HomeMy WebLinkAboutPermit Building 1999-08-16COM M ERCIAL/ I N DUSTRIAL-
PERMIT APPLICATION
225 Fifth Street, $pringfield, Oregon 97477
SPRINGFIELD JoB NUMBE " ?2// <
LOCATION OF PROPOSED WORK:
ASSESSOBS MAP:
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:
,,PHONE:
ZIP:STATE:d/L<
OWNER:
ADDRESS
CITY:
NEW
-
REMODEL ADDITION DEMOLISH OTHER ?7{VALU 7
DESCRIPTION OF WORK:
AFICHITECT
CONST.
MECHANICALi
-
ELEfiRICAL:
PHONENAMEADDRESS
PHONE
,Q
I RESRESS
/
coNrRAT'CONTRACTOR'S-
GENERAL:
PLUMBING
PLU MBING
NO.FEE CHARGE
Single Fixture
Relocated Bldg.
(new fix. addtl)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
MECHANICAL
NO trtrF EHA RGtr
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
from
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
- OFFICE USE -
LAND USE:
* OF UNITS:
HANDICAP ACCESS
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER:
ZONING:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
# OF BLDGS
CONSTR. TYPE:
HEAT SOURCE:
SQ. FT.$/SQ. FT.VALUE
TOTAL VALUE OF PROJ
x
x
x
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
PLAN CHECK FEE RCPT#DATE BY
BUILDING P IT s@ PLUMBING DEMOLITION
State
Su
VALUE
FMECHANI
SIDEWALK SUBTOTAL
rTsPAVING
CUT
D LOEVE PM ENT
,r.5eI?ft,3,iH1155ffi,.o.
/F-
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
._-.-----* UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equlpment items are
in place but before any
concrete is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
dralnage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
REQUIRED INSPECTIONS
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing lnspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.t. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 l)
HIGH STRENGTH BOLTING:
During all bolt installation and
ti ghtening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: lnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25-10,11).
STRUCTU RAL MASONRY: (s06
a.7)
,V
,(
It isthe responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726'3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
LATH AND/OR GYPSUM
BOARD: To be made after all
Iathing and gypsum board,
interior and exterior, is in
place but before any
plastering ls applied or before
gypsum board joints and
fasteners are taped and
f inished.FLOOR INSULATION &
VAPOR BARRIERS: To be
made prlor to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
RooF sHEATHTNG AND iHRS^H?fJ'"r::#X'"
NAILING: Prior to installing erected but prior to placing
any roof covering. concrete.
iti the ins
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
Clty or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. AII project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, etectricat,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify th"at all information
herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be mide of any atructure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address ls readable from the
street, thai tne permit card is located at the front of the property, and the approved set of plans will remain on the site at all
ction.
DateSignature 3-/6times during c
VALIDATION
RECEIVED BY:
DATE PAID:AMouNTRECETVED: f25i6.
REcErPr -. 7U?27
lprupuaul
D
"We go to any length to serve you better,,
TOP OUALTT ROOFING CONSTRUCTTON
5780 Royat Avenue
Eugene, Oregon gl40z
Phone: I54ll 6AB.9lSZt
TelfFax: I54U 46t-9386
Job Name
APARTMENT BUILDTNG
Job Location
1 60 N. 20th Springfield, OR 97477
Job Phone
CCB #I05I35
We hereby submit speifications and estimates for:
revl_sed contract dafollows:
Reroofing Main Apartment Buildingted June 17, 1990 as designated iy
Date
at above address
. James Humphreys
June 28, 1999
AS
as
Remove old deteriorated roofing, haul a way all debris. rnspect the roof deckfor defective sheathing, wet r5of insuiatiort, and rusted out flashing. Make rpairs as needed for an-additional "ost-"r malerial and labor at $35.00 per mahour' This will keep your roofi-ng cost down to a minimum for any repairs that::"1";;;8rT:f;' nepricins 3g-"'it"-;; i1s.o0 p.',,"r,t will be in addirional
After which a new 4 pIy fi-berglass hot built-up roofing system wilr be instalas per manufacture specification and building ;"a;-;;quir6ment. rtri= roof syshas over 20 year lifa expectancy wiirr-.rumir,lm top coat. s year workmanshj-pwarranty starts on date of compteti-on.
Also will clean up all debris and make periodical checks of the roof to assur,leakproof protection with -proper
maj_ntenance.
"Please NOte" we offer a wide selectj-or, gf lggf systems giving you the one th.right for your buildings. we also have flexible plv*""t terms- sot d.ownpaymen,with no interest. we hive a leak ."p.ir-program wilrr labor discounted 2oz ex-clusive to our repeat customers.
next page
lffie lprtrFtrBE hereby to fumish materials and labor----complete in accordance with above specifications, for the sum of:
dollars
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be completed in a workmanlike manneraccording to stmdad practies. Any alteration or deviation from above specifications invorving
exrra cosrs wirl b€ executed onry upon wrirten orders, and will become m extra charge over aniabove ttrc atimte. AIr agreernents contingent upon srikes, accidents or derays beyondL mnrol.owner to cany fire, tornado and other necessary insurance. our workers re ii:ny covered byWorkmn's Compensation Insurance.
Authroized
Signature
Note: This proposal may withdrawn
See reverse side for additional terms and conditions
specified. Payrent will be made a Signature
Arceptunte uf lflrupu sal--- rhavercadand fully undastand the tm ild
conditions contained
ile herby acepted.
outlined above.
Date of Arceptmre:
hsein md on the revere side hqeof which ue a part of this agreerent md
Proposal Submirted ToATTN: JAMES HUMPHREYS 726-8735
Phone
Stret
1 1 70 N. 38th
City, State, Zio CodeSpringfield, OR 97478
Architect Date of PIans
You ile authorized ao do the work u
Signatue
accepted within---days.
I
lprupurul
"We.* to any length to serve you better"
TOP OUALITY ROOFTNG CONSTRUCTION
5780 Royal Avenue
Eugene, Oregon 97402
Phone: (54t1 688qSZt
TetlFax: (5411 461 -9386
ccB #105135
.l Submitted ToIN: JAMES HUMPHREYS
10 N. 38th
ite, Zip Coderingfield, OR 97478
bvsubmirspecificationsandestimatesfo'' Reroofing Main Apartment building continued)
nes, I highly recommend that we al-uminized your new roof after completi-on.I reason is because after the final surface coat of the premium grade 20 yea
rminum has been applied you have protected the asphalt from drying and crack
Ir and added many more years to.the life of your roof. The above 20 year aIu
rum that will be used on your roof will reflect up to BOE of the sun's ultra>let rays. Your roof lasts longer with minimal maintenance.
riII gi-ve you a discounted cost for the above dluminizing at $1945.00-otal cost of $9950.00. This includes 39 new high vents.
rnk you we will do you a top quality job.
making
D
;
i
i
I
I
pfUpnf e hereby to fumish materials and labor----complete in accordance with above specifications, for the su
IETY NINE HUNDRED FIFTY DOLLARS & no/100
Lm of:
dollars 9950 00
7 26-87 35
Phone Date June 28, 1999
APARTMENT BUILDING
Job Nme
ingfield. OR 97477
Job Location
Date of Plans Job Phone
:nrrobemadeasfollows: $4925. 00 down please
)75.00 and any additional cost upon completlon. thanks...
rrial is guililte€d to bc as specified. All work to be completed in a workmanlike manner
lg lo standard prac(ices. Any alteration or deviation from above specifications involving
sts will be executed only upon wrinen orden, md will beonr an extra chage over md
'e estimale. All ageenrns contingent upon srikes, accidents or delays beyond our conrol.
:o carry ftre, tornado and other necessary insurance. Our workers ue fully covered by
.rn's Compensalion Insurmce.
Authroized
Signarure
Note: This proposal may be with&awn by us
See reverse side for additional terms and conditions
:pttrntP Uf lpf UpUSEf --- I traue rcad md tully undasrand thc tm md
,ns contained hsein and on the rcvssc sidc hmof which re a pan of this agrcment md
,y acclpted. You arc authorized io do tlle work as specified. Payment will be made as
above.
Annmranna'
Signanre
Signature
accepted within_days.
I
I
t.
t