Loading...
HomeMy WebLinkAboutPermit Building 1999-08-16COM M ERCIAL/ I N DUSTRIAL- PERMIT APPLICATION 225 Fifth Street, $pringfield, Oregon 97477 SPRINGFIELD JoB NUMBE " ?2// < LOCATION OF PROPOSED WORK: ASSESSOBS MAP: INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT: ,,PHONE: ZIP:STATE:d/L< OWNER: ADDRESS CITY: NEW - REMODEL ADDITION DEMOLISH OTHER ?7{VALU 7 DESCRIPTION OF WORK: AFICHITECT CONST. MECHANICALi - ELEfiRICAL: PHONENAMEADDRESS PHONE ,Q I RESRESS / coNrRAT'CONTRACTOR'S- GENERAL: PLUMBING PLU MBING NO.FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT MECHANICAL NO trtrF EHA RGtr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent from System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE - LAND USE: * OF UNITS: HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER: ZONING: OCCY GROUP: * OF STORIES: QUAD AREA: # OF BLDGS CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ x x x SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RCPT#DATE BY BUILDING P IT s@ PLUMBING DEMOLITION State Su VALUE FMECHANI SIDEWALK SUBTOTAL rTsPAVING CUT D LOEVE PM ENT ,r.5eI?ft,3,iH1155ffi,.o. /F- SITE INSPECTION: To be made after excavation, but prior to setup of forms. ._-.-----* UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equlpment items are in place but before any concrete is placed. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and dralnage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. REQUIRED INSPECTIONS ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing lnspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S.t. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 l) HIGH STRENGTH BOLTING: During all bolt installation and ti ghtening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.BC. STDS. 25-10,11). STRUCTU RAL MASONRY: (s06 a.7) ,V ,( It isthe responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726'3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. LATH AND/OR GYPSUM BOARD: To be made after all Iathing and gypsum board, interior and exterior, is in place but before any plastering ls applied or before gypsum board joints and fasteners are taped and f inished.FLOOR INSULATION & VAPOR BARRIERS: To be made prlor to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. RooF sHEATHTNG AND iHRS^H?fJ'"r::#X'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. iti the ins tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, Clty or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. AII project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, etectricat, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify th"at all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be mide of any atructure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address ls readable from the street, thai tne permit card is located at the front of the property, and the approved set of plans will remain on the site at all ction. DateSignature 3-/6times during c VALIDATION RECEIVED BY: DATE PAID:AMouNTRECETVED: f25i6. REcErPr -. 7U?27 lprupuaul D "We go to any length to serve you better,, TOP OUALTT ROOFING CONSTRUCTTON 5780 Royat Avenue Eugene, Oregon gl40z Phone: I54ll 6AB.9lSZt TelfFax: I54U 46t-9386 Job Name APARTMENT BUILDTNG Job Location 1 60 N. 20th Springfield, OR 97477 Job Phone CCB #I05I35 We hereby submit speifications and estimates for: revl_sed contract dafollows: Reroofing Main Apartment Buildingted June 17, 1990 as designated iy Date at above address . James Humphreys June 28, 1999 AS as Remove old deteriorated roofing, haul a way all debris. rnspect the roof deckfor defective sheathing, wet r5of insuiatiort, and rusted out flashing. Make rpairs as needed for an-additional "ost-"r malerial and labor at $35.00 per mahour' This will keep your roofi-ng cost down to a minimum for any repairs that::"1";;;8rT:f;' nepricins 3g-"'it"-;; i1s.o0 p.',,"r,t will be in addirional After which a new 4 pIy fi-berglass hot built-up roofing system wilr be instalas per manufacture specification and building ;"a;-;;quir6ment. rtri= roof syshas over 20 year lifa expectancy wiirr-.rumir,lm top coat. s year workmanshj-pwarranty starts on date of compteti-on. Also will clean up all debris and make periodical checks of the roof to assur,leakproof protection with -proper maj_ntenance. "Please NOte" we offer a wide selectj-or, gf lggf systems giving you the one th.right for your buildings. we also have flexible plv*""t terms- sot d.ownpaymen,with no interest. we hive a leak ."p.ir-program wilrr labor discounted 2oz ex-clusive to our repeat customers. next page lffie lprtrFtrBE hereby to fumish materials and labor----complete in accordance with above specifications, for the sum of: dollars Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanlike manneraccording to stmdad practies. Any alteration or deviation from above specifications invorving exrra cosrs wirl b€ executed onry upon wrirten orders, and will become m extra charge over aniabove ttrc atimte. AIr agreernents contingent upon srikes, accidents or derays beyondL mnrol.owner to cany fire, tornado and other necessary insurance. our workers re ii:ny covered byWorkmn's Compensation Insurance. Authroized Signature Note: This proposal may withdrawn See reverse side for additional terms and conditions specified. Payrent will be made a Signature Arceptunte uf lflrupu sal--- rhavercadand fully undastand the tm ild conditions contained ile herby acepted. outlined above. Date of Arceptmre: hsein md on the revere side hqeof which ue a part of this agreerent md Proposal Submirted ToATTN: JAMES HUMPHREYS 726-8735 Phone Stret 1 1 70 N. 38th City, State, Zio CodeSpringfield, OR 97478 Architect Date of PIans You ile authorized ao do the work u Signatue accepted within---days. I lprupurul "We.* to any length to serve you better" TOP OUALITY ROOFTNG CONSTRUCTION 5780 Royal Avenue Eugene, Oregon 97402 Phone: (54t1 688qSZt TetlFax: (5411 461 -9386 ccB #105135 .l Submitted ToIN: JAMES HUMPHREYS 10 N. 38th ite, Zip Coderingfield, OR 97478 bvsubmirspecificationsandestimatesfo'' Reroofing Main Apartment building continued) nes, I highly recommend that we al-uminized your new roof after completi-on.I reason is because after the final surface coat of the premium grade 20 yea rminum has been applied you have protected the asphalt from drying and crack Ir and added many more years to.the life of your roof. The above 20 year aIu rum that will be used on your roof will reflect up to BOE of the sun's ultra>let rays. Your roof lasts longer with minimal maintenance. riII gi-ve you a discounted cost for the above dluminizing at $1945.00-otal cost of $9950.00. This includes 39 new high vents. rnk you we will do you a top quality job. making D ; i i I I pfUpnf e hereby to fumish materials and labor----complete in accordance with above specifications, for the su IETY NINE HUNDRED FIFTY DOLLARS & no/100 Lm of: dollars 9950 00 7 26-87 35 Phone Date June 28, 1999 APARTMENT BUILDING Job Nme ingfield. OR 97477 Job Location Date of Plans Job Phone :nrrobemadeasfollows: $4925. 00 down please )75.00 and any additional cost upon completlon. thanks... rrial is guililte€d to bc as specified. All work to be completed in a workmanlike manner lg lo standard prac(ices. Any alteration or deviation from above specifications involving sts will be executed only upon wrinen orden, md will beonr an extra chage over md 'e estimale. All ageenrns contingent upon srikes, accidents or delays beyond our conrol. :o carry ftre, tornado and other necessary insurance. Our workers ue fully covered by .rn's Compensalion Insurmce. Authroized Signarure Note: This proposal may be with&awn by us See reverse side for additional terms and conditions :pttrntP Uf lpf UpUSEf --- I traue rcad md tully undasrand thc tm md ,ns contained hsein and on the rcvssc sidc hmof which re a pan of this agrcment md ,y acclpted. You arc authorized io do tlle work as specified. Payment will be made as above. Annmranna' Signanre Signature accepted within_days. I I t. t