Loading...
HomeMy WebLinkAboutPermit Plumbing 1996-03-04COMM ERCIAL/ IN DUSTRIAL PERMIT APPLICATION 225 Fitth Street, Springfield, aregon 97477 SPFIINGFIELO JOB NUMBER INSPECTION LINE: 726.3769 OFFICE: 726.3759 LOCATION OF PRO ED WORK ASSESSORS MAP:TAX LOT: NAME ADDRESS PHONE ARCHITECT: CONST. CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE G EN ERAL: PLUM BI NG: MECHANICALi ELECTRICAL: OWNER ADDRE CITY:STATE: PHONE: ztP VALUEADDITION DEMOLISH OTHER DESCRIPTION OF WOR NEW- REMODEL PLU MBING NO.FEE CHARGE Single Fixture Relocated Bld (new fix. addtl s ) Water Service f t.\D@ Sanitary Sewer f t. Storm Sewer ft. Backflow Device TOTAL PERMIT 40 cl MECHANICAL NO FFF (]HA AL-tr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent se parat e Stationary evap. cooler Vent Fan/Single duct Vent f rom Systern apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE _ ZONING HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET. WATER HEATEB + OF UNITS: OCCY GROUP: * OF STORIES: QUAD ABEA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJECT X X SQ. FTG MAIN SO. FTG ACCESS SQ, FTG OTHER PLAN CHECK FEE DATERCPT#BY BUILDING PERMIT PLU M BI NG +t)!1)DEMOLITION 5% State Su rch arge 5% State Su rcharge +, () t-DMECHANICALFENCE VALUE $ 5% State Su rch arq e SIDEWALK FT. SU BTOTA L PE HM ITS PAVI NG CURBCUT FT. SYSTEMS DEVELO PMENT \3tTOTAL PERMIT FEES EXCLUDING ELECTRICAL LAND USE: REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3269 (recorder), state your City designated.iob number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work daY. SITE INSPECT|ON: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance ELECTRTCAL & and approved. section 306 0f the state specialty code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & Oy ine Owner/ Contractor during CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: EroEDr A^E. c copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steel in place, but framlng inspection' STRUCTURAL CONCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (306 a.1) CONCRETE SLAB: To be made after all lnslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UN DERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer..6a?fr)nO drainage linesYo be made prior to covering or f illing trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or f loor sheathlng. POST & BEAM: TO bE MAdE prior to installation of floor insulation, decking or floor sheath i ng. FLOOR INSULATION & VAPOR BARRIERS: TO bE made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and requlred vaPor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and fi ni shed. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. STRUCTURAL WELDS: Performed on the job. (2722 I) HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. srDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7\ "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Bullding, City or Development Code. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify th.at all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this proiect. I further agree to ensure that all required inspections are requested at the proper time, that project address ls readable from the the permit card is located at the front of the property, and the approved set of plans will remain on the site at all Date u ng constructionti Sig AMOUNT R RECEIPT *: DATION ECE .V RECEIVED BY: DATE PAID FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parklng lot stri ping, etc. must be completed before requesting this insPection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE .Nr\bnon \$NN so ). fr t \,e €<**t_L YDD TC