fee: 10 -L6—
Posta a Fee: $0
TOTAL FEES:
PROJECT NUMBIl
Date Received
APR 0 9 2022
Revised 1/1/08 Molly Markarian Original Submiltal �J I of 4
Signatures
The undersigned acknowledges that the Information In this application Is correct and accurate.
fJ 0--,� Date:
Signatur
owner,
Date:
Signature
Print
Revised 1/1/08 Molly Markarian 2 04
Floodplain Overlay District Development Application Process
1. Applicant Submits a Floodplain Overlay District Development Application to the
Development Services Department
The application must conform to the Floodplain Overlay District Development
Submittal Requirements Checklist on page 4 of this application packet.
Planning Division staff screen the submittal at the front counter to determine
whether all required items listed in the Floodplain Overlay District Development
Submittal Requirements Checklist have been submitted.
Applications missing required items will not be accepted for submittal
2. City Staff Conduct Detailed Completeness Check
• Planning Division staff conducts a detailed completeness check within 30 days of
submittal.
• The assigned Planner notifies the applicant in writing regarding the completeness of
the application.
• An application is not be deemed technically complete until all information necessary
to evaluate the proposed development, its impacts, and its compliance with the
provisions of the Springfield Development Code and other applicable codes and
statutes have been provided.
Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
3. City Staff Review the Application and Issue a Decision
This is a Type I decision and thus is made without public notice and without a public
hearing since there are clear and objective approval criteria and/or development
standards that do not require the use of discretion.
• Decisions address all the applicable approval criteria and/or development standards.
• Applications may be approved, approved with conditions, or denied.
• The City mails the applicant and any party of standing a copy of the decision, which
is. effective on the day it is mailed.
• The decision issued is the final decision of the City and may not be appealed.
Revised 1/1/08 Molly Markarian 3 of 4
Floodplain Overlay District Development Submittal Requirements Checklist
NOTE: If you feel an item does not apply, please state the reason why and attach the
explanation to this form.
Q Submitted Concurrently with Site Plan Review, Minimum Development Standards, or
Residential Building Permit applications, where applicable
Q Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development Services
Department. The applicable application, technology, and postage fees are collected at the
time of complete application submittal.
Q Floodplain Development Application Form
Q Copy of the Deed
Q Preliminary Title Report issued within the past 30 days documenting ownership and
listing all encumbrances.
Q Narrative explaining the proposal and any additional information that may have a bearing
in determining the action to be taken, including findings demonstrating compliance with
the Floodplain Overlay District Development Standards described in SDC 3.3-420.
NOTE: Before the Director can approve a Floodplain Overlay District Development
request, information submitted by the applicant must adequately support the request. All
of the Floodplain Overlay District Development Standards must be addressed by the
applicant. Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
[,j Three (3) Copies of a Plot Plan drawn to scale to include:
N/A ❑ Name, location, and dimensions of all existing and proposed structures
❑✓ Name, location, and dimensions of all fill
N/A ❑ Name, location, and dimensions of all storage of materials
0 Name, location, and dimensions of all drainage facilities
0 Base flood elevation area
❑✓ Elevation in relation to mean sea level
❑✓ Of the existing grade of the proposed development (for residential structures,
show elevations at the corners of the proposed structures)
N/A ❑ Of the lowest floor (including basement) of all structures
N/A ❑ To which any structure has been flood -proofed
NIA ❑ For residential structures, elevations at the corners of proposed structures
N/A ❑ Certification by an Oregon licensed Engineer or Architect that flood -proofing
methods for any non-residential structure meet the flood -proofing criteria in SDC 3.3-420
B.2.
N/A ❑ Description of the extent to which any watercourse will be altered or relocated as a result
of the proposed development
Revised 1/1/88 Molly Markarian 4 &4
March 8, 2022
THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS
WILLAMETTE VALLEY OREGON TEMPLE
"No -Rise" Floodplain Overlay District Development
Map 17-03-15-40, Lots 3200, 3300, 3400, and 3500
WRITTEN STATEMENT
In accordance with Floodplain Overlay District Development requirements, this written statement
describes the proposed development and demonstrates that the proposal complies with the standards
contained in SDC 3.3-420.
LAND USE REQUEST
Having announced plans in April 2021, The Church of Jesus Christ of Latter-day Saints is moving
forward with its plans to construct a new temple to be known as the Willamette Valley Oregon Temple
— on a 10.5 -acre site in the Gateway neighborhood of Springfield. Plans call for an approximately
30,000 square feet building serving some 30,000 Latter-day Saints. This will be the third temple in
Oregon, the other two being located in Lake Oswego (the Portland Oregon Temple) and in Central
Point (the Medford Oregon Temple). Oregon is home to more than 150,000 Latter-day Saints, who
worship in more than 300 congregations.
The applicant hopes to break ground on the Willamette Valley Temple by summer 2022. A number of
land use applications are required for development, including Major Replat, Site Plan Review,
Floodplain and Drinking Water Protection Overlay permit. To prepare the site for construction, in
concert with a Pre -Approval LDAP application, the applicant is submitting this "No -Rise' Floodplain
Overlay District application; no structures or improvements are proposed as part of this land use
application.
A. Project Directory
Owner/Developer
The Church of Jesus Christ of Latter-day Saints
50 East North Temple Street, 10th Floor
Salt Lake City, UT 84150
Planner (and Applicant's Representative)
Rick Satre, AICP, ASLA, CSI
The Satre Group
375 West 41h Avenue, Suite 201
Eugene, OR 97401
Phone: (541)686-4540
Email: rickasatregroup.com
Landscape Architect
John Anderson, ASLA
The Satre Group
375 West 4'h Avenue, Suite 201
Eugene, OR 97401
Phone: (541)686-4540
Email: iohnaf satrecroup.com
Date Received
PLANNERS ' LANOSCAPEARCHITECTS ENVIRONMENTAL SPECIANSTS
375 West4th, SuggRR, ()L*,N�i 97401
Phone: 541. A540
www.sairegroup.com
Oliginal
�r
���
THE
SATRE
GROUP
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Map 17-03-15-40, Lot 3200, 3300, 3400, and 3500
"No -Rise" Floodplain Overlay District Development
SuweyOY
Mike Dahrens, PLS
SSW Engineering Inc
2350 Oakmont Way, Suite 105
Eugene, OR 97401
Phone: (541)485-8383
Email: mikedgilsswencineers.com
Civil Engineer
Matt Keenan, PE
KPFF Consulting Engineers
800 Willamette St, Ste 400
Eugene, OR 97401
Phone: (541) 684-4902
Email: matt.keenan0koff.com
Architect
David Henderson, AIA
HKS Architects
90 South 400 West, #110
Salt Lake City, UT 84101
Phone: (801)384-7604
Email: dhenderson(fdhksinc.com
Page 2 of 8
II. THE SITE AND EXISTING CONDITIONS
A. Development Site
The site is located north of International Way in the Gateway area of Springfield. It is comprised
of four tax lots (Map 17-03-15-40, Lots 3200, 3300, 3400 and 3500) and is approximately 10.29
acres in size. The site abuts offices to the west and east and farmland to the north. To the south
is property owned by PeaceHealth.
B. Planning Context
1. Planning and Zoning.
_,
a. Jurisdiction:
City of Springfield
Campus Industrial"-
004-04
b. Metro Plan:
c. Refinement Plan:
Campus Industrial
d. Base Zoning:
Campus Industrial
e. Overlay Zoning:
Drinking Water Protection
and Floodplain Development'
_ -
f. Map:
17-03-15-40
- ,r
�t
g. Tax Lots:
3200, 3300, 3400,
'°
and 3500
h. Acreage:
10.29 acres
r �V'
Tax Lot Map Excerpt
RLID 2020
2. Transportation.
a. Metro Area TransPlan.
The metro area's adopted transportation plan, The Eugene — Springfield Transportation
System Plan (Trac lan), does not include projects abutting the subject property.
The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w satreamuasom
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Map 17-03-15-40, Lot 3200, 3300, 3400, and 3500
"No -Rise" Floodplain Overlay District Development
Page 3 of 8
b. City of Springfield 2035 Transportation System Plan.
The City of Springfield's transportation plan adopted in 2014 and updated in 2020, does
not include projects abutting the subject property.
c. Street Classification.
Springfield's Street Classification Map identifies International Way as a collector street
and Corporate Way as a local street. The street classification carries with it a standard
right-of-way (ROW). The standards for International Way and Corporate Way are as
follows:
Street
Classification
Existing ROW
, Minimum ROW
Existing Min. Cub-tc-
Curb-to- Curb
Curb
International
Major Collector
72 feet
1 56 feet
48 feet 36 feet
Way
I
Cemorate
Local Street
50 feet
41 feet
24 feet 20 feet
Wa
d. Public Transit.
The metro area's public transit system, Lane
Transit District (LTD), provides service in
front of the adjacent property to the east via
the EMX International Center Station. No f b �--. '�•°.�
other bus route intersects the area.
e. Bicycle and Pedestrian Facilities. _
There are sidewalks and a center turn lane"^•�"
on International Way.
xmMr
Utilities.
a. Stormwater and Wastewater.
The subject site is located in the North
Gateway Stormwater Drainage Basin. The
Springfield Stormwater Facilities Master Plan
identifies one capital improvement project,
"Low Priority CIP 43," to address current
issues around water quality in the campus
industrial area.
Capital Improvement Map Excerpt (Fig. 5-1)
Stormwater Facilities Master Plan
City of Springfield 2008
9
The Satre Group • 375 West 41" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • w saUearoumcom
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Map 17-03-15-40, Lot 3200, 3300, 3400, and 3500
"No -Rise" Floodplain Overlay District Development
Stormwater service exists
with an 18 -inch line in
International Way and a
72 -inch line along the
western boundary of the
site. Wastewater service
is also available to the site
via International Way by a
12 -inch line.
Existing Sanitary and
Starr Facilities
City of Springfield 2022
Page 4 of 8
b. Water and Electric Service.
The site receives water service
via with a 12 -inch line in
International Way which has an 8 -
inch stub to the subject property.
There is sufficient capacity within
the electric system to support the
proposal.
Existing Water and Electric Infrastructure
Springfield Utility Beard
2017
Wellhead Protection.
The Springfield Wellhead
Protection Areas Map shows the f SPORTS WAY
subject site as within the 1 -year
Time of Travel Zone and within i r-•----1
the 2 -year Time of Travel Zone -
along the eastern boundary.
Development of the property is
therefore subject to the Drinking + y
Water Protection Overlay District
and certain land use criteria will ....
ti
apply.
Wellhead Protection Areas Map Excerpt
City of Springfield 2019
The Satre Group - 375 West 0 Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 - rave satessoupecre
v
Existing Water and Electric Infrastructure
Springfield Utility Beard
2017
Wellhead Protection.
The Springfield Wellhead
Protection Areas Map shows the f SPORTS WAY
subject site as within the 1 -year
Time of Travel Zone and within i r-•----1
the 2 -year Time of Travel Zone -
along the eastern boundary.
Development of the property is
therefore subject to the Drinking + y
Water Protection Overlay District
and certain land use criteria will ....
ti
apply.
Wellhead Protection Areas Map Excerpt
City of Springfield 2019
The Satre Group - 375 West 0 Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 - rave satessoupecre
The Church of Jesus Christ of Latter -Day Saints Page 5 of 8
Willamette Valley Oregon Temple
Map 17-03-15-40, Lot 3200, 3300, 3400, and 3500
"No -Rise" Floodplain Overlay District Development
4. Natural Resources.
a. The Springfield Water Quality
Limited Watercourses Study does
not identify a wetland or Water
Quality Limited Watercourse on the
property.
b. The tax lot is shown as being in the
Special Flood Hazard Area—
�
Floodplain Zone A. Development of
1>
the property is therefore subject to
the Floodplain Overlay District and
a Floodplain Permit is required.
z
0
u
INi ER❑ATIptNL Shi
Floodplain Fleodway Map Excerpt
City of Springfield 2022
III. FLOODPLAIN DEVELOPMENT PERMIT–APPROVAL STANDARDS AND FINDINGS
This section is presented in the same order of applicable requirements found in Section 3.3-420,
Floodplain Overlay District Development Standards of the Springfield Development Code. Applicable
sections of the code are in bold italics, followed by proposed findings of fact in normal text.
A Floodplain Development Permit shall be reviewed under Type I procedure by the Building Official
and the City Engineer. They shall approve, approve with conditions or deny the request on the
following standards.
A. General Standards. In all areas of special flood hazard within the City and its urbanizable
area, the following standards apply.,
1. Anchoring. All new construction, manufactured homes and substantial improvements
subject to less than 18 inches of flood water during a 100 -year flood shall be anchored
to prevent flotation, collapse or lateral movement of the structure and shall be installed
using methods and practices that minimize flood damage. Anchoring methods for
manufactured homes may include, but are not limited to, use of over -the -top or frame
ties to ground anchors (Reference FEMA's "Manufactured Home Installation in Flood
Hazard Areas" guidebooks for additional techniques). If subject to 18 inches or more
of flood water, or located in the floodway, manufactured homes, apart from
manufactured homes in Mobile Home Parks and Subdivisions, shall be anchored to
prevent floatation or lateral movements and the design shall be certified by an
engineer or architect. Manufactured homes in an existing Mobile Home Park or
Subdivision may use the ties to ground anchors and additional techniques specified
above.
Response: This No -Rise Floodplain Overlay District Development permit is for earthwork and
not construction of structures. Therefore, a response to this standard will be generated for
the Floodplain permit submitted concurrent with the Site Plan Review application.
2. Construction Materials and Methods.
a. Ali new construction and substantial improvements shall be constructed with
approved materials and utility equipment resistant to flood change.
The Satre Group • 375 West 4'h Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 • wwwsatrecrouo.com
The Church of Jesus Christ of Latter -Day Saints Page 6 of 8
Willamette Valley Oregon Temple
Map 17-03-15-40, Lot 3200, 3300, 3400, and 3500
"No -Rise" Floodplain Overlay District Development
March 8 2022
b. All new construction and substantial improvements shall be constructed using
approved methods and practices that minimize flood damage.
c. Electrical, heating, ventilation, plumbing and air-conditioning equipment and other
service facilities shall be designed and/or otherwise elevated or located to prevent
water from entering or accumulating within the components during conditions of
flooding.
Response: This No -Rise Floodplain Overlay District Development permit is for earthwork;
no structures or improvements are proposed at this time. Therefore, a response to this
standard will be generated for the Floodplain permit submitted concurrent with the Site
Plan Review application.
3. Utilities.
a. All new and replacement water supply systems shall be designed to minimize and
eliminate infiltration of flood waters into the system;
b. New and replacement sanitary sewage systems shall be designed to minimize or
eliminate infiltration of flood waters into the system and discharge from the
systems into flood waters; and
c. On-site waste disposal systems shall be located to avoid impairment to them or
contamination from them during flooding.
Response: This No -Rise Floodplain Overlay District Development permit is for earthwork;
no structures or improvements are proposed at this time. There will be no utility work
associated with this permit. There will be no off-site changes to surface stormwater. On-
site surface stormwater will remain on-site. A thorough response to this standard will be
generated for the Floodplain permit submitted concurrent with the Site Plan Review
application.
4. Subdivision Proposals.
Response: This development is not a proposal for a subdivision.
5. Review of Building Permits. Where base flood elevation data is not available either
through the Flood Insurance Study or from another authoritative source, applications
for Building Permits including those manufactured home placement shall be reviewed
to assure that proposed construction will be reasonable safe from flooding. The test of
reasonableness shall include but not be limited to the use of historic data, high water
marks, photographs of past flooding, where available. Failure to elevate at least 2 feet
above (the exterior) grade in these zones may result in higher insurance rates. This
requirement does not apply to manufactured homes in existing Mobile Home Parks
and Subdivisions.
Response: Acknowledged and agreed.
B. Specific Standards. In all areas of special flood hazard within the City and its urbanizable
area where base flood elevation data has been provided as specified in Section 3.3-410A.
and B. or 3.3-4158.4, the following provisions are required:
1. Residential Construction.
Response: This development is not a proposal for residential development.
The Satre Group • 375 West 4" Avenue, Suite 201, Eugene, OR 97401 • (541) 686-4540 - w sv satmorouo.mm
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Map 17-03-15-40, Lot 3200, 3300, 3400, and 3500
"No -Rise" Floodplain Overlay District Development
Page 7 of 8
Non -Residential Construction.
a. New construction and substantial improvement of any commercial, industrial or
other nonresidential structure shall have either the lowest floor, including the
basement, elevated to a level at least 1 foot above the base flood elevation; or
together with utility and sanitary facilities shall:
L Be flood -proofed to 1 foot above the base flood level, so that the structure is
watertight with walls substantially impermeable to the passage of water;
ii. Have structural components capable of resisting hydrostatic and
hydrodynamic loads and effects of buoyancy.
iii. Be certified by an engineer or architect that the design and methods of
construction are in accordance with accepted standards of practice for
meeting provisions of this Subsection based on their development and/or
review of the structural design, specifications and plans. The certification shall
be provided to the Building Official as specified in Section 3-415B.6.b.
Response: The first floor of the Willamette Valley Oregon Temple will be elevated at
least one foot above the base flood level. Areas that may be below the base flood
elevation will be flood proofed. A thorough response to this standard will be
generated for the Floodplain permit submitted concurrent with the Site Plan Review
application.
b. Nonresidential structures that are elevated, not flood -proofed, shall meet the same
standards for space below the lowest floor as specified in Subsection B. 1.b.,
above.
Response: The first floor of the Willamette Valley Oregon Temple will be elevated at least
one foot above the base flood level. Areas that may be below the base flood elevation will
be flood proofed. A thorough response to this standard will be generated for the
Floodplain permit submitted concurrent with the Site Plan Review application.
c. Applicants flood -proofing non-residential buildings shall be notified that flood
insurance premiums will be based on rates that are 1 foot below the flood -proofed
level (e.g., a building constructed to the base flood level will be rated as 1 foot
below that level).
Response: Acknowledged and agreed.
3. Manufactured Homes.
Response: This development is not a proposal for a manufactured home.
Foundations. Foundations for all new construction, substantial improvements and
manufactured homes subject to 18 inches or less of flood water through a 100 -year
flood shall be specified in the Springfield Building Safety Codes. Foundations for all
new construction, substantial improvements and manufactured homes not in Mobile
Home park or Subdivision subject to 18 inches or more of flood water during a 100 -
year flood or located within a designated floodway shall be certified by an engineer to
meet the following foundation requirements:
a. Concrete footings sized for 1000 psf soil pressure unless data to substantiate the
use of higher values are submitted;
b. Footings shall not extent less than 18 inches below the undistributed natural grade
or engineered fill and in no case less than the frost line depth; and
The Satre Group • 375 West 4t' Avenue, Suite 201, Eugene, OR 97401 - (541) 686-4540 -w .salremouv.com
The Church of Jesus Christ of Latter -Day Saints
Willamette Valley Oregon Temple
Map 17-03-15-40, Lot 3200, 3300, 3400, and 3500
"No -Rise" Floodplain Overlay District Development
Page 8 of 8
c. Reinforced concrete, reinforced masonry, or other suitably designed supporting
systems to resist all vertical and lateral loads which may reasonably occur
independently or combined.
Response: This No -Rise Floodplain Overlay District Development permit is for
earthwork; no structures or improvements are proposed at this time. A thorough response
to this standard will be generated for the Floodplain permit submitted concurrent with the
Site Plan Review application.
5. Streets.
a. Adequate provisions shall be made for accessibility during a loo -year flood, to
ensure ingress and egress for ordinary and emergency vehicles and services
during potential future flooding.
Response: Acknowledged and agreed. The development site is currently served by one
existing driveway on International Way. The proposed improvements include provisions
to improve the accessibility of the site by providing two additional driveway connections
on Corporate Way. There will be new drive aisles and paved parking areas around the
perimeter of the new temple. There will be ample continuously connected drive aisles
around the perimeter of the development.
b. No street or surface of any new street shall beat elevation of less than 1 foot
below the base flood heights.
Response: The proposed development does not include a new street.
C. Floodway. Located within areas of special flood hazard established in Section 3.3-410A.
and B. are areas designated at floodways. Since the floodway, is an extremely hazardous
area due to velocity of flood waters which carry debris, potential projectiles, and erosion
potential, the following provisions apply.
Response: The development proposal is not located in the floodway.
D. Encroachment. The cumulative effect of any proposed development, when combined with
all other existing and anticipated development, shall not increase the water surface
elevation of the base flood more than 1 foot at any point.
Response: Acknowledged and agreed. The proposed improvements will not increase the water
surface elevation of the base flood more than 1 foot at any point.
IV. CONCLUSION
Based on the information and findings contained in this written statement, associated exhibits, and
plan set, the proposed Willamette Valley Oregon Temple meets the No -Rise Floodplain Overlay
District Development standards contained in the Springfield Development Code. Therefore, the
applicant requests that the City of Springfield approve the proposal.
If you have any questions about the above application, please do not hesitate to contact Rick Satre at
The Satre Group, 541-686-4540, or ricknp satrecroup.com.
Sincerely,
Ric41cSatYe`
Rick Satre, AICP, ASLA, CSI, Principal / Partner
The Satre Group
The Satre Group -375 West 4j°Avenue, Suite 201, Eugene, OR 97401•(541) 686-4540-u .salreorouo.com